HomeMy WebLinkAboutGabel Paving, Inc. - Camino Arroyo Bridge Project No. 07-CDD-141 - Change Order No. 4
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0451; Fax (408) 846-0429
CHANGE ORDER NO.4
To contract for: Camino Arroyo Bridge Project, Phase I
Project No. 07-CDD-141
Contractor: Galeb Paving, Inc.
Contract Date:
7/16/2007
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
This Change Order provides for the following:
Construct additional drainage inlet on north side of Sixth Street west of Maple Street.
Modify catch basin at northwest comer of Sixth Street and Railroad Street.
Revise forms for raised curb at northeast comer of Sixth Street and Railroad Street.
Remove and replace sidewalk at southwest comer of Sixth Street and Chestnut Street.
Construct temporary AC walkways at northwest and southwest comers of Sixth Street and Railroad
Street.
Overhead compensation due to deleted contract bid items 9, 10, 75, 76 and 77.
Remove buried concrete in conflict with conduit boring operation.
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss
of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with
the Extra Work.
f--
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$2,438,986.62
$60,430.60
$2,499,417.22
$16,979.74
$77,410.34
$2,516,396.96
Percentage Initial
2.48% ~
3.17%~
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $16,979.74
CONTRACTOR
By: :;; {ob()t{an ~I.e
Date: / 0/1'1/0 t
ACCEPTED BY:
Engineer
pmj~~=~
IO/I'/or
.
RECOMMENDED BY:
Date
/
GALEB PAVING, INC.
General Engineering Contractors Since 1975
RECEIVED
OCT 3 1 2007
ENGINEERING
State License No. 325912
12340 Saratoga - Sunnyvale Rd., Saratoga, CA 95070
Telephone: (408) 253-4747
Facsimile: (408) 253-4753
10-31-07
Hand Delivered at Site MeetinQ
City of Gilroy
Attention: Charlie Kreuger
7351 Rosanna Street
Gilroy, Ca 95020
JOB SITE: CAMINO ARROYO BRIDGE PHASE I, PROJECT #07-CDD-141
EXTRA WORK
C. Aparicio Cement Contractor, Inc.
(see attached breakdown)
Add extra City St. Flat Grate Inlet on
the North side of Sixth Street
SUB-TOTAL:
5% P. & 0.:
SUB-TOTAL:
1% BOND:
TOTAL:
$ 3,208.00
$ 3,208.00
$ 160.40
$ 3,368.40
$ 33.68
$ 3,402.08
Sincerely,
A~
Slobodan Gal
Page 1 of 2
/
GALEB PAVING, INC.
General Engineering Contractors Since 1975
RECEIVED
OCT 3 1 2007
ENGINEERING
State License No. 325912
12340 Saratoga - Sunnyvale Rd., Saratoga, CA 95070
Telephone: (408) 253-4747
Facsimile: (408) 253-4753
10-31-07
Hand Delivered at Site MeetinQ
City of Gilroy
Attention: Charlie Kreuger
7351 Rosanna Street
Gilroy, Ca 95020
JOB SITE: CAMINO ARROYO BRIDGE PHASE I, PROJECT #07-CDD-141
EXTRA WORK
c. Aparicio Cement Contractor, Inc.
(see attached breakdown)
",Unit$1HoufS,; ... . ~ctiPt;q~Ciuipment. ,.
Cap off old existing catch basin top &
place a new pipe (supplied by others)
from new catch basin to existing catch
basin on the Northwest corner of 6th 51.
& Railroad SI. - 9/13 -18/2007
SUB-TOTAL:
5%P.&O.:
SUB-TOTAL:
1 % BOND:
TOTAL:
Amount
3,191.47
$ 3,191.47
$ 159.57
$ 3,351.04
$ 33.51
$ 3,384.55
Sincerely,
I'- ~
Slobodan Gal~
Page 1 of 2
/
i
i
.---
GALEB PAVING, INC.
General Engineering Contractors Since 1975
State License No. 325912
12340 Saratoga - Sunnyvale Rd., Saratoga, CA 95070
Telephone: (408) 253-4747
Facsimile: (408) 253-4753
1-16-08
City of Gilroy
Attention: Charlie Kreuger
7351 Rosanna Street
Gilroy t Ca 95020
JOB SITE: CAMINO ARROYO BRIDGE PHASE I, PROJECT #07-CDD-141
EXTRA WORK
12-19-07 C. Aparicio Cement
(see attached exta)
"l''',,: w"",,,,'_
...~
Reset form for the Raised Curb on the
Northeast corner of 6th Sl & Railroad
Per Charlie Krueger
Remove/replace Sidewalk on the Southwest
corner ofjth& Chestnut
SUB-TOTAL:
5% P. & 0.:
SUB-TOTAL:
1% BOND:
TOTAL:
$ 944.48
$ 2,136.31
$ 106.82.
$ 2,243.13
$ 22.43
$ 2,265.56
Sincerely,
1- ~
Slobodan Ga';;fPTP'Y
, J n .rrA CC;?"VV/.; Ie:
'v l'vI --r{,tl
0og) 254lt?-o42Q
Page 1 of 3
02/14/2008 15:33
4082534753
GALEB PAVING INC
PAGE 01/05
GALES PAVING, INC.
General Engineering Contractors Since 1975
State LIcense No. 325912
12340 Saratoga - Sunnyvale Ad., Saratoga, CA 95070
Telephone; (408) 253-4747
Fac9imlh~: (408) 253-4753
14-Feb-08
City of Gilroy
Attention: Charlie Kreuger
73S 1 Rosanna Street
Gilroy, Ca 95020
JOB SITE: CAMINO ARROYO BRIDGE PHASE I, PROJECT #07-CDD-141
EXTRA WORK
2/12f08 Galeb Paving, Inc. - Temporary
Paving
4
4
2
120 AD Roller $
650 Ferman $
Foreman & Pickup $
SUB-TOTAL:
lS% P. & 0.:
bP W
2463 $
22.34 $
B1.00 $
$
$
$
98.52
89.36
182.00
349,88
52.48
40 36
Gale avine, Inc. ork: 2.
1/12/08 Work performed by George O. Garcia, Inc. Raise base rock. from 4" for $ 3,429.21
l(se8 attached Quota} concrete to 2" for temp A.C.
walk. Place 2" A.C.
'1/1'1/08 work pertormed by George D. Garcia, lOCi. Remove 2 small tree & haul to $ 131.56
I/sae attached Cnlote) dum" 3M! corner Chestnut &
6th Stral1lt
Sincerely,
SUB.TOTAL:
5%P. &0.:
George D. Garejat Inc. Work:
SUB"TOTAL:
1"10 BOND:
TOTAL EXTRA WORK:
$ 3,560.77
$ 178.04
$ 3,738.81
$ 4,141.17
$ 41.41
$ 4,182.58
---e r J ~ 1<<----.
Torno Galeb
Via Facsimile:
408.846-0429
Paae 1 of6
/"
GALEB PAVING, INC.
General Engineering Contractors Since 1975
State License No. 325912
12340 Saratoga - Sunnyvale Rd., Saratoga, CA 95070
Telephone: (408) 253'-4747
Facsimile: (408) 253-4753
RECEIVED
MAR 5 2008
I=NGINEERING
3-5-08
Hand Delivered @ MeetinQ
City of Gilroy
Attention: Charlie Kreuger
7351 Rosanna Street
Gilroy, Ca 95020
JOB SITE: CAMINO ARROYO BRIDGE PHASE It PROJECT #07-CDD-141
EXTRA WORK
2-7-08 Chrisp Company
(see attached breakdown)
Overhead Compensation Due to Deleted
Contract Items #75, #76, #77, #9, & #10
$ 1,051.31
SUB-TOTAL:
5%P.&0.:
SUB-TOTAL:
1% BOND:
TOTAL:
$ 1,051.31
$ 52.57
$ 1,103.88
$ 11.04
$ 1,114.91
Sincerely,
Il #
Slobodan Gale.
Page 1 of2
07/11/2008 11:25
4082534753
GALEB PAVING INC
PAGE 01/04
(.~--"""
GALEB PAVING, INC.
Gen~ral Engineering Contractors Since 1975
$tate UC8flae No. 325912
12340 Saratnga . Sunnyvale Rd., Saratoga, CA 95070
Telephone: (408) 253-4747
facsimile: (408) 253.4TSS
718/08
City of Gilroy
Attention: Charlie Kreuger
7351 Rosanna Street
Gilroy~ Ca 95020
JOB SITE: CAM~NO ARROYO BRIDGE PRASE It PROJECT #07-CDD"141
EXTRA WORK
'a"-".""f"-"i"111~!,j'(J'lWllJ!~. '~".~ (~"'''~.:;r;'''''''''\'".''''l'r~ ij'il~'~ll '1' r .. ~'I r,,,'(,, ""'jI",!!' J~'1Jmlll1!i"::"""' , --. T'" 'ffi~I]l'-:,"jIT'jIT-r;."" 11'.I~~ill"~; I" >""'W"~t"'I.
: rnl'~ ~,:Jif~! .i.hT~l [j .?)'jit;~:;~'t\,,":dl~ ~jrl.~tl~;\flTPf.~~,' tIt 1 t 1f. ~~:r,J '~l:l ~1~~L",\".J'';.'~1 '1. !.t'~ r ,it:{.1J 'r),.1 ")"1 ; ii~t7'h:~j-ll.)\; jf~' ~;,,;' ~~tlr.t\or~;&r
1CV10/07 Signal Ell!!ctti<:, IrI<:. Unforseen work. - R,emQVe QOncrete $ 2,,480.02
1 (S88 attached breakdown) in way of bor8 In two loe.atlons at 6th
Street & Railway
SUB-TOTAL:
5%P.& 0,:
SUB-'l'O'l'U:
1 % BONO:
'1'O'J'Al.: .
$ 2,480,02
$ 124.00
$ 2,604.02
$ 28.04
$ 2,830.08
Sincerely,
/:OOdan Ga~
Via Facsimile:
(408) 846-0429
Page 1 of 4