HomeMy WebLinkAboutGolden Bay Construction - Monterey Streetscape Improvement Project - Project No. 06-CDD-119
SECTION 00500 .-
AGREEMENT
Monterey Streetscapelmprovement Project, Phase III, Project No. 06-CDD-119, Federal Project
No. CML-5034 (012
"") 51 '-1-6- -
THIS AGREEMENT, made this d 1--'" day of --rt: 1Zla1,/_ 2L/O<c , by
and between the City of Gilrov , hereinafter called the "City," and Golden Bav Construction,
Inc., hereinafter called the "Contractor."
WI TNE~~E T H:
WHEREAS, the City has caused the Contract Documents to be prepared
comprised of bidding and contract requirements and technical specifications and drawings for the
construction of the Monterey Streetscape Improvement Project, Phase III, Project No. 06-CDD-
119, Federal Project No. CML-5034 (012, as described therein, and
WHEREAS, the Contractor has offered to perform the proposed work in
accordance with the terms of the Contract Documents.
NOW, THEREFORE, in consideration of the mutual covenants and agreements of
the parties herein contained and to be performed, the City and Contractor agree as follows:
Article 1. Work.
Contractor shall complete the Work as specified or indicated in the Contract Documents.
Article 2. Contract Time.
The Wark shall be completed by the Contractor in accordance with the Contract Documents
within the time period required by Paragraph 00810-2.0, Time Allowed for Completion, subject
to extension as expressly provided in the Contract Documents.
Project No. 06-CDD-119, Monterey Streetscape Improvement Project, Phase III
Federal Project No. CML-5034 (012
Section 00500-1
Article 3. Liquidate~ Damages.
- -
THE CITY AND THE CONTRACTOR RECOGNIZE THAT THE CITY WILL SUFFER
SUBSTANTIAL DAMAGES AND SIGNIFICANT FINANCIAL LOSS AS A RESULT OF
THE CONTRACTOR'S DELAYS IN PERFORMANCE OF THE WORK DESCRIBED
IN THE CONTRACT DOCUMENTS. THE CITY AND THE -CONTRACTOR HE]lEBY
ACKNOWLEDGE AND AGREE THAT THE DAMAGES AND FINANCIAL LOSS
SUST AINED AS A 'RESULT OF ANY SUCH DELAYS IN PERFORMANCE WILL BE
EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN. THEREFORE,
THE CITY AND CONTRACTOR HEREBY AGREE THAT IN THE EVENT OF SUCH
DELA YS IN PERFORMANCE, THE CITY SHALL BE ENTITLED TO
COMPENSA TION BY WAY OF LIQUIDATED DAMAGES (AND NOT PENALTY)
FOR THE DETRIMENT RESULTING THEREFROM IN ACCORDANCE WITH
PARAGRAPH 00700-6.5, LIQUIDATED DAMAGES, OF THE CONTRACT
DOCUMENTS. THE CITY AND THE CONTRACTOR FURTHER AGREE THAT THE
AMOUNTS DESIGNATED AS LIQUIDATED DAMAGES ARE A REASONABLE
ESTIMATE OF THE CITY'S DAMAGES AND FINANCIAL LOSS IN THE EVENT OF
ANY SUCH DELAYS IN PERFORMANCE CONSIDERING ALL OF THE
CIRCUMST ANCES EXISTING AS OF THE DATE OF THIS AGREEMENT,
INCLUDING THE RELATIONSHIP OF SUCH AMOUNTS TO THE RANGE OF
HARM TO THE CITY WHICH REASONABLY COULD BE ANTICIPATED AS OF
THE DATE OF THIS AGREEMENT AND THE EXPECT A TION THAT PROOF OF
ACTUAL DAMAGES WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL.
BY INITIALING THIS PARAGRAPH BELOW, THE PARTIES HERETO SIGNIFY
THE pp, D CONSENT TO THE TE OF THIS ARTICLE 3.
CitY~
Article 4. Contract Price.
In consideration of the Contractors performance of the Work in accordance with the Contract
Documents, the City shall pay the Contract Price set forth in the Contract Documents.
Article 5. Contract Documents.
The Contract Documents which comprise the entire agreement between City and Contractor
concerning the Work consist of this Agreement (Section 00500 of the Contract Documents) and
all of the following attachments to this Agreement, all of which are hereby incorporated into this
Agreement by reference with the same force and effect as if set forth in full.
Project No. 06-CDD-1l9, Monterey Streetscape Improvement Project, Phase III
Federal Project No. CML-5034 (012
Section 00500-2
Invitation to Bid
Instructions to Bidders.
Bid Documents
Designation of Subcontractors
Bid Guaranty Bond
Agreement
Acknowledgements .'
Performance Bond
Payment Bond
General Conditions
Supplementary Conditions
General Requirements
Standard Specifications
Technical Specifications
Drawings
Addenda, if any
Executed Change Orders, if any
Notice of Award
Notice to Proceed
Article 6. Miscellaneous.
Capitalized terms used in this Agreement which are defined in Section 01090, References, of the
Contract Documents will have the meetings set forth in Section 01090, References.
Contractor shall not assign any rights, obligations, duties or responsibilities under or interest in
the Contract Documents without the prior written consent of the City, which consent may be
withheld by the City in its sole discretion. No assignment by the Contractor of any rights,
obligations, duties or responsibilities under or interests in the Contract Documents will be
binding on the City without the prior written consent of the City (which consent may be withheld
in City's sole discretion); and specifically but without limitation monies that may become due
and monies that are due may not be assigned without such consent (except to the extent that the
effect of this restriction may be limited by law), and unless specifically stated to the contrary in
any written consent to an assignment, executed by the City, no assignment will release or
discharge the assignor from any liability, duty, obligation, or responsibility under the Contract
Documents.
Subject to the foregoing, the Contract Documents shall be binding upon and shall inure to the
benefit of the parties hereto and their respective successors and assigns. Nothing contained in
the Contract Documents shall in any way constitute a personal obligation of or impose any
personal liability on any employees, officers, directors, agents or representatives of the City or its
successor and assigns.
Project No. 06-CDD-119, Monterey Streetscape Improvement Project, Phase III
Federal Project No. CML-5034 (012
Section 00500-3
In accordance with California Business and Professions Code Section 7030, the Contractor is
. .
"required by law "to be licensed andregulated by the Contractors'"StateLicenseBoard which has
jurisdiction to investigate complaints against .Contractors if a complaint regarding. a patent act or
omiss~on is filed within four years of the date of the alleged violation. A complaint regarding a
latent act or omission pertainingto structural defeCts must be filed within 10 years of the date of
"the alleged violation. Arty questions concerning the Contractor may be referred to the Registrar,
Contractors' State License Board, P.O" Box 26000, Sacramento, California 95826.
Sf
IN WITNESS WHEREOF, this agreement has been executed on this ,d.-I - day
of !:khrutl r y , '}'oOb~. .
~
Golden Bay Construcf n, Inc.
J"d
B-:t ksa. C i-f
.J
Ad m'l n istra.-b r
Title of Signator
ATTJ/T: 'l
~JfAyvi^- V:A_~_jjC~~
Signature
***END OF SECTION***
Project No, 06-CDD-119, Monterey Streetscape Improvement Project, Phase III
Federal Project No. CML-5034 (012
Section 00500-4
State of California
County of San Mateo
On 2/17/2006 before me D, Chan, Notary Public, personally appeared
Johnny L Zanette ( ) Personally known to me - or ( X ) proved to me on the
basis of satisfactory evidence to be the person(s) whose name(..s) is/are subscribed
to the within instrument and acknowledged to me that he/shefttrey executed
their name in his!herftheir authorized capacity(ies), and that by his/llim%eir
signature~on the instument the person(s) or the entity upon behalf of which the
person(sj'acted, executed the instrument.
Witness my hand and official seal
J......-------...-.--..................
@ D.CHAN
_ -..." Commission # 1508883 ~
~ -,,; Notary Public - California f
i' San Mateo County f
MyComm. Expires Aug 20. 2008
........-------------------.
j,j) '1)/ ti.Y)
D. Chan, Notary Public
Optional Information
Though the information below is not required by law, it may prove valuable to persons
relying on the document and could prevent fraudulent, reattachment of this form.
Any inquiries regarding the preparation of this document should be directed to:
D. Chan
Golden Bay Construction, Inc.
582 Bragato Road
San Carlos, CA 94070
650-593-0310 X 232
sharedGBC/ Acctg/N otarylN otaryStatement
./ ....O.f.. ~:;;:?. .
;3~~~,4'l,
1~1l1Wf.; .11 * ,
.., '.'S'.. ~; ,.~.'
. . II, I..::...." '~.' , .
..,.....::!i.i;;::..,.,. .
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO.1
To contract for: Monterey Streetscape Improvement Project, Phase III
Project No. CML-5034(0 12), City Project No. 06-CDD-ll9
Contractor: Golden Bay Construction, Inc. Contract Date:
2/21/2006
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Perform median traffic control modifications and provide changeable message boards per attached Change Order Request
Nos. GBC/CG/048 and GBC/CG/052.
Remove additional tree on the north side of Martin Street, install temporary trash cans and expose leaking water line per
attached Change Order Request Nos. GBC/CG/047, GBC/CG/050 and GBC/CG/05l.
Remove 37,742 SF of underground concrete slab in addition to the quantity paid on Bid Item 9 and remove 6 reinforced
foundations in addition to the quantities paid on Bid Items 56 and 82 per attached Letter No. GBC/CG/066.
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with
this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption,
loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby
waives any right to claim any further cost and time impacts at any time during and after completion of the Contract
associated with the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the T INCREAS~.()L~9
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
P.M.
Cost Percentage Initial
$4,130,554.75 /AP
$0.00 0.00% -ff- ^'
$4,130,554.75
$52,562.89
$52,562.89 1.27% $-
$4,183,117.64
~L-nW ~Nc...,
Date: \ o...~ \J '--0..,
RECOMMENDED
ACCEPTED BY:
Date
7/14/2006
~'
d~~OO~OO~~~ golden ~QY
construction,
.
Inc.
-- general engineering contractors
25 May 2006
GBC/CG/048
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Median Traffic Control Modifications Change Order Request
Mr. Krueger:
The following change order request is for the modifications made to the median located
on Monterey Street north of Fourth Street at the subject project. The median was
modified to accommodate additional traffic control measures per the direction of the City
of Gilroy. The total amount due for this change order request is $3,49~ broken down as
follows:
1. 226 square feet of median removal at Bid Item # 10 unit price of $425 per square
foot = $96~. Pay on B.I#/O
2. Installation of asphalt concrete at force account = $2,530!!1 (see attached Force
Account Summary Sheet 001 for further detail).
Please process a change order in the amount of$3,49~ to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (650) 539-0310 x229 should you have any questions.
Thank. You
Golden Bay Consttiiction, Inc.
/
Cortese
ct Manager
..~.,:,'.,. '- "'c',,', ..:,.,~ ',_" -,:.<';"i-
582brogato road e san carlos, california 940]{). Iic~nse#451401
650/593.:0310 e650/593-0123fox e _ ....,1 'c'. -TlJI L I -
.---:::;;;
~~~OOOO~~~~ golden ~QY
construction,
.
Inc_
general engineering contractors
26 May 2006
GBC/CG/052
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Changeable Message Board Change Order Request
Mr. Krueger:
The following change order request is for supplying two (2) changeable message boards
for the subject project. The message boards were procured and installed on a force
account basis per the direction of the City of Gilroy. The total amount due for this work
is 6,43700 broken down as follows:
1. Labor to assist with the installation, setup and removal of the message boards:
$75021 (see Force Account Summary Sheets 005 - 007 for further detail).
2. Rental costs of the message boards: $5,68609 (see Force Account Summary Sheet
008 for further detail).
Please process a change order in the amount of $6,43700 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (650) 539-0310 x229 should you have any questions.
Thank You
Golden Bay C
.' ....c ...... -'_", ,::_,,' ....,..'. ,_;
582 brogat~ r<:Kld4 san carlos, <iOliforoia94()70-tkenseH5 140~
6501593-0310 .,oSOlS93-0123 fox - 1- -., l' if '7~.i_. --
~~rnm~~ golden ~QY .
construction, Inc.
-- general engineering contractors
25 May 2006
GBCICG/047
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Additional Tree Removal Change Order Request
Mr. Krueger:
The following change order request is for the removal of one (1) additional tree at the
subject project. The additional tree removed was located outside of the project limits on
the north side of Martin Street. The amount due for the tree removal is $62000. This
price was approved verbally by the City of Gilroy on 13 April 2006.
Please process a change order in the amount of $62000 to compensate for the aforesaid
work. Unless notified otherwise, Golden Bay Construction will assume that the City of
Gilroy is in agreement with this change order request and a change order for the work
will be processed. An expedited process of the change order will be appreciated as the
work was performed in April.
Please feel free to contact me at (650) 539-0310 x229 should you have any questions.
ri Cortese
Pro ect Manager
582 br'Ogotoroad .500 cortos, califomia9401g~ik:~
6501593-0310. 650/593-0123 fox · Ln. ..I . L ~..II
----: '
n~~mrn~~ golden ~QY
construction,
.
Inc.
~ general engineering contractors
\I (~
;\;
26 May 2006
GBC/CG/OSO
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Temporary Trash Can Installation Change Order Request
. Mr. Krueger:
The following change order request is for temporarily installing the trash cans previously
removed from the subject project site. The trash cans were installed for use of the public
during construction per the direction of the City of Gilroy and placed at the locations
designated by the City of Gilroy. The work was performed on a force account basis as
directed on 10 May 2006 and 18 May 2006. The total amount due for this work is
$1,23308 (see attached Force Account Summary Sheets 002 & 003 for further detail).
Please process a change order in the amount of$I,23308 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (650) 539-0310 x229 should you have any questions.
Thank You
Golden Bay Cons
. on, Inc.
582 bragat<> road. san <aOOs,collfomia 94070., J
6SOI59~31<). 650J59~1~3 fox ·
~~~~ golden ~QY
construction,
.
Inc.
-- general engineering contractors
26 May 2006
GBC/CG/051
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Water Main Exposure Change Order Request
. Mr. Krueger:
The following change order request is for exposing a portion of the existing water main
for the City of Gilroy to repair at the subject project site. The water main leak was a
preexisting condition and not caused by Golden Bay Construction. The water main was
exposed on a force account basis per the City of Gilroy's direction. The total amount
due for this work is $64211 (see attached Force Account Summary Sheet 004 for further
detail).
Please process a change order in the amount of $642 71 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (650) 539-0310 x229 should you have any questions.
Thank. You
Golden Bay Cons
Cortese
Pr ~ect Manager
'- - ---,'\,,'- - --,..--'",',:,-;'-:,"
582brogoto road · san 'Carlos, cal~IQ 94Ql&" ticense#45~1401
650/593-0310. 650159~123fOx. am- .~ OI...J_1..._..Q' L___ -:';'W
, ..,' . i:1
f:'.:.-..-..,;..,.....,.:,....',..'-.,..:.,'.::.......'.....:;.........,-.'.::.::...:'.:--._' -"
. _0' ," " ,'-,' ..... _'
--~---_._---"---~~-_.__.--'--~~-_.:~=
~~m~mm~~ golden ~QY
construction,
.
Inc.
- general engineering contractors
05 July 2006
GBC/CG/066
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Underground PCC Slab & Foundation Removal Overages Adjustment
Mr. Krueger:
Per the City of Gilroy's request, the following analysis of the quantity overages
pertaining to Bid Items #009, #056 and #082 is being submitted regarding the subject
project. The City of Gilroy requested that Golden Bay Construction investigate the bid
item unit rates and determine if a unit price adjustment would be warranted given that the
quantities have exceeded more than 125% of the original bid item amount. The
following analysis will be specific to each affected bid item:
Bid Item #009: Remove Underground Concrete Slab
The total quantity removed from the project site for this bid item is 69,617 square feet
with an original bid item amount of25,500 square feet. The original bid item unit rate is
$1 00 per square foot. Golden Bay Construction will require that the original bid item unit
rate be applied to the 125% of the original quantity (31,875SF @ $1 oO/SF = $31,87500:>.
Please note that this quantity was paid by the City of Gilroy at that rate through progress
billing invoice # 1. Golden Bay Construction will offer a seven percent (7%) discount to
the unit rate for the remaining 37,742 square feet (37,742SF @ $o2J./SF = $35,1O~).
Please process a contract change order in the amount of $35, 1 oollli to compensate for the
total removal of the underground concrete slabs.
Bid Items #056 & #082: Remove Existing Reinforced Foundation
Golden Bay Construction submitted a change order request for the removal of six (6)
additional reinforced foundations found below the existing pavement surface. The
original bid item quantities for this work is in Signal Electric Construction's (project
electrical subcontractor) subcontract. Therefore, Golden Bay Construction is not able to
offer any discount for the additional foundation removal as the item is now being
performed by two separate contractors with no cost savings for the added quantity.
Please process a contract change order in the amount of $6,00olill to compensate for the
additional foundation removal.
582 brogato road · san carlos, california 94070 . license #451401
650/593-0310 · 650/593-0123 fax · 1.. ._:1. ~IJ. .h_y 81~.. ,~l~_... I
'..~...m'v\lES~
!~r, ~*'
,~ ~
-!!..TI f\ '">
Rnt/.d wry High In
CiNmrlt'r Satisfaction
05 July 2006
City of Gilroy (GBC/CG/066)
Page 2 of2
Per our conversation at today's weekly meeting, the amounts issued for contract change
orders #001 and #002 will be combined into one change order including the
aforementioned. Golden Bay Construction will bill out the change orders as already
issued through #001 and #002 and add the two amounts stated above to progress billing
#3 for the month of June 2006.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Cons
..... "'0 ~ ~~~;~"'"
..:"--.~~... ....0.
/D':,." ;;c:;i'\,:"'<:'.
: ;' ,.', ,"iillUH_ ~\ * I
\ ~ \tm'''i1!.'.:~; .~.i
., ... .....:> h. _, ...~.' .
\. ..........:~~:.i.;l~:/... "
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO.2
To contract for: Monterey Streetscape Improvement Project, Phase III
Project No. CML-5034(012), City Project No. 06-CDD-119
Contractor: Golden Bay Construction, Inc. Contract Date:
2121/2006
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be retl.UTIed
to him as his authority to proceed with the work
Description of Work
Perform additional waterline work per attached Letter GBC/CG/054 and Letter GBC/CG/056. Items included in the cost for
this change order are circled. Costs/credits for adjustments to bid item quantities will be covered rmder the appropriate bid
items. As part of this agreement, the waterline subcontractor will have two crews on site for the duration of work and both
crews will work overtime on weekdays and two Saturdays.
All requirements of the original Contract Docwnents shall apply to the above work except as specifically modified by this
Change Order. Consideration of time adjustment will be deferred rmti1 receipt of a Time Impact Analysis in accordance with
Section 01310-6.0 of the Contract Docwnents.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost contained herein are in full
satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change
Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of
efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost impacts at any time during and after completion of the Contract associated with the Extra
Work
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $203,505.50
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$4,130,554.75
$52,562.89
$4,183,117.64
$203,505.50
$256,068.39
$4,386,623.14
P.M,
Percentage Initial
1.27% ~
6.20% ~
Date: 3\A0'-'-\:l\'-
ACCEPTED BY:
Date
This Change Order does not release, waive, impair or constitute an accord and satisfaction with regard to the following: (a) issues regarding delay,
disruption and time extensions, including liquidated damages and extended field costs, general conditions, overhead, etc. (b) changes, extra work,
differing conditions and other matters that are not the subject of this change order, including such matters as may arise in the future; and (c) matters /
that are the subject of the proposed "global resolution" of time-related issues currently being negotiated and/or under consideration of the parties. As
to all ~~ing items and issues listed at (a) through (c) in the previous sentence, the parties reserve their rights, defenses and remedies.
\A\J~-u\.
~~mm~~~~ ~:~~~~c~:~, inc.
.-
'J__ general engineering contractors
15 June 2006
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
GBC/CG/054
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Water Changes Change Order Request
Mr. Krueger:
Please see attached change order request as submitted by Pacific Underground
Construction (project utility subcontractor) pertaining to additional work requested by the
City of Gilroy regarding the subject project. The total cost for the attached change order
work, including ten percent (10%) general contractor mark-up is $103,62000 (see attached
request for change order from Pacific Underground Construction for further detail).
In addition to the aforementioned, change order amount, a Contract time extension of ten
(l0) working days will also be required due to the additional work. The water main
activity is on the critical path of the project schedule, and therefore, warrants a Contract
time extension.
If the aforesaid change order request is acceptable, please sign below indicating
acceptance of this change order request in its entirety and directing Golden Bay
Construction to proceed with the additional work.
Please feel free to contact me at (650) 539-0310 x229 should you have any questions.
, Cortese
/h- Pr ~ect Manager
Acci:pted: City of Gilroy
Sign
Print Name
Date
582 bragato rood · san carlos, california 94070 . license #451401
650/593-0310 · 650/593-0123 fox fl. III oJ' .. . ""'. __...
:.~,...GEj}~:)
Q~
0\',,-!.1)/,
P.:li,rI \<'ry IhJ:/1 if/
~ "'~C'P'I:I
. .-:t'UND6"IiI"DUN6:I
.... B CDNSTRUDTlDN
Uc:. jl4234Ut
1117 STONE AI/E. . SAN JOSE, CA 9S125. 1311 .
(401) !t77-leSS .
FAX (408) 977.1659
Golden Bay Construction, Inc.
582 Bragato Road
San Carlos, Ca 94070
Attn: Brian Cortese
Ph: 650-593-0310 Fx: 650-593-0123
Re: Monterey Streetscape Phase 3 - City 0/ Gilroy
-Request/or Change Order
Scope of Work
June 14,2006
Scope of this change order will require an additional ten working days be added to existing
utility schedule.
Monterev & Fifth
Add approximately 75 If of 6" DIP. Extend to work limits shown on Fifth Street.
6" DIP
Monterev & Martin
Add one valve cluster
(2) 12" gate valves
and (1) 6" gate valve.
75 LF
$ 121.00 I LF
Ci 9,075.o.v
<.f6,7~
lEA
$ 6,750.00 I Ea
Add 55 If of 6" DIP.
55 LF
$ 125.00/LF
~
@,500.OV
Add connection to
existing 4" Main
lEA
$ 3,500.001 Ea
2nd to 4tll Street
Add: 836 with reader lid as requested per City of Gilroy Letter #17
Price to replace existing box with 836 box and replace sidewalk to nearest joint.
Add: 4" fire service and reconnect to existing fire service at Station 6+40 +1- and Station 9+40+1-
836 box with reader lid 12 EA
and sidewalk replacement
$ 2,550.001 Ea
(f30,60~
4" DIP fire service 2 EA
aod reconnect to
existing.
$ 18,700.00/ Ea
~
rota. ChaOl:~e Order Rcquest
$ 94,200.00
~~mmm~~~ golden ~QY .
.~ construction Inc. EOE/AA
._~ ,
~~- general engineering contractors
19 June 2006
GBC/CG/056
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Various Underground Changes Change Order Request
Mr. Krueger:
$1'1/885,,50
Please see attached request for change order #2 as submitted by Pacific Underground
Construction (project utility subcontractor) pertaining to additional work requested by the
City of Gilroy regarding the subject project. The total cost for the attached change order
work, including ten percent (10%) general contractor mark-up is $2 ~2,8n 00 (see attached
request for change order #2 from Pacific Underground Construction for further detail).
Some of the attached work has been completed while some remains to be completed
pending approval of the change order request. Please be advised that non-agreement to
this change order request may result in project delay.
In addition to the aforementioned change order amount, a Contract time extension of nine
(9) working days will also be required due to the additional work. The underground
activities are on the critical path of the project schedule, and therefore, warrant a Contract
time extension.
If the aforesaid change order request is acceptable, please sign below indicating
acceptance of this change order request in its entirety and directing Golden Bay
Construction to proceed with the additional work.
Please feel free to contact me at (650) 539-0310 x229 should you have any questions.
Thank You
Go en Ba?,,5.onstruction, Inc.
".-'
Accepted: City of Gilroy
Sign
Print Name
Date
jts~b aepoT road. Ptaywaro, california 94~4~
510/783-2960 . 510/783-2971 fax. license #451401
~ ... .A-"DIPIC
&I~UND.R.RDUND
IT CDN.TIfIUDTlDN
Lie. 11423418
1.11 STONE AYe. . SAN JOSE. CA 95125 . 1311
(408) "77-1855
FAX (408) 977.1659
Golden Bay Construction, Inc. June 16, 2006
582 Bragato Road
San Carlos, Ca 94070
Attn: Brian Cortese
Ph: 650-593-0310 Fx: 510-783-2961
Re: Monterey Streetscape Phase 3 - City 0/ Gilroy
-Request/or Change Order # 2
Scope or Work
Scope of this change order will require an additional nine working days be added to existing
utility schedule.
2" Domestic Service Bid Unit Prices do not include previous unit pricing as stated in change
order request # 1. Unit prices in CCO #001 to be utilized as applicable.
Sheet C-07
Add 2" service on
east side of Monterey St.
@ Sta. 4+87(7660 Monterey)
(Bid unit price)
Sheet C-08
Eliminate SDMH #3
(Bid unit price)
1 EA
$ 4,900.00
1 EA
$ 3,500.00
Eliminate 2" Dom. Service
@ Sta. 10+80 east side of
Monterey
(Bid Unit Price)
1 EA
$ 2,800.00
Eliminate 2" Dom. Service
@ Sta. 13+45 east side of
Monterey
(Bid Unit Price)
J EA
$ 2,800.00
Add: Single 4" fU'e service and
reconnect @ Station 13+75
J EA
~5~
Sheet C-09
Add 2" Dom. Service on
east side of Monterey St.
@ Station 16+30
(Bid Unit Price)
lEA
$ 2,800.00
Add:6" fire service and reconnect to
on east side of Monterey St. @
Sta. 171-35
lEA
~
Hcmove valve @ 5th St. I.@ Sta
17'33
"ill C!ll'};)
lEA
$ 0.00
~ ... .A1.DIJII'IC
..-::t'UNDIIRIIRDUND
... B DDNIII.,."UDrlDN
Lie. "42341la
1817 STONE AVE.
. SANJOSE,CA95125.1311
(408) 977.1855
FAX (408) 977-1659
Sheet C-09 ( Continued )
Add: 2" Dom. Service on 1 EA $ 2,800.00
west side of Monterey @
sta. 18+90
(Bid Unit Price)
Add: Connect new 12" main 1 EA ( See Change Order Request #001)
to 4" on Martin, add valve
cluster and extend 6" DIP to
work limits on Martin St.
( See Change Order Request 1.100 I )
Eliminate: 2" Dom. Service on cast 1 EA $ 2,800.00
side of Monterey A Sta. 19+37
(Bid Unit Price)
Add:6" fire service and reconnect to ] EA G750JiV
existing on east side of Monterey St. @
Sta. 19+45
Eliminate: fire service on west side of ] EA $ 9,500.00
Monterey St @ sta. 20+00
(Bid Unit Price)
Add: Single 6" fire service @ sta. 19+90 ] EA ~oo~
without reconnection
Add:6" fire service and reconnect to ] EA 0,750~
existing on east side of Monterey St. @
Sta. 20+25
Eliminate: 2" Dom. Service @ 20+25
on east side of Monterey St.
(Bid Unit Price)
2EA
$ 2,800.00
$ 5,600.00
Add: Extend 6" DIP @ 5th & Monterey
to work limits shown on 5th street.
I LS
( See Change Order Request #00] )
Add; Replace fire hydrant @ south Vtest
comer of Monterey & 5th Street.
(Bid Unit Price)
] EA
$ 6,100.00
Sh~et C-IO
Add: 2" Dom. St:rvice on east side
Of Monterey St. @ sta. 21 +08
(Bid {)nit Price)
lEA
$ 2,800.00
~"~CI"D
..-rUNDIIR.RDUND
~ BCDNSTRUDTlDN
Lie. "42341~ 1817 STONE AVE. . SAN JOse. CA95125 -1311 (408)977-1655 FAX (408) 977-1659
Sheet C-l 0( Continued )
Add:6" fire service and reconnect to lEA <f9, 75O-:OV
existing on east side of Monterey St. @
Sta. 22+20
Eliminate: 2" Dom. service on east 2EA $ 2,800.00/EA $ 5,600.00
side of Monterey St. @ sta. 22+20
(Bid Unit Price)
Add:6" fire service and reconnect to lEA ~OV
cxisting @ 7430 Montcrey St.
Sheet C-ll
Eliminate: Fire hydrant reconnection 1 EA $ 6,000.00
@ Lewis St. 10+60
(Bid Unit Price)
Add:Fire hydrant on north side 1 EA $ 8,800.00
of Lewis St. @ 10+60
(Bid Unit Price)
Add:6" fire service and 1 EA Qil,5ooji)
reconnect ex. fire service on south
side of Lewis @ 11+30
Add: 2" Dom. service on south 2EA $ 4,900.oo/EA $ 9,800.00
side of Lewis @ 11 +30
(Bid Unit Price)
Sheet C-14
Eliminate 6" gate valve @ fire 43EA $ 600.oo/EA
services
Add: permanent blow off assembly 43EA $ 8oo.00/EA C!34,4oo.0V
on fire services.
Add: Slurry fill for shallow portion of 14EA $ 465.00/EA $ &,519.0{} C!1-7OV
services on west side of Monterey St.
for the entire length on west side. Fire
3crvice pipe was shallowcd to be installed
over 27" RCP storm drain line
.~""O'f' G;;' ".
,.:::-~..,.,.. ...~~.
\#1." - ....0 .
: '11 ~ I!..~"~""
,* .:..'.::qlllll:~\ \
'. tII" "C j * I
. ~._...,"
.......~ --.'
. .a..... .
,.' .
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846HD450; Fax (408) 846-0429
CHANGE ORDER NO.3
To contract for: Monterey Streetscape Improvement Project, Phase ill
Project No. CML-5034(012), City Project No. Q6..CDD-119
Contractor: Golden Bay Construction, Inc. Contract Date:
2/21/2006
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be retwned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be retwned
to him as his authority to proceed with the work.
Description of Work
Perfonn force account work related to installation of the new water main per attached Extra
Work Orders 1, 2, 4, 5, 7, 9, to & II.
All requirements of the original Contract Docwnents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with
this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption,
loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby
waives any right to claim any further cost and time impacts at any time during and after completion of the Contract
associated with the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
fortheNETINCREASEof $19,140.41
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$4,130,554.75
$256,068.39
$4,386,623.14
$19,140.41
$275,208.80
$4,405,763.55
P.M.
Percentage ~
6.20010 M
6.66% W
n,:;,U, ~.
ACCEPTED BY:
RECOMMENDED BY:
This Change O~der ~oes n~t rel.ea~, waive, impair or constitute an accord and satisfaction with regard to the foUowing: (a) issues regarding delay, disruption
and time extenSions, IDcludlDe liqUidated damaees and extended field costs, eeneral conditions, overhead, etc. (b) chanees, extra work, difJerine conditions
and other matters that are oot the subject of this change order, including such matters as may arise in the future; and (c) matters that are the subject of the
proposed "alobal resolution" of time-related issues currently beioe ntlotiated and/or under consideration of the parties. s to all the fortloine items and
issues listed at (a) throueh (c) in the previous sentence, the parties reserve their riahts, defenses and remedies.
9/1312006
...
~
Pacific Underground Construction
1817 Stone Ave.
San Jose, CA 95125
Ph : 408-977-1655
Change Request ~
To: Johnny Zanette
Golden Bay Construction, Inc.
3826 Depot Road
Hayward, CA 94545
Ph: (510)783-2960 Fax: (510)783-2971
Number: 1
Date: 6/26/06
Job: 2674 Monterey Streetscape Ph 3
Phone:
Description: EWO 01
We are pleased to offer the following specifications and pricing to make the following changes:
Unmarked "Gn Sta 12+83
The total amount to provide this work is ..................................................................................................
$5,842.45
If you have any questions, please contact me at (408)977-1655.
Submitted by: Thad M. Corbett
Pacific Underground Const.
Approved by:
Date:
Page 1 of 1
Performed by: PACIFIC UNDERGROUND CONSTRUCTION, INC. Report Date: 06/26/06
Contractor: Golden Bay Construction, Inc. Job Number. 2674
Job Name: Monterey Streetscape Improvement Project - Phase 3 EWO Number: 01
Description of Work: Unmarked "G" Sta 12+83 Date Performed: 05/09/06
EQUIPMENT LABOR
Hours Hrlv Rate
Description Hours Hrlv Rate Ext. Amt. Descriotion S.T. O.T. S.T. O.T. Ext. Amt.
Loader-CAT IT 28G 4.00 $ 51.93 $ 207.72 G. Hernandez - Lab For 13.00 $ 58.53 $ 760.89
Air Compressor 016-025 4.00 $ 12.16 $ 48.64 P. Prudell- OP1341 13.00 $ 60.34 784.42
Excavator 9030 0100B 13.00 $ 59.86 $ 778.18 A. Jimenez - Grp1 4.00 $ 46.29 185.16
Excavator 9030 0100B 2.00 $ 59.86 $ 119.72 C. Castillo - Grp3 13.00 $ 44.20 574.60
G. Shipp - OP3705 2.00 $ 62.94 125.88
SUBTOTAL $ 1,154.26 SUBTOTAL $ 2,430.95
MATERIAL & WORK BY SPECIALISTS Labor Surcharge at: 25% $ 607.74
Description Qtv Cost Ext. Amt.
12" Mega-lugs 7.00 $ 68.20 $ 477.40 Subsistence, number At:
12" MJ 45 2.00 $143.97 $ 287.94
concrete yd 1.00 $122.10 $ 122.10 Travel Expense, number At:
Other:
TOTAL COST OF LABOR A $ 3,038.69
TOTAL COST OF EQUIPMENT, MATERIAL
SUBTOTAL $ 887.44 AND SPECIALIST WORK B $ 2,041.70
Markup on Labor Cost 15% A $ 455.80
Contractor's Representative
Markup on Equipment, Material and
Accepted for Progress Payment By: Specialist Work 15% B $ 306.26
SUBTOTAL $ 5,842.45
Owner's Representative
Bond Fee 0%
Date Accepted
TOTAL THIS REPORT $ 5,842.45
PACIFIC' ... .~DERGROUND CONSTRUCT "N, INC.
1817 STONE AVENUE
SAN JOSE, CA 95125-1311 At- c- C.
CONTRACTOR'S LICENSE #423419 U}" ..J -- .,
DAILY EXTRA WORK REPORT
DATE: LOCATION: Ult. tl\Y't...~ -~" ~.. 11--...,-83 JOB NO;.
TYPE OF WORK: .7M~k.\J Drudut.-Lw-. (""1&f.;..\ {"l\ufC} +rcY\ C;-~ / <;'-~ )
DESCRIPTION OF WORK: J -- ,
.
lABOR NAME CRAFT
(~/~r', '-I( Ufr-^~Nl(:;L- F~~^
7~ YrJcl<JI Mer
bi-{; ..1~o.tt'Z- ILAscv
U ~ C-t. 5tT1 ( (, L-./J-L.r:v-
At bf.r::- ~ ~\..j Cs L..JJ:-s:v-
. \-Ai ~ L6JJ<h~ L f,~v"'-
o~""'"''''\~ <1J: .j//) o(Rr
1/ f
HOURS I
13
13
4
13
-&
~
EQUIPMENT DESCRIPTION
HOURS I
,..
~
FLATBED
PICKUP
LDR/BACKHOE - 580 - CAT 426
LOADER ~
AIR COMPRESSOR A,;" ~qrb
DUMP TRUCK - 5 C.Y. ,
EXCAVATOR -L-.€A. 6\(, / Co,''/'.
SMALL TOOLS I
4
''1
i
'3/7-
.
7E-J...,
MATERIALS. SPECIAL FORCES AND SERVICES DESCRIPTION:
I'll 'Elf) It&! r /Z ,~ DJ;r
J J
7.... 'Eft-.. ~ LIS ~. I 2-
I./rdi cp).~t[+e {; r 'I)t' ./~ k lur
-
ORDERED BY AND APPROVED AS TO SUBSTANCE
r.. --H-:---
By: \....:It! &.~;r l .
Contractor's Representative
Date: ~-9 -Ob By:
Owner
Date:
"" Pacific Underground Construction
1817 Stone Ave.
San Jose, CA 95125
Ph: 408-977-1655
Change Request ~
To: Johnny Zanette
Golden Bay Construction, Inc.
3826 Depot Road
Hayward. CA 94545
Ph: (510)783-2960 Fax: (510)783-2971
Number: 2
Date: 6/26/06
Job: 2674 Monterey Streetscape Ph 3
Phone:
Description: EWO 02
We are pleased to offer the following specifications and pricing to make the following changes:
Pothole for possible G crossing conflicts 16+40 and 18+93
The total amount to provide this work is ..................................................................................................
$402.20
If you have any questions, please contact me at (408)977-1655.
Submitted by: Thad M. Corbett
Pacific Underground Const.
Approved by:
Date:
Page 1 of 1
.".
Performed by: PACIFIC UNDERGROUND CONSTRUCTION, INC. Report Date: 06/26/06
Contractor: Golden Bay Construction, Inc. Job Number: 2674
Job Name: Monterey Streetscape Improvement Project - Phase 3 EWO Number: 02
Description of Work: Pothole for possible G crossing conflicts 16+40 & 18+93 Date Performed: 05/10/06
EQUIPMENT LABOR
Hours Hrlv Rate
Description Hours Hrly RatE Ext. Amt. Descriotion S.T. O.T. S.T. O.T. Ext. Amt.
Ldr/Backhoe Case 580 1.50 $ 29.32 $ 43.98 P. Prudell- OP1341 1.50 $ 60.34 $ 90.51
C. Castillo - Grp3 1.50 $ 44.20 66.30
G. Hernandez - Lab For 1.50 $ 58.53 87.80
SUBTOTAL $ 43.98 SUBTOTAL $ 244.61
MATERIAL & WORK BY SPECIALISTS Labor Surcharge at: 25% $ 61.15
Description Qty Cost Ext. Amt.
Subsistence, number At:
Travel Expense, number At:
Other:
TOTAL COST OF LABOR A $ 305.76
TOTAL COST OF EQUIPMENT, MATERIAL
SUBTOTAL $ - AND SPECIALIST WORK B $ 43.98
Markup on Labor Cost 15% A $ 45.86
Contractor's Representative
Markup on Equipment, Material and
Accepted for Progress Payment By: Specialist Work 15% B $ 6.60
SUBTOTAL $ 402.20
Owner's Representative
Bond Fee 0%
Date Accepted
TOTAL THIS REPORT $ 402.20
'!
r= PACIFIC r ~DERGROUND CONSTRUCT ~N, INC.
1817 STONE AVENUE
SAN JOSE, CA 95125-1311 ~ I C:)
3J.. ~-
CONTRACTOR'S LICENSE #423419 ri
-\ /
'-"
DAILY EXTRA WORK REPORT
DATE: cC;-1 G ._~ G-OCA TION: /6+- 'fD (fly (1/'Jii. ') If.? 97 (if" p/ ~ ') JOB NO'd67 Y -
_ . -r . .5 . '!IJI.<-
TYPE OF WORK: 0 ht~\e, ~~sJd ~, G (' ,/'jc.
taT i:-t.rt/5 il"~'.. ',,,';/1'" I t <.:
;:. '1 EcJ , t.iJ fj -(..\/... j
DESCRIPTION OF WORK: f>.~- f r-t- ~~/ /) /._r-- {'" r- L:liJl /p..".
~... '.. (-:-'
k/r-T ,cJ O.L~ ! -( , ;;:---- f ·
J'---t- ...., !se i PI "if.! .~ arAclc .~... fr:::> .pi:;fFc) .A(f,J /2- i:
. .I't:c . ~ h' I IrA r,", {-k
/:;1/ _\L~ 'r ~ /1,'::'/ 'I I , cP~J
r-:r-;-. .4sf..'~ c:T ~ -~ -. ........;. /{.. r ':.r C1 ~fr..:.) //y"
t..-+ J 0;6 t t~,
I . J Gh.:" f)~)~/Z bP (\-+ LJ,..kh."'<:; / /{!.. c,) I 2-< f2 ",.p
k:(.Ir" r ' t:t: ~ ,....."c. ~.-J.
rJ /:< I .
/J
LABOR NAME CRAFT HOURS I EQUIPMENT DESCRIPTION HOURS I
/"i::;r:-(-> ffLA:JE.,AA ~ r.~
(!,~;'v.'CD Cr. I ' t i1 Ll.'fcd" I..) FLATBED
C"" --<I r -1 P-i:.J'I'lN'I"L} ., cVTr ,~f'\. /- PICKUP /f'"'..
. /. C~ . (,
LOR/BACKHOE -IS80/- CAT 426 /cS-
LOADER
AIR COMPRESSOR
DUMP TRUCK - S C.Y.
EXCAVATOR
SMALL TOOLS
I MATERIALS, SPECIAL FORCES AND SERVICES DESCRIPTION: I
ORDERED BY AND APPROVED AS TO SUBSTANCE
A
// " ~ tJ
Date:)- /6-0 t; ;)~"ild7L#
I -"/[:7 I By:h Date:
BYk]" ,/. .t:,. (
Contractor's Representative .-t5wne~
-"l
.5l
/1/
Pacific Underground Construction
1817 Stone Ave.
San Jose, CA 95125
Ph: 408-977-1655
Change Request ~
To: Johnny Zanette
Golden Bay Construction, Inc.
3826 Depot Road
Hayward, CA 94545
Ph: (510)783-2960 Fax: (510)783-2971
Number: 4
Date: 6/26/06
Job: 2674 Monterey Streetscape Ph 3
Phone:
Description: EWO 04
We are pleased to offer the following specifications and pricing to make the following changes:
Unmarked utilities/structure
The total amount to provide this work is ..................................................................................................
$4,566.57
If you have any questions, please contact me at (408)977-1655.
Submitted by: Thad M. Corbett
Pacific Underground Const.
Approved by:
Date:
Page 1 of 1
Performed by: PACIFIC UNDERGROUND CONSTRUCTION, INC. Report Date: 06/26/06
Contractor: Golden Bay Construction, Inc. Job Number: 2674
Job Name: Monterey Streetscape Improvement Project - Phase 3 EWO Number: 04
Description of Work: Unmarked utilities/structure Date Performed: 05/11/06
EQUIPMENT LABOR
Hours Hrly Rate
Description Hours Hrly Rate Ext.Amt. Description S.T. O.T. S.T. O.T. Ext. Amt.
Loader-CAT IT 28G 7.00 $ 51.93 $ 363.51 G. Hernandez - Lab For 7.00 $ 58.53 $ 409.71
Excavator 9030 0100B 7.00 $ 59.86 $ 419.02 P. Prudell- OP1341 7.00 $ 60.34 422.38
Excavator 9030 0100B 7.00 $ 59.86 $ 419.02 G. Shipp - OP3705 7.00 $ 62.94 440.58
C. Castillo - Grp3 7.00 $ 44.20 309.40
A. Jimenez - Grp1 7.00 $ 46.29 324.03
A. Reyes - Grp3 7.00 $ 44.20 309.40
SUBTOTAL $ 1,201.55 SUBTOTAL $ 2,215.50
MATERIAL & WORK BY SPECIALISTS Labor Surcharge at: 25% $ 553.88
Description Qty Cost Ext. Amt.
Subsistence, number At:
Travel Expense, number At:
Other:
TOTAL COST OF LABOR A $ 2,769.38
TOTAL COST OF EQUIPMENT, MATERIAL
SUBTOTAL $ - AND SPECIALIST WORK B $ 1,201.55
Markup on Labor Cost 15% A $ 415.41
Contractor's Representative
Markup on Equipment, Material and
Accepted for Progress Payment By: Specialist Work 15% B $ 180.23
SUBTOTAL $ 4,566.57
Owner's Representative
Bond Fee 0%
Date Accepted
TOTAL THIS REPORT $ 4,566.57
~~-:c ;.
,
PACIFIC'. 'DERGROUND CONSTRUCT "'N,INC.
1817 STONE AVENUE
SAN JOSE, CA 95125-1311
CONTRACTOR'S LICENSE #423419
$
::,-ll-
HOURS
FLATBED
PICKUP
LDR/BACKHOE - 580 - CAT 426
LOADER :L ,. orr-
AIR COMPRESSOR
DUMP TRUCK - 5 C.Y.
EXCAVATOR '2.€:A. ~(\
SMALL TOOLS
MATERIALS. SPECIAL FORCES AND SERVICES DESCRIPTION:
ORDERED BY AND APPROVED AS TO SUBSTANCE
Date: -ll-~(,
Date: 5//g/o6
J
Pacific Underground Construction
1817 Stone Ave.
San Jose, CA 95125
Ph: 408-977-1655
Change Request I
To: Johnny Zanette
Golden Bay Construction, Inc.
3826 Depot Road
Hayward. CA 94545
Ph: (510)783-2960 Fax: (510)783-2971
Number: 5
Date: 6/26/06
Job: 2674 Monterey Streetscape Ph 3
Phone:
Description: EWO 05
We are pleased to offer the following specifications and pricing to make the following changes:
Unmarked utilities/structure Sta 17+53 to 17+70
The total amount to provide this work is. ..................................................................................................
$3,458.89
If you have any questions, please contact me at (408)977-1655.
Submitted by: Thad M. Corbett
Pacific Underground Const.
Approved by:
Date:
Page 1 of 1
Performed by: PACIFIC UNDERGROUND CONSTRUCTION, INC. Report Date: 06/26/06
Contractor: Golden Bay Construction, Inc. Job Number: 2674
Job Name: Monterey Streetscape Improvement Project - Phase 3 EWO Number: 05
Description of Work: Unmarked utilities/structure Sta 17+53 to 17+70 Date Performed: 05/12/06
EQUIPMENT LABOR
Hours Hrlv Rate
Description Hours Hrly Rate Ext. Amt. Description S.T. O.T. S.T. O.T. Ext. Amt.
Loader-CAT IT 28G 4.00 $ 51.93 $ 207.72 G. Hernandez - Lab For 4.00 $ 58.53 $ 234.12
Air Compressor 016-025 4.00 $ 12.16 $ 48.64 P. Prudell- OP1341 4.00 $ 60.34 241.36
Excavator 9030 0100B 4.00 $ 59.86 $ 239.44 G. Shipp - OP3705 4.00 $ 62.94 251.76
Excavator 9030 0100B 4.00 $ 59.86 $ 239.44 C. Castillo - Grp3 4.00 $ 44.20 176.80
A. Jimenez - Grp1 4.00 $ 46.29 185.16
A. Reyes - Grp3 4.00 $ 44.20 176.80
SUBTOTAL $ 735.24 SUBTOTAL $ 1,266.00
MATERIAL & WORK BY SPECIALISTS labor Surcharge at: 25% $ 316.50
Description Qty Cost Ext. Amt.
12" MJ 45 2.00 $143.97 $ 287.94 Subsistence, number At:
12" MJ Megalug 5.00 $ 68.20 $ 341.00
Iconcrete yd 0.50 $122.10 $ 61.05 Travel Expense, number At:
Other:
TOTAL COST OF LABOR A $ 1,582.50
TOTAL COST OF EQUIPMENT, MATERIAL
SUBTOTAL $ 689.99 AND SPECIALIST WORK B $ 1,425.23
Markup on labor Cost 15% A $ 237.38
Contractor's Representative
Markup on Equipment, Material and
Accepted for Progress Payment By: Specialist Work 15% B $ 213.78
SUBTOTAL $ 3,458.89
Owner's Representative
Bond Fee 0%
Date Accepted
TOTAL THIS REPORT $ 3,458.89
.'.';'"1
PACIFIC UNDERGROUND CONSTRUCTION,INC.
1817 STONE AVENUE
SAN JOSE, CA 95125-1311 qp'S -- J 1--
CONTRACTOR'S LICENSE #423419
DAILY EXTRA WORK REPORT
DATE:~-jL-Ob LOCATION: [;-<<... ,fj"" f ~bittt.N JOB NO.1h7 y--] G
TYPE OF WORK: ~ IJJrrc;> JJroJv~ /.v-l5.iJ~ U^- h~tcl utllfia J ffrJiW,.e
1 ~'~ ~t \ i t,{;,> S7A ,7-tS- 3 1U 17t 70 +-
DESCRIPTION OF WORK: U1{..WIif{.rc
t'1ML ~ rc'- ~v\t O'~. ~-\d. MVtl.cX. . 0i V S'- -'-- (! 1"-E6~ ;U~J .
t ~!(}"l.I I'f - M5(J..,j~J tJl ~U J. , --; J
Jt'> ~~~~~) -r&. h/f.
J J
LABOR NAME CRAFT HOURS I EQUIPMENT DESCRIPTION HOURS I
\. >of"'. " 1./ I~_.A wrV hYt~ V
"-Kif B
t' ~ ~ flrJdt.. U aJ. ~ c) FLATBED
r ;> ~ ~' .\k :mJ Dw &'. l.j PICKUP
r,J.~ --. IV- i .1 l~'- </ LDR/BACKHOE - 580 - CAT 426
. L ~\tL ..........-0-, llf.
AtJE v~~ (... '/ll~ ,.- l/ LOADER --- Cpt - '-I
.....i.1
IJl bf:rLt> it:... t " U i .~yy i.J AIR COMPRESSOR - /),(- ~lj' 4
f/ DUMP TRUCK - 5 C.Y.
EXCAVATOR 7-EA. Y/i./
SMALL TOOLS ,
I MATERIALS, SPECIAL FORCES AND SERVICES DESCRIPTION: I
.
"Z..-& i Lo. ","\ '-I<u
.t)eA ;4-\:) h t)f ~, lll.-,{'
) ./
l/"'L vrd. (WtJ:_,-etr;
. I
ORDERED BY AND APPROVED AS TO SUBSTANCE
:~ /, Date: r; -(1.. -0 & By: C4JJJ)!~ ~ Date: s/f'S-/ot
- .1T~,..,
By: '"'Pi I~ ~ ~
Contractor's Representative Owner V (7
Pacific Underground Construction
1817 Stone Ave.
San Jose, CA 95125
Ph : 408-977-1655
Change Request I
To: Johnny Zanette
Golden Bay Construction, Inc.
3826 Depot Road
Hayward, CA 94545
Ph: (510)783-2960 Fax: (510)783-2971
Number: 7
Date: 6/26/06
Job: 2674 Monterey Streetscape Ph 3
Phone:
Description: EWO 07
We are pleased to offer the following specifications and pricing to make the following changes:
Backfill 05/19/06
The total amount to provide this work is ..................................................................................................
$744.64
If you have any questions, please contact me at (408)977-1655.
Submitted by: Thad M. Corbett
Pacific Underground Const.
Approved by:
Date:
Page 1 of 1
Performed by: PACIFIC UNDERGROUND CONSTRUCTION, INC. Report Date: 06/26/06
Contractor: Golden Bay Construction, Inc. Job Number: 2674
Job Name: Monterey Streetscape Improvement Project - Phase 3 EWO Number: 07
Description of Work: Backfill Date Performed: 05/19/06
EQUIPMENT LABOR
Hours Hrlv Rate
Description Hours Hrlv RatE Ext. Amt. Description S.T. O.T. S.T. O.T. Ext. Amt.
Loader-CAT IT 28G 2.00 $ 51.93 $ 103.86 G. Shipp - OP3705 2.00 $ 62.94 $ 125.88
Excavator 9030 0100B 2.00 $ 59.86 $ 119.72 P. Prudell- OP1341 2.00 $ 60.34 120.68
A. Jimenez - Grp1 2.00 $ 46.29 92.58
SUBTOTAL $ 223.58 SUBTOTAL $ 339.14
MATERIAL & WORK BY SPECIALISTS Labor Surcharge at: 25% $ 84.79
Description Qtv Cost Ext. Amt.
Subsistence, number At:
Travel Expense, number At:
Other:
TOTAL COST OF LABOR A $ 423.93
TOTAL COST OF EQUIPMENT, MATERIAL
SUBTOTAL $ - AND SPECIALIST WORK B $ 223.58
Markup on Labor Cost 15% A $ 63.59
Contractor's Representative
Markup on Equipment, Material and
Accepted for Progress Payment By: Specialist Work 15% B $ 33.54
SUBTOTAL $ 744.64
Owner's Representative
Bond Fee 0%
Date Accepted
TOTAL THIS REPORT $ 744.64
I
PACIFIC UNDERGROUND CONSTRUCTION, INC.
1817 STONE AVENUE
SAN JOSE, CA 95125-1311
CONTRACTOR'S LICENSE #423419
~. ,(II
C;,- I
-,'
DAILY EXTRA WORK REPORT
DATE:S--lq~ LOCATION: ~^lrr'~ >l'.. 1 '-[WI5
TYPE OF WORK: l3NcK '{~ll I
DESCRIPTION OF WORK: Lu't,Lri~d\ I;/J IYlTl!../5
Ar<~. ctrl C\Jt [,.L () G t i -k!r 1 Q; 100
J l I.jJ
iit-fr.;~e'II.~~OB NO. ~7l(-~ 0
bl <:L.{ i "l1/vt ~
G _J
Dr. ,m- /j . '"
I
(. c .- JLJ.~X~.,io.
flE.lA~ :;J
,
I LABOR NAME
, ( -:>F-Vt f. ~ L.kt2
r.'=::rr- r;..;;lCU
!.. ./..,,{ f.-: ..jl ",.;'f~e'2.....
CRAFT
o/Er .
Mer.
'LN.-.x..1r
HOURS II
''")
'-
EQUIPMENT DESCRIPTION
HOURS I
1-
'-
FLATBED
PICKUP
LOR/BACKHOE - 580 - CAT 426
LOADER err" qi~6.
AIR COMPRESSOR
DUMP TRUCK - 5 C.Y.
EXCAVATOR r.-iO~~
SMALL TOOLS
7_
-,
L-
MATERIALS. SPECIAL FORCES AND SERVICES DESCRIPTION:
By: G;-lh:)~T
Contractor's Representative
ORDERED BY AND APPROVED AS TO SUBSTANCi)
Date' t:;"7~()(, BV:~ t! '~Date, sl"i4hb
Owner (/ (I
. Pacific Underground Construction
1817 Stone Ave.
San Jose, CA 95125
Ph: 408-977-1655
Change ReqUest'
To: Johnny Zanette
Golden Bay Construction, Inc.
3826 Depot Road
Hayward, CA 94545
Ph: (510)783-2960 Fax: (510)783-2971
Number: 9
Date: 6/26/06
Job: 2674 Monterey Streetscape Ph 3
Phone:
Description: EWO 09
We are pleased to offer the following specifications and pricing to make the following changes:
Unmarked utilities/structure, 12+15 to 12+33
The total amount to provide this work is ..................................................................................................
$903.79
If you have any questions, please contact me at (408)977-1655.
Submitted by: Thad M. Corbett
Pacific Underground Const.
Approved by:
Date:
Page 1 of 1
Performed by: PACIFIC UNDERGROUND CONSTRUCTION, INC. Report Date: 06/26/06
Contractor: Golden Bay Construction, Inc. Job Number: 2674
Job Name: Monterey Streetscape Improvement Project - Phase 3 EWO Number: 09
Description of Work: Unmarked utilities/structure, 12+15 to 12+23 Date Performed: OS/24/06
EQUIPMENT LABOR
Hours Hrly Rate
Description Hours Hrlv Rate Ext. Amt. Description S.T. O.T. S.T. O.T. Ext. Amt.
Excavator 9030 0100B 2.00 $ 59.86 $ 119.72 G. Hernandez - Lab For 2.00 $ 58.53 $ 117.06
P. Prudell- OP1341 2.00 $ 60.34 120.68
C. Castillo - Grp3 2.00 $ 44.20 88.40
A. Reyes - Grp3 2.00 $ 44.20 88.40
SUBTOTAL $ 119.72 SUBTOTAL $ 414.54
MATERIAL & WORK BY SPECIALISTS Labor Surcharge at: 25% $ 103.64
Description Qty Cost Ext. Amt.
10 Wheeler w/driver 2.00 $ 74.00 $ 148.00 Subsistence, number At:
Travel Expense, number At:
Other:
TOTAL COST OF LABOR A $ 518.18
TOTAL COST OF EQUIPMENT, MATERIAL
SUBTOTAL $ 148.00 AND SPECIALIST WORK B $ 267.72
Markup on Labor Cost 15% A $ 77.73
Contractor's Representative
Markup on Equipment, Material and
Accepted for Progress Payment By: Specialist Work 15% B $ 40.16
SUBTOTAL $ 903.79
Owner's Representative
Bond Fee 0%
Date Accepted
TOTAL THIS REPORT $ 903.79
PACIFIC UNDERGROUND CONSTRUCTION, INC.
1817 STONE AVENUE 4C .
SAN JOSE, CA 95125 -1311 c-2-Y
CONTRACTOR'S LICENSE #423419
::::>
DAILY EXTRA WORK REPORT
DATE:S -7- L-t " tM>CATION: C€tJ{.'S ~ $lA. f1..+IS"" "'1\ 1'2.. .... ..3 JOB NO. ;)..(;,7 L/ ... ~
2)l .
\J fl ~~(l { IT1l \ +._\(S C i>~- J)N:\ eel fr;y' u <,.,t \-l\.f"- -
TYPE OF WORK:
DESCRIPTION OF WORK: 'f~VV\.cl A~ 1;Ci N\("W ' i - \ ' .' (;J : ,~cJ~ u <;'
L ('t Ilc:, \Il~lt.<:) tJC
uiSr l (I i:.0 J..lotJ.",dc./\ lli'\LS Y4t=L / L( ,'j (,-;- L / 1../" VI) r Aootj (ll ,
~, .
I~ W[~,(;",~ I I!
Hr,. r ISf> c1 )it) (f0,:.<,j f._';"
v \:=-
J
LABOR NAME CRAFT HOURS I EQUIPMENT DESCRIPTION HOURS I
( I k' ~,^4.A. k:-r.. _ ft.rt,~ ",.,1\ "1-
.> ,-
K--tE ~ f-lj c:\~J.) ()j)J'- L- FLATBED
r ~\.~ r b.).'trt\~- C~ i.e.",-- 7 PICKUP
AjLA;~ ILE"-I6\ II J,l-x,( I LDR/BACKHOE - 580 - CAT 426
-r LOADER
AIR COMPRESSOR
DUMP TRUCK - 5 C.Y.
EXCAVATOR '-i6SD -,
l.-
SMALL TOOLS
/0 tJ h f:',~. If. r ,..;/ iJt;.\JFf" L
I MATERIALS, SPECIAL FORCES AND SERVICES DESCRIPTION: I
ORDERED BY AND APPROVED AS TO SUBSTANCE
&t' Date:-S'-L.Y -Q '" Bvl~/ .x~-?' _ Date 5h6~6
By: f&^~ ..
Contractor's Representative Owner V .?7
(\
. Pacific Underground Construction
1817 Stone Ave.
San Jose, CA 95125
Ph: 408-977-1655
Change ReqUest'
To: Johnny Zanette
Golden Bay Construction, Inc.
3826 Depot Road
Hayward, CA 94545
Ph: (510)783-2960 Fax: (510)783-2971
Number: 10
Date: 6/26/06
Job: 2674 Monterey Streetscape Ph 3
Phone:
Description: EWO 10
We are pleased to offer the following specifications and pricing to make the following changes:
Dig, compact around unmarked HP gas main Sta 12+12
The total amount to provide this work is ..................................................................................................
$1,297.43
If you have any questions, please contact me at (408)977-1655.
Submitted by: Thad M. Corbett
Pacific Underground Const.
Approved by:
Date:
Page 1 of 1
Performed by: PACIFIC UNDERGROUND CONSTRUCTION, INC. Report Date: 06/26/06
Contractor: Golden Bay Construction, Inc. Job Number: 2674
Job Name: Monterey Streetscape Improvement Project - Phase 3 EWO Number: 10
Description of Work: Dig, compact around unmarked HP gas main Sta 12+12 Date Performed: OS/25/06
EQUIPMENT LABOR
Hours Hrly Rate
Description Hours Hrlv Rate Ext. AmI. Description S.T. O.T. S.T. O.T. Ext. AmI.
Excavator 9030 0100B 2.00 $ 59.86 $ 119.72 P. Prudell-OP1341 2.00 $ 60.34 $ 120.68
Excavator 9030 0100B 2.00 $ 59.86 $ 119.72 G. Shipp - OP3705 2.00 $ 62.94 125.88
C. Castillo - Grp3 2.00 $ 44.20 88.40
A. Jimenez - Grp1 2.00 $ 46.29 92.58
SUBTOTAL $ 239.44 SUBTOTAL $ 427.54
MATERIAL & WORK BY SPECIALISTS Labor Surcharge at: 25% $ 106.89
Description Qtv Cost Ext. AmI.
Slurry yd 3.00 $118.11 $ 354.33 Subsistence, number At:
Travel Expense, number At:
Other:
TOTAL COST OF LABOR A $ 534 .43
TOTAL COST OF EQUIPMENT, MATERIAL
SUBTOTAL $ 354.33 AND SPECIALIST WORK B $ 593.77
Markup on Labor Cost 15% A $ 80.16
Contractor's Representative
Markup on Equipment, Material and
Accepted for Progress Payment By: Specialist Work 15% B $ 89.07
SUBTOTAL $ 1,297.43
Owner's Representative
Bond Fee 0%
Date Accepted
TOTAL THIS REPORT $ 1,297.43
PACIFIC UNDERGROUND CONSTRUCTION. INC.
1817 STONE AVENUE f>
SAN JOSE. CA 95125-1311 :#-~...
CONTRACTOR'S LICENSE #423419
DAILY EXTRA WORK REPORT
DATE: :)-L)-~ LOCATION: Lt:.u{.5 SC 5'"7iC. ;1- 1- I "'L -t-. - JOB NO. '[..."7 Y" 3 ('
TYPE OF WORK: ...D "'I UI"",/7J~: r::.riL/it.) VIA /V'(U-'CV Hc G J>.') ,.... P I r.,
./ U / I
DESCRIPTION OF WORK:
PC;) C r ~ c;..... f ':7';-
>.1f1T.Tl E/"
. I
LABOR NAME CRAFT HOURS I EQUIPMENT DESCRIPTION HOURS I
..(~I?~/J 6JO'i..r 7
~ c: /l G .5-'.:/..0 !/)C~ ,." FLATBED
.......
(' (.) f ~ {{&\ tIT' i.I 7- PICKUP
~tY-" ..
/JL If:: J' I'> {A'!.-cJ- ~~-- .:.- LDR/BACKHOE - 580 - CAT 426
LOADER
AIR COMPRESSOR
DUMP TRUCK - 5 C.Y.
EXCAVATOR o{"I-.--- tia} ~ L
SMALL TOOLS
I MATERIALS, SPECIAL FORCES AND SERVICES DESCRIPTION: I
5 v~k ~t ,rY'--/ 7// v,c.O VJ1,,/(r-- r I t') --\'" \-.\ j) C, At p,.. II i~
l I I I /' ,.,.; ) f )';. l
~ .
r A'(~~)\ {
v .J J
ORDERED BY AND APPROVED AS TO SUBSTANCE
G 1J Date: (:-Z-J: Ob BvcAL/J iXJ- Date:5~/a
By: J/RJ1 J --...
Contractor's Representative Owner [/ or
#~
'"
. Pacific Underground Construction
1817 Stone Ave.
San Jose, CA 95125
Ph : 408-977-1655
Change ReqUest'
To: Johnny Zanette
Golden Bay Construction, Inc.
3826 Depot Road
Hayward, CA 94545
Ph: (510)783-2960 Fax: (510)783-2971
Number: 11
Date: 6/26/06
Job: 2674 Monterey Streetscape Ph 3
Phone:
Description: EWO 11
We are pleased to offer the following specifications and pricing to make the following changes:
"G" SS repair
The total amount to provide this work is ..................................................................................................
$1,012.99
If you have any questions, please contact me at (408)977-1655.
Submitted by: Thad M. Corbett
Pacific Underground Const.
Approved by:
Date:
Page 1 of 1
Performed by: PACIFIC UNDERGROUND CONSTRUCTION, INC. Report Date: 06/26/06
Contractor: Golden Bay Construction, Inc. Job Number: 2674
Job Name: Monterey Streetscape Improvement Project - Phase 3 EWO Number: 11
Description of Work: "G" SS Repair Date Performed: OS/25/06
EQUIPMENT LABOR
Hours Hr\V Rate
Description Hours Hrlv Rate Ext. Amt. Description S.T. O.T. S.T. O.T. Ext. Amt.
loader-CAT IT 28G 1.50 $ 51.93 $ 77.90 G. Hernandez - lab For 1.50 $ 58.53 $ 87.80
Excavator 9030 0100B 1.50 $ 59.86 $ 89.79 P. Prudell- OP1341 1.50 $ 60.34 90.51
Excavator 9030 0100B 2.00 $ 59.86 $ 119.72 G. Shipp - OP3705 1.50 $ 62.94 94.41
C. Castillo - Grp3 1.50 $ 44.20 66.30
A. Jimenez - Grp1 1.50 $ 46.29 69.44
A. Reyes - Grp3 1.50 $ 44.20 66.30
SUBTOTAL $ 287.41 SUBTOTAL $ 474.76
MATERIAL & WORK BY SPECIALISTS labor Surcharge at: 25% $ 118.69
Description Qty Cost Ext. Amt.
Subsistence, number At:
Travel Expense, number At:
Other:
TOTAL COST OF LABOR A $ 593.45
TOTAL COST OF EQUIPMENT, MATERIAL
SUBTOTAL $ - AND SPECIALIST WORK B $ 287.41
Markup on labor Cost 15% A $ 89.02
Contractor's Representative
Markup on Equipment, Material and
Accepted for Progress Payment By: Specialist Work 15% B $ 43.11
SUBTOTAL $ 1,012.99
Owner's Representative
Bond Fee 0%
Date Accepted
TOTAL THIS REPORT $ 1,012.99
rr=
',I
PACIFIC UNDERGROUND CONSTRUCTION, INC.
1817 STONE AVENUE
SAN JOSE, CA 95125-1311
CONTRACTOR'S LICENSE #423419
:$. --
~ _ 7--5
DAILY EXTRA WORK REPORT
DATE:S-Z-S--oC, LOCATION: L~t5 ST' ~, '1.+-1-L + - JOB NO.767Lj-3c
TYPE OF WORK: ",::: < ~ tl 55 R.c:.r~i r :L;t'\.O/..r~0 Pi (:kTI~';')
DESCRIPTION OF WORK: 'f.," ~ I, if c. P ~ ~ - J~t'd tLri:J,-,f.l., ~rAr/ct..." s: ,51/
SID vI (~(J/'vif J Pxc",t r.1tit;rL S tut.-h::j t:;'t SPJ!.. {, vtTti
D^u J' '& \ v1 E tJ (!1;.-- (I"~ fi- <.0 l lrvr-- " I
,
LABOR NAME
"_./1 ~ /.1 iA A....A '""V-
I _t t-._""f',J 11 . lAl -
P e:..rL .p rvJ ~,--l
/~-ejA-D ~L it?
f_ fo..uv.k; (MGtli
~hi{j ..J~tJvCv
A IbCl"Td 7~~j Cs
I
CRAFT HOURS
Pt'irf';.- ty\ !. S
~ ,e;-
~;?V- I.~
Ct.bs ,. II <-
LJ. hlSr i,)
j JL..__ I,;...r
EQUIPMENT DESCRIPTION
HOURS
FLATBED
PICKUP
LDR/BACKHOE - 580 - CAT 426
LOADER 9 C;-D
AIR COMPRESSOR
DUMP TRUCK - 5 C.Y.
EXCAVATOR Len. 9D]' (:.
SMALL TOOLS
/1' ;::-
Iv) /'L
/
.
MATERIALS. SPECIAL FORCES AND SERVICES DESCRIPTION:
By: G~~
Contractor's Representative
ORDERED BY AND APPROVED AS TO SUBSTANCE
Date:5-2S-=-oc. Bv: ~fl- ")!~Date:5~~lctf
V ~
Owner
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO.4
To contract for: Monterey Streetscape Improvement Project, Phase III
Project No. CML-5034(012), City Project No. 06-CDD-l 19
Contractor: Golden Bay Construction, Inc. Contract Date:
2/2 I/2006
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
This change order provides for the following:
Establish grades per attached Change Order Request Letter Nos. 125,187 and 193.
Install flag pole holders per attached Change Order Request Letter Nos. 126 & 188.
Adjust sub-slab form per attached Change Order Request Letter No. 150.
Lower fire service boxes below sidewalk grade per attached Change Order Request Letter No. 164.
Fill cistern with slurry and remove concrete top per attached Change Order Request Letter No. 184.
Remove and replace portion of curb and gutter at Martin Street per attached Change Order Request Letter No. 186.
Furnish and install concrete drain boxes per attached Change Order Request Letter No. 192.
Perform additional storm drain work per attached Pacific Underground Construction Change Request Nos. 3, 6 and 8.
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are
in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work"), including but not limited to labor. materials, overhead and profit. delay, disruption, loss of
efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with
the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $21,658.74
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
\l('\\~ I ~.
Cost
$4,130,554.75
$275,208.80
$4,405,763.55
$21,658.74
$296,867.54
$4,427,422.29
P.M.
Percentage Initial
6.669'0~
7.19% Jv..J
y: biZ..~ ~\l~
c,
Date: \C\.t-LT-O\e
RECOMMENDED BY:
ACCEPTED BY:
10/17/2006
06-CDD-119
Change Order No.4
- _ golden ~QY
construct Ion,
.
Inc.
__ general engineering'contractors
16 August 2006
. ,
,-:>../....., _ L
GBC/CG/125
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-l19
Establish Grades ChaIlge Order Request
, \.
Mr. Krueger:
The following change order request is for establishing grades absent from the Contract
Drawings in various locations throughout the subject project (see attached sheets for
details and locations). All grades have been approved by the City of Gilroy. The work
was performed on a. force account basis as directed by the City of Gilroy. This is a partial
request of the work required to establish all the grades absent from the Contract Drawings
and covers work performed through 15 August 2006 only. The total amount due for this
work is $3,46~ (see attached Force Account Summary Sheets 018 thru 022,028,034
and 035 for further detail).
Please process a change order in the amount of$3,46~ to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Cons
. on, Inc.
Cortese
Pr ~ect Manager
3826 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
-
~
~~~mmm~~ golden ~QY
construction,
.
Inc.
___ general engineering contractors
16 August 2006
GBC/CG/126
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscc;tpe Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Flag Pole Holders Change Order Request
\
Mr. Krueger:
The following change order request is for removing "green" concrete for the flag pole
holders in the east side sub-slab area per the direction of the City of Gilroy at the subject
project. Locations of flag poles were placed as field-designated by the City of Gilroy in
the sub-slab area from the project's north limit to just north of Fifth Street. The work was
performed on a force account basis as directed on 10 August 2006. The total amount due
for this work is $21229.(see attached Force Account Summary Sheet 027 for further
detail).
Please process a change order in the amount of $21229 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construct" c.
3826 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
",---. .
. ~~mm~m~~ golden ~QY .
construction, Inc.
___ general engineering' contractors
25 August 2006
GBC/CG/150
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Sub-slab Form Adju~~ent Force Change Order Request
Mr. Krueger:
The following change order request is for raising the back sub-slab form approximately
one inch (1") in locations specified by the City of Gilroy (see letter GBC/CG/13 8) at the
subject project. lIDs work was performed on a force account basis as directed on 17
August 2006. The total amount due for this work is $81760 (see attached Force Account
Summary Sheets 037 for further detail).
Please process a change order in the amount of $81 760 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Co
an ortese
Proje t Manager
3826 depot road, hayward, california 94545
510/783-2960.510/783-2971 fax, license #451401
d~~mmm~~ golden ~QY
construction,
.
Inc.
~ general engineering contractors
31 August 2006
Sent Via Fax & Hand-Delivered
SEP 0 1 2006
GBC/CG/164
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
REVISED Fire Servife Box Lowering Change Order Request
Mr. Krueger:
The following REVISED change order request of for the lowering the fire service boxes
below sidewalk grade throughout the subject project site. Golden Bay Construction
submitted a price of$5,20~to perform the work through letter GBC/CG/133 dated 16
August 2006. The work is progressing at a quicker rate than what was expected when the
change order request was created. Per our conversation at the project site on 29 August
2006, Golden Bay Construction and the City of Gilroy agreed to a lump sum of $4,00~
to lower the fire service boxes.
Please process a change order in the amount of $4,OO~ to compensate for the aforesaid
additional work.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You ~-
Golden Bay ConsttUction, Inc.
ri Cortese
Proj ct Manager
3826 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
-. . golden ~QY
construction,
.
Inc.
- general eng ineering' contractors
RECEIVED
14 September 2006
SEP 1 5 2005
ENGINEERING
GBC/CG/184
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Cistern Work Change\?rder Request
Mr. Krueger:
The following change order request is for filling the cistern with slurry and removing the
concrete top for grading activities at the Fifth Street intersection of the subject project as
directed in City Letter #27 and RFI #036. This work was performed on a force account
basis on 15 August 2006 and 25 August 2006. The total amount due for this work is
$7,22286 (see attached Force Account Summary Sheets 042 and 051 for further detail).
Please process a change order in the amount of $7,22286 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
3826 depot road, hayward, california 94545
c 510/783-2960. 510/783-2971 fax, license #451401
'lillrnm~~~ golden ~QY
construction,
.
Inc.
__ general engineering contractors
RECEIVED
14 September 2006
SEP ! 5 2006
ENGiNEERING
GBC/CG/186
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetsc~pe Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Martin and Monterey, Curb and Gutter Change Order Request
\
Mr. Krueger:
The following change order request is for the removal and placement of the curb and
gutter with a wing taper to accommodate the revised grades at the northeast comer of
Martin and Monterey Street at the subject project. The work was performed on a force
account basis as directed in City letter #62 on 25 August 2006, 28 August 2006 and 29
August 2006. The total amount due for this work is $66234 (see attached Force Account
Summary Sheets 041, 045 and 050 for further detail).
Please process a change order in the amount of $66234 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Constructio
ri ortese
Proj ct Manager
3826 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
"
. ~m~~~ golden ~QY .
construction, Inc.
- general engineering'contractors
RECEIVED
, '
SEP 1 52006
ENGiNEERING
GBC/CG/187
14 September 2006
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Establish Grades Ch\fe Order Request
Mr. Krueger:
The following change order request is for establishing grades absent from the Contract
Drawings in various locations throughout the subject project(see attached sheets for
details and locations). All grades have been approved by the City of Gilroy. The work
was performed on a force account basis as directed by the City of Gilroy. This is a partial
request of the work required to establish all the grades absent from the Contract Drawings
and covers work perfonned on 28 August 2006 only. The total amount due for this work
is $23521 (see attached Force Account Summary Sheet 046 for further detail).
Please process a change order in the amount of $23521 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
3826 depot road, hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
_ golden ~QY
construction,
.
Inc.
---general engineering contractors
RECEIVED
14 September 2006
SEP i 5 2006
ENGINEERING
GBC/CG/188
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-619.7
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Flag Pole Holders Change Order Request
\
Mr. Krueger:
The following change order request is for removing the concrete sub-slab to allow
installation of the flag pole holders at a later date per the direction of the City of Gilroy at
the subject project. Locations of flag poles were placed as field-designated by the City of
Gilroy in the sub-slab area. The work was performed on a force account basis as directed
on 29 August 2006. The total amount due for this work is $15349 (see attached Force
Account Summary Sheet 048 for further detail).
Please process a change order in the amount of$15349 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Cons
3826 depot road, hayward, california 94545
, 510/783-2960. 510/783-2971 fax, license #451401
- . golden ~QY
construction,
.
Inc.
--
general engineering 'contractors
14 September 2006
RECEIVED
SEP !. 5 2006
ENGINEERiNG
GBC/CG/192
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Concrete Boxes Chan~ Order Request
Mr. Krueger:
The following change order request is for providing and installing two (2) V9 and one (1)
VI concrete boxes on the east side of Monterey Street between Martin and Sixth Streets
of the subject project as directed by the City of Gilroy. This work was performed on a
force account basis on 6 September 2006 and 7 September 2006. The total amount due
for this work is $1,53155 (see attached Force Account Summary Sheets 058 and 063 for
further detail).
Please process a change order in the amount of $1 ,53155 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x219 should you have any questions.
Thank You
Golden Bay Cons ction, Inc.
3826 depot road, hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
13
)1
Raud \.&1')' High in
Customtr Satufaction
. ~mm~h golden ~QY .
. construction, Inc.
__ general engineering contractors
RECEIVED
14 September 2006
SEP 1. 5 2006
ENGINEERiNG
GBC/CG/193
,
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Re-Design Elevations of Handicap Ramp Change Order Request
I
\
Mr. Krueger:
The following change order request is for re-designing the elevations of the handicap
ramp opposite south Fifth Street on the east side of Monterey Street to conform to ADA
standards at the subject project as directed by the City of Gilroy. This work was
performed on a force account basis on 7 September 2006. The total amount due for this
work is $23521 (see attached Force Account Summary Sheet 061 for further detail).
Please process a change order in the amount of $23521 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Constructi
3826 depot road, hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
-
Pacific Underground Construction
1817 Stone Ave.
San Jose, CA 95125
Ph : 408-977-1655
Change ReqUest'
To: Johnny Zanette
Golden Bay Construction, Inc. '
3826 Depot Road
Hayward, CA 94545 .
Ph: (510)783-2960 Fax: (510)783-2971
Number: 3
Date: 6/26/06
Job: 2674 Monterey Streetscape Ph 3
Phone:
.'
Description: EWO 03
We are ph;~ased to offer the following specifications and pricing to make the following changes:
Pothole high pressure line Sta 12+16.16
The total amount to provide this work ~ .................................................................................................. $819.08
. . w/5% 11/u $860,03
If you have any questions, please contact me at (408)977-1655.
Submitted by: Thad M. Corbett
Pacific Underground Const.
Approved by:
Date:
Page 1 of 1
- ~..
Pacific Underground Construction
1817 Stone Ave.
San Jose, CA Q5125
Ph: 408-977-1655.
Change Request'
To: Johnny Zanette
Golden BaY Construction, Inc.
3826 OepotRoad
Hayward, CA 94545
Ph: (510)783-2960 Fax: (510)783-2971
Number: 6
Date: 6/26/06
Job: 2674 Monterey Streetscape Ph 3
Phone:
Description: EWO 06
We are pleased to offer the following specifications and pricing to make the following changes:
Moved SO line, Sta 20+14.78; hit unmarked 2" WS
The total amount to provide this work i~ .................................................................................................. $1,598.38
, II w/S% Mlu $/678.30,
If you have any questions, please contact me at (408)977-1655.
Submitted by: Thad M. Corbett
Pacific Underground Const.
Approved by:
Date:
Page 1 of 1
,
Pacific Underground Construction
1817 Stone Ave.
San Jose, CA 95125
Ph: 408-977-1655
Change Request I
To: Johnny Zanette
Golden Bay Construction, Inc. ,
3826 Depot Road
Hayward, CA 94545 ,
Ph: (510)783-2960 Fax: (510)783-2971
Number: 8
Date: 6/26/06
Job: 2674 Monterey Streetscape Ph 3
Phone:
"
Description: EWO 08
We are pleased to offer the following specifications and pricing to make the following changes:
MH #, Sta 14-85.90 eliminated
The total amount to provide this work i~ ...............................................................................................j $552.91
wi 5 % M/u 580.56 .
If you have any questions, please contact me at (408)977-1655.
Submitted by: Thad M. Corbett
Pacific Underground Const.
Approved by:
Date:
Page 1 of 1
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO.5
To contract for: Monterey Streetscape Improvement Project, Phase III
Project No. CML-5034(012), City Project No. 06-CDD-119
Contractor: Golden Bay Construction, Inc. Contract Date:
2/21/2006
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
This change order provides for the following:
Install alternate bricks per attached Change Order Request Letter No. 152.
Furnish and install seven new decorative trash cans and seven new benches per attached Change Order Request Letter
No. 175.
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are
in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption. loss of
efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any
right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the
Extra Work.
('\'\<>-.l, ~N L.
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
P.M.
Cost Percentage Initial
$4,130,554.75 1\
$296,867.54 7.19% ~
$4,427,422.29
$21,880.00 J )
$318,747.54 7.72% ~
$4,449,302.29
1 (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $21,880.00
--------
Date: ;:;)\DO(.\-~
neL ~
Project Engineer -::::-
Date
120
/6 .C5i/ot
Date
/07 f%b
Date
ACCEPTED BY:
The final sales contract for the order of the trash receptacles and benches was signed on 24 October 2006. The material has a lead time of eight to twelve
(8 - 12) weeks from the date of order which may place the delivery of the trash receptacles and benches at or past the current Contract completion date of
15 January 2007. Golde~ Bay Con~truction wi~l install the material immediately upon receipt, but can not be r e and/or responsible for any delays
charges should the matenal be received and/or Installed past the current Contract completion date
10/23/2006
06-CDD-119
Change Order NO.4
" . ~~mmm~~~ golden ~QY
construction"
.
Inc.
--. general engineering ,contractors
25 August 2006
GBC/CG/152
City of Gilroy , .
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Alternate Bricks Change Order Request
Mr. Krueger:
The following change order request is for installing alternate bricks in their designated
locations at the subject project. Golden Bay Construction submitted brick samples, per
the Contract Document's requirements, through Submittal #031. The City of Gilroy
returned the submittal with the comments that the manufacturer has to be Pacific Clay
and mixtures of two different types of brick are to be used. There are two cost impacts
associated with the aforesaid changes:
1. Material Cost Increase
The type and mixture of bricks requested by the City of Gilroy are more
expensive than the ones specified in the Contract Documents. Attached is the
original quote for the bricks from Graniterock used when the project was bid.
Also attached is a price quote from Peninsula Building Materials for the bricks liS
specified by the City of Gilroy. There is a material cost increase of-$5,00000 $/6'10
(including ten percent markup) for the bricks as specified by the City of Gilroy.
2. Production Loss Costs
The submittal response requires that one (1) brick of Medium Ironspot is to be
placed randomly for every nine (9) bricks of Red Flashed. There will be
production losses due to the mixing of the bricks (a separate stock will have to be
J:. on hand and placed throughout the site). The additional cost for the production
7'2700 - loss it$3,70000. The pattern ofthe randomly placed Medium Ironspot is to be
approved through the sample panel which will be cast next week.
The total amount due for this change order request is $8,78000. .$+3/0
If the aforesaid change order request is acceptable, please sign the attached page
indicating acceptance of this change order request in its entirety and directing Golden
Bay Construction to proceed with the additional work. A timely response and/or
approval is needed as brick installation may begin as early as 05 September 2006 and
there is a lead time in procuring the bricks to the site prior to installation.
3826 depot road, hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
"
~mOOm~~~9olden ~QY
construction"
.
Inc.
__ general engineering contractors
08 September 2006
Sent Via Fax & Hand-Delivered
SEP I I Z006
GBC/CG/175
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Decorative Trash Cans & Benches Change Order Request
.Mr. Krueger:
The following change order request is for furnishing and installing new decorative trash
cans and benches at the subject project. The Contract Documents specify that the
existing trash cans and benches are to be refurbished and reinstalled. The City directed
Golden Bay Construction to furnish and install new decorative trash cans and benches
through RFI #024. The decorative trash cans and benches to be supplied were approved
with "no exceptions taken" through Submittals 041 and 042, respectively.
The Contract amounts as specified through Bid Items 150 and 152 are for the
refurbishment of the existing trash cans and benches. These bid items need to be deleted
and replaced with the following bid items to compensate fdr the new work scope:
. Decorative Trash Cans: 7EA @ $1,10500/EA = $7,73500
Purchase Price Per Each: $92500 (includes tax and delivery)
Installation Price Per Each: $12<fill
Removal of Existing & Delivery To City Per Each: $6<fill
. Benches: 7EA @ $1,40500/EA = $9,83500
Purchase Price Per Each: $1,22500 (includes tax and delivery)
Installation Price Per Each: $12000-
Removal of Existing & Delivery To City Per Each: $6<fill
The price quote for the decorative trash cans and benches is attached for reference.
If the aforesaid change order request is acceptable, please sign the attached page
indicating acceptance of this change order request in its entirety and directing Golden
Bay Construction to proceed with the additional work. The decorative trash cans and
benches have an approximate lead time .of 8 - 12 weeks from the date of order. The price
from the supplier is only valid until 30 September 2006. Please respond to this change
order request as soon as possible to ensure that the material is available for installation
prior to the comnletion of the Contract. . .
--sgZ6 depot roaa. hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
"
~"Of 6/>..
.' ~"~"'" . ....(,L'>..
( , .. .. "0' .
[ j.~, . ~~. .
f : ,...:'~",,, ,:~~:t,....L.'.
, ,..: ......"...,1.1): _.j; ,
, .'iZ'...,~..",,:--./ * :
". .......' ...
". ..
._,~."............
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO.6
To contract for: Monterey Streetscape hnprovement Project, Phase ill
Project No. CML-5034(012), City Project No. 06-CDD-119
Contractor: Golden Bay Construction, Inc. Contract Date:
2/21/2006
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work
Description of Work
This change order provides for the following:
Revise receptacles on electroliers per attached Change Order Request Letter No. 76
Revise conductors for pedestrian safety system from #12 wires to #6 wires per attached Change Order Request Letter
No. 174.
Revise electrical service cabinets per attached Letter No. 63 and Change Order Request Letter No. 202.
Reimbursement for premium portion of overtime costs for labor and additional electrical work per attached
Change Order Request Letter Nos. 129, 190,233 and 267.
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend Wlless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with
this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption,
loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby
waives any right to claim any further cost and time impacts at any time during and after completion of the Contract
associated with the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $21,361.77
Original Contract Price
Previous Change Orders
T ota! to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$4,130,554.75
$318,747.54
$4,449,302.29
$21,361. 77
$340,109.31
$4,470,664.06
P.M.
Percen\1ul:e Initial
7.72%-M
8.23% -dvi
'S\(W~~I ~
1.')I.o..3t'l\1-()\,n
'8/a
Date
II g" (J~
t1b'
Da /
I / ~ I Ok
Project Engmeer Date
This Chan~e Order does not release, waive, impair or constitute an accord and satisfaction with regard to the following: (a) issues regarding delay, disruption and time extensions.
mcludmg liqUIdated damages and extended field costs,. general conditions, overhead, etc. (b) changes, extra work, differing conditions and other matters that are not the subject of
thIS change order. mcludmg such rs as may anse m the future; and (c) matters that are the subject of the proposed "global resolution" of time-related issues currently being
negotiated and/or under c nsid tion of the parties. As to all the foregoing items and issues listed at (a) through (c) in the previous sentence, the parties reserve their rights.
defenses and remed,es
111212006
ACCEPTED BY:
06-CDD-119
Change Order No. 4
~.. .
, ~~~m~m~~h golden ~QY .
construction" Inc. EOE/AA
-- general engineering contractors
14 July 2006
GBC/CG/076
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street .
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Street Light Audio Receptacles Change Order Request
Mr. Krueger:
Per the City of Gilroy's request, the following change order request is being submitted to
cast one (1) audio receptacle per street light pole and move the receptacle from its plan
location at the top of the pole to the base of the pole adjacent the audio receptacle at the
subject project. The cost to install the receptacles, including markup is $4,71500 (see
attached correspondence from Signal Electric Construction for further detail). Please be
advised that the poles were pulled out of production when the request for the audio
receptacles was made. This is a manufacturer condition and a requirement that was out
of Signal Electric Construction's control. As a result, the procurement of the poles has
been delayed. The anticipated delivery date for the poles, if direction is received within
the next two days, is late September 2006. This date is not a guaranteed date as the
manufacturer will provide a more definite delivery date once the order is placed and the
poles are taken offhold and in production. In an effort to minimize the delay already
encountered, Signal Electric Construction has issued a purchase order for the audio
receptacles to expedite the placement of the poles back into production.
Please provide direction with respect to the aforesaid change order request as soon as
possible to avoid further project delay and complications. A time impact analysis will be
submitted once the change order request is approved and all dates are received from the
manufacturer. In the interim, Golden Bay Construction and Signal Electric Construction
fully reserve Qur rights to delay and compensation thereof.
Please feel free to 0007510) 783-2960 x229 should you have any questions.
Thank You /
./
Golden Bay ~iruction, Inc.
/'
/
ri1n Cortese
3826 depot road, hayward, california 94545
510/783-2960 . 510/783-2971 fax. license #451401
07/14/2ee6 13:49 4eS9294ge5
SIGNAL ELECTRIC
PAGE elle2
77~ - 0938
SIGNAL ELECTRIC CONSTRUCTION INC
Ph ,408 929-4900
Fax 408 929-4905
, FAX TRANSMITTAL
DATE:
7-13-06
TO: Golden bay Construction Inc.
FROM:
Frank A Garcia X-24
Am: Brian Cortese
FAX: 510-783-2961
Project:
Monterey Streetsca~ Phase III
~ignal Job No. 26111
Location: Gilroy
Brian,
Below is a price adder for adding the Audio Receptacle Box oal! on the Ornamental Pole.
The installation of the Audio, Digital & Duplex. Receptacles are still to be paid under Bid Items
126, 127 & 128 accord ally. Difference only is mo\ing from Tree Grates to Ornamental Pole.
1.
30ea. Add Box for Audio Receptacle on Pole
$120.00 ea. =
tax
Sub Total:
10% M.U.
$3600.00
$ 297.00
$3897.00
$ 389.70
Total: 54287.00
Brian I already release the PO to proceed with Audio Receptacle Box on Poles.
Attached is copy of quote from Jam. Services for adding Audio Receptacle Box.
Any questions. please call me at 408.929-4900 ext. 24.
Thanks
Frank A Garcia
....---' ,
, ~~~mmm~~ golden ~QY
construction,
.
Inc.
-general engineering contractors
08 September 2006
Sent Via Fax & Hand-Delivered
I
SEP 1 1 2006
GBC/CG/174
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Pedestrian Safety Sy~tem Wiring Change Order Request
Mr. Krueger:
As requested through City letter #58, the following change order request is for increasing
the wire feeders to the pedestrian safety system at the subject project. The cost to
perform the work per City letter #58 is $78700 (see attached information from Signal
Electric Construction for further detail).
If the aforesaid change order request is acceptable, please sign below indicating
acceptance of this change order request in its entirety and directing Golden Bay
Construction to proceed with the additional work.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Constructi
Accepted: City of Gilroy
Sign
Print Name
Date
3826 depot road, hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
8~/24/2806 87:26
4889294985
SIGt~AL ELECTRIC
PAGE 81/82
SIGNAL ELECTRIC CONSTRUCTION INC
408929-4900 X-23 FAX 929-4905
FAX TRANSMITTAL
R.F.C.
DATE 8-23-06\
FROM BRIAN GREENE X23
NO/PAGES -2-
Job # 2611 RFC # 7 Increase wire size
to Ped. Safety System
Letter # 58
TO; Golden Bay Construction
ATTN; Brian Cortese
FAX; 510 783-2971/
Dear Brian,
We are pleased to submit price to increase size feeders to pedestrian safety system
per letter # 58. We will not charge additional labor cost. Please issue change notice
for $ 714.74
# 12 THW per M (thousand)
# 6 THW per M (thousand)
$ < 233.60 >
$ 948.34
Material cost difference
$ 714.74
Sincerely,
<!titp of ~ilrop
Planning Division
Engineering Division
Building, Life & Environmental Safety Division
Housing & Community Development
COMMUNITY DEVELOPMENT DEPARTMENT
7351 Rosanna Street, Gilroy, CA 95020
(408) 846-0440 FAX: (408) 846-0429
(408) 846-0450 FAX: (408) 846-0429
(408) 846-0430 FAX: (408) 846-0429
(408) 846-0290 FAX: (408) 846-0429
August 25, 2006
Golden Bay Construction, Inc.
3826 Depot Road
Hayward, CA 94545
ATTN: Mr. Brian Cortese
Letter No. 63
RE: Monterey Streetscape Improvement Project, Phase III
Electrical Services
We are in receipt of Letter GBC/CG/116 dated August 14,2006 regarding the PG&E
electrical services at the northwest corner of the Monterey/Fourth Street intersection
and the southwest corner of the Monterey/Fifth Street intersection. PG&E will not
allow the traffic signal system to share the same meter with the street lighting,
pedestrian safety system and receptacles.
In order to address this issue, the existing service cabinets are to remain in place and
will feed the new traffic signals (metered), internally illuminated street name signs
(metered), and intersection safety lights (unmetered). The new service cabinets are
to be modified to feed only the streetlights, receptacles, and pedestrian safety
systems. The meter cabinet at the Monterey/Fourth Street intersection will also feed
the irrigation controller as noted in RFI 42. These changes are reflected in attached
revised Sheets E-01, E-02 and E-05.
The 3" conduits shown on the plans are not to be installed until PG&E provides a
PM number and drawings incorporating these changes. This information will be
provided as soon as it is received from PG&E. If you have any questions, please do
not hesitate to contact me at (408) 846-0410.
s~r"
~~1
Charles J. Krueger (jI'
Resident Engineer
cc: City Engineer
Kristi Abrams, Senior Civil Engineer
Don Dey, Transportation Engineer
Laurie Loveless, Engineering Technician/Inspector
"First In Service to the Communitv"
~
~~-
---,.
lo-wfIi01;lf4J.:U'011d
==.-= l~JW-'
II~;:..-=~a
"::lUI 'SJ88UI6UW
V/N '^
lNQN'H31'W:IS
'1IO'31Vll
... JftIrol.. 'AlII
,-
.-
AOl:tll~ .:10 A.1I:>
x
w
Cl
~
-
~ '" i<
!!! 8 "' il! ..
~ ~ ~ ; ! t
gilil~3 i ~~ ~
~; ~lillil ~ ~~ ~ ~
~ ~ ~ ~~ ~ ~~ lil !i
gJ ~ ; ~ ~ ~~ ~ z ~ ~ !l 8 i !i'
i ! I i !~ ;: i i ! i ; ! n ~ ;
~ ~ ~ ~ I~ ii; ; ~ : ; ; ; ;~ : i
~ ! I ~ g ~ ~ lil ~ ; ~ ~ ~ ~ ~~ ~ !
~ ~
lil
g~~
~~~
~~(
!i' ~~~
~ ~~~
o li ~ ~ '\i!;l
~I i ~ ~ ~ ~ ; iifi
~ ~ ~ !i' ~ - el::!~
- 0 ~ i I ~ ~ 1<i \!~ g
~ ~ ; ~ I ~ ~ i I ~ I ~ ~ I~ ~~~!;
~ ~ I I ~ 3 I ; i ~ ~ i ~ ~ ; ~ _ I ~ I ~ ~i ~!~~
~ ~
o ~
~ I~~~
~
~ 1111
~
~ ~ ~
~ ~ f ~
1VlI:l:N:l::J 1YJIlIJ.J:n:l:
C/.DlU.S lUXIS 0.1 BlIUlOl)
1:lIt08d l.NiIlIA08dIII Idr.lSJ.ilIlIJ.S .lJ8I.LNOII
10-1
"'"'
tcnlt'O-lI:o
."''''''
BeG & 0
,
I
I w
! [!]IID@]~[ID 000ffils g g i'i ~ gg" I!' ~ ill ~ ~ ~ ~.. i; .+~.il. ~
I
I
R esl ~~ ~~i I I
il; ~ U
5~i i!l~!i ~ i~!!l~;;! ~
~ g! ' ~ t'Of~
i"'::!
::i~\i_iH~;.. ~;/~~~~ ~
~~i~~"~~~ 1~;Ii:j~ ~~
~Ii~~~,,~~ n~~~1 ~:
!i3~ lli!~1;i1;i ""
~ ~EID ~
~ i@ l'lil i@)
" S ~ w
~ ~lil ~m ~lil
0 ~..J
" r;:~
w ,~ ~~ J
--' H
::> ~~
Cl
w
:r:: ~
u ~
V1 ~
w ~"'
~ gS ~
t- ~,.
X
L:;:
'" ail!
t- ~ ~ .::l~
~ ~ ~~~
--'
I: N
a
~ ~ ~~
,J, i5' ih
~* ~ ~ ~ ~~
~g ~i~ ~ ~ i~ ~ ~~~;/
~g ~~~ ~ ~~? ~ ~~ ~ w ~ ~~!6 ~~
~~ !I:!~i ~I;:~i ;!!~I !I:~i IIi!! ;i
~@ @
S5 I ..~
~~~ i ~~
~'i'! ~ ~~z
I~ ~ ~;a
1m, Ii ~i II!!, j!
~a5~!~ ~a~ la~ 9~~ a~ d
e @J
. ~~~ ~i ~ !i'
<I~ !i ~ ~ i~!i ~~; i~ ~~;;/~ ~ ~~
15 i!i ~8~ 2 "I 1;:11I fl~!;; ~"' x
1> i i II; 1j &\,," !l:~ ~~ ~sllfn ~ !i ;Sgil
5i5~ ~ Ii! ~ ;!!1O ~'i'" I!I~ l''li.ill 'i l' i,-~
~;~ ~ ~ ~ g~~ ;i; ~i ~~~iiS ~ ! ;;~
!i!<~ : ~., ~~I ~1l h ~U~~~ i g ~~i5
f2 0 iiO III l:t io ~ i1i ~ lI:l~"'"
~d ~~ ~! i~i5~ ~8! :~ ~~"i~~ ~ ;) il!l:
,. ~~I;i ~~ ~ d~~ ~~il! ~~ i ne~ ~~ ili i~
~ i:~qi ~ i ;~:~i ~~I ~I ~h~d i~ I la~
z: l\tll<~ ~ ~ ~ ~~~ ~.,~ g! ~;;! ~.~ 152 w Ii!~li
--' .vfg~ ~~ ., ~ ~~.. ~"9 il . ~i5~n~ ~~ 5 ~~ll
~ ~~il:il: I~ ~!i' i5~d i5;~ . ~!~ 1!I~~ii5l'~ la ~ ~,,~
!2!::i i' 111 ::i ~ . ~;;;8~ ~~::i~ l&!J! ~~!5 ~i:!~ ;;!~ R. !!~~
~ ;;!n~ ~ ~ ;;!~ ~rJ!l ~:;:~g s~~ ~~gil'h ~~ ;;!~ ;;!..;s
~~ ~
~H ~~~~H!;
.. ~~e; Ejlli ~~~ ~~~ ~
~ ~Ilili! !j~- ~Ililli ~n ~
~ ~!~%i ~ ~ ~!!si ~
~.~~lj
t> ....00..._91 ~ 0'1......_ .....N~_&i ~
w P .... ;:: ~ p p-;; ;:; ~
-;)... .. - .... ..... .. .., ~
~~ ~ ~ ~ ~lh
B B El G BEJEl
N ...;....n ~
ai e ,....,
~
j
...
<>8
.5.....
!~
8~
~
...
~
,.~ ,.~ !
~ ~ ~-.-: ~-.-.
~-~ ~-_ gfu~ g~fu
~~~ ~~. ~Ii!~ ~~Ii! s
~Iliil! ~Ili~ ~~~s ~~~s ~
!j~~s !j~~s un ~ -;
~~~~ ...~co~ ~....~- ......00_ :
N"~_ ......00_ S ~ ~
e t:" ~
j j j j j
llil @] [ill IEl 00
~
!~ !~ ~~ !~ !~I !~ !~
~ii ~ii ~~~s ~ii ~~i~ ~i~ ~~~
~~=~in!g~~
~::: =:;: ~ ::;: ::::: ::::: ~::!
. . ........ . . . .
~ ~ - ~ ~ ~ ~
~ ~ ~ j ~ ~ ~
@] [;] @] @] @] @] @]
~
!~I !~ !~ ~~
~iii ~~i ~~~ !~i
~~ !2i~ ~ ~~
~~~~-~ ~~~-e ~~~- ~~~-
~ ~~ ~~ ~
~ ~ ~ ~
8 ~ ~ @]
&'P.ow>nW\iO-tillaKO\:ft :j]lf)(
\1fT Aq ~:tl IIO/tvao fi.P.iO~~O\I.O-1i9KO\'1'I :nu
~
~
"""""" II ..:= AOHll9:10 A.lI'" ,...........<>>W<
':13 .,J II t'iOG~~ !:lX'tJ
~__'.NOll. - --- ...
~,~--r~,~r _H~LY!"" '_.,::.. :==:."
~'r 1 ~~!lL !! Ii!! ~ ~J~ i ~J !i!j
.'1' t" ", , /", " ~ · I, z :.":. ,!It \' "I, II,
",......:'~~~......~/// '//i'i'. .;~:..ii;..',..'.'.."" ~ II il ~ i i ;:':1 il!; I!!
'1 ' ."'@/ .. L~. ." ,"" ~. · ,. - ,-I' r
." ' ' " ,<3'" " e' , 'I' > ,I .1'
.,' :'~, / _ /1'1 ,tif'l ' e e e e;;; e'
I ,...~,.. _ _ / 10.", I - ~.~O-3 ~33HS 3
~, / 1_ -~~JL:'t':", J[l'fT T 3h~,,)"'Llfl"
.,,, I 'I~ji'"'"'fi:''' '/, "i- ,. ' /". , n -
:~ ti<<</' /zt-"i'4"'C',J ::,R: iEJ!i'""J: Ii"; i I //~:f
J ....._~_ i" J~ , '.. ,',........ !!/I..~.E<.F.~ I:..ik....
~: /' 1--....-j,,,I I'I~ ~ . "~L" .' ~
/11 ~~/ i/~~~III.ir/'..'[. ;~.' . J,'if%8K' '~'. @ ,~':It
i.'i'..il a..~....~. t /..~~i~",,'\...'...."'.;II"i,.:.....,.>,/,/;Jf--{' ... 1.0... :I...k....
"" ',/' " ,J'" ", 1\ if' 'I(
N@it..,I...,/...ni.I"',II....fl....".i.,.. III I. ilL.. ~
-. . . / +.. . ., . , .. ..
.: . : I >/Jlili'. ..~ wi->
. J . : .,/ 1/ .' . Ii ,.T I i..c.'..i 1111....i~.: - " ~ -~ ~ lID
. il ...... / .1 ". i II.i.'~/.'. ", [ ii'
'J~~ /, f'1,1Irl'.''-1 J~ !llrl~ !t5 ~~ ~
iir~0 n ',,,:' !laN' ,," I
iji\~V :ib '" i -9' -.. g' B ~
I I, @j,~, lr~~' 1"j";.'i'....~..;.,.I.. .:.., ~=-~=~ r
, ifi II.i...\,.>>~I.... :::?l L:+__-E II
~ .. "~.t. I" "t
I .~l....i I::i..,.x... : ~ ~i.ilr~..,.....'..&
~ ilH,i! I 'f' ~:1 1!:'
~./.....1rrll;:.::~.-J ,:. J ""',
, \,i 't' I !"1 "I:. "'iF' " ~. ik
I :~th--,I.~. '~":l...~~ Ill! -L,;boL'~B~/~Ji~LvW--
J.. j ij;p II
[ffi--i , .. ! I ,c; ~:
~ _1_ ,..,_:"" _ -I II .1\'_') I~
I I ~'/ - -ll~'"
I .1 ." 11'1
!~~@ -t t
I : 1i.t...,a I ~
II ..."
I~ 1l..i.~.:,,;1
II 1.,;_..:::.:.......
L_I_~___.(~J','it T - ~ --'::1-=~ i
L 'y I'll '.:',.' ,I,' '! d '" I ,
~1 '~ltj .~.,. II~~ "~~,~P
1: Ifill ~t~ ,I ~~.&l Ml
iLc,.;@".l.jl. ~..'.i.. i ". ~5..~~~~!!
t, !,1 @~ >~
...
o
-
V/H '^
,(II:-.I;Il~S
il80:11'f'CI
~~
~j
g
:;::I
~~
~~
_ I
:::l;
W
l-
V)
>-
V)
>-
I-
W
....
-c(
V)
:z
~'i'
c::b
I-N
V) "
w'-
~~
lI"nno~;;"t;~~~~g::=g~:: ;:
"l-gr.. lj](JllOB
0/:"" nt~.IP'=~~~~g::=g~:: :=
6l1p"ode! -UDN-)( CYO'!'\ ~o V9
00' ~q to,,"l 9O/1>Vao~':;3~~;1l9=~~ ::
-8tlKO\'1'I :TlL:l
Aa~3:!
-------.,.
'UJftIrollllW",GI
,.........
..........
''''''''''
Y/M '/I
lNOH,,,:J'W:)S
~ lID 'll'fO
~
!!~~25~ ~ ~
~~i!i~ !! ~g
%'~ ;; ~
~ ~.! ~ ~
AOUll9 .:10 A.LI:>
~o-tt8Q) "QH .L3'Olld
=::::f:JWJ
~I=~~-=~_&
'OUt 'SJ88UtfiUW
!lO-1
"'"'
WIim)-IE'O
"OH90r
~ ~ ~ ~ ~ ~ ~ ~
Z ~~ Z ~~ Z ~~ ~ ~~ ~ ~~ z ~~ ~ ~~ ~ ~~
VJr:-:-:-:IVJ~VJ~~r;--:-:--:-lVJ~r-:----:Ir-:----:I
~ '" ~.:
~;; . '5 ~.. !;~~
fi ~. ~ -"'5
~~~ ~p I'-~ ~"'ib
~I'l" ?~)i ?!1~ I'l!~
~~~ a~~ a~~ h~
)~:s W!~ w3 ",illo
"l<~ 0 ~ 010 "
~ :~S ~ ~ ~~~ ~~~
~
e-J ~ ~
~ ~ ~ 3~~
~i:~ In
t ~ 10 e~.-!l'
:'0
~ "
~~I~. it ~i~
oo~ ~p ~~ ~\i!~
I;" ?~ii ?11~ ~!~
~~~ B5~ a~~ b~
~~:S . ~ ~!i !,iillo
~ :~i n~ I!~ ~~~
~
w w
~ ~
~ II
~g~~m x [;] II ~ '"
~ "':;:
I Vi b:l::I e~ ~15 u ~ ~~
" I'~&l~~ ~u ~D~ :HI~
0 ~;5~! ~~ ~~
" 1i::1i" ~ ~lL
~ ~ . w w 0
8~a;zfiL~4: ~~ U"Z ~ folttl
I ~~~g~1F ~lj8 "'~
~ ~~~~~:.i
~ ';::: ~
~
:z
0:::
~p
ill
w"
~d
5~
(f)~
r;;ill~~
~
eL~ s ~
~ :il 3~~
~~~~ l!l~
i~! 10 ~~~
,.... nil
1'0
~ "
~
did!! ~ ~ ~ ~ ~
~ =~i~ ~ ~ ~~ ~~ ~~ ~~
~~ ~~ ~ ill ~..-=-:--:-,~~~~~~
!
"
w
'"
~
~
~
"'~
~!ie~~
~~a~!Ii
~~;~:~ ~
is;!iCi:'~3iN c;)
-'
<
I-
w
Cl
~ ~
~ ~~ Ii ~~
~~
~"
~
~
I ~
NOI1.Oi
'" I
::::lE
<(
0:::
~
::f
Cl
~
:z
0::
~~
~~
::;;i!i
~i
&
:p
~8
]~
~
"'" I
"
z
'"
w
:z 0:::
0 i =>
;:::: (f)
<( 0
-' -'
-' U
<( :z
I- w
(f)
~ w
U
w ::;;
-' 0:::
U w
<( (f)
l-
e.. '-'-
w <(
U I
w
0:::
w w
w e..
g:1i .1 ~~
- I il'~
~&i
r..p.'""".W\~-lIi~O\:" '.:D~
"'"I',(q 11\:1>1 iO/tl/llO r..P-"03~O\~O-1I9KO\'" '311.:1
~ golden bay
construction, inc. EOE/AA
general engineering, contractors
--
21 September 2006
Sent Via Fax & Hand-Delivered
SEP 2 1 2006
GBC/CG/202
City of Gilroy
Engineering Division ,
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
City Letter #063 Change Order Request
Mr. Krueger:
The following change order request is for performing the additional work as stated
through City letter #63 regarding the subject project. The total cost to perform the work
per the attachment from Signal Electric Construction (project electrical subcontractor) is
$33000.
If the aforesaid change order request is acceptable, please sign below indicating
acceptance of this change order request in its entirety and directing Golden Bay
Construction to proceed with the additional work.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construct'
ri Cortese
Proj ct Manager
Accepted: City of Gilroy
Sign
Print Name
Date
3826 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax license#451401
09/20/2005 08:59 408~294905
S I Gt~AL ELECTR I C
PAGE 01/01
SIGNAL ELECTRIC CONSTRUCTION INC
408929-4900 X-23 FAX 929-4905
FAX TRANSMITTAL
R.F.C.
DATE 9-20-06 \
FROM BRIAN GREENE X23
NO/PAGES -1-
Job # 2611 RFC # 9 Service changes
Gilroy letter # 63
TO; Golden Bay ConstructIon
ATTN; Brian Cortese
FAX; 510 783-2971/
Dear Brian,
We are pleased to submit price to make changes to service cabinets as noted in letter
# 63.
", I ,~
. ',:;'~,;s
$ 300.00
ExcludLS; Any modification to eitJz,e1;.service other than labeling
Sincerely,
Brian Greene
~[l]JIDl~ golden ~y
construction,
.
Inc.
- general engineering contractors
16 August 2006
GBC/CG/129
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetsc~pe Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Signal Electric Extra Work Change Order Request
Mr. Krueger:
The following change order request is for Signal Electric Construction performing
various extra work items per the direction of the City of Gilroy at the subject project. The
work was performed on a force account basis as directed on 30 June 2006, 12 July 2006
and 26 July 2006. The total amount due for this work is $4,0IoJ.Q (see attached Force
Account Summary Sheets 030 thru 032 for further detail).
Please process a change order in the amount of$4,0IoJ.Q to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Con
Cortese
Proj ct Manager
3826 depot road, hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
10 ...
~ ....
Q)
X N
M
.. CIO
U ....
'E 6'
...
i. ~
III ><
or: J!
'D 0
III to
e Q)
N
0 M
Q. CIO
tD ....
'D 6'
to ...
N ~
CIO
CO') .
C
0
or:
Q.
(J
C
~
c
.2 f
...0
(J-
::s g
~b
"'c
fI) 0
C to)
ocn
(J ,5
...
~CD
tU !
.c 'a,
c ;
(1)-
"Cf!
_ CD
o c
0)&
~
<C
:IE
:IE
;:)
en
I-
Z
;:)
o
o
o
<C
w
o
D::
o
LL.
";
co co
0
1'/ 0 0
co 0 N
0 N ';j
0 N Q)
(") ::J
0 Q) c: CI
N ::J ::J
N ..., <
0
(") 'V
~
0:: 0:: 0 W
W W W ~
m m :E
:E :E 0::
::l ::l 0 Ii:
Z Z u..
Ii: m 0:: 0
0 W a..
0 ..., a.. W
i a.. 0 W 0::
W m !(
0:: e"
ii 0
','
z
9
i
:.
e
0
u..
a
..~
8:
a::
Q.;
I':
,.,.
(")
Q)
I/)
ClI
J::
a..
~
c:
Q)
E
Q)
>
2
c..
.E c:
0
Q) u
c.. .... 2
~
I> I/) I~ ';j
Q) Q) c:
::J 0
1< Q) ~ 0
.... >>
- ,g >>
ii en ~ ClI
>> <5 ~ m
I, l!! '5 J:: c:
.!l 0 Q)
; c: ~ '0
; 0 ~ '0
:E (3 e"
." W >- >-
:E m m
< 0 0
Z W W
l- N :E
0 0:: 0:: 0::
W W 0 0
..., Z J: u..
0 3: I- 0::
0:: ::l W
a.. 0 < a..
CI
c:
:;::;
::J
2
I
l!!
<Ii
~
o
,c
co
(")
I
Z
-
J::
g
'1i)
l!!
';j
o
~
CI
c:
'S;
o
E
l!!
~
~
,c
.2-
Q)
.s
-
o
'0
c:
Q)
J::
t:
o
c:
~~
.s~
tS ~
::J,C
'0'0
'0 c:
ClI ClI
g.~
Q),C
J:: 0
;'C
c: .-
~3
Q)'O
x g
Q) 0
~~
'0
.!l c:
.~ ~
o ....
= !
ClI'O
I/) c:
';j ClI
8 ~
~ 0
Qj'c
tiii
E g.
"g.s
ClI I/)
Gi~
~.g
o c:
c..o
c: 0
~~
c:'1i)
g ~
=0"0
'0
<(N
::i.:::
0::
o
3:
u..
o
Z
o
j::
a..
0::
(,)
en
W
o
Z
"', 0 1 I I , I I I I I I I I I I I I I I I I
. en
Z
'~
.w~~~~~~~~~~~~~~~~~~~~
.C; W
~
~~
eno
0::0::
00
mm
:5:5
1-1-
0(,)
Ww
I- I- I- I- I- I- I- I- I- I- I- I- I- !!;;o !!;;
oenoenoenoenoenoeno 0
~~
~<(
01-
I-~
en
0::
::l
~I-I-I-I-I-
.....enoenoen
r~l
Ii:
~
(,)
::1
: .'
:
. Z
::,f-::~::. ~ I I I I I I I I I I I I I
Z
W
'I-
l~~~~~~~~~~~~~~
~~~ ~
'#ffl.cfl. .:J
000 ~
000 0
MNu) I-
~ ~ N 0::
@)@@ 0
m
I-I-a.. :5
enO::l
wwlil::
e"e,,0::
0::0::<(
<(<(:E
J:J:O::
(,)(,)0
O::o::m
::l::l:5
en en
0::0::
00
mm
:5:5
Z Z Z
010 101 I I I
en en en
Z Z Z
W W W
I- I- l-
X X X
.',.' W ~ W ~ W ~ ~ ~ ~
.'..... R' ~ R'
w w w
m m m
:E :E :E
::l ::l ::l
Z Z Z
W W w
/g g g
000
> > >
Z Z Z
..J
oC(
a:
w
t-
oC(
:IE
w w w
:EZ:EZ:EZ
<(0<(0<(0
Zj::Zj::Zj::
0::Q:0::Q:0::Q:
00::00::00::
0(,)0(,)0(,)
zenzenzen
wwwwww
>0>0>0
.:J;;R.:J
~:h~
o~o
I-@t-
ma..~
::l::l<(
en . 0::
~lil::w
<(0::1-
0::<<(
w:E:E
!(
:E
...
Q)
. . I cD
N
....
N
----
.:.i.:.i.:.i.:.i
" , oC( oC( oC( oC(
t-t-t-t-
0000
t-t-t-t-
o::t-~~
OZoC(o::
mWa:o
>jl~;:
II:: -oC(t-
oC( ::l""en
:IE aC::::i
Ii w :!;
::J (,)
en W
I- a..
a:: ~
f 0
W t-
a:: 0
~
t-
Z
o
o
m
::l
en
I
Z~Z Z ~
o '0 . 0 . cO
,. en ~ en en Ol
'. Z ~~ Z Z :3-
WNW W ..
I- I- l-
X X X
W~w~w~~
~ R' ~ .:J
~'O~ ~ ~
:EQ):E :E 0
::l'fi::l ::l I-
Z~Z Z m
w<(w w ~
(,)Q)O 0
~5~5 5 i2
0:> > > 0
o~ ~ ~ 3:
:~ l-
t- en
en ::i
::::i <(
oC( <3
(;) w
W a..
Go en
- u;
fiu 0::
OE 0
t;g t;
~u ~
1-2 I-
z- Z
o~ 0
00 (,)
IDO~ m
::J .2 0 ::l
-'53: en
Q)
iii
m
o
"~ ~
ClQ)
U5iii
w w w
:EZ:EZ:EZ
<(0<(0<(0
Zj::Zj::Zj::
0::Q:0::Q:0::Q:
00::00::00::
0(,)0(,)0(,)
zenzenzen
WWWWWW
>0>0>0
-
~
en
.
GO
N
.....
~
N
~
...J
<C
I-
o
l-
e
z
~
C)
I-
~
o
Q.
W
~
10 ~
mOl
mcO
N N
..... ....
N
~~
~.:J
:h~
@O
a..t-
::l~
~o::
0::0
<(~
:EI-
en
::i
<(
<3
w
a..
en
U;
0::
o
I-
(,)
~
I-
Z
o
(,)
m
::l
en
II) ....
~ .....
0)
: N
I
CO)
II CD
U .....
i s
....
i !2.
ftl i<
.c J!
'tI Q
e CO
0)
N
'0 I
CO)
Q. CD
Gl .....
'tI S
CO ....
N !2.
CD
CO) .
C
0
.c
Q.
u
c
-
c
.2 f
...0
u-
::s ~
.. ..
...-
fn S
C (J
Oel
U ,5
..
>-~
<U ~
.c 'c>>
c i
(1)-
"Of
- ~
o r:
0)&
~
c(
:is
:is
::)
tn
~
Z
::)
o
o
o
c(
w
o
a::
o
LL
!<
..... co
coO
co 00
ON
0 N-;;
\ C;; N ~I~
0 en
N ...., ::J
N N<
.......,.
.....
0:: 0:: OW
W W WI-
m m ~~
~ ~
::l ::l 0 Ii:
<) Z Z I.L.
<'ii Ii: m 0:: 0
0 W ll.
;[;' ~ ...., ll. W
0 W 0::
w m I-
0:: 0 <
..< 0
i..
,
}I.
Ii
I,
....
Ii;!
I.
('t)
CD
....... lQ
.r=
ll.
f/l
'E
CD
i..'. E
~
e
0-
.E <::
0
CD 'fi
0- S
B ~
J!l f/l
CD c:
CD 2 0
CD 0
..;.. ~ >- ~
(/) ,g ,!!,! >-
III
>- (] 1ii m
l!? - .r= c:
; ~ 0 0 CD
~ "C
0 ...: <5
~ U ~ 0
W >- >-
~ m m
< 0 0
Z W W
l- N ~
0 0:: 0: 0::
w W 0 0
...., Z :c I.L.
0 s: I- 0::
0:: ::l W
ll. 0 < ll.
iii
'0
::J
"C
"C
III
::J
0"
CD
=:
...
.E
.r=
o
<::
~
CD
=:
-
o
>-
ftl
~
CIl
=:
.5
CD
~
f/l
III
Cl
"C
'0
CD
=:
'0
t;j
>
o
E
l!?
Gl
=:
.s
.~
"C
CD
'tii
'u
o
f/l
f/l
ftl
f/l
-;;
o
o
~
o
0-
<::
ftl
E
t;j
<::
g
'i5
"C
<
r---
H' Z C') C")
, . , . . , . , , . . I ....
) Q I . . . I , , . . , . , . , I iii
CD 0r-
(/) ..,. ati
Z I>
w CO
E ... lIIl:t
EI) EI) EI) EI) EI) EI) EI) EI) EI) EI) EI) EI) EI) EI) EI) EI) EI) EI) EI) EI) EI) EI) EI) EI) i. ****
~~ ~';je.(f!. ..:..i .:.i.:.i.:.i.:.i
;~: w (/)0 ~ .... ~~~~
I- 000
~ 0::0:: 000 0 0000
00 <"'iNtO I- 1-1-1-1- ~
mm .......... N
55 0:: O::I--I~
...... (/) @@@ 0 ozcco:: . .
1-1- m mWa:o ..J
0:: 00 I-I-ll. 5 ~ j~w;= <(
;> ::l Ww (/)O::l 0.1-
0::0:: Ww~ -<l-
........0 frl- 1-1- liib 1-1- 1-1- 1-1- 1-1- 1-1- 1-1- cc ::l~U) I-
55 000:: a -
) :c (/)0 (/)0 (/)0 (/)0 (/)0 (/)0 (/)0 (/)0 O::O::~ :Ii W -I 0
...... -1-1 :Ii ~
~< << I-
0 :C:co:: ::l 0
! 01- 000 U) W
I-~ O::O::m ~ 0. 0
::l::l5 ~ Z
Ii: (/)(/) 0
0::0:: 0. 0 ~
~ 00 W I-
0:: 0
0 mm ~
55 l- e>
z I-
0
,. . 0 0::
m
. ::l 0
U) 0...
I
w \ W
i~ 0::
<
[(; Z
1<; ,i
....
l.Y.. z Z z Z Z ('t) Z Z ('t) o ('t)
0 0 ..... .....
Iii ~ . , . . . , . . , , . . . 0 . 0 . 0 . . . . 0 N 0 . 0 . N <"'itO
< en en en en co en en co N ClO
."z Z Z Z Z ..,. Z Z ..,. ..,.
.; w W w w w w w
~ ....... l- I- l- I- l- I-
X X X X X X
,w ~EI)EI)EI)EI)EI)EI)EI)EI)EI) EI)~EI) w EI) w EI) w EI) ~ EI) EI) ,w EI) w EI) w EI) EI) EI) EI)
.. >a: << "i:' ;[2' fa: <<
..:..i~..:..i ..:..i~..:..i ..:..i ~..:..i
.. W ~~~ W W W ~~~ W W W ~ ~~
~ m m m m "C m m
0.....0 ~ ~ ~ 0.....0 ~ Gl ~ ~ 0 @O
.r=
I-@I- ::l ::l ::l I-@I- ::l u ::l ::l I- ll.1-
mll.1- Z Z Z mll.-I Z III Z Z m
::l::lZ ::l::l< :: ::l ::l~
...., W . W W W < W W (/) ,0::
0 (/) . W 0 0 0 (/) I a: 0 0 0 ~o
I-~~ Gl
< 5 5 g ...I~w g CD g 5 ~ ~s:
zO::ll. <0::1- ~ U) 0::
I- w<- > > ffi~~ 0:: > 0 ~I-
0 ~~::l ~ ~ ~ ~ ~ z ~ s: (/)
ll. a ~ ::i
- W I- <
::l
I- 0 ~ l- (/) U
0 w U) ::i w
:i < ll.
c( U (/)
I- -I U W W
z c( W ll. 0::
WI- a: G. ~ 0
:E(/) W ~ (/) I-
0. 0 0:: 0
5 !;( e E 0 ~
gw :Ii c I-
0 0 U I-
0 ~ 'fi ~ z
0 0
u 2 I- U
Z -;; z m
0 <:: 0 ::l
W 0 0 u (/)
~ III 0...: m
~ ::l o ... ::l
U) "t: 0 (/)
uS:
(/) .!!!t;j
W 0
(/) 1ii "t:
5 <::'0
ClCD
0 u.;ili
z W W W W W W
0 ~z ~z ~z ~z ~z ~z
i= <0 <0 <0 <0 <0 <0
ll. zi= zi= zi= zi= zi= zi=
0: 0::Q: 0::Q: 0::Q: 0::Q: 0::Q: 0::Q:
0 00:: 00:: 00:: 00:: 00:: 00::
(/) 00 00 ou 00 00 00
w
0 z(/) z(/) z(/) z(/) z(/) z(/)
ww ww ww ww ww ww
>0 >0 > 0 >0 >0 >0
::il::
0::
o
s:
I.L.
o
Z
o
i=
ll.
0:
u
(/)
w
o
10 or
~ l;;
... N
G) M
lIII CD
U ,...
-Co
[E
lIII >><
.c J!!
-
'0 0
e !
'0 cJ,
Q,CD
Gl ,...
'0 0
10 or
g ~
CO') iD
c
o
.c
Q,
CJ
C
-
c
.2 f
..0
CJ1)
~ l!
"'"-
..c
tn 0
C (,)
Oel
CJ .E
...
~Q)
('G :g
.c '0,
c ;
Q)-
-cl!
- Q)
o c
e>>&
co
COO
co8~
('\I9N1i)
C')Sl-j
ONj
N~~
N"<t
.....
~
c(
:liE
:liE
::;)
en
...
z
::;)
o
o
o
c(
w
o
a:::
o
LL
C')
Q)
w
co
.c
a..
w
C
Q)
E
Q)
>
e
a.
,g
c
o
G) 13
a. .... j
m CD.t:;
:i1 C) w
Gi ~ g
~ ~~ u
(I) ,g .!!! i;'
~C3~m
....'I-,s=.c
Q)OuQ)
"E~ :2
o:!::: ...; 0
::i:u:E"
w >->-
::i: 10m
e( 00
Z Ww
I- !:::!:E
Uo::O::O::
Wwoo
""z:I:U-
0s:1-0::
g:o~~
C)
~
-0
e
'0
c
co
C)
~
ii:
.><:
(.)
co
.0
C
.2
tij
'0
c
j
.E
(.)
IE
Jg
Q)
oS
-
o
>-
co
~
Q)
oS
.!:
Gi
e
Ci5
.c
iO
tij
Q)
~
w
co
C)
(0
co
C)
c
'>
o
E
l!!
.c
~
~
'0
!l
co
'0
o
w
w
co
.l!3
w
8
Iii
".,
!l
co
E
'0
C
co
I
a.
c c::
co .2
Etij
Iii '0
c c
~.e
=0 Q)
~oS
.....--
, Z N N
i 1< or
0 I I I . . . . . I I I . I . . . . I . . . . I . . . a:)
en < G) ~
,... .
'ffi CD
~ CJ')
.....
l' w - .,. - .,.
~~ .,. ~ ~~ ~ .,. ~~ ~ .,. ~~ ~~ ~ .,. .,. ~ ~~~ .,.
ee; ~~ "*'#. :S!. .:..i .:i.:i.:i.:i
'~2 w (1)0 0 ~ <(<(<(<(
~ 0::0:: 00 0 c 1-1-1-1-
00 0 0 0000
~,~ 00 MN ori I- 1-1-1-1- ~
10m ..... ..... N
:5:5 0:: O::I-..J:lI::
@@@ 0 Oz<(o:: . .
(I) 1-1- 10 mW~o ..J
'. 0:: Uu 1-1-0.. :5 j:Ew;:
ii :> Ww (l)0::J ~ 9:~1- <C
0 1-'-1- 1-1- 1-1- liit5 1-1- 1-1- 1-1- 1-1- 1-1- 0::0:: ww::':: i 5:E~ I-
.d :I: eno (1)0 (1)0 (1)0 (1)0 (1)0 (1)0 eno ee ",,0::
0::0::<( W ..J 0
....1....1 <(e(:E :IE :!
I ~e( :I::I:O:: ;:) 0 I-
01- uuO (/) W
I-~ 0::0::10 ~ a.. C
- ::J::J:5 ~ Z
I- (1)(1) 2
u- 0::0:: 0 ~
~ 00 W I-
c' 0:: 0
U 10m ~
:5:5 C)
. I-
Z I-
, 0
0 0::
m
..... :> 0
en 0..
\
W \ W
k ::i: 0:::
<(
teL' Z i..
i.
I
Z Z Z Z z N Z Z ..... 0; N
N .....
F< 0 . I I . I . I . . . . . I f> Q . 0 . 0 . . . . I, 0 cx:i 0 . 0 I cx:i ,...: cO
en (I) en en en 10 en en 10 C') (1)
Z Z Z Z Z ,... Z Z ,... r--
F. w w w w w w W
l- I- E l- I- ~ ~
) ~ ~ X ~
ffl"'~"''''~~'''~~ ~~~ ~ ~ w ~ ~~~ ~ w ~ w ~ ~ ~~
t .:..i~.:..i 1i: ~ 1i: .:J~.:..i <~ ~ ~ .:..i ~.:J
w ~~~ / W W W ~~~ cW W W ~ ~~
~ m m m 10 '0 m m
0.....0 ::i: :E :E 0.....0 ::i: Q) ::i: :E 0 @o
.... .c
I- @) I- :> ::J :> I-@I- :> (.) :> :> I- n.1-
100..1- .. Z Z Z mo......I Z 1lI Z Z m
::J::Jz ::J:>e( ~ :> :>::.::
..., w w w w w w (I) :.::0::
0 (I) I W U U U (I) I ~ U Q) U U 0::0
e( I-::'::::i: 0 g g ...J::'::w g Q) 0 g ::.:: ~~
zO::o.. e(0::1- ~ (I) 0::
I- we(- > ~e(~ 0:: > 0
0 :E:E:> Z Z Z w::i: ~ ~ ~ ~ s: (I)
a.. 0 !;{ ::;
::J W l- e(
I- 0 ::i: I- (I) U
(/) ::;
0 w ::i e( w
a..
oi( U (I)
I- ..J 0 W (j)
Z <( w a.. 0::
w I- ~ Q.. (I) 0
:IE en ~ (j) I-
Q.. W 0 0:: U
5 ~ 0 -= 0 ~
(3 :IE ~ C I-
W W U I-
0 0 ~ Z
0 'is 0
U I- 2 I- U
z 1ii Z 10
8 c 0 ::J
W 0 U (I)
::.:: m u .><: 10
i.. e( :> (.) 0 :>
::i: fI) :u s: (I)
Q)
(I) W Iii
(.)
(I) 1ii 'C
:5 co
C)Q)
u ii5w
Z w w w w w w
0 :J:Z ::i:Z :EZ ::i:Z :EZ :EZ
F e(0 e(0 e(o e(0 e(o e(o
a.. ZF zF zF ZF zF zF
~ 0::9: 0::9: 0::9: 0::9: 0::9: 0::9:
u 00:: 00:: 0 0:: 00:: 00:: 00::
(I) OU ou ou ou ou ou
w
0 zen Z(I) Z(I) Z(I) Z(I) Z(I)
~~ ww ww ww ww ww
>0 >0 >0 >0 >0
:ii
0::
o
s:
u-
o
Z
o
F
a..
~
u
(I)
w
o
~m~~h golden ~QY .
construction, Inc.
-- ~eneral engineering contractors
RECEIVED
14 September 2006
SEP I 5 2006
ENGINEERING
GBC/CG/190
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Signal Electric Extra ~ork Change Order Request
\
Mr. Krueger:
The following change order request is for Signal Electric Construction performing
various extra work items at the subject project. The work was performed on a force
account basis as directed by the City of Gilro,7s on 9 August 2006 and 15 August 2006.
The total amount due for this work is $1,581~ (see attached Force Account Summary
Sheets 052 and 053 for further detail).
Please process a change order in the amount of $1 ,58145 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construct" , Inc.
ri Cortese
Pr ect Manager
3826 depot road, hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
10 ....
! ~
Q) .;
CD CXl
U ,...
-aC
li :0
t7.'
CD )(
r. J!
'0 <:)
CD cD
2 ~
.. .;
o CXl
~,...
'0 S
lD ....
~ ~
C") Gi
c
o
r.
Q.
(J
C
-
c
.2 f
~o
(J-
::s g
... ...
~-
U) g
c u
ot>>
(J ,E
...
~CI)
ca ~
,Q '6>
r:: ;
CD C'll
"tS ...
_ CI)
o c
C)~
,
U)
U)O
00
oN
U)N~
N9i;).c
8~2.~
N::;~
N<(~
en(/)
010
o
-<
;
,
C!' 0:: 0:: 0 ~
WWW...
mm:E....
..... . :E :E 0:: 0
....:::l:::l 0....
... Z Z u. 0::
'he .... a:l 0:: 0
-<20:: Own.
;-'O-,n.w
a. OW 0::
... w m ~
O::Clo
~
c(
:liE
:liE
::)
rn
I-
Z
::)
o
o
o
c(
w
o
0:::
o
LL.
z
~
C(
I
~
l:
~
~
~
C')
CD
.."
ell
.s::;
a.
jIJ
c
CD
E
CD
>
e
Q.
.E g
!!! 'fi
~ .... ~
f3 !e. -=
.!l ~~
CD ~ 0
~~~()
(/)eCD>-
~G~&l
~oo.s::;~
C.,.. :!2
O~' .... 0
:Eo:ECl
w >->-
:2 a:lm
<( 00
Z Ww
.... !::!:2
00::0::0::
wwOO
O~j!:~
o::>::>w
a.0<(a.
ui
G)
l!!
en
.s::;
;;
"C
C
ell
.s::;
iO
a;
.."
8
.~
CD
.."
~
'>
l!!
.s
o
u
CD
Q.
II)
.E
~
o
"C
C
ell
W
all
Cl
a.
0>
.E
Gl
CD
E
:;
.~
"C
.!!
ell
'0
o
.."
.."
ell
II)
Ui
o
u
~
(jj
a;
E
"C
C
ell
(jj
~
o
c.
C
ell
E
Iii
c
,g
:0
"C
<(
-
'Z .... ~
. . . . . . . . ....
0 " . . . . . . . . I . . I . I I . . . M
en .... or-
.... .
/ ffi CO?
~
S or-
~~ ~~ ~~ W~ ww ~w ~w U) w w U) ww w U) w U) 4It 4It <II- 4It
iw ~~ 'fft"#.ef!. .:.i .:.i.:.i.:.i.:.i
(/)0 g c(c(c(<(
'.... 0::0:: 000 ....1-1-1-
000
~ 00 C->N.o 0000 ~
mm ........ N .... ....1-1-....
:5:5 0:: 0::1-...1:'::
,. @@@ 0 oZc(O:: . .
'(/) ........ m a:lwito ..J
0:: 00 ........a. :5 ~:Ew~
:::l ww (/)0::> ~ ~!;;(I- <(
0 ........ It>5 ........ It>5 It>5 It>5 It>5 It>5 ........ 0::0:: ww~ c( 5:IE~ t-
X (/)0 (/)0 (/)0 00 ClClO:: :IE w ...I 0
-= ...1...1 O::O::~ :E :$
g~ <(<( t-
O' J:xO:: ::I 0
10 000 Cf) w
:i ....~ O::O::m ~ a. 0
~~:5 (/) Z
Ii: 0 ~
0::0:: a. 0 ~
~ 00 W I-
0:: 0
0 mm ~
:5:5 l- e>
z t-
O
0 0::
a:l
::I 0
(/) D..
.. W
w
:E \. 0::
<(
z
......
..
Z Z Z Z Z NZ Z N N....
~o C') CD ....
0 I . . . I , . . . . . I . 0 I 0 . 0 . . I . 0 . 0 . <0 <OC->
, Ci.i Ci.i Ci.i Ci.i Ci.i U) _ en
C')(/) C') ....
Z Z Z Z Z ....z Z .... ....
w w w w w w w
E S S .... E ~ ....
~ X
~wWU)ww~WihU) ih~~ ~ ih fI') ~ihih ih W W W ~ W W U)
.:J~.:..i . " " " ..:.i~.:.i " ~ " .:.i ~.:J
< w ~~~ w w w ~~~ w w w ~ ~~
~ a:l m m a:l "ia:l m
0....0 :E :E :E 0....0 :E .s::;:E :E 0 @O
....@.... :::l ::> :::l ....@.... :::l o:::l :::l .... a.....
ma..... Z Z Z ma....1 Z ~z Z m ::>:ll::
::>:::lZ w w w :::l::><( w <(W w ::> .0::
.., (/)
0 (/) . W 0 0 0 (/) . it 0 CDO 0 :ll::o
<( ....:ll:::E 0 g 0 ...I:ll::w g ~g g ~ ~~
zO::a. ~o::.... .~ 0::
5 w<(- > ~ ffi~~ a: 0 :2....
:E::Z:::l ~ ~ ~ ~ ~ ~ ~ (/)
a. 0 ~ ::::i
- W I- <(
::>
.... 0 ::z .... (/) u
0 w Cf) ::::i w
:i <( a.
.... C( u (/)
...I fd w (;j
z C( 0- 0::
w.... it a. (/) 0
::E(/) ~ (;j ....
0.. W 0 0:: 0
:5 .!;;( ~ .E 0 ~
gw :E c ....
.~ 0 0 ....
0 'fi ~ Z
0 0
0 l- S .... 0
Z III Z m
0 c 0 :::l
W 0 0 0 (/)
:ll:: ID ~i: m
~ ::I ::>
Cf) 'C 0 (/)
u~
CD-
(/) ill f3
(/) mE
:5 c 0
0 0> CD
i:i.iill
Z w w w w w w
0
i= ::zz ::zz ::zz ::zz ::zz :Ez
<(0 <(0 <(0 <(0 <(0 <(0
a. zi= zi= zi= zi= zi= zi=
~ 0::Q: 0::Q: 0::Q: 0::Q: 0::Q: 0::Q:
0 00:: 00:: 00:: 00:: 00:: 00::
(/)
w 00 00 00 00 00 00
0 Z(/) Z(/) Z(/) Z(/) Z(/) Z(/)
ww ww ww wW ww ww
>0 >0 >0 >0 >0 >0
~
0::
o
~
u.
o
z
o
i=
a.
~
o
(/)
w
o
10 ,....
~:a
: :;
3 ~
-eo
. :0
}j
- -
"0 0
! =
... C\Il
15 .:a
t~
"00
co ....
C\Il 10
GO -
f') ..
!
o
.,c
Q.
u
c
-
C
o I!
..0
u-
~ :i
...b
....c
en 0
c ~
00)
u.5
..
~CD
as !
.co.
c ;;
0)-
"Cf
_ CD
o c
C)~
~
<C
:e
:e
::>>
en
I-
z
::>>
o
(.)
(.)
<C
w
(.)
a::
o
lI.
~ 8
0
N
....
8. N .
CO) .. .D
II) N i~ E
0 ca !
N ::2
......... N <(
II) I
,.... II)
\ . 0
<< << 51 III
III III t-
..... III III ~ ~
2 2
..... :;) :;) 0 It
.......... ~ Z IL
It ~ << fl
III
". 0 .., ~ III
~ 0 ~ <<
~ ID
C) 0
,2;.
iC
I
o.
II;;
.~.
t-
O
!
Ii!
a.
C')
CD
II)
III
s:.
0.
J!!
C
~
~
IS
E C
Ij 0
13
8 s
II) II)
1) CD C
2 0
e ~ ~ 0
ti) .!! i;
~ =
(!j 't: ID
III C
.!l '0 s:. "
C I~ 0 "0
~ ~ '0
0
W >- >-
:::IE III ID
<( 00
Z UJUJ
t ~:!
0: a: a:
UJ UJ 00
.., Z :I:IL
0 ~ I-a:
a: ::lW
a.. <(a..
ci
...J
Cl
C
=8
.
~
-
"
e
ti)
s:.
US
o
:e
o
::s
'0
'0
III
::s
cr
iii
C
o
:e
'0
i
I
.E
.s
Z
0" ., . . . . . . . . . . . I . . . . . .
ii)
ffi
t-
~--------------------
t=-=t=-=
III 00
~ a:<<
<< 00
11I11I
:55
o t-t-
~ ~~
g~t-I-I-I-t-t-t-Ol-t-Ol-I-Ot-I-Ot-t-Ot-t-O~O~O
.......,00000000000
;J....J
b5
1-1-
~
o
I \
;
Cl
C
>
o
E
!!
s:.
J
'j
III
U
o
II)
II)
18
II)
'Iii
8
Z
o . . . . . I . . . . I . .
(i)
Z
UJ
I-
~-------------
UJ
1-.
~
.:..i~.:..i
j!1Dj!
0-0
I-@I-
ID~I-
:;):;)Z
0.W
I-~:!
Z<<~
W<(-
:::IE:!:;)
~ 0
5 W
o
W
..,
o
<(
b
b
~
!
E
'0
C
lD
!
D-
C
III
E
iii
C
~
:g
~
I-
Go0
:5
Ill' W
o
o
o
W
~
~
~
a:
o
s:
IL
o
Z
o
~
j(
o
o
W
o
o
~
o
Z
o
i=
~
ji
(.)
o
UJ
o
-
....
. . . CO) ~
. . . . cD CO')
CO)
~ .
.... CD
CO')
---- ~
--- - ~
'#'#'i!- ~ ;,j;,j;,j;,j
C<CC<C
000 t- t-t-t-t-
000 ~ 0000
caiNoO t-I-t-t- 4B-
__N << ':I-~~
888 0 o~_<< . '.
III "2.:0 ..J
I-t-~ :5 j...lII~ c(
(1)0:;) -!Ct-
1II111~ :;)2. I-
00<< :E: CJ -
a:<<< III ;l 0
<<2 ~ U I-
:I::I:G::
~~g III
~ IL C
:;):;)5 ~ Z
0rn 0
a: a: ~. 0 ~
00 I-
IDIII .: ~
55 C)
I-
Z I-
0
0 a:
ro
:;) 0
. Q.
W
a:
Z Z Z
o . 0 . 0 . . . .
(i) (i) (i)
Z Z Z
W W III
t; I- I-
w_~_i':i____
'iE ~ ~
W W W
.. ~ ~ ~
:;) :;) :;)
Z Z Z
W W W
000
(5 g (5
.~ ~ ~
...J
C
<<
~
c
2
UJ W UJ
:!Z:::IEz:!z
<(0<(0<(0
zi=Zi=zi=
a:!?:a:!?:a:!?:
00:::00:00:
000000
ZCI)ZCI)ZCI)
WWwWWW
>0>0>0
~~.:..i
~1Dj!
0-0
1-81-
ro~...J
:;):;)<(
rn.ji
...J~~
<(a:
ffi.i i
i
NO-
ClD ~ t")
oi cO cO
~CD~_
ZNZ Z
O<<!O'O'
(i)m(i) (i)
Z C')_z Z
w-w W -
~ ~ ~
UJ_w-w____
~ ~
.... W W
lII"iro
2s:.:E
:;)U::l
ZIIIZ
III~W
.2:2
Ig0g
OZ Z
at
t-
.
~
U
III
IL
.
ii!o
0'=
t- -
(,)C
~~
...2
z-
o!
(,)0
mO~
=>>.go
.03:
,,-
w ~
Cii'i:
CO
OCD
(i)w
~
UJ
ro
2
:;)
Z
III
o
~
.:..i ~~
j! ID t-
~ ~~
:;) :;) ~
CI.)~<<
~<<~
~~~
3: ::;
I- --
CI.) ~
::; fd
~ ~
o rn
W -
~ ~
~ 0
rn I-
a: 0
~ ~
o I-
~ ~
!z ~
o ::l
o CI.)
ro
:;)
o
W UJ W
:!Z:!Z:!Z
<(0<(0<(0
zi=zi=zi=
a:Q"a:!?:a:!?:
Oa:Oa:OO::
000000
zrnzCI.)zrn
WWWIIIWW
>0>0>0
. ~~mmm~~~ golden ~QY
construction,
.
Inc.
-- general engineering contractors
OCT 1 {\ "nr;r
I . V LUUO
5 October 2006
GBC/CG/233
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Signal Electric Extra Work Change Order Request
Mr. Krueger:
The following change order request is f~r Signal Electric Construction performing
various extra work items at the subject project. The work was performed on a force
account basis as directed by the City of Gilroy on 31 August 2006, 05 September 2006,
07 September 2006, 08. September 2006 and 16 September 2006. The total amount due
for this work is $6,58724 (see attached Force Account Summary Sheets074 and 082 thru
085 for further detail). .
Please process a change order in the amount of $6,58724 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, In
3826 Depot Road, Hayward, CA 94545
510-783-2960-510-783-2971
License: 451401
CJ
C
c
.2 f!
.....0
CJ-
::J ~
...b
.....c
en 0
c u
o C'l
CJ .E
~
~CI)
cv ~
.c 'CJ
c i
Q)-
-of!
_ CI)
o c
0)&
II) ....
~ po.
G)
. N
CJ) .
C')
III ClO
I,) po.
'E 0
....
III ~
~
l'lI >C
.s::. J!
-
"0 0
III ClO
0 en
... N
- M
0
Cl. ClO
CD po.
"0 0
co ....
N ~
ClO
C") Gi
c
0
.s::.
Cl.
>-
IX:
<(
:e
:e
:::l
f/)
I-
Z
:::l
o
(,)
(,)
<(
w
(,)
IX:
o
LL
co co
0 0
0 0
co N N
N 0 'lil ~
co N ~ .0
0 a> 0
N ::J '0
N <( 0
.... M
M 0
0:: 0:: 0 W
< W W W ~
10 10 :!:
:!: :!: 0:: 0
::> ::> 0 I-
Z Z u. 0::
..' ~ 10 0:: 0
0 w a.
0 .... a. w
a. U w 0::
W 10 ~
0:: Cl
Z
0
t::.
<
:IE
It:
0
u.
~
I-
0
W
"")
~
A-
M
Q)
fI)
tlI
.r:.
a.
IJl
'E
Q)
E
Q)
:>
0
0..
.s c
0
Q) :g
a. ~ ::J
tlI
0 Gl';'
IJl 0l1Jl
Q) CD C
::J 0
~ >- ~U
en ,g >-
~ tlI
~ a 0::10
<ll c
Qj - .c Q)
0
'E I~ U'O
0 ...;(5
~ U ~Cl
w >- >-
~ 1010
<( 00
Z Ww
I- !:::!~
U 0:: 0::0::
W w 00
.... z :cu.
0 s: 1-0::
0:: ::>w
a. 0 <(a.
ci>
c
:c
o
c
~
'0
c
as
-
~ II) II)
. . . , . . . , . , , , , . . , , . . . , , . . . . . en
.0 0')
en . .
Z ~ It)
w ....
I- "'ICt
x C"')
W
<h <h <h <h <h <h <h <h <h <h <h ~ <h <h <h <h ~ <h <h <h <h <h <h <h ~<h~~ ~
-r-
w ~~ "ff!.~'Cf!. .:.i ..:.i..:.i..:.i..:.i
~ eno 000 ;:: ;::;::~~
0::0:: 000
00 (,,)NtO 0 0000 ~
I 1010 ........ N I- 1-1-1-...
:5:'5 0:: 1t:.....Jx:
@)@@ 0 OZ<o:: . .
en "'1- lXl mW~o -I
0:: uu 1-1-0. :5 ::5::EW3:
::> I Ww en 0::> ~ 0..... ~
0 0::0:: Ww~ -<I-
1-1- 1-1- 1-1- 1-1- 1-1- 1-1- 1-1- 1-1- 1-1- < 5::E~
:c eno eno eno eno eno eno eno enO enO 00 ClClO:: :IE
0::0::<( W ..J 0
It: ..J..J <(<(:!: :e ~
0 ;::<( :c:ca: ::l U t-
m 01- UUO rn W
::5 I-~ O::O::lXl ~ Q. C
~~:5 U)
I- 0 ii: Z
u. 0::0:: Q. 0 ~
~ 00 W ...
a: 0
U lXllXl ~
:5:5 ... e>
z ,t-
O
0 0::
!XI
::) 0
\ rn D..
W W
~ ,0::
<(
z
Z z Z Z Z ~Z Z co a>lO
"'! o a>
0 , , . , . . . , , , , . . .. 0 I 0 . 0 . , . . 0 '0 I 0 . ~tO
(j) (j) (j) (j) (j) Ui(j) (j) ....
co co.
Z Z Z Z Z N_Z Z N.. M.
W W W W W ....w W .... ....
l- I- l- I- R l- I-
X ~ X X ~ X
W <h<h<h<h <h<h<h<h <h<h <h <h <h <h W <h W <h <h <h <h W <h <h W <h <h <h <h
..:.i ~~ ~ [2" ~ ..:.i~.:J ir: [2" R' ..:.i ~..:.i
w <( 0 <( W W W ;::~;:: W W W ;:: :b;::
~ I-lOl- lXl m m lXl 'OlXl lXl
0....0 ~ :E :!: ~@~ :E Gl:E ~ 0 @)O
I-@I- ::> ::) ::> ::> 13::> ::> I- 0.1-
100.1- Z Z Z lXlo...J Z ~z Z lXl ::>~
::>::>z w w w ::>::><( w <(W w ::> Ia:
.... en . W en . ~ 00 ~O
0 U U U U GlU U
<( I-~:E ~ ~ g ..J~w ~ Gl- 0 ~ ~s:
zO::o. <(0::1- x: oo~ 0::
I- w<(- ffi~~ It: > 0 :!:I-
0 :!:~::> z ~ ~ 0 ~ ~ ~ s: 00
a. 0 I- 3: ::i
- w ~ I- <(
::>
I- 0 ... 00 (3
0 w rn ::i W
::i <( a.
< (3 00
fo- ..J 0 W U5
z <( W a. 0::
WI- ~ Q. ~ 0
lw W ct) 00 l-
ii: 0 0:: U
:5 ~ 0'= 0 ~
aw :IE f0- r: I-
Wo 0 0 U ...
~~ ~ Z
0 0
U I- U
z 'lil Z lXl
0 c 0 ::>
w 0 0 U 00
~ m U.,.: !XI
~ ::l I,) ~ ::>
U) "C 0 00
uS:
Gl_
00 w fl
00 CiiE
:'5 c 0
OQ)
U cnw
Z w w w w w w
0 ~z ~z :EZ :EZ ~z :!:z
f= <(0 <(0 <(0 <(0 <(0 <(0
a. zf= zf= zf= zf= Zf= Zf=
~ 0::9: 0::9: 0::9: 0::9: 0::9: 0::9:
U 00:: 00:: 00:: 00:: 00:: 00::
00 OU OU OU OU OU OU
w zen zen zoo zen zoo zoo
0 ww ww ww ww ww ww
>0 >0 >0 >0 >0 >0
-
'5
'0
c
o
o
N
o
&
a;
'lil
.5:
~
.~
'0
Gl
m
'0
o
Ul
Ul
as
IJl
'lil
o
I,)
a;
.~
m
E
'0
C
tlI
~
o
a.
c
tlI
E
a;
c
o
:;::;
:c
'0
<(
:i.::
0::
o
s:
u.
o
z
o
f=
a.
0:
U
00
w
o
10 ....
~ ~
.... N
ea ~
ft ~
i~
!7.-
. )(
~ J!
'0 0
. CO
2 ~
1) ~
~co
. ....
'Os
co ....
N !!!.
I ii
c
o
~
~
(,)
C
.-
-
C
o I!
;;0
(,)1)
::J f
'--
....c
(I) 0
C ()
00)
(,).5
..
~CD
CO !
.Q"Q
C i
CI)-
"Cl!
_ CD
o c
a&
8 8
0
N 0
~ ! N
..
C') .
~ ~ E ..a
. ~
N '2
N 0
.
en C')
10 0
0
IE: IE: 0 ~
W W w
m m ~
::i :::E 0
::> ::> 0 ~
z Z IL
~ m IE: 0
0 W 0.
0. W
0 '""J IE:
0. 0 W
W m ~
IE: (!) 0
Z
0
~
:I
.~
IL
~
~
~
0.
C')
:
.
.s::
0.
.
C
.
E
~
Ig
S c
0
.! is
3 II 2
.
.!l . c::
. ::J 0
!! I~ .. 0
~
en ~ !
~ a Ii
... '0 .r: c::
.s 0 .
c:: ,~ 't:l
0 ~ '0
:::E 0 C)
w >- ~
:::E m
c( 0 0
z w W
l- N :::E
0 a: j( a:
w w 0 0
.., Z J: H:
0 ~ I-
a:: ::> w
0. c( 0.
~
<C
:IE
::i
~
fJ)
t-
Z
~
o
(,)
~
w
(,)
~
o
II.
~
'3
't:l
c::
8
't:l
c::
.
~
..a
10
o
Ct
.E
i
.E
-=
'j
'0
.!l
.
'8
=
.
I
8
..
"C
.!l
.
E
'0
c::
.
I
0-
c
.
E
..
c::
~
'6
~
z
o · , . . , . , I . I I . . . . . . . . I
ii)
Z,
W
I-
~--------------------
~~
w eno
~ a:: a::
IE: 00
mm
, ~~
en tb
~ ww
~~b~b~b~b~b~b~5~b~b~~
IE: ~~
~ g~
t:
~
o
~ \
~
z
o . I J I . . , , I . I . .
iij
z
w
5__________---
i::
IE:
o
~
IL
o
Z
o
i=
0..
~
o
en
w
o
.:.i~.:.i
W -< <> -<
i 1-101-'
0"'-0
ti@1-
::>0.1-
.., en::>Z
0 .w
.0( !z~:::E
b w~!:!:
:::E ::>
0. 0
5 w
b 0
W
I- ~
Z
WI-
len ii
w
:5 ~
Ow :IE
Wo
0
0
w
~
~
en
en
~
0
z
0
t
<<
0
en
W
0
...----
CO') (II')
, . . , . . . 0
.0 0
....
ea .
10
t--
CJ)
--- - -...
'$.'#.'#. g .:i.:i.:i.:i
888 i!i!i!i!
t"il'i.o 0000 41>>-
...-...- N I- t-I-I-I-
IE: 1E:1-:il~
@@@ 0 o:l-IE: ..:J
1-1-0. ~ 10:18:0
eno::> >-::iCL.I!!~ <(
ww~ IE: -e(1-
e( ::>:lECIO I-
(!)(!)IE: :IE 0 -
1E:1E:~ :IE w :! 0
~~IE: ::;) g I-
000 ct)
~ CL. 0
a: IE: 10 ~
::>::>~ Z
en en 0
IE: IE: CL. 0 ~
00 W ...
mID IE: ~
~~ C)
I-
Z ~
0
0
10
::;) 0
ct) 0.
W
0::
z Z Z
Q 10 . 0 . . . .
en iij iij
Z Z Z
W ~ w
5.w.5----
ii: ~ ii:
w w w
m m m
:::E :::E :E
::> ::> ::>
zz Z
w w w
000
(5 (5 (5
~ ~ ~
w w w
~Z::iZ::iZ
0.0(0.0(0
i=zi=zi=
a::~a::~a::~
oa:oa:OIE:
000000
zenzenzen
wwwwww
>0>0>0
.:.i~.:.i
~~i!
0....0
ti @ I-
::;)o.~
en~~
~lE:w
~~i
i
ZOZ Z g~S
OCC!O'O'cOcO.o
iijreiij iij N........
ZCDZ Z CD (J)
W W W
I- ~ ...
l:l_w-l:l----
'D: ~ "<<
w w w
~j~ ~
::>0::> ::>
z~z Z
w.o(W w
0.0 0
ii~~~ ~
o -
~
t-
en
;:j
e(
()
w
CL.
en
<< u
0.E
tic
~~
...2
z.
oc::
00
mOi!:
::;).20
ct)-U~
~3
~lj
0>.
wID
.:i iJ? ..:..i
~ 10 ~
o @O
ti CL. I-
:l=?~
en ~ 8:
~ 8: ~
~~t-
~ ~
t; ~
- 0
~ w
- 0.
o ~
W (I)
0.. a:::
~ 0
(I) t-
a:: 0
~ ~
~ g
!z ~
o ::>
o en
m
:l
en
w w w
:::EZ:::EZ:::Ez
.0(0.0(0.0(0
zi=zi=zi=
1E:~1E:~a::~
o a:: 0 a:: 0 a::
000000
zenZ(l)zen
WWWWWW
>0>0>0
10 ....
;z ...
m
: N
~
. CO
U ...
~ 6'
... ....
. 10
!,7:'
~ S
-
'g 0
e CO
m
N
.. ~
8- CO
. ...
'g 6'
lD ....
N !!.
CO
C') Gi
c
0
.s=
Q,
U
C
-
c
.2 f
...0
U"
:::s ~
... ...
.....
(I) g
c u
00)
U'=
...
~CD
ca !
aC"Sl
c ;
CI)-
-cf!
_ CD
o c
0)&
~
<C
~
:IE
~
en
I-
z
~
o
o
~
w
o
a:
o
u.
:g co
0 0
N 0
...... co Qj N
0 Qj
~ . .c
CIO N E .c
........0 en . 0
N -at)
cc' N .0
i' (/) C')
c' ... 0
0
ii;,.;
Ie 0:: 0:: 0 W
"M:: W W !;(
m ::E
::E ::E 0:: 0
:) :) 0 ~
0 Z Z LL
~ m 0:: 0
0 W 0..
,.... 0 '"") 0.. W
..... 0.. U W 0::
W m ~
0:: " 0
I
~
I
.~
~
.....
(.)
W
'"")
0
lr!.
D..
(")
.
<IJ
III
.s:::.
0..
<IJ
C
.
E
!l!
0
...
a.
.E c:
0
. 1:5
a. 2
III Qj
0 iii
!l Cl
eo c:
eo :;, 0
l!! f ~ u
<i5 >-
~ III
>- a lii al
l!! - .s:::. c:
2 0 u eo
c: Z. 'g
0 ~ (5
::E C3 "
W >- >-
:2 al al
<( 0 0
z W W
l- N :2
u 0:: ~ 0::
W W 0 0
'"") Z J: LL
0 ~ I- 0::
0:: :) W
0.. <( 0.
cD
'g
III
l:>>
.s
~
.c
.
.s:::.
-
Cl
.5
~
.Q
'0
c:
III
I
<i5
.s:::.
1::
:;,
o
LL
1ii
)(
o
.c
co
C')
I
Z
Cl
c:
..
<IJ
'x
.
eo
:;
Cl
c:
'0
III
Q.
l!!
:;
'3:
'0
2
III
'0
o
II>
II>
III
II>
iii
o
o
~
Qj
1ii
E
'0
c:
III
i
a.
c:
~
1ii
c:
:8
:0
'0
<(
z.
:>:J'O I I I I I . I I I I I I I . I . I I I .
.'. ~
W
~
W~~~~~~~~~~~~~~~~~~~~
~~
(/)0
0::0::
00
alal
~~
(/) 1-1-
.iO:: uu
:) Ww
~~I-I-I-I-I-I-I-I-I-I-I-I-I-I-I-I-I-~o~
~(/)O(/)O(/)O(/)O(/)O(/)O(/)O(/)O(/)O 0
~ ~~
o ~<(
~ 01-
~ I-~
t:
~
u
. ~
~
....
W
::E
~
z
o I I I I I I . I I I I I I
(j)
Z
W
~
'W~~~~~~~~~~~~~
'W
~
.:J~.:J
~~~
0.....0
I-@I-
alo.l-
:):)z
(/) , W
I-~::E
zO::o.
w<(-
::E::E:)
0.. 0
_ W
:)
o
W
'"")
o
<(
I-
o
I-
o
...
Z
wI-
:Ii(/)
D..
5
o
WW
o
o
u
W
~
<(
:2
:i
0::
o
S
LL
o
Z
o
i=
0..
~
U
(/)
W
o
(/)
(/)
~
u
z
o
i=
0..
~
U
(/)
W
o
-
co co
, I I , . , . ~
.... N
~ .
"""
.... llllt
II)
~~~ ~ 4It 4It 4It 4It -
"""
'#.~'#. .:J .:.i.:.i.:.i.:.i
~ <(<(<(<(
000 1-1-1-1-
000
MN.o 0 0000 -
.......... N I- 1-1-1-1-
0:: 0::"'-1::'::
@@@ 0 oz<(o:: . .
al mWji:O -J
1-1-0. ~ >jl~3:
(/)0:) ~
WW~ 0:: -<(I-
<( :):::IE(/)
",,0:: :::IE 0 -
O::O::~ :Ii w ~ 0
<(<(
J:J:O:: :;) u to-
UUO CI) W
O::O::al ~ 0.. C
CI)
:):)~ ~ Z
(/)(/) 0
0::0:: Q. 0 ~
00 W I-
0:: U
alal ~
~~ l- e>
z ~
0
U
al
=>> 0
(/) 0..
W
0:
z z z
010 101 I I I
i.i5 i.i5 i.i5
z z z
W W W
... I- l-
X X X
wtI)WtI)wtI)tI)tI)tI)
it it ~
W W W
m al al
::E ::E ::E
:) =>> :)
z z z
W W W
U U U
is is is
> > >
z ~ z
-I
<(
ji:
w
!;(
:Ii
W W W
::EZ:2Z:2Z
<(0<(0<(0
zi=zi=zi=
0::9::0::9::0::9::
00::00::00::
OUOUOU
Z(/)Z(/)Z(/)
WWWWWW
>0>0>0
~~.:J
I-IO~
0.....0
... @ I-
alo..~
=>>:)<(
(/) , ~
~~w
<(0::1-
~<(<(
w::E::E
i
en en CIO
CIO C') N
,...: (W'j ~
co ... ~
~. 10.
z~z z
i.o.....:o '0 '
i.i5~i.i5 i.i5
z -z z
.... w..... W W
~ ~ ~
wtI)WtI)w~tI)
~ it it .:J
W W W ~
~~~ ~ 0
:)0:) :) I-
z~z Z al
w<(w W :)
UeoU U (/)
~~~~ ~ ~
0- - - 3:
3: t>
t; ::::i
:i <(
<( 0
(3 W
W 0.
D.. (/)
(/) en
~u 0::
0-= 0
t; g b
~1:5 ~
... 2 I-
ziii z
ga 8
mU~ al
:;) .2 0 :)
(/)133: (/)
~~
~n
Cleo
i:i)[j
~ tI)
~.:J
o <(
101-
@O
0....
:)~
.0::
~O
0::3:
~I-
(/)
::::i
<(
(3
W
ll.
{Q
(/)
0::
o
I-
~
I-
Z
o
U
al
:)
(/)
W W W
::EZ:2Z:2Z
~~~~~~
0::9::0::9::0::9::
00::00::00::
OUOUOU
Z(/)Z(/)Z(/)
wwwwww
>0>0>0
<'
!5
.. N
c::
U .....
-e~
i.~
.! ,;
.-
11
'0 ~
Q.~
-86'
co _
f:!!.
t") .
g
~
Q.
CJ
C
-
c
.2 l!
..0
CJ-
=' i!
...-
..c
. 0
c u
OQ
CJ C
't:
~CD
as !
.Q"Q
c i
<<1)-
-a!
_ CD
o c
0)&
~
<C
:Ii
:Ii
::)
en
I-
z
::)
o
o
o
<C
w
o
a:
o
u.
8 8
0
N 0
l!? j N
~ j
N i
0 0>
N g. 1;
N
. 0
(I) (t)
II) 0
0
a: a: 0 w
w w w ~
ID ID ~
~ ~ 0
~ ~ 0 ~
Z Z ~
~ ID 0
0 W 0-
0 ..., 0- ~
0- 0 W
W ID ~
0:: C) 0
Z
Q
i
0:
0
u.
a:
...
0
w
..,
~
Q.
(t)
.
10
III
.c
11.
~
.
E
~
Q.
.E c
0
. 'fj
D- 2
~ I~ Oil
t . c
::lI 0
! l ~ ~
en ~
~ III
C; li ID
i '0 .c c
0 .
c ld' '0
0 ..: 0
~ 0 ~ C)
w >->-
~ IDID
<( 00
Z Ww
t; ~~
0:: 0::0::
W W 00
.., Z xu.
0 ~ ...0::
0:: ~w
0- <(11.
z
o It . . . . 1 . . . . . . . I . . . . I .
(ij
Z
W
t-
~--------------------
~~
w (1)0
~ 0::0:
0: 00
IDID
~:5
o t-t-
a: 00
~ ww
g~t-ot-t-ot-t-t-t-ot-t-ot-t-ot-t-t-t-t-t-o~o-oO::
.....v. (I) (l)oen en en enoenoen
0: ~~
o ~~
m 00
~ t-t-
Ii:
~
o
gj
c
o
~
.2
o
!
.5
.
:S
.
III
Ol
'0
o
.
:5
at
c
~
E
!
.c
j
!
'0
o
.
.
III
.!l
.
o
u
Cii
;::
.!l
III
E
'0
C
III
w
~ \.
z
o . I . I I . I . , I . I .
iij
Z
W
~----------(I)(I)-
.:...i~.:...i
w <(0<(
i t-1Ot-
0"'-0
t-Ot-
~Il.~
.., en=?w
0 t-~~
<( za:o-
b w~-
~ ~
11. 0
:5 w
b 0
w
... ...J
Z
Wt- c(
~en a:
W
5 ~
Ow 2
Wo
0
0
w
~
~
en
en
:5
0
z
0
i=
11.
a:
0
(I)
w
0
I
D-
c
III
E
Cii
c
~
:c
~
~
0::
~
u.
o
Z
o
t:
~
o
f3
o
-
..... .....
. . . . . . . 10
coo) 10
ca
- C"i
- CJ)
....
--- - ---- -
....
'#-'#-'#- .:...i ..:i..:i..:i..:i
000 ~ ~~~~
000 ~ 0000
c-)N.o .,.
,..-,..-N ............
0:: o::......JlIl::
OO@ 0 OZ<l(O:: .~
ID w-O
t-t-O- :5 j20:: ..J
(l)0~ >- Q.~~ <(
wwlll:: IX: -CC'"
<( ~211.) I-
C)C)a: ::E 0 :J 0
a:o::<( ::E w ~
<(~:E
X a: ~ 0 I-
000 en w
a:a:1D ~ 11. C
~~:5 0 ~ Z
~a: Q. 0 ~
W ...
IDO a: ~
:5~ C)
...
z I-
0
0 a::
ID
~ 0
II.) 0-
W
a::
z z z
o . Q . 0 . . . .
(ij (I) (jj
Z Z Z
W W ~
~_~_~f&___
<< ii:' <<
w w W
ID ID ID
~ ~ :E
~ ~ ~
Z Z Z
W W W
000
g g g
~ ~ ~
w w w
~Z:EZ~z
<(0<(0<(0
zi=zi=zi=
0::Q:a:Q:a:9::
00::00::00:::
000000
zenzenzen
wwwwww
>0>0>0
.:...i~.:...i
~1O~
0"'-0
t;@t-
~O-~
en~~
~~a:
<(a:w
ffi~i
i
Z(t)z Z ~~lI;
Q~Q'Q'.ocO";
CI)(t)en en MIOO>
z,..-z Z ,..- T'"
~.......w W -r- ~
~-~-~----
<< ~ <<
w W W
ID'OID ID
~ij~ ~
Z:1!lz Z
W<(W w
Q:Q Q
~~CI)~ ~
~- - -
~
~
C3
W
Q.
~ U
0=
be
~:fi
... 2
ZOil
8 g
IDO~
~.go
en1;~
.!Iii
w CJ
~1S
O)eD
Ci)iij
w w w
~z~z~z
<(0<(0<(0
Zi=Zi=Z-
0::Q:0::9::0::~
00::00::00::
000000
zenzCl)Z(/)
wwwwww
>0>0>0
.:i ~ ..:..i
~ 10 ~
~ @~
~~lIl::
(I) ~ 0::
~i~
~ ~
... ~
(/) ~
::i ~
~ 0-
o ~
W (IJ
11. 0::
~ 0
~ b
~ ~
o t-
~ Z
t- 0
z 0
o ~
o en
ID
~
en
10 ....
~ ...
G
:; N
.
C')
. CO
(J ...
'E Cl
. :0
~:-:
~ J
"C Cl
. CI)
e G
N
0 .
C')
Q. CO
GI ...
"C 6'
CD ....
N ~
CI)
C') a;
C
0
J:.
Q.
..
c
.2 f
...0
U1:;
~ I!
'--
...c
(I) 0
C Co)
00>
u-E
~G)
co !
.at>>
C ;
0)-
'Of
_G)
o c
t>>&
U
C
~
c(
:!ii
:!ii
:::I
UJ
I-
Z
:::I
o
o
~
w
o
0::
o
1L
:g :g
0 0
N N
:g j lD
..,. D
..... &1 E E
0 r! II
N 19
N
. II
0 0
CD N
.... N
a:: a:: 0 w
w w w !;(
ID ID ~
2 2 0
;:) ;:) 0 ~
Z Z IL
I- ID a:: 0
a:: 0 w D-
O ., D- W
D- O W a::
W ID !;(
a:: C) 0
Z
0
~.
a::
0
IL
~
I-
(,)
W
'"')
f
C')
II
II)
.
.r::
Q.
II)
C
~
~
~ c
E
j 0
1i
I~ S
.e II)
CD c
~ ~ 0
g 0
u; II ~
~ 6 'E m
. c
- .r::
.!! 0 0 CD
c ?1 "0
0 :E '0
2 (,) C)
w >- >-
~ m m
0 0
Z W W
I- ~ 2
0 a:: a:: a::
w w 0 0
"'") Z :J: IL
~ ~ 5 a::
w
D- e( Q.
Z
OJI . . . . . . . . . . . . . I . . . . .
fi)
~
I-
~fifififififififififififi_fi000fi_fi
t-=t-=
W 00
!;( a:: a::
a:: 00
IDm
:5S
o bl-
~ w~
~~b~b~b~b~b~b~b~b~b~~
0:: ~~
o ~e(
m 01-0
j 1-1-
t::
~
o
:>.
.
'E
::l
iii
o
c
o
:c
g
1)
l!!
;;)
II
-=
...
.e
Q
~
:;
Q.
l!!
"i
.2
2:-
~
II
E
:;:l
E
::l
E
l!!
0.
II
-=
-=
"i
"0
.!!
III
U
o
II)
III
III
i
w
~
%
o . . . . 1 . I . . . . . .
fi)
Z
W
I-
~_fi_fi0fififi___fifi
.:.i~.:.i
w c( 0 e(
~ 1-101-
0....0
I-@I-
mo..l-
., ::l:JZ
0.w
0 1-~2
c( za::D-
b l~~
5 w
b (]
W
l- ...I
Z
wI- c(
10 <<
W
5 !<
Ow :IE
Wo
0
0
w
~
i
0
0
:5
0
Z
0
i=
D-
o:
0
0
w
0
"iii
"t:
4D
ii
E
"0
C
CIll
j
&.
c
.
E
"iii
c
.0
i:<
"0
"0
c(
~
a::
~
IL
o
Z
o
i=
D-
o::
o
o
w
o
-
....
, , , . , . . ~ ~
.... ~
C')
ID
.... ~
C")
10
__fi - ---- a
~
.".'#.,. .:.i .:.i.:.i.:.i.:.i
000 ~ ~~~~
000 ~ 0000
MN.o .,.
........ N ............
a:: o::t-...I~
@@@ 0 OZ<Co:: .".
m mW<<O ..J
t-t-o.. :s >-jl~~
00;:) <(
wW~ 0:: 5<Cm I-
C)C)a:: <C a:IE-
a::a::~ ::E w ...I 0
:IE ~
~~a:: :J fd I-
~Oo 0
~ D- C
;:)o::m ~
(/)~:5 0 Z
a:: a:: Q. 0 ~
00 W t-
mm 0:: ~
:5:5 C)
...
Z ~
0
(,)
ID
:J 0
(/) 0-
W
0::
Z Z
0'0
fi) fi)
Z Z
W W
~fiS
~ ~
W W
ID ID
2 2
;:) ;:)
Z Z
W W
o 0
~ ~
Z
. 0 1 . . .
fi)
Z
W
I-
0~fi0_0
~
W
ID
~
::l
Z
W
o
g
~
w w w
2Z~Z~Z
~g~gzg
a::Q:a::Q:a::Q:
OO:Oa::OO:
000000
Z(/)Z0Z(/)
WWIUWWW
>0>0>0
.:.i:.i.:.i
e(0'e(
1-101-'
0....0
I-@I-
IDQ.~
;:):Je(
(/).<<
...I~W
<(a:: I-
ffi~~
i
Z~Z Z ~~.
0'0 '0 'c:ON~
fi):8fi) fi) lD.....n
z""-Z Z ~ If)
W.....W W ..... ....
~0S_~0_fi_
~ ii: ~
W W W
ID"OID ID
~fj~ ~
Z.Z Z
w~W w
2112 2
~~~~ ~
0- - -
~
...
m
~
(,)
W
Q.
CI)
jEo
0.5
bC
~~
... 2
~~
(,) 0
1D0il:
:J.Qo
Cl)i:i3:
~1;
~li
Q4D
U5w
w W W
~z~Z~z
~g~g~g
a::Q:0::Q:0::Q:
o 0:: 0 0:: o a::
000000
Z(/)Z(/)Z(/)
wwwwww
>0>0>0
;.Jij..:..i
~ 10 ~
o @O
... 0.. ...
!!! ;:) ~
oJ to::
(/)~O
~0::3:
~~...
3: ~
I- ;J,
~ <3
~ w
~ 0..
o ~
W (/)
D- 0::
~ 0
(/) I-
0:: (,)
~ ~
o I-
~ ~
Z 0
o ~
o UJ
m
:J
(/)
.-----"',
. d~~mmm~~ golden ~QY
construction,
.
Inc.
--general engineering contractors
26 October 2006
GBC/CGI267
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Signal Electric Extra ,Work Change Order Request
\
Mr. Krueger:
The following change order request is for Signal Electric Construction performing
various extra work items per the direction of the City of Gilroy at the subject project. The
work was performed on a force account basis as directed on 12 September 2006, 18
September 2006, 28 September 2006, 30 September 2006 and 02 October 2006. The total
amount due for this work is $3,35022 (see attached Force Account Summary Sheets 101
thru 105 for further detail).
Please process a change order in the amount of $3,35022 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Cons
n, c.
3826 depot road, hayward, california 94545
510/783-2960. 510/783-2971 fex, license #451401
10 ...
~ S;
J :::
III CD
U ....
"2~
l~
.c J!
'tI 0
III 10
e g:
'0 ~
a, CD
. ....
'tiS
10 ...
~~
C') CD
c
o
.c
a,
u
s::
..
s::
.2 !
.....0
ut)
~ l!
'--
.....c
en 0
s:: (.)
OD
u.E
...
~CD
ca :g
J:2 "6>>
c ;
Q) ClJ
"C...
_ CD
o c
0)&
~
c(
::IE
::IE
:::)
en
I-
z
:::)
o
o
o
c(
w
o
~
o
lL
co
Oco
00
NO
CO...N
, 0.'"
-- I .c Z
~SlEO
N20
N g- 0
enO
NN
...
o:o:cw
WWW~
enen:::!:C
::i::::!:o:
::>::>01-
ZZu.O:
I-en 0: 0
O:OWo..
O-,o..W
o..OWO:
Wen!;;:
O:C>C
~
~
:&
a:
o
II.
~
...
~
~
Q.
C")
.
U)
as
.r:
a..
U)
'E
.
E
.
>
e
a.
.5
c:
o
. is
a. ...::>
~ Q) ~
. J!! ~ ~
. ::> 0
~>-~O
en ,g .~ ~
~a1iien
~-.-~C:
200.
g~..:~
:::!:0:EC>
w >->-
:::!: enen
<C Cc
z Ww
I- ~:E
00:0:0:
wwOO
-'z:cll..
0:s:1-0:
~O~~
x
o
.D
.
E
.5:
J!!
'3
'0
c:
8
Ol
c:
~
I
'0
c:
III
.
'0
III
a
.s
U)
~
o
.D
Ol
c:
~
'x
.
Gl
E
Ol
c:
j
E
.~
'0
.
1Q
'0
o
U)
U)
III
U)
iii
8
~
2
III
E
'C
c:
III
!
a.
c:
III
E
Iii
c:
~
:0
'0
<C
-
z C") M
C')
.... 0 . , . . . , . , . , . , . , , , , , . , . , . , , , . ....: M
en N
10 .
ffi .....
~ N
w II)
~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~~ ~ ----
~~ te.'#.?f!!. .:..i .:..i.:..i.:..i.:..i
w eno ~ oe(oe(oe(oe(
> ~ 0:0: 000 ................
000 0 0000
00 C->N.o I- ............. ~
en en ..... ... N
~~ 0: O:.......I~
fen @@@ 0 OZoe(O: . .
1-1- en enwi20 ..J
0: 00 1-1-0.. ~ ~ j:&w:!: c(
::> Ww eno::> 0......
0 0:0: ww~ -oe(....
:c liil) 1-1- ....1- 1-1- 1-1- 1-1- ....1- 1-1- 1-1- 00 C>C>O: oe( 52!!! I-
eno eno enO enO eno enO eno eno O:O:~ :& w ...I 0
a: ...1...1 <C<C :& ~
0 ~~ :c:co: ~ 0 l-
S 00 000 en w
1-1- 0: 0: en ~ a.. 0
~~~ en
.... 0 ~ Z
lI.. 0:0: Q. 0 ~
C2 00 w ....
0 en en a: ~
~~ .... e>
z ~
0
(.)
en
::> 0
en a..
w \ W
~ \ 0:::
z z z z Z N Z Z N ..... C")
N C'! ..... C")
0 , . . , . . , , . . , , , 0 , 0 , 0 , , . . 0 N 0 , 0 , N .0"":
en en en en en 0 en en 0 NN
Z Z Z Z Z It) Z Z It) It)
w w w w w w w
5 5 l- I- ~ ~ ~
~~~~~~~~~~ ~~~ ~ ~ ~ ~ ~ ~~~ w ~ w ~ w ~ ~ ~~
.:..i~.:..i ~ ~ ~ .:..i~.:..i ~ ~ ~ .:..i ~.:J
w ~~~ w w w ~~~ w w w ~ ~~
~ en en en en 'C en en
0.....0 :::!: :::!: :::!: 0......0 :::!: . :::!: :::!: 0 @~
.r:
I-@I- ::> ::> ::> I-@I- ::> 0 ::> ::> I-
eno..l- z z z en 0.....1 z co Z z en o..~
::>::>z w w w ::>::><C w :e w w ::> ~o:
-, en , w 0 (.) 0 en . ii: 0 0 0 en ~o
c I-~:::!: Gl
<C 5 5 g ...I~w 5 . 5 ~ ~ ~:s:
zO:o.. <CO: I- x: en 0:
I- w~- > ~ ii:<C<c It: ~ > 0 :::!:I-
0 :::!: ::> ~ ~ w:::!::::!: 0 ~ :s: en
a.. 0 I- :!: ::;
- w ~ I- <C
::>
I- 0 ... en <3
UJ ::;
0 w :J <C w
a..
-c <3 (J)
... 0 w -.
...I en
z oe( w a.. 0:
w Q. ~
::IE l- ii: ~
en ~ en
Q. w 0 0: ~
5 ....
oe( .s .= 0
a ::IE c: I-
W W (.) 0 I-
C ~ 0 C2 z
0 is 0
0 .... 2 I- 0
z iii z en
0 c: 0 ::>
w (.) 0 0 en
~ en 0 ~ en
<C ~ 0 ~
:::!: UJ 1S 0 en
:s:
Gl-
en iiJ B
en mE
~ c: 0
OlGl
0 U5iiJ
z w w w w w w
0 :::!:z :Ez :Ez :Ez :EZ :Ez
~ <cO <cO <cO <cO <cO <cO
a.. z~ z~ z~ z~ z~ z~
0: 0:Q: 0:Q: 0:Q: 0:Q: 0:Q: 0:Q:
0 00: 00: 00: 00: 00: 00:
en co co CO CO CO co
w
c zen zen zen zen zen zen
ww ww ww ww ww ww
>c >c >c >c >c >c
:i
0:
o
:s:
lI..
o
z
o
~
a..
0:
o
en
w
c
10 ....
;z ~
: :x
III CO
U ...
i~
III ~
~ ..
III )(
.r: .e
'tl 0
III CO
e ~
1:3
III ...
'tl 6'
co ....
~ !!!.
CO) .
c:
o
.r:
Q.
-
c
.2 !
..0
u~
::s l!
'--
..c
en 0
c (,)
0=
u.E
~
>tG)
as !
.c"Q
c ;
0)-
"t!
_ G)
o c
Q&
u
c
>
a::
c(
:e
::i
::;)
fJ)
I-
Z
::;)
o
o
o
c(
w
o
a::
o
u.
<0
0 8
0
.'" N 0
<0 ....N
.....N q Gl ....
.c Gl
0 N E.g
.... m
N .!!'Q
N g-o
...... en 0
co N
....
a: a: 0 w
. w w w ~
CD CD :E
:E :E a: 0
:J :J 0 ~
Z Z ~
~ CD a: 0
0 w 11.
0 -:l 11. W
11. 0 W a:
w CD ~
a: "
z
0
j;:
io(
I
0
u..
3
...
(.)
w
"~
CL
<">
Gl
II)
C1l
.s:::
11.
II)
C
Gl
E
~
e
Q.
.5 c::
0
Gl ts
a. .5
~ ~
!l Cl II)
Gl c::
Gl ~ 0
l!! >> ~ 0
(;) ,g .~ >>
C1l
>> a :u CD
l!! - .s::: c::
.!! 0 0 Gl
c:: ~ 't:l
0 ~ '0
:E <3 "
w >- >-
:E CD CD
<( 0 0
z w W
l- N :E
0 a: 0:: a:
w w 0 0
-:l Z J: ~
0 ~ I- a:
a: :J w
11. 0 <( 11.
.l!i
.s:::
~
Cii
l!!
1ii
....
.E
>-
l!!
.!!
c::
o
:E
't:l
c::
III
II)
.~
Gl
...I
'Iii
~
.c
10
""
III
Cl
c::
'S:
o
E
l!!
:5
.~
't:l
Gl
'Iii
'0
o
II)
II)
III
II)
1ii
8
:!2
G>
'Iii
E
't:l
c::
III
~
o
a.
c::
III
E
Qj
c::
~
=0
't:l
<(
-
z C>> en
N
0 , . , . . , . , . , , . , , , , , , , , , . , , , . . ci N
.....- 0
en II) .
~ 0
0
It)
ww ww ww ww ww ww ww ww WW o W W0W 0 ----
.:-:.:-: "if!.'#."cf!. ..:..i .:.i.:.i.:.i.:.i
w eno ~ :!:!:!:!
I- 000
.'. ~ a: a: 000 0 0000
00 ";N.o I- 1-1-1-1- ~
CD CD ........N a: a:1-...I~
'en ~~ @@@ 0 oz<(a: . .
1-1- CD IDWii:O ..J
a: 00 1-1-11. ~ ~ ~:&W3: <(
:J Ww enO:J 11.1-1-
0 1-1- a: a: WW~ 5c((I) I-
J: li;b 1-1- 1-1- 1-1- 1-1- tib 1-1- 1-1- 00 ""a: c( a::i-
eno eno eno eno eno eno eno a:a:<( :& w ..J 0
<< ...1...1 <(<(:E :& ~
, ~<( J:J:a: :J 0 I-
01- 000 (I) W
I-~ 0:: 0:: CD ~ 11. C
I- ~~~ 0 ~ Z
~ a: a: 11. 0 ~
~ 00 W I-
0:: 0
0 IDCD ~
~~ l- e>
z I-
0
0 ~
CD
;:)
(I) 0-
w \ W
:E \ a::
<(
z
z z z z z "'z z '" N m
'<1:0 ..... co N
0 , . , , , , , . , , . , . 0 . 0 , 0 , , . , 0 , 0 , u:i ";0
m m m m m <O_ m
"'en '" NO
Z Z Z Z Z .....z Z ..... 10
W W W W W W W
~ ~ l- I- ~ ~ l-
X X ~
W 0WW0WWWWWW WWW W W W W W W WWW W 0 W W W W WW
..:..i~..:..i "ii:' ii:' "ii:' ..:..i~..:..i ii:' "ii:' ii:' ..:..i ~..:..i
W ~~~ W W W <( 0 <( W W W g ~~
~ CD CD CD 1-101- CD 't:l CD CD
0....0 :E :E :E 0....0 :E Gl :E :E @o
.s:::
I-@I- :J :J :J I-@I- :J u :J :J I- 11.1-
CD 11. I- Z Z Z CD 11....1 Z III Z Z CD
:i :J~
:J:Jz W W W :J:J<( W W W :J ,a:
-:l en . W 0 0 0 en , ii: 0 0 0 en ~o
0 3l
<( I-~:E 0 ~ 0 ...I~w 0 ~ 0 ~ a:~
za:Q. <(a: I- ':11: en a: ~I-
I- W<(- > > 0::<(<( << > > 0
0 :E:E:J ~ ~ ~ w:E:E i z ~ z ~ en
11. 0 i :J
5 w I- <(
I- 0 I- en C3
0 w (I) :J w
:::; <( 11.
~ U en
I- ..J 0 W (;)
Z c( W 11. 0::
W l- ii: Q. en 0
:& en ~ (;) I-
Q. W t.i 0:: 0
5 ~ S .E 0 ~
a :& c I-
W W 0 0 I-
0 ~ .2 ~ Z
0 'Q 0
0 I- 2 I- 0
z 1ii z CD
0 c:: 0 :J
W 0 0 0 en
~ ID ~~ CD
~ :J :J
(I) "C 0 en
'Q~
Gl_
en jjj r3
en mE
~ c:: 0
ClGl
0 (j)jjj
Z W Wz W W W W
0 :Ez :Ez :Ez :EZ :Ez
i= <(0 :Eo <(0 <(0 <(0 <(0
11. <(-
zi= Zl- zi= zi= zi= zi=
0:: o::!!:: o::!!:: o::!!:: a:!!:: o::!!:: a: 11.
0 oa: oa: oa: oa: oa: oa:
en 00 00 00 00 00 00
w
0 zen zen zen zen zen zen
ww wW ww ww ww ww
>0 >0 >0 >0 >0 >0
~
a:
o
~
~
o
z
o
i=
11.
0::
o
en
w
o
10 ....
;I ....
G)
~ N
G) ~
. ClO
l.) ....
i 0'
....
[ ~
. >C
.c J!
'C CI
. 10
2 G)
N
1) I
CO)
Q. ClO
. ....
'C S
10 ....
N ~
ClO
CO) iD
c
0
.c
Q.
M
c
.2 e
..0
U"
~ ~
.. ...
....
fI) S
C (,)
ot>>
uoE
...
~CD
ca :g
.Q'Q
c i
C1)-
-at!
_ CD
o c
e>>&
u
c
~
<C
~
~
:::>>
U)
to-
Z
:::>>
o
o
o
<C
w
o
~
o
u..
co
0 co
0 0
N 0
8 Gi N
...
<') ~ .0 CD
0 E.o
...... N .!!~
N ~o
en 0
co N
N
,,'
0:: 0:: 0 LU
LU LU LU ~
III III ~
~ ~ 0::
::> ::> 0 ~
z Z IL.
I- III 0:: 0
0:: 0 LU 0.
0 -, 0. LU
0. 0 LU 0::
LU III ~
0:: C) 0
,~
Q
!i
:I,.
5
II.
a
I-
(.)
W
"')
i
a.
<')
CD
<11
m
.s;;;
0.
<11
C
CD
E
CD
>
0
c.
.E c:
0
CD 'U
Q. 2
fl Qj ~
J!l Ol
CD c:
CD ::;] 0
~ >- ~ 0
CiS ,g .!!1 >-
III
>- (5 :a III
~ - .s;;; c:
.!! 0 0 CD
c: .?:' 't:l
0 ~ '0
~ <3 C)
LU >- >-
:; III III
<( 0 0
z w W
l- N ~
0 0:: it: 0::
W W 0 0
-, z :r: IL.
0 ~ I- 0::
0:: ::> W
0. 0 <( 0.
iii
CD
e>
III
.s;;;
t.l
CD
E
:e
CD
>
o
:5
.~
't:l
CD
Qj
'0
o
<11
III
III
<11
~
8
-
z G) en
....
0 . , . . . . . . , , . , . . , . . , , , . . . . . . . cD
(i'j CO) ~
.... .
z CD
UJ C")
~ ~
~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~~ ~ tit tit tit tit
~~ ?J!.?J!.'#. .:..i .:..i.:..i.:..i.:..i
LU eno ~ c(c(c(c(
~ 000 ............
0::0:: 000 0 0000
00 MN.o I- ............ -
III III ............ N
:5:5 0:: O::.......I~
'en @@@ 0 ozc(o:: . .
1-1- III IIlW it: 0 ..J
0:: 00 1-1-0. :5 :3:1iw~
::> LULU eno::> ~ a.... ~
0 0::0:: WLU~ -c(...
:r: liit3 1-1- 1-1- 1-1- 1-1- 1-1- 1-1- 1-1- 1-1- 55 C)C)O:: 5:1i!!!
eno eno eno eno eno eno eno eno O::O::C( :Ii W ....I 0
0:: ....1....1 C(<(~ :Ii ~
0 ~~ :r::r:o:: ::> 0 I-
~, 00 000 en W
1-1- 0:: 0:: III ~ a. C
~~:5 en
... 0 ~ Z
IL. 0::0:: a. 0 ~
~ 00 w ...
0:: 0
0 III III ~
:5:5 ... e>
z I-
0
0 ~
III
::>
rn 0..
w \ w
:; a:::
<(
z
z z z z z Oz z 0 <>> <>>
"':0 .... ~......
0 , . , . . , . , . . , . , 0 , 0 . 0 , , . . 0 . 0 . a> coco
<>>-
(i'j (i'j (i'j (i'j (i'j Nen (i'j N <')
Z Z Z Z Z ......z Z ...... ......
w w w w w w w
~ ~ ~ I- ~ ~ l-
X X
w, ~~~~~~~~~~ ~~~ ~ w ~ w ~ ~~~ w ~ w ~ w ~ ~ ~~
.:..i~.:..i " ~ " .:..i~.:..i [2' " ~ .:..i ~..:J
w ~~~ w w w ~~~ w W W ~ ~~
~ III III III III j III III
0......0 ~ :::2: ~ 0......0 ~ .s;;; ~ ~ 0 @O
I-@I- ::> ::> ::> I-@I- ::> (,) ::> ::> Iii 0.1-
III 0.'" Z Z Z 1Il0.....I Z III Z Z
::>::>z ::>::><( ~ ::> ::>~
-, w w w w w w en ~o::
0 en , w 0 0 0 en . ii: 0 CD 0 0 0::0
<( I-~~ ~ 5 ~ ....I~w ~ CD ~ 5 ~ i~
zO::o. <(0::1- ~ en 0::
I- w<(- > it:<(i 0:: > 0
0 ~~::> ~ i!; ~ w:::2: ~ ~ ~ ~ ~ en
0. 0 i :::i
- w ... <(
::>
I- 0 ... rn (3
0 w !!! :::i w
....I <( 0.
c( (3 en
... ....I 6 w Ci;
z c( W 0. 0::
W ... ii: a. en 0
:Ii en ~ Ci; I-
CL W 0 0:: ~
...
0 c( e -= 0
a ::Ii c I-
W W ~ 0 ...
0 0 ~ z
0 :a 0
0 ... 2 ... 0
z ~ Z III
0 c: 0 ::>
w 0 0 0 en
~ III ~i!: III
<( ::> ::>
:::2: rn Oi:: 0 en
o~
CD_
en W r3
en CD Oi::
:5 c:o
OlCD
0 (i)w
z W LU W W W W
0 ~z ~z ~z ~z ~z :;z
i= c(0 <(0 <(0 <(0 <(0 <(0
0. zi= zi= zi= zi= zi= zi=
it: 0::9::: 0::9::: 0::9::: 0::9::: 0::9::: 0::9::: .
0 00:: 00:: 00:: 00:: 00:: 00::
en 00 00 00 00 00 00
LU zen zen zen zen zen zen
0 ww wW ww wW ww WW
>0 >0 >0 >0 >0 >0
~
G)
Qj
E
't:l
c:
III
~
Q.
c:
m
E
Iii
c:
:8
'6
't:l
<(
:i
0::
o
~
IL.
o
Z
o
i=
0.
it:
o
en
w
o
II) ....
~ :;;
CJi :J:
:! ~
i~
III e
~ )(
.! .!
"'C 0
III CQ
e ~
8.:1
Gl ....
"'C 6'
CQ ....
~ ~
C') iD
c
o
.c
a.
u
c
ft
c
.2 f
....0
u-
~ ~
~b
....c
U) 0
C u
0=
U,f
~CI)
ca !
J:2 '51
c ;
0)-
-cl'!!
_ CI)
o c
0&
co
88
NO
8~~
..o~
~ E 0
N.!!1)
N g.0
Wo
ON
C")
~
<C
:i
:i
:)
en
....
z
:)
o
o
o
<C
w
o
a::
o
LL
>->-
alal
00
Ww
I- ~:2
Uo:::O:::O:::
WwOO
~z:r:u.
03:1-0:::
g:o~~
....
Z
01 I I I I I I . I I I I I I , I I I I I I
; -
2i; ffi
0~
>.Wwwwwwwwwwwwwwwwwwwww
.:-:.:-:
wo
0:::0:::
00
alal
:5:5
1-1-
UU
Ww
I-I-I-I-I-I-I-I-I-I-I-I-~~
wOWOWOWOwOWO............
...J...J
~~
00
1-1-
.w
!;(
a::
..
IW
. a::
::J
:r:o I- I- I- I- I- I-
wowowO
'ti
:J
'C
'C
(\l
:J
0-
Gl
-E
Cl
c::
:c
o
c::
~
'C
c::
(\l
III
Gl
(5
a.
Cl
c::
'5
c::
.l!!
III
iii
Gl
21
III
.c
o
Gl
E
'E
~
o
-E
.~
'C
4\l
1ii
'0
o
III
III
(\l
III
Ui
o
o
Qj
.;:
.!!
(\l
E
'C
c::
(\l
~
o
a.
c::
III
E
Qj
c::
~
'5
'C
<(
l-
..... u.
~
U
~ \
<(
z
.......z
o I I I I I I I I I I I I I
en
z
w
l-
X
, Wwwwwwwwwwwwww
w
~
..:..i~..:..i
~:o~
O~O
I-@I-
ala.I-
::J::Jz
W , w
1-::'::::2
za::a.
w<(-
:2:2::J
a. 0
::J W
o
W
~
o
<(
.. I-
o
b
I-
:p;
WI-
:Ew
D.
5
fiIw
.0
o
U
w
::.:::
<(
:2
~
0:::
o
3:
u.
o
z
o
i=
a.
0::
U
w
w
o
w
w
:5
U
z
o
i=
a.
0::
U
w
w
o
,...-
....
. . . . . C') -r-
. . .0 C'?
~ .
II)
.... ~
II)
www w wwww ft
-r-
cf!.~';!e ..:..i .:..i.:..i.:..i.:..i
~ 4(4(4(4(
000 1-1-1-1-
000 0 0000
Mc-.i.o ~
~ ~ N I- 1-1-1-1-
a:: a::1-...JX::
@@@ 0 OZ4(a:: . .
al IIlwjio ..J
I-I-a. :5 >~~~~
WO::J c:(
wwX:: << -4(1-
i4( ::J:E!! ~
C)C)a:: :E a ..J
a::a::<( :IE W ~ 0
<(<(:2 ~
:r::r:a:: ::>> 0
UOO II) W
a::a::al .~ a. 0
::J::J:5 ~ Z
Ww 0
0::: a:: D. 0 ~
00 W I-
u: 0
alal ~
:5:5 l- e>
Z ~
0
0 0::
III
:J 0
W a..
w
0::
..
z z z
010 101 I I I
.. en Ci5 en
z Z z
w w w
~ ~ ~
wwwwwwwww
'ii' 'ii' ii'
w w W
al al al
:!: :!: :2
:J ::J ::J
Z Z Z
W W W
000
<5 <5 <5
> > >
z z ~
..J
4(
ji
W
!C
:E
w w w
:2Z:!:Z:2Z
<(0<(0<(0
zi=zi=zi=
0:::Q::0:::Q::a::a.
00:::0 a:: 0 a::
ooouoo
zwzwzw
wwwwww
>0>0>0
.:.i~.:J
~:o~
O~O
I-@I-
alQ....J
::J::J<(
W , ji
...J::':::w
<(a:: I-
ji<(<(
w:!::!:
I-
~
N 0> ~
": ~ :ri
t:....~
"'=- ~
z~z z
....Q...: Q . 0 .
w....w en
z"'=-z z
w~w W
I- I- l-
X X X
wwwwwww
.. . ii' 'ii' 'ii' ..:..i
w w w <(
al'Cal al I-
:2~:!: :E 0
.::J O::J ::J I-
>z~z Z al
w<(w W ::J
04\lO 0 W
x::g~g g ~
~z ~ ~ 3:
~ l-
t; 3
~ ~
(3 w
W a.
D. W
~ 0 ~
0-= 0
... - l-
V l5 0
~'tS ~
1-2 I-
Z- z
O~ 0
00 0
lIlo....: co
::>>.25 ::J
1I)-U3: W
Gl_
. W ~
~:a
ClGl
Uiw
ww
~.:J
:o~
@O
a. I-
::J::':::
,a::
::':::0
~3:
:EI-
W
::i
<(
(3
w
a.
en
en
a:
o
I-
o
~
I-
Z
o
o
al
::J
W
w w w
:2Z:2Z:2z
<(0<(0<(0
zi=zi=zi=
0:::Q::a::Q::0:::Q::
o a:: 00:::0 a::
000000
ZWZWZW
wwwwww
>0>0>0
10 ....
~ .....
m
J N
I
&")
. CIO
U .....
i is
....
i e
. >C
.c J!
'g 0
. CIO
e m
N
0 .
&")
Q. CIO
Gl .....
'g is
CIO ....
N e
CIO
&") iD
c
0
.c
Q.
(.)
e
..
e
.2 f
.....0
(.)1:)
::s 1!
....
.....c
(I) 0
C (,)
OD)
(.).5
..
>tCD
as !
.Q"Q
c i
C1)-
-cl!
_ CD
o c
Q&
~
c(
:E
:E
::::>>
tn
I-
Z
::::>>
o
o
o
c(
w
o
D::
o
u..
88
0 0
8 ("11("11
00 !!
0 N
.... en o 0
("II 00
("II 00
("II 0
0("11
.. 0:: 0:: ow
W W w~
m m ~o
::!::!
:::l :::l f2~
z z
~ m 0::0
0 wo.
0 .., o.w
0. 0 wO::
w m ~
0:: Cl 0
%
0.
.j;
!II(
:i
0::
a
II.
~
I-
hl
..,
~
0..
C')
3l
<II
.s:
0.
f/)
'E
Q)
E
Q)
e
Q.
~ c:
0
Q) U
Q. 2
~ lD
!! Cl iii
Q) c:
Q) :;) 0
l!! >- ~ 0
Ci5 ,g Q) >-
<II
>- a 'E m
~ <II
- .J::. c:
.l!l 0 0 Q)
c Z;- "0
0 ~ (5
::! U Cl
w >- >-
::! m m
<( 0 0
z w W
l- N ~
0 0:: 0:: 0::
W W 0 0
.., Z I u.
0 ~ I- 0::
0:: :::l W
0. <( 0.
B
.~
Q)
f/)
~
~
Q}
~
IA
~
Q)
c:
Q)
;
o
:s
-
z I:) 0
I 0 I . 0 I 0 ClC!
0' 0 . . I . I 0 , , 0 0 0 . . 0 0 I I , I .... co
en ~ .
~ "'l"'"
I- IlIlt
x CD
w
~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~ ~~~ ~ ----
~~ 'iJi!.'#.?ft. .:..i .:.i.:.i.:.i.:.i
w eno ~ ~~~~
~ 000
0::0:: 000 0 0000
00 C'iN.o I- 1-1-1-1- ~
mm ..........("11
:5:5 ~ O::I-..J~
I @@@ o.%c(o:: . .
en 1-1- m IDwii:o. ..J
0:: 00 1-1-0. :5 :5:&w;:
:::l ww enO:::l t: 0..1- ~
0 0::0:: ww~ -c(1-
tib 1-1- 1-1- 1-1- 1-1- 1-1- 1-1- 1-1- 1-1- c( ::;):&rt)
I eno eno eno eno eno eno eno eno 00 ClClO:: :i a -
O::O::~ w ..J 0
0:: ..J..J :i ~
~~ <(<( t-
o II 0:: ::;) (,)
III 00 000 cn w
:5 ~ 0.. C
1-1- O::O::m ~
:::l:::l:5 Z
I- enen 0
u. 0::0:: 0.. 0. ~
~ 00 W I-
0:: (,)
0 IDID ~
:5:5 l- e>
z ~
0
0
ID
::;) 0
cn 0-
w \ w
::! n::
<(
z
z z z z Z '<f Z Z '<f coo
C'! C'! 0010
0 0 0 , , 0 0 . 0 0 0 . , 0 0 0 0 , 0 , 0 I I Q .... Q I 0 . .... ci~
en en en en en co en en co C')'<f
z z z z z z z co
w w w w w w w
~ I- ~ l- I- l- I-
X X X X X
W ~~~~~~~~~~ ~~~ w ~ w ~ w ~ ~~~ w ~ w ~ w ~ .,. ~~
.:..i~.:..i oc oc oc .:..i~.:..i << oc << .:..i ~.:..i
w ~:o~ w w w ~:o~ w w w ~ :o~
~ ID m m ID j ID m
0....0 ~ ~ ~ 0....0 ~ '5 ::! ::! 0 @~
I-@I- :::l :::l :::l I-@I- ::;) :::l :::l I-
mO.l- z z z mo...J z <II z Z ID o.~
:::l:::lZ W W w :::l:::l<( w ~ w W :::l =?o::
.., W I W 0 0 0 en , ii: 0 0 0 en ~O
0 I-~::! Gl
<( (5 (5 ~ ..J~w (5 Q) (5 ~ ~ o::~
zO::o. <(0::1- :.::: en 0:: ~I-
I- w~- > > o::<(~ a:: > > 0
0 ::! :::l ~ ~ ~ w~ ~ z ~ ~ ~ en
0. 0 ~ :::i
- W I- <(
:::l
I- 0 ~ I- en U
0 w cn :::i w
::i <( 0.
c( U W
I- ..J (3 W U3
% c( W 0- 0::
w l- ii: lL W 0
:i en ~ U3 l-
lL W 0 0:: 0
:5 ~ S c: ~ ~
a :i c
w w ~ 0 0 I-
0 U ~ z
0 0
0 I- 2 I- (,)
% iii z m
0. c: 0 :::l
W (,) 0 0 en
~ ID OJ<: m
~ ::;) o ... :::l
cn .~ 0 en
ts~
Q)-
en iij ~
en "iii OL:
:5 c:o
ClQ)
0 (j)iij
Z w w w w w w
0 ::!z ~z ~z ~z ::!z ~z
j:: <(0 <(0 <(0 <(0 <(0 <(0
0. zj:: zj:: zj:: zj:: zj:: zj::
ii: 0::9: 0::9: 0::9: 0::9: 0::9: 0::9:
0 00:: 00:: 00:: 00:: 00:: 00::
en 00 00 00 00 00 00
w
0 zen zen zw zen zw zen
ww ww ww ww ww ww
>0 >0 >0 >0 >0 >0
8
.~
Q)
f/)
Cl
c:
:;;
'x
Q)
Q)
;
E
o
~
l!!
.~
i
Ol
c:
:::
:;)
Q.
;
.~
"0
Q)
iU
'0
o
f/)
f/)
<II
f/)
iii
o
o
~
lD
iU
E
"0
c:
<II
!
Q.
c:
<II
E
Qi
c:
~
:0
"0
<(
:it:
0::
o
~
u.
o
z
o
j::
0.
0::
o
en
w
o
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
.........OF Gi.(" .
.... -\ ....... . /f>. .
(~\i"':"~~~ '
\. .~\ '.IIll~',,,,,;_/ .
, " ........;. .
.... "., "...... ....
.\.. '..,.~.."...,.... ....
CHANGE ORDER NO.7
To contract for: Monterey Streetscape Improvement Project, Phase III
Project No. CML-5034(012), City Project No. 06-CDD-I 19
Contractor: Golden Bay Construction, Inc, Contract Date:
2/2112006
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
In him as his authority to proceed with the work.
Description of Work
Remove and replace unsuitable subgrade at various curb and gutter
locations per attached Change Order Request Letter No. 124
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are
in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of
ei'liciency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any
ri~ht to claim any further cost and time impacts at any time during and after completion of the Contract associated with the
Extra Work,
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$4,130,554.75
$340,109.31
$4,470,664.06
$28,829.05
$368,938.36
$4,499,493.11
P.M.
Percentage Initial
8.23% .M
8.93% ~
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $28,829.05
CONTRACTOR
By:
Date:
ACCEPTED BY:
RECOMMENDED BY:
12/19/2006
06-CDD-119
Ig/2. J t)b
Change Order No. 7
d~~mmm~h golden ~QY .
construction" Inc.
- 9~neral en~i"eerin9' contractors
16 August 2006
t\UG
~ r:
1. .:
"
GBC/CG/124
.~,
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, P~ III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-l19
Unsuitable Subgrade ~mediation Change Order Request
Mr. Krueger:
The following change order request is for the removal and replacement of unsuitable sub-
grade encountered at various curb and gutter locations of the subject project (see attached
sheets for details and specific locations). The areas were excavated, the unsuitable
material was removed, Mirafi fabric was installed and baserock was placed and
compacted per the direc~on of, and at the locations designated by, the City of Gilroy.
The work was performed on a force account basis as directed. The total amount due for
this work is S]I,J~Jli~ (see attached Force Account Summary Sheets 011 thru 016,023
and 024 for further detail). $g 8.1829.05
There are eight (8) occurrences of force account work associated with the unsuitable
subgrade remediation efforts. Utilizing the July 2006 update of the baseline schedule,
Golden Bay Construction estimates the delay and t4ne extension required with this
change order request to be on the of magnitude of six (6) working days. The force
account resulted in delays to the opening of the roadway, sidewalk and overall project
completion.
It is inappropriate to submit a time impact analysis while the City of Gilroy and Golden
Bay Construction are in the process of negotiating a "global resolution" which will
establish new completion date(s). While this delay is not contained in, or part of, the
"global resolution", the date(s) establishing the basis to evaluate and create the time
impact analysis for this and any other future delays will be established through the
"global resolution". A time impact analysis will be submitted promptly after the "global
resolution" is in place and the information is available to properly analyze and create the
time impact analysis. Please be advised that Golden Bay Construction fully reserves our
rights to all delays and remedies.
3826 depot road, hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
16 August 2006
City of Gilroy (GBC/CG/124)
Page 2 of2
I'
$2..8/82.'1.05
Please process a change order in the amount of '31 Jl~ ~ to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that .
the City of Gilroy is in agreement with this change order request and a change order for
the work. is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Co
. on, Inc.
"
I'
"
"
"
,.'
",
,d
--.
10 ....
~ ....
Q)
3 N
.
CO)
.. 110 COco
U .... ~go
-e s NO
.... :::C\lG)N
III ~
~ ore!53
)( N""
.s: .! N....
OM
-
'0 0
.. CD
0 Q)
... N
- ~
0
a. 110
. ....
'0 S
CD ....
N ~
110
CO) .
C
0
.s:
a.
u
c
..
C
o !
~O
U-
::s u
t!
.~ -
"C
U) 0
C' u
OCD
U.5
...
~4D
&a !
J:2"Q
C i
Q)-
"CSt!
_ CD
o c
a&
~
c(
~
~
::::::>>
fn
~
Z
::::::>>
o
o
o
c(
w
o
a::
o
LL
co
It)
0'
m
.... CO
~ I ~
.... N
N
m
r--:
N
....
~~~ ~
~~
fJ)0
a:: a::
00
alal
::s::s
fJ)N ~~
a:: 00
~ Ww
~~~~~~~~~~~~~~~~~~~-Oa::O~
~fJ)OfJ)OfJ)OWOWOfJ)OfJ)OWOfJ)O
...J...J
~<(
O~
~g
.:.i.:.i.:.i.:.i
~~~~
0000
~ ~.~ ~
a::~..J1IC
OZ<a::
ID W .ii: 0
:5:EW~
Q.~~
5~fI)
a--
w ..J
<
o
W
Q.
~
g
~
~
Z
o
o
ID
~
fI)
,*,~cfe
000
000
~N.o
........ N
...
l!!
o
.c
..
...J
@@@
~~a..
fJ)0~
WWlIe
ClCIa::
a::a::~
~~a::
000
a::a::1XI
~~C:(
fJ)fI)..J
a:: a::
00
alal
::s::s
<<I"I'N
,~~~
.....0')0
<<110M
"I' It)
z
, 0
en
~W
,:j ~,:j
~ :n~
0 @O
~ a..~
IXI ~lIe
~
fJ) ~a::
lie a:: 0
a:: ~~
0
s: W
::::i
~ $
fJ)
::::i 0
W
$ a..
u (1)
W en
a.. a::
fJ) 0
en ~
a:: u
0 ~
~
U ~
~ Z
0
~ 0
Z al
0 ~
0 (1)
IXI
~
fJ)
z
'0
en
z
o
Q)
.
CD
o
r--
~
. .
..J
~
o
l-
e
z
~
C)
~
o
Q.
W
It::
CD ....
~ ....
~
J N
. >-
CO') COco !
III CD
U .... cogo s
i is 9N~ c:
0
[ .... NNQ)>- :E
!!. ore 5'5
III >C N-'-'
.c .! 10....
ot"'l
'U 0
e CD
~
N
-8. co/)
CD
" ....
'U is
CD ....
N !!.
CD
CO') .
c
0
.c
Q,
u
c
-
C
o !
+:;0
u-
- Co)
- !
.... -
.....c
fI) 0
CoCo)
0=
U-E
~CD
.!
.aa
c i
Q)-
-a!
_ CD
o c
D>>&
~ ~
r-..: I ci
~ N
I I I I I I I I . I I I .
co
10
. I
t"'l
t"'l
CO
t-:t-:
1/)0
0::0::
00
mm
~~
~~ ~ ~ bb
~ Ww
~~~O~o~~~~~~~o~~o~~o~~~~o~o-oo::
~I/) I/) 1/)01/)01/) I/) I/) 1/)01/)
...J...J
~~
f2f2
CO
~
a)
t"'l
~
N
....
N
10
~
...
.2
I!!
Q)
Q,
o
~
<C
:E
:E
::)
rn
~
z
::)
o
o
o
<C
w
o
~
o
u.
8
:;,
cD
>-
I!!
8
o
c:
.!!
:E
e
o
wa;a;~:e~~~~
!;(cici~~~cOcON
o::NN~IO~ t"'l
~~~~~~~~
~~~~~
WOO...JO 0
ONNXN"OOOCO
ONNc(NQ)IOIO....
O........t"'l~'fiNN....
III
=
W~~ZO::c(D..D..C)
~~~~WQ):E:Ec(
<(alIalIO::WQ)OO:E
:E~~~o~oom
I/)~~Z~~C)C)N
1/)0000::Q):J::J:~
c(~~~0::0:::E:E0
..lO::O::O::O 00
O~~~...J .000::
Q)
o
.r.
~
'0
><0::
..:.i~..:.i
~:b~
0....0
~@~
mD..~
~~Z
I/) I W
~~:E
zO::D..
W<(-
:E:!:~
D.. 0
- W
~
o
W
~
10
.!Ie\!
a1CO
01<<
!:g
gN.5..
<;;.l!Q)
~~5:
ceO
~.2=FE
~~~5
w W W
~Z:::EZ:::EZ
Qc(Qz<Q
~Z~ ~
~, 0:: e: 0:: e: 0:: ~
,OO::OO::OI.L
.,000000
Z I/) Z .1/) Z I/)
WWWWUlW
>0>0>0
CO co
t"'l en
N . cO
co ....
....
~~~
~~~
000
000
C-;NIti
.... ....N
@@@
~~D..
I/)O~
WW~
C)C)O::
O::O::~
~~o::
00:: 0 0
O::m
::J::Jc(
I/)I/)..l
0::0::
00
mm
~~
..:.i :,; ..:.i
c(0'<
~IOI-'
0....0
~@~
mD.....J
~::J<
I/)~ii:
...Jo::w
<c:(~
ffi:!:~
i
U)
0
.
.... (It)
U)
(It)
-
N
.:.i.:.i.:.i.:.i
;!;!;!;!
0000 ..,.
~~~~
a::~..J~
OZ<O:: . .
mW-o
j::&ffi~ ~
a..~~ ~
5<fI)
a::&-
w ..J 0
c(
(; ~
W
D.. C
~ Z
e ~
~
~ C)
Z ~
0
0
m
:;) 0
fI) a..
w
~
Z
'0
c;;
Z
W W W
:EZ:!:Z:EZ
~~~~~~
o::e:o::e:o::e:
go:: 0 0::00::
00000
ZI/)ZI/)ZI/)
WWWWWW
>0>0>0
~~
..:.i~~
~ 10 I-'
f2 @O
mD..~
~ :n~
~ ~ ~
.:5 ~ ~
~ ~
t; ~
- 0
$ ~
o ~
W I/)
D.. 0::
~ 0
0:: b
f2 ~
o ~
~ ~
!z ~
o ::J
o I/)
m
~
I/)
It) ....
:I; ~
J ~
lJ ~
i~
i.~
III ;c
.c J!
.-
" 0
~ !
.. e/)
_ &. CO
GI ....
"6'
CO ....
::!!.
('I) ;.;
C
o
.c
Do
u
c
.-
..
c
.2 I!
..0
u-
::su
I!
,.. -
..c
1)0
a~
u.5
..
>.CD
as~
.aa
ci
CD-
-csl!
_ CD
o c
a>> &
.=-:.=-:
UJO
a:: a::
00
IDID
~~
~~ ~ ~ ~ ~ bb
~ Ww
OJ:~~~~~~~~~~~~~~~~~~~oo~
UJoUJoUJoUJoUJoUJoUJoUJoUJo
...J...J
~<
ob
~~
fDg8
MqN~
....Sl~-
ON::J::J
N"'-'
0)....
OM
>-
l!?
.!!
c:
o
::!:
'0
Q)
:g E
fI) ::J
0"0
l-g
Q) III
;'E
c: III
oiS
~.s
e! II)
~1i
ili
Q) 0
:i5i
,mo
::J-
II) Q)
3,g
.s II)
~~
"0.2
is .~
e Q)
:.!
III 0.
.c E
"0 ::J
liO
.Q~
.01
J! fI)
I;::: fI)
:s g
~ Q)
Iii;
~o
.- .c
":t:
.l:l! 0
Q) c:
a;~
E ._
0."0
E c:
::J tV
"O='
_ III
.!! !
~ ~
~ u
Q) Q)
0;
- ...
tl :
8 c:
-is
.l:l! ..2
Q).c
1ii:2
E E
~ fD
<'! . "': .
~ ~
N N
0) O!
m'c;;
M M
fD
..,.
m
M
fit
N
....
C'i
10
fit
0)
0)
m
~
i ~!!
... 0 0
8. ~, ~
o ...J ...J
o
c:
..!!!
:E
e
(3
~
2
ID
>-
l!?
o
o
g
'6
III
CI
~
c:
III
.c
.!!
fI)
W
>
a:::
c(
=t
=t
::)
U)
...
Z
::)
o
o
o
c(
w
o
a:::
o
LL.
~W<t<t~~<t~~~~
!;;:c:ic:i"":cOc:i"':C'icOcO
a::NN..,.MN..,.M
fit fit fit fit fit fit fit fit fit
WOO...J:I:o 0
O~~X~~"OfD:5:5
ONN~It)NQ);:NN
o~"I""'" N.....ti
III
:=
~~~~ffi~~(')~~
c:Ca!la!la::wa!lGioo
:!~~~O~~IDOO
Iii
UJ~~Z~~CN(')(')
UJOOOa::OG~~~
c{~~~a::~a::O'""'""
0...1 a:: a:: a:: 0 a:: a:: 0 0
~~~...J~ 00
I I I I I I I I ,
$
cO'
0)
O!.
0)
~
~
c:
o
CI
III
Iii
::!:
"ii
::J
.2>>
::!:
~~~
mg~
~ N....
- N
.:..i~.:..i
~~~
0....0
~@~
1Da.~
~~Z
UJ . W
~~::!:
za::a.
wc(-
::!:::!:~
a. 0
5 W
o
W
~
It)
N
cO
"
c:
.s
8-
It)
It)
C'i
;; II)
.!! "II) i
~g ..2,
~~.5'?
~..s:
"OiS3G
Geo\L
~ : ~ E
:l.!~6
><
Q)
W W W
::!:z::!:z::!:z
~Q~E~a
a::~a::9:a::a.
ga::ga::OiX
o 000
z UJ Z ,UJ Z UJ
WWWWIUW
>0>0>0
:g t:
m . ..,:
It) fD
N It)
fit fit fit
~~~
000
000
(")C'i1O
........N
@@@
~~a.
UJO~
WW~
(')(')c(
a::a::::!:
~~a::
~~~
~~~
a:: a::
00
IDID
~~
.:.i.:.i.:.i.:.i
i!i!i!j!
0000
~~~~
a::~...I:ll::
ozca::
mW-o
j~a::~
-~~
::::l"",(I)
0"'-
W ...I
C
hi
a.
(I)
<<
e
~
z
o
(,)
m
::::l
(I)
z
'0
en
W W w
:!z::!:z::!:z
~Q~a~a
a::~a::~a::9:
o a:: 0 a:: 0 a::
000000
ZUJZUJZUJ
wwwwww
>0>0>0
N
CO
N
.....
.....
cD
.,.
. .
..J
<C
~
o
~
c
z
~
C)
~
~
o
Q.
W
~
.:..iij..:..i
~ 10 ~
e @e
1Da.~
~ =? a::
UJ~O
~ a:: 3:
~ i ti
~ ~
~ (3
c W
(3 5;
w (Ij
5; a::
(Ij e
a:: (,)
o ~
~ ~
~ 0
Z 0
o ~
o UJ
ID
~
UJ
10 ....
~ ti;
:I :3:
CD GO
U .....
-E~
l~
.c .!
'0 0
! I
.. N
'0 ~
. Q. GO
CD .....
'OS
GO ....
g!!!.
CO') Ii
c
o
.c
Q.
CJ
C
..
c
.2!
....0
CJt;
~ l!
. ... -
....C
fIJ 0
a~
CJ.5
..
~CD
as!
.Q'Q
c i
CD-
-al!
_ CD
oc
ts)&
......
......
N N
It) N
~ . .0
CD ~
...... ......
I I I . I I 1 I . I I
CD
It)
ai'
(1)
CO
COco
cogo
~qN~
......Sl~-
ON::J ::J
N"")"")
N......
......('1)
Z;!
o ~ I ai I
-('I) ('I)
~N ......
W
~
~~~~~~~~~~~~~~~~~~~~
~~
(/)0
E!E!
00
10m
~~
(/)~ ~ ~ ~ G~
~ W@
~~~~~~~~~~~~~~~~~~~E!o-~
~(/)O(/)O(/)O(/)O(/)O(/)O(/)O(/)O(/)O 0
...J...J
~~
gg
ti
!!
en
.c
co
-
o
.c
1::
o
c:
Q)
!!
en
:>.
!!
.!!
c:
o
:;E
'0
CD
'0
'i)
'tD
~
CD
S
c:
o
CD
'0
l!
Cl
.c
::J
III
CD
:is
.s
'5
III
c:
::J
.s
CD
::J
'C
~
::J
iii
...
::J
o
0..
'C
c:
III
is
e
CD
III
III
.c
8
1\1
Q.
.s
~
8
(1)
..a:
CO
~
ai
('I)
~
N
.....
N
It)
~
i
B
l!
&
o
!
o
.c
CII'
...J
o
c:
..!!
:E
e
(3
8
::J
en
:>.
!!
o
o
c:
o
Cl
CII
"iii
:;E
"iii
::J
Q
:E
i;:
c(
:i
:i
~
t/)
~
Z
~
o
o
o
c(
w
o
a::
o
u.
W~~~:ect~~~~
!;(cicir-:..rci"':NcOcO
o::NN~It)N~('I)
~~~~~~~~~
~1t)1t)1t)1t)1t)1t)1t)1t)1t)
(/)(")(")(") (")(") (")(")(")(")
WOO...JOO 0
8~~~~~'icol5l5
o~~(")~~..c:::NN
U
~
~~~~ffi~-;o~~
oetollol:lE!WollCDioo
:::E~~~o~~moo
-, (/) ~ ~ Z ~ ~ ~ N 0 0
(/)OOOIX:OCD~~~
c:C.=:l=:l=:lE!=:lE!0""''''''
0..3E!E!E!0E! E!oo
~~~...J~ 00
.:.i~.:.i
~:o~
0......0
~@~
mll.~
=:l=:lZ
(/) I W
~~:::E
zE!ll.
W<(-
:;E:;E=:l
ll. 0
_ W
=:l
o
W
W W W
~Z:;EZ:;EZ
Q<(Q<(Q
~z~z~
E!9::E!9::E!ll.
OE!OE!O~
000000
Z(/)Z(/)~(/)
WWIUWWW
>0>0>0
It) ('I)
(1) co
ci I ,....:
(1) (1)
~~~
';'cf!.?f!.
000
000
(")N.o
............N
@@@
~~ll.
(/)O=:l
WW~
ooE!
E!E!i
~~E!
000
E!E!m
=:l=:lc:C.
(/)(/)..3
E!E!
00
10m
~~
Z :e~a;
, 0 . ,r-: N ai
(ij ~CD&1
CO
cO
ex)
(1)
CD CO') or'
.... G>> G>>
. . . .
GONG>>
GO....N
G>> C!. CD
....
.:.;.:.;.:.;.:.;
~~~~
0000
~~~~
E!~...J~
OZ<(o::
I:9Wi20
::.:iw~
9::~~
=:l...C/)
0""-
W ...J
<(
(j
f
I
o
~
~
~
Z
o
o
m
:)
C/)
Z
'0
(ij
o
o
T""
C"')
CD
N
~
. .
..J
:!
o
~
Q
Z
~
C)
~
o
n.
w
a::
.:.i ~.:.i
~:o~
o @O
~ll.~
10 =:l ~
=:l . E!
(/)~o
~E!3:
~ i~
3: ~
~ ...J
(/) ~
- 0
...J W
~ ll.
o (/)
W en
ll. E!
~ g
a:: 0
g ~
o ~
~ Z
~ 0
Z 0
o ~
o (/)
10
=:l
(/)
W W w
:;EZ:;EZ:EZ
~~~Q~~
E!9::E!~E!9::
gE!OE!OE!
00000
Z(/)Z(/)Z(/)
wwwwww
>0>0>0
10 ...
~ ~
J :::
. ClO
U ,...
-Co
! ~
~ >><
.c J!
-
" 0
2 !
"8. ~
_ ClO
Gl ,...
" S
10 ...
&1!!.
C') .
C
o
.c
Q.
..
c
Oe
~o
u'tS
::s!
'.. -
..c
en 0
cu
OCD
U,f
~CD
as !
.0'&
c i
(1)-
-a!
_ CD
o c
0>>&
u
c
~
c(
=s
=s
::)
en
I-
z
::)
o
o
o
c(
w
o
a::
o
La.
N 0
0) N
0) , M
0) N
t') ..,.
co
.....
z:8:8 ~.~
o en . r.O . .
-N N ~
~Il) ;;; ..,. C')
w
5
~~~~~~~~~~~~~~~~~~~~
.:..:.:..:
wo
IX: IX:
00
~~
Wco co co co co co G~
IX: wO
~ w
~~b~6~b~b~b~b~6~b~b~~
...1...1
~<
Ob
~~
iii
li
l!!
Ci5
.s::
co
'0
c
.
.s::
it;
c
Gl
!
Gl
.Q
li
l!!
Ci5
>-
l!!
B
c
~
'0
j
;;;,
0)
'0
C
.
€
;;;,
U
Gl
'0
Ow
-
III
III
Gl
Gl
-=
1ii
~
l!
~
;;;,
III
Gl
j5
.!!
os
III
C
;;;, ;;;,
BOO
III '0
> c
~ III
~~
.915
.l!l 0
Ill..
~1ii
o~ i
B 0
e!
'0.9
c Gl
~ 05
Gl-
~ :l
0.'0
C ;;;,
1lIe:;
E 05:
- Gl
~J!
.2 0.
=6 E
" ;;;,
c(0
0)
~
0)
0)
en
..,.
~
co
..,.
en
C')
~
N
,...
N
Il)
~
~
...
.9
l!
Gl
0.
o
C
III ...
E l!!
...
l!!
o
.a
.
...I
...
l!!
o
.a
III
...I
5
1)
:>
o
c
.!!!
~
e
o
8
;;;,
.Ii
>-
I!!
o
o
c
o
0)
.!!
III
:E
"ii
;;;,
0)
:il
,g
:0
III
0)
"ii
o
c
11
B
III
W
z~~~g;:!;~~:e:il:erems;
Q....:....:cDcDr.Or.OcOcticO"":"":cti-.i
WCO co,... (")(")C').....O)ol)OO)OO)
Z..........C')..,.(")C')NNN.....C!:!...,.q
W N C')
~
X
Wfh~~~~~fh~~~~~~
w~~~~~~g~~~~*~
~ 0 0000. 0 0 0 .~Il)~
c(oO,.....,.O.....,...fONfOO.....O
IX:NN""Il)N..,.NC')C') ~@~
~~~~~~~~~~mo..~
~::::>z
W , w
~::':::E
ffi~e,
~ ~
::::>
o
w
WOO...lOO 1l)J:0
O~~XN~"O)gco:5
ONN~~N~~Il)::N
0.......... N.....U N
.
==
~t:t:~ffit:~ffiffio~
~GlSGlSIX:wGlSGlwwio
:E~~~o~U?oomo
III
w::'::::'::Z~::'::C~~N~
WOOOIX:O GlIX:IX:.....
cC~~~IX:~IX:IX:IX:5:E
O..J IX: IX: IX: 0 IX: 0 0 IX: 0
~~~...I~, ...1...1 0
)(
Gl
Gl Gl E
0.:0: 0 E
,~ .s:: g .s:: Ii III
0...:0:.:0:...15"'15 15=IX:
o::uu~IlI~2WGlO"
022Gl.a~ ...I.aIX:c
W~~lDo=~ooO)IlI
>to .c~:;::;""..........alG)
~!:~~,...~BN""E'E
;;oo::;-~ooo;;;,
~~........,~;>...,...,m~
I I I I I I I
N'
N
..,.
N
o
0)
N
Il)
~
2
l!
Gl
0.
o
C
GI
E
~
>-
€
52
ff.
It)
N
cD
.
c
.9
...
II)
0.
It)
It)
N
.....
II)r ~
,.- as
O)S ,2,
l!!;;cfO
g""iii.a
c( , ... Gl
,,155Gl
l!!ooLL
;;;,1i:EE
; = * ;;;,
04:moo
w w w
:EZ:E~:EZ
~~~j::~~
IX:e,IX:e,IX:0..
OIX:OIX:O~
000000
ZWZWZW
wWWWu.lW
>0>0>0
co fO
co N
.. . ..j.
~ ~
o
~
.....
N
..,.
t'i
~~~
~
?1.~*,
000
000
ctiNr.O
..........N
@@@
~~o..
Cl)0~
ww::'::
ooIX:
IX:lX:i
~~IX:
000
IX:lX:m
~~:s
IX: IX:
00
mm
:s:s
Z Z
. 0 . 0
(ij (ij
Z Z
W W
IX:
W
m
:E
~
Z
w
o
g
~
.:.i:l.li.:.i
~:o~
0.....0
~ @~
mo.....I
~~c(
W'O::
...I::'::w
c(IX:L-
ffii~
i
0,.....,.
C')at,...
or:...;.ui'
NatO
..,.01'01
c-)c-)N
----
.:.i.:.i.:.i.:.i
;!;!;!;!
0000
~~~~
IX:~..J::'::
OZc(IX:
IIIW~O
:5~W~
o..~~
SOCW
a~-
w ~
(j
W
0..
~
e
~
I-
Z
o
o
III
~
rn
IX: IX:
W W
m m
:E :E
~ ~
Z Z
W W
o 0
~ ~
or-
o
.
f")
N
....
..
CO
.,..
. .
-I
~
o
l-
e
z
~
C)
I-
0::
o
n.
w
0::
~~
...I:l.li.:.i
~:o~
e @e
m 0.. ::.::
~=?IX:
W ::.:: 0
~ ~ ~
~ ~
~ ~
::::i ~
~ 0..
~ ~
0.. ~
~ 0
W ~
a:: 0
~ ~
o ~
c( Z
~ 0
Z 0
o ~
o W
m
~
W
w w w
:EZ:EZ:EZ
"~~~~~Q
dX: e, IX: e, IX: ~
o IX: 0 IX: 0 IX:
000000
ZWZWZW
wwwwww
>0>0>0
10 ...
~ ~
J :x
. ClO
U ,...
-e~
i~
! J
.- -
" 0
2 :I
~
,I ::
IS.
I ;;
ClO -
C') Ii
c
o
.c
Q.
u
c
..
c
Oe
:;:;0
U'tS
.C I!
.....
.6
c.U
OCD
u.e
~,.
.:
.0-0
ci
.-
-at!
_ CD
oc
0>>&
j,
~
c(
=e
=e
::)
en
I-
z
::)
o
o
~
w
o
a::
o
La.
.:..:.:..:
wo
IX: IX:
00
11Im
:s:s
~U) U) U) U) U) U) U) Gt
~ Ww
~~b~6~5~6~6~5~6~6~6~~
...1...1
~<
~~
Ie ~ ~ ~. ~ :g
cO'cO'cO'T"'" ..-..:'cO
t') ..... ..,. ,... ..... (")
N t') N N (") N
~
!
US
.s::
to
"
C
GI
.s::
it;
e
I
..
!
Ci5
>-
!
~
o
:i
'0
j
;;;,
0)
"
C
GI
€
B
II)
"
..
1ii
III
Gl
~
1ii
l
31
GI
.a
'0
e
~
.
0.
E
8
"
e
GI
e
o
13
2
1ii
e
8
.s::
III
'c
~
.9
I
8.
e
GI
E
..
e
o
:!
"
~
0)
~
co
N
r.ri
~
co
..,.
en
t')
~
N
,...
N
10
~
~
...
.9
l!
8
e
CD ...
I!!
! !
o 0
.a".a
~ ,j
o
e
.!!
:E
e
o
8
2
m
>-
!
<3
c
o
Q
CD
Ii
:i
"'ii
::lI
Q
~
~
CD
"
C
II)
E
c(
.2
"3
...,
Z ~ ~ ~ :5 ~ St ~ ~. ~ ~ ~ &1 ~
Qr.ri....:cticDr.ricONoNcO"':"":r.ri
WNIOCONN,...U)NO),.....,.NU)
~""'NNC')...t')"'N'" ;;;(")~
~~.,.~.,.-------~
~~~~JJ~~~~.:.i*.:.i
l!! . . . . . . . . . .~IO~
~o...,.....,.OO,...U)NCOO...O
N..,...,.IONNN(i)C')
~@~
.,.~.,..,.__-~.,.-mo..~
::::>~z
w~w
~IX::::E
zio..
W -
:i ~
0.. a
- W
~
o
W
Wo ...100010:1:0
oo~~~~~~!!gU):5
N_ ,...NN'"IO"'N
oor-1i N.........NN"t"""
!!
w~<ZIX:~~IX:IX:OO"
!..~.'..~ II) ~ W ~ ~ W W ~.:E
GlSII)IX:WGlSGlSWW:iiO
~0~0~~00mo
.
..
rn::'::cZ~::'::::'::~~NO
wOII)OIX:OOIX:IX:~i
d.~IX:~IX:~~IX:IX:0'"
O..J IX: IX: 0 IX: a: 0 0 .., 0
~ ~...I ~,~...I...I.... 0
~
Q ~ 15 ~ ~
~ .s:: 2 .s::IiCD
Q.1515...15.:o:~ 15 = IX:
i2 ::lI 2 ~ .u2 ".. W CD S "
0.... Gl.a .,.-...1 .a .... c
0~~~0~~00QCD
w>-li,'" "..~...... CD~
0:1::-;>""=' N""Et::
;=.00;=<")000;;;,
~~......,~~...,...,m~
~
IX:
~
u.
o
z
Q
Ii:
0::
o
w
W
o
I I I I .
N
N
....:.
N
o
N
o
0)
N
10
~
co
en
(")
.,.
....
.9
~
8-
!
o
.a
III
...I
c
.
E
~
~
52
~
o
:c
u
"ii
:::E
.s::
0.
II)
~
...,
Z Z
'0 . 0 . oJ
(ij (ij
"
ww
:iZ:iZ:iZ
~~~~~Q
a:g,IX:g,IX:~
o IX: 0 IX: 0 IX:
000000
Z rn Z'0 ~ W
, WWuJWWW
';~"">0>0>0
~ m
Pi . N
co ,...
N 10
~.,.~
ff.ff.ff.
8g8
ctiNoO
..... ... N
@@@
~6~
ww::'::
00 IX:
IX:lX:i
~~IX:
000
IX: IX: 11'1
~~cC
W0..J
IX: IX:
gg
:s:s
.:.i~.:.i
~IO;!
0"'0
~@~
mo.....I
~::::>~
W~IX:
~IX:W
ffiii
i
I,
.:.i.:.i.:.i.:.i
;!;!;!;!
0000
I-~~~
a:~..J~
OZ<(IX:
alIW-O
:5l'~.~
-<(I-
::;)...rn
a...-
w ..J
:S
u
W
0..
~
~.
I-
Z
o
U
III
::;)
rn
Z
'Q
I
(X)
In
~
\Q
"
"
C\J
.,..
..:.i
~
o
l-
e
z
~
C)
~
o
n.
w
0::
.:J~.:.i
;!IO~
~ o~
roo.::.::
~ =? IX:
~~o
a: ~ ~
0::E~
~ W
~ ~
W 0
~ w
~ ~
~ ~
o ~
! ~
o ~
~ W
::;)
U)
10 ...
~ ~
. ~
at C')
.. ClO
U ,...
i~
.. !!.
~ >><
.c J!
" 0
. CD
2 ll:
1~
Gl ,...
" S
10 ...
~!!.
C') !
o
.c
Q.
u
c
..
C
o e
~o
u-
::sU
.. !
..-
en 6
c U
OCD
U,f
~:
IS c
.0'&
c i
CI)-
-a!
_ CD
o c
0>>&
~
co
.....
cD'
It)
...
,... 0 C')
..,. ,... ..,.
-.:t . cO . a)
Nit).....
... ..... .....
I . I I I I I I I
0)
C')
ai'
It)
r--
N
,...
&1
o
0)
"':
~~~~~~~~~~~~~~.~~~.~
.:..:.:..:
WO
IX: IX:
00
mill
:S:S
w(") t') C') C') (") G~
IX: wO
~ W
O~~~~~~~~~~~~~~~~~~~~
-J:WOWOWOWOWOWOWOWOWOOO
...1...1
~c(
Ob
~~
~
~
o
0)
N
It)
~
...
! .; !
.& 8.,.&
,j 0 ~
~
c(
=s
:i
:::)
en
....
z
::)
o
o
o
c(
w
o
a::
o
La.
~
;;;,
...
m
>-
l!!
o
o
c
o
Q
III
Ii
:i
"ii
;;;,
0)
:il
c
CD
E
~
.e
52
W~~~~~~~~~
!;(o 0"": cO O"":NcOcO
IX:NN..,.(")N..,.(")
fh~~~0~~~~
WOO...lJ:... 0
o~~xO)~"U):5:5
ONNc(:5NGl.....NN
O-r-~(I)N-or-a.....
!
~t:t:~ffit:~~~~
c(GlSGlSIX:WGlSII)::EOO
::E~~~o~Wmoo
,
W::'::::'::Z~::'::.!! 00
WOOOIX:oi~J:J:
:S~~~IX:~IX:0~::E
o ~ ~ ~ 9~, IX: 0 8
co
ai
(")
~
l!!
...
o
~
"ii
:E
.s::
0.
.,
III
o
...,
.:.i:l.li.:.i
~:o~
0.....0
~@~
mo..~
~::::>z
W , W
~::'::::E
zIX:o..
wc(-
::E::E~
0.. 0
5 W
o
W
ff.
It)
N
~
c
.9
Ii
0.
It)
It)
N
.....
Bt ~
~ c ~
.,.9
Qco.5~
0)'" .!! III
<~51
ieoLL
;;;'Gl:EE
= = x :J
c(mOo
W W W
::EZ:iZ:iZ
~~~~~~
IX: g, IX: g, IX: , g,
o IX: 0 IX: 0 IX:
000000
ZWZW~W
I1IWWWWW
>0>0>0
N (")
,... It)
cD ' ..,:
<>> .....
N
~~~
ff.ff.ff.
000
000
ctiNr.O
.......... N
.:.i.:.i.:.i.:.i
;!:!:!:!
0000
~~~~
IX:~..J::'::
oZ~IX:
mWIX:O
c(~w~
.Jo..~
-oc~
;:)....w
0"'-
W ..J
c(
(j
W
0..
~
e
~
z
o
o
III
;:)
rn
@@@
~~o..
WO~
ww::'::
o o IX:
IX:IX:~
~~IX:
000
IX:lX:m
~~CC
Ww..J
IX: IX:
00
IDID
:s:s
Z
'0
(ij
.:.i:l.li.:.i
~:o~
0"'0
~@~
mo.....I
::::>~c(
w,o::
...I~W
~<(~
ffi::Ei
i
W W W
:iZ::EZ::EZ
~~~~~~
IX:~IX:~IX:g,
o IX: 0 IX: 0 IX:
000000
ZWZWZW
WWWWWW
>0>0>0
co
CO
~
e
II)
..
N
.,..
-I
<C
I-
o
l-
e
z
~
C)
~
o
n.
w
0::
.-
.:.i:l.li.:.i
c(:O~
~ ~~
~::.::
~~IX:
w~O
~i~
o W
~ ::::i
~ c(
::::i 0
c( ~
o W
w (;j
0.. IX:
W 0
~ ~
o ~
~ ~
~ 0
Z m
o ~
o W
m
~
W
. .
----
10 ...
~~
J ~
C')
3 ;:e
-e~
i~
! J
,-
" 0
2 !
.1 ~
Is
10 ...
~!!.
C') .
C
o
.c
Q.
u
c
..
c
o e
~o
u-
::s ~
.. ..
..-
enS
cu
OCD
u.E
..
~CD
ca l!
.0,&
C ;
Q)-
-at!
_ CD
o c
0>>&
.:..:.:..:
wo
IX: IX:
00
mm
:s:s
IX: t') C') t') (") tG
~ Ww
~~~o~~o~~o~~o~~o~~~~o~~~~~o~o
....w w w w w wow wowo
...1...1
~<
Ob
~~
U)
...
cD'
10
...
~ ~ ~
.,j-'.,;.cri'
N C') ...
... ... ...
N
,...
N
10
~
0)
~
co
N
.n
..,.
~
~
...
l!!
o
.Q
III
...I
...
l!!
o
.Q
III
...I
~
c(
:i
=s
::)
en
t-
z
::)
o
o
o
c(
w
o
a::
o
La.
\
5
;;;,
...
lD
>-
l!!
o
o
c
o
l:>>
III
..
:E
"ii
;;;,
l:>>
:il
.!:i!
a;
"
C
Gl
E
c(
.2
"3
...,
...
...
g'
U)
(") U)
10 U)
cO I c:i
,... ,...
....
~~~
ex;
ai
C')
~
~'#.'#.
800
00
('I)N.n
... ... N
...
!
o
.Q
j
@@@
~~o..
wo::::>
ww::'::
00IX:
IX:lX:i
~~IX:
000
IX:lX:m
~::::><l"
ww..J
IX: IX:
00
IDID
:s:s
~
o
:c
u
"ii
:E
.s::
0.
Gl
III
o
...,
coco 0,....,...
00 ....0)0
aiai '~~~
,... ... co
W~~~~~~~~~
~OO"":"':O"":NcOcO
IX:NN..,.ION..,.C')
~~~..~~~~
_~oo
:.:...1010
1:~NN
u
~
~t:t:~ffit:~o~~
c(GlSGlSIX:wGlSGlioo
:E~~~o~U?moo
w::'::::'::Z~::'::~NOO
WOOOIX:OII)~~~
:S~~~IX:~IX:0..::;..::;
0~~~9~ IX:88
Gl
.:.i:l.li.:.i
~:o~
0....0
~@~
mo..~
~::JZ
w , W
~::':::E
zIX:o..
wc(-
:E:E~
0.. 0
- w
::::>
o
w
.:.i.:.i.:.i.:.i
~;!;!~
0000
~""~I-
IX:1-..J:lIl:
~OZ~IX:
IDWIX:O
:5~w~
o..~~
S<Crn
a~-
w ..J
<C
(j
W
0..
~
o
~
~
~
z
o
o
m
;:)
rn
w w w
:EZ:EZ:EZ
c(0c(0c(0
Zj::Zj::Zj::
IX:g,IX:g,IX:g,
o IX: 0 IX: 0 IX:
000000
ZWZWZW
wwwwww
>0>0>0
e
CO
.
N
CD
c>>
..
N
.,..
. .
-I
<C
l-
e
l-
e
z
~
C)
I-
0::
e
n.
w
0::
~~
.:.i~.:.i
~ :0 ~
o @o
tDa.~
~::.::
~~IX:
w a:: 0
~~~
~ ~
~ ~
::::i 0
c( ~
(3 ~
w w
a. a::
~ 0
w ~
g ~
o ~
~ ~
~ 0
Z m
o ::::>
o w
m
~
w
,.,.'....O'F...Gi;--. ". .
""-\~""-,1>O'
/'"~):',.."'." ,~'f~';-'\-L.\
i i", :::"'::~"iill~} *
'*":"~""'!'i"-C.."
. .,.'"~'-"' --."
\\., ~ is::::;: ..."-
" >"> .,.'
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
'.
"'.
CHANGE ORDER NO.8
To contract for: Monterey Streetscape Improvement Project, Phase III
Project No. CML-5034(012), City Project No. 06-CDD-119
Contractor: Golden Bay Construction, Inc. Contract Date:
2/21/2006
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Reimhursement for the premium portion of the overtime costs for labor per attached Change Order Request Nos.
GBC/CGII28,
(;BC/CGII49,
GBC/CGII8I,
GBC/CGII82,
GBC/CG/224,
GBC/CG/225,
GBC/CG/230,
GBC/CG/258,
GBC/CG/263,
GBC/CG/296,
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are
ill full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of
efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any
right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the
Extra Work,
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $25,682.63
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$4,130,554.75
$368,938.36
$4,499,493.11
$25,682.63
$394,620.99
$4,525,175.74
P.M.
Percental!:e Initial
8.93% M
9.55% ~
CONTRACTOR
By:
Date:
ACCEPTED BY:
/;2 '2. //tJ6'
RECOMMENDED BY:
Date
12/19/2006
06-CDD-119
Change Order No. 8
d~mmm~~~ golden ~QY
.,~ construction,
.
Inc.
.'-~ general engineering contractors
16 August 2006
GBC/CG/128
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Premium Cost for Acceleration Change Order Request
Mr. Krueger:
The following change order request is for the premium cost expenses for the acceleration
work performed on Saturdays at the subject project as directed by the City of Gilroy
through City letter #49. This is a progress payment request of the acceleration work and
is for work performed on dates 29 July, 5 August and 12 August 2006 only. The total
amount due for this work is $3,88824 (see attached Force Account Summary Sheets 017,
025 and 029 for further detail). $2-/ 758.' 22-
Please process a change order in the amount of$J,XX8M.to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Con
----------~
ri Cortese
Pro ect Manager
3826 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
'{m:..(I: ES}11
" WI
,-/. GV
-!irr f\~J~
d~m~mm~~ golden ~QY .
;~" r construction, Inc.
",rql
.'!~ general engineering contractors
25 August 2006
GBC/CG/149
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Premium Cost for Acceleration Change Order Request
Mr. Krueger:
The following change order request is for the premium cost expenses for the acceleration
work performed on Saturday at the subject project as directed by the City of Gilroy
through City letter #49. This is a progress payment request of the acceleration work and
is for work performed on 19 August 2006 only. The total amount due for this work is
$1,72~o (see attached Force Account Summary Sheet 039 for further detail). This
change order request is for work performed by Golden Bay Construction only. Quality
Landscape Service (project irrigation and landscaping subcontractor) also worked
Saturday. Additional compensation will be required for these premium expenses. These
costs will be forwarded to the City of Gilroy for payment upon receipt.
tJ~2Z.7. 04-
Please process a change order in the amount of $1, 72t:jJl to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay ConstrucJ,ion;Tnc.
~.
/--~
/,Bri~1 Cortese
Pro' ct Manager
3B26 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
;m'(G [;1",
/~ ~~\.
;r .'
r, ~':/
4'~ r!!\..~ ','
--'~oomm~~~ golden ~QY .
~~f,f=;1:1 construction, Inc.
''''<'''!;:!!!'' general engineering contractors
,..... I ~ . ',", j--' l , . ".)-
A <1:.C".:1,1' ',1
14 September 2006
')!:P I ,j 1111/1)
EN(~I \.; "'r", .." 1\, 18''''
- v I \ll~ C i \.1 i 'J
GBC/CG/181
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Premium Cost for Acceleration Change Order Request
Mr. Krueger:
The following change order request is for the premium cost expenses for the acceleration
work performed on Saturday at the subject project as directed by the City of Gilroy
through City letter #49. This is a progress payment request of the acceleration work and
is for work performed on 19 August 2006, 26 August 2006, 2 September 2006 and 9
September 2006. The total amount due for this work is $8,62697 (see attached Force
Account Summary Sheets 043, 044, 056 and 064 for further detail).
t6; 5"88.66
Please process a change order in the amount of S8,6209Lto compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golde Bay Constructio
ria Cortese
Proj ct Manager
3826 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
/c.'m".(ZTS/~';'\
-,' *1
r Q/
"'I' _,-, 5j):/
d~mmm~~~ golden ~QY .
;i~~ construction, Inc.
"'*" .4.d
'!"~ general engineering contractors
:~::C;;!" n
14 September 2006
~ ',I' I -; "lllij
ENGiNEEf-<ING
GBC/CG/182
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Premium Cost for Acceleration Change Order Request
Mr. Krueger:
The following change order request is for the premium cost expenses for the acceleration
work performed on weekdays at the subject project as directed by the City of Gilroy
through letter GBC/CG/163. This is a progress payment request of the acceleration work
and is for work performed on 5 September 2006 and 6 September 2006. The total amount
due for this work is ~284~ (see attached Force Account Summary Sheets 057 and 060 for
further detail).
452.2 #'70
Please process a change order in the amount of$72848 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Gold n Bay Construction, Inc.
~/'
3826 depot road, hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
3
~m<DE'}',
':"," "1'\
, .
*
/" ~~
,'III f~/"
~OO~~~~~~ gOlden ~y .
~>!~~f1 construction, Inc. EOE/AA
"-- general engineering contractors
5 October 2006
i.
GBC/CG/224
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Premium Cost for Acceleration on Weekdays Change Order Request
Mr. Krueger:
The following change order request is for the premium cost expenses for the acceleration
work performed on weekdays at the subject project as approved by the City of Gilroy.
This is a progress payment request of the acceleration work and is for the work
perfonned on 19 September 2006 and 21 September 2006. The total amount due for this
work is S~132l\-(see attached Force Account Summary Sheets 071, 071B, 073, and 073B
for further detail). t681.29
Please process a change order in the amount of $9132.11.. to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
. ri Cortese
/ Pr ect Manager
Thank You
Gold n Bay CO~-IJHT.--
--
/,/""
3826 depot road. hayward, california 94545
510/783-2960 . 510/783-2971 fax. license #451401
~~~mmm~~ golden ~QY .
;~~~~= construction, Inc.
...~~ general engineering contractors
50ctober 2006
GBC/CG1225
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Premium Cost for Acceleration Change Order Request
Mr. Krueger:
The following change order request is for the premium cost expenses for the acceleration
work performed on Saturday at the subject project as directed by the City of Gilroy
through letters GBC/CG 179 and GBC/CG/203. This is a progress payment request of the
acceleration work and is for work performed on 16 September 2006 and 23 September
2006. The total amount due for this work is '6,36903. (see attached Force Account
Summary Sheets 069, 069B, 076 and 076B for further detail).
.$1;376.95
Please process a change order in the amount of $6,36903 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golde Bay Construc~.
,......",--
~//
/~
//"
____ .} Cortese
/
Pro ect Manager
3826 depot road, hayward, california 94545
510/783-2960. 510/783-2971 fnx lirDl"I<!D :tt.4~1.4f'l1
, /m,(i;-E:'}~,.,
;'- .p\
, ~
'-/' ~
R j I f \"'" "
~~illrnm~~ golden ~y .
;;'=~lLi construction, Inc.
~~~~ general engineering contractors
5 October 2006
GBC/CG/230
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Mark Harrison Grading Overtime Work Change Order Request
Mr. Krueger:
The following change order request is for the overtime premium expenses incurred by
Mark Harrison Grading at the subject project. This work was performed on a force
account basis as directed by the City of Gilroy on 09 September 2006, 12 September
2006, 14 September 2006, and 16 September 2006. The total amount due for this work is
$2,83500 (see attached Force Account Summary Sheet 067 for further detail).
Please process a change order in the amount of $2,83500 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, Inc.
~
/' 1 Cortese
Pri ~ect Manager
3826 Depot Road, Hayward, CA 94545
510-783-2960-510-783-2971
License: 451401
",/m.',,\~-f.-:,}~~\
.'
/ 'Q/
!f}'JI}9,
~~mm~m~~ golden ~QY .
':~-:.~= construction, Inc.
"; 'V
'1<i~ general engineering contractors
26 October 2006
GBC/CG/258
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Premium Cost for Acceleration Change Order Request
Mr. Krueger:
The following change order request is for the premium cost expenses for the acceleration
work performed on Saturday at the subject project as directed by the City of Gilroy
through letters GBC/CG/212 and GBC/CG/223. This is a progress payment request of
the acceleration work and is for work performed on 30 September 2006 and 07 October
2006. The total amount due for this work is $6,65181 (see attached Force Account
Summary Sheets 080, 080B, and 087 for further detail).
.$i03/.21
Please process a change order in the amount of $6,85183 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, Inc.
3826 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
"m,";:CI:S;:;,
:C' +\
, *;
'c/ " ,,,'0/
Ii.rl !.Y' ''J
--.--.
u~mmm~~~ golden ~QY .
';f~~ construction, Inc.
'~ general engineering contractors
26 October 2006
GBC/CG/263
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Premium Cost for Acceleration Change Order Request
Mr. Krueger:
The following change order request is for the premium cost expenses for the acceleration
work performed at the subject project as directed by the City of Gilroy. This is a progress
payment request of the acceleration work and is for work performed on 29 September
2006 and 17 October 2006. The total amount due for this work is.sl,17571 (see attached
Force Account Summary Sheets 079, 079B and 097 for further detail).
.'f,82.0.40
Please process a change order in the amount of$I,17571 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, Inc.
4;---------
ri Cortese
Pr ~ect Manager
3826 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax
'/.m..~\J:';';'\
,..:.. +\
--~ .:
- I
I Y'
~t ! }_Y:.~) ,
-Joooom~~~~ golden ~QY
,+"r,''l''l'':U11 construction inc. EOE/AA
'<,' ',~'; r; ,
,>jj:r general engineering contractors
r~ECEIVED
21 November 2006
~Jl)V 2 ~ '~~lJIl6
ENGINEERING
GBC/CG/296
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Premium Cost for Acceleration Change Order Request
Mr. Krueger:
The following change order request is for the premium cost expenses associated with the
acceleration work performed on Saturday at the subject project as directed by the City of
Gilroy through letter GBC/CGI278. This is a progress payment request of the
acceleration work and is for work performed on 04 October 2006 and 28 October 2006.
The total amount due for this work is $2,61864 (see attached Force Account Summary
Sheets 115 and 122 for further detail).
i J/84/.0B
Please process a change order in the amount of $2,61864 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
3826 depot road. hayward california 94545
510/783-2960 . 510/783-2971 fax. license #451401
.-........of..Gi/..... .
'" ....". -Po'
/~'~;.k\
i r:;;fll\~~; 'jj * .
\ * l~'''~~~;",~/ ;'
, . iI'i_:..,.."., .
.... ;'..' ':::::.' .... "
.... . -."'" ....-
~ "'-'.n...
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408)846-0450; Fax (408) 846-0429
CHANGE ORDER NO.9
To contract for: Monterey Streetscape Improvement Project, Phase III
Project No. CML-5034(0l2), City Project No. 06-CDD-119
Contractor: Golden Bay Construction, Inc. Contract Date:
2/2112006
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Perform additional work to accommodate PG&E gas services per attached Change Order Request Nos.
GBC/CG/123, GBC/CG/148, GBC/CG/183, GBC/CG/226,
GBC/CG/127, GBC/CG/l5I, GBC/CG/l9I, GBC/CG/228,
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are
in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of
efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any
right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the
Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $9,275.99
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$4,130,554.75
$394,620.99
$4,525,175.74
$9,275.99
$403,896.98
$4,534,451.73
P.M.
Percentage Initial
9.55% ~
9.78% ~
CONTRACTOR
By:
Date:
RECOMMENDED BY:
Date
ACCEPTED BY:
12/19/2006
06-CDD-119
Change Order No. 9
J~mmm~~~ golden ~QY .
}~ construction, Inc.
.~ general engineering contractors
16 August 2006
GBC/CG/123
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Crew Inefficiencies due to PG&E Change Order Request
Mr. Krueger:
The following change order request is for crew inefficiencies and additional work
performed due to PG&E gas valve work site interference at the subject project. The crew
inefficiencies took place while forming the sub-slab area from Fifth to Sixth Streets on
the west side of Monterey Street. The inefficiencies and additional work was tracked on
a force account basis on 15 August 2006. The total amount due for this work is $90gll
(see attached Force Account Summary Sheet 036 for further detail).
Please process a change order in the amount of $90gll to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
::HSZ6 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
.(-.m(\JESri~
, ~
\("/> ~(J
JUJ..D (9
R.Il, d V'IT HIt!.. in
---~..._~
~~mmm~~~ golden ~QY .
:':~ JUal construction, Inc.
?I'l'" ...,
'~~..-l..:V general engineering contractors
16 August 2006
GBC/CG/127
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-1l9
PG&E Block Outs Change Order Request
Mr. Krueger:
The following change order request is for blocking out the sub-slab areas for PG&E gas
valve work at the subject project per the direction of the City of Gilroy. Alllocations
and sizes of block outs were placed as designated by the City of Gilroy. The work was
performed on a force account basis as directed on 9 August 2006. The total amount due
for this work is $88450 (see attached Force Account Summary Sheet 026 for further
detail). This amount is for the block outs performed on 9 August 2006 only. Be advised
that further force account payment will be required for other block outs and the additional
work to place concrete in blocked out areas when PG&E is completed. The City of
Gilroy will be required to pay all labor and equipment expenses for the placement of
concrete in the blocked out areas.
Please process a change order in the amount of $88450to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Constructien;Inc.
------~
/'"
,....--
,/,.-
.-;/ ,
"Br' tin Cortese
Pr aeet Manager
Ii
V
3826 depot road, hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
/\1',,\:\1 E 01:;.,"
/"" '1'\
,* *
''.\(:/, <,...0)
'~J..I..IY' ,
/<:.'It"'1 j,~ry High In
~~mm~~~ ~:~~~~c~~~, inc.
- general engineering contractors
25 August 2006
GBC/CG/148
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
PG&E Blocked Out Area Work Change Order Request
Mr. Krueger:
The following change order request is for installing aggregate base, grading and placing
carpet in the sidewalk area blocked out for PG&E service at the northwest corner of
Fourth Street and Monterey Street at the subject project. The City of Gilroy directed
Golden Bay Construction to block out the area due to unknown requirements from
PG&E. This work was performed on a force account basis on 19 August 2006. The total
amount due for this work is $66J10 (see attached Force Account Summary Sheet 040 for
further detail). .
Please process a change order in the amount of $66740 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You /
Golden Bay ConstrUcif~n, Inc.
l ///
/
:" -/,~/,,..?/"
~'/~
'B"~. :n Cortese
protect Manager
3826 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
/CD-"G~~
pm'''1'\
\:~ ,~*)
':I' _ x,"V1
:~L1D/!')
/--.i [((/ HIgh In
/' c
d~~mm~~~~ golden ~QY .
':'__ construction, Inc.
:5~
-...-- general engineering contractors
25 August 2006
GBC/CGIl51
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
PG&E Claim Change Order Request
Mr. Krueger:
The following change order request is for compensation from a PG&E claim to repair a
cut gas line at the subject project. Golden Bay Construction was performing unsuitable
sub-grade remediation on force account when it was discovered that the gas line was in
conflict with the remediation work. Golden Bay Construction cut the gas line as the City
of Gilroy stated it was inactive. The line was still in service and had to be repaired by
PG&E. The total amount due for this work is $1,14236 (see attached Force Account
Summary Sheets 038 for further detail). Golden Bay Construction is requesting the City
of Gilroy to pay for this claim as Golden Bay Construction was working on force account
when the incident occurred.
Please process a change order in the amount of$I,14236 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
----
Thank You ~
Golden Bay 7c;fu;n, Inc.
(/
1150 east 19th avenue · san mateo, california 94403
650/655-3900 · 650/655-3901 fax · license #451401
6.._,Am,;cDl'-1~\
* 1*)
((. '0/
/i1~~,t
P,ill'd \10")' HI:r-h tn
r '"
d~mmm~~~ golden ~QY
;~.. construction,
.
Inc.
general engineering contractors
~-(' /,r-'\1''"'
/"':-:! \j LJJ
14 September 2006
.'l II
)I!
'1111i)
ENGIN
HING
GBC/CG/183
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Drain Holes in Curb and Gutter Change Order Request
Mr. Krueger:
The following change order request is for coring new roof drain holes through the curb
and gutter to accommodate PG&E gas valves and grades throughout the subject project.
This work was performed on a force account basis on 29 August 2006. The total amount
due for this work is $36960 (see attached Force Account Summary Sheet 049 for further
detail).
Please process a change order in the amount of $36<ft! to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golde Bay ConstI1!ction, hic.
3826 depot road, hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
,.I....(m.:~ES~
" *1
~~ ~(i
~ ~-LfJ--~ ('J
~~mmm~~~ golden ~QY
..,..~~:- J construction, inc.
"<lIIl/_llIlP"
- general engineering contractors
14 September 2006
; r:l,l "/lil iI
r-v..! .'"~P I
;-~ IV { '" ll\,
.__ '~Jll ,
F~~j t\~G
GBC/CG/191
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Placement of Sub-Slabs in PG&E Areas Change Order Request
Mr. Krueger:
The following change order request is for the labor to place sub-slabs at areas blocked-
out for PG&E gas valve work at the subject project. Please note that labor only is being
charged on force account. The City of Gilroy will be required to pay for the sub-slab
under the appropriate bid item based on actual quantity placed. The total amount due for
the force account work performed on 7 September 2006 is $1,06344 (see attached Force
Account Summary Sheet 062 for further detail).
Please process a change order in the amount of $1 ,06344 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Constru
3826 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
/.m~\J "s"-"
(". ,"'\
, *)
';' "Q
~.ID-0'C,
NUir'd
~~mmm~~~ golden ~QY
;!~_ - construction,
.
Inc.
.:-.,__ Ib general engineering contractors
5 October 2006
GBC/CG/226
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Excavate and Grade Sub-grade in PG&E Areas Change Order Request
Mr. Krueger:
The following change order request is for excavating and grading the sub-grade in
locations where PG&E damaged the sub-grade while performing gas valve work at the
subject project. This work was performed on a force account basis as directed by the
City of Gilroy on 05 September 2006. The total amount due for this work is $2,44726 (see
attached Force Account Summary Sheet 055 for further detail).
Please process a change order in the amount of $2,44726 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Gold n Bay Construction, Inc.
------------
~---
/
3826 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
a~
*~QJ
.1.0JY"
i",de:!
"
j~mmm~~~ golden ~QY .
~:-r- construction, Inc.
"~~ general engineering contractors
5 October 2006
GBC/CG/228
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
CDF in PG&E Areas Change Order Request
Mr. Krueger:
The following change order request is for installing CDF in areas where PG&E
performed the gas valve work at the subject project. This work was performed on a force
account basis on 06 September 2006. The total amount due for this work is $1,792lf1. (see
attached Force Account Summary Sheet 059 for further detail).
Please process a change order in the amount of $1,79216 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, Inc.
I _____-
~
3826 depot road. hayward. california 94545
510/783-2960. 510/783-2971 fax, license #451401
3
1
!-(m",\:E s~"
* ~
\(\ -Q
,1~~); ,
R.Jt,'d
".,..,,"oi' 'ci /. . ,
.... 4..~." q,-.,,-po'
/(;- "~~,,,;'if;;\A \
' ...,....,:,"'~~'*.
\ * \.'C" "'::'l~,!,'1t_/ "
, '. liil~,.,..", _'. .
... "'- :~:;::.' 0""
.... ........--..".......
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408)846-0450; Fax (408) 846-0429
CHANGE ORDER NO.1 0
To contract for: Monterey Streetscape Improvement Project, Phase III
Project No. CML-5034(012), City Project No. 06-CDD-119
Contractor: Golden Bay Construction, Inc. Contract Date:
2/21/2006
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for, signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Ikscrintion of Work
Perform additional work related to installation of the new water main per attached Change Order Request Nos.
G HC/CG/ I 89 and
GHC/CG/234
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are
in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of
ct"ficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any
right to claim any further cost and time impacts at any time during and after completion ofthe Contract associated with the
Extra Work.
I (We) agree to make the above change
suojectto the terms of this Change Order
for the NET INCREASE of $5,977.46
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$4,130,554.75
$403,896.98
$4,534,451. 73
$5,977.46
$409,874.44
$4,540,429.19
P.M.
Percentage Initial
9.78%~
9.92% M
CONTRACTOR
By:
Date:
RECOMMENDED BY:
ACCEPTED BY:
1 2/1 9/2006
06-CDD-119
Change Order No. 10
, ,..,,---"->
~~mmm~~~ golden ~QY
~1 construction,
.
Inc.
general engineering contractors
f,", r-(,", r- i' ..r.")
,.",-- V.,.'.'.!
_,,_ ..1 I,. L. ,.
14 September 2006
;3F::J) ; ;5 ililJt;
ENGiNEEHING
GBC/CG/189
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Pacific Underground Extra Work Change Order Request
Mr. Krueger:
The following change order request is for Pacific Underground Construction performing
various extra work items at the subject project. The work was performed on a force
account basis as directed by the City of Gilroy on14 June 2006. The total amount due for
this work is $2,66412 (see attached Force Account Summary Sheet 054 for further detail).
Please process a change order in the amount of $2,66412 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
ri Cortese
Pro ect Manager
3826 depot road, hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
/,'m:(\:E~~" .
/" l'
" *
-/ <:1/
1,~'}__YY/'"
'-nfililm~~~ golden ~QY .
"'<':~~t'::!; construction, Inc. EOE/AA
,-- general engineering contractors
5 October 2006
GBC/CG/234
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Pacific Underground Extra Work Change Order Request
Mr. Krueger:
The following change order request is for Pacific Underground Construction performing
various extra work items at the subject project. This work was performed on a force
account basis as directed by the City of Gilroy on 15 July 2006, 18 July 2006, and 24
August 2006. The total amount due for this work is ~,85J3Jl(see attached Force Account
Summary Sheet 075 for further detail). .$ 3/3/2,57
Please process a change order in the amount of $6,8SJ30 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction c.
Cortese
/.,<
/ Pro ect Manager
3826 depot road. hayward, california 94545
510/783-2960 . 510/783-2971 fax. license #451401
ol) ...
.., 1'-'
V'l en
'3:, ~
rl ~
-e~
l~
.c J!
" C)
.. CQ
e ~
i~
-8 ~
o
10 ...
1'01 10
U) --
~ ~
i
u
c
.-
~
c
.2 e
..0
UlS
21:
..c
en 0
c u
00>
U.f
~a:
as c
.om
c ;
1)-
-cl!
_ CI>
o c
cn&
~
c(
:I:
:I:
i
!Z
:)
o
o
~
w
(.)
~
o
La.
CD lD
0 0
0 0
N N
10 8 B B
..... N E E
0 0) ! 1
N
N Gl
W
U) N
..... N
IX: IX: 0 ~
w w W
ID en ::E C3
::E ::E IX:
~ ~ 0 ~
z Z LL
~ en IX: ~
0 w
~ ..., 0.. W
~ w IX:
w ~
IX: 0
i-
M
i
.s::
0..
<II
1:
Gl
E
~
f c
8- ~
I I i
s
If 0
.1 i
I 0 ~
., j
'0 .s::
0
~ ~ ~ 0
0 0
w >->-
::E mID
~ 00
ww
~ ~::E
0 IX: IX: IX:
w w 00
~ Z J:LL
~ sffi
0.. c(o..
2'
o I I I I f I I I I I I I . I I I I t
tri
z
w
5
-~~~-~-~~~--~~~~-~~-
.:..:.:..:
w wo
~ ~a::
IX: 00
IDm
:s:s
w G~
~ w~
~~6~6~b~b~6~6~6~6~6~~
~ ...1...1
~ ~c(
Ob
~~
t:
~
o
c
o
ts
2
'lil
5
o
"
e
;;;,
e
e>
Gl
"
e
~
u
!E
u
l'C
0..
~
C
;;;,
~
.,
~
.e
e
o
)
8-
i!:
i
'0
I
!
o
'1:
~
s::
l
I
l~
=
III
~
u
1ii
'1:
Gl
1ii
E
-g
III
1
c::
.,
E
..
c
o
:e
'0
~
w
i
Z
o I . · I I . . . I I . I .
(ij
,"Z
s~..~.__.._..~
i ~~~
b"'b
liiO~
~o..i
a w=?!
c( i~
6 wi~
~ 0
5 w
~ 0
0 w
I~~
0
0
0
w
::.::
i
w
(f)
:s
0
Z
0
t
0::
0
CI)
w
0
~
a::
~
LL
o
Z
o
i=
0..
ii
o
w
w
o
~ CJ'J f1)
rft.?!-cf.
o c. C>
000
('I)N.o
..........N
e>@@
~6~
ww::'::
O(!)IX:
IX:1X:c(
c(c(::E
J:J:a::
000
IX:lX:m
~~:s
IX: a::
00
IDID
:s:s
z :r: z
o . 0 . 0 . . I I
(ij (ij in
,z ~ z
t,S.~.S....._
"<< ~ 12'
w w w
! ~ ~
i zz
~ ~ ~
~ ~ ~
..J
i
i
w w w
:i~::E~::E~
~~~~~~
858585
Z(f)ZWZCI>
~~~~~~
.:.i~.:.i
~~~
gog
~~~
W , IX:
Iii
i
C>
C";
. , ,....;
It)
lIC)
iii
-
.:.i
~
o
~
IX:
o
m
:s
411.........
.:.i.:.i.:.i.:.i
~~~~
0000
~...~...
IX:~..JI
oZC
IDWii
~:51~...
1 g:Eg
~ r
I
6
I
-f',
I;..' 10
r" (
.. v
--..
\if
m'
I
tRr
. .
-I
~
o
l-
e
z
~
C)
~
o
n.
w
0::
~;~aa~u II
l') ~ . ~ : ~ . ~ ... ~
12' << << ,. ,. ..
," i )' J I) g ~ g
:. i i i i Iii ~ ~~
~ ~c~ ~:ac:
I~!~!~!~ i~
- ~ ~
::::i ~
~ 0..
U U 0 ~ ~
.E .E .E 0.. IX:
C C C ~ ~
! i 1 fl ~
8 <3 <3 ~ ~
-gi!:-gi!:'8~0 ~
::lIo::llo::l_oO W
e~e~e~1D
iii il~
~i~ ~G.
~fi ~I
o..:;)o..~.f~
w w w
:i~::EZ::EZ
~i=~Q~Q
IX:e:IX:~~~
g585~5
zwzrnzw
~~~~~~
< ! ',-'"
CHANGE ORDER NO.1
&,-' 1<-- p&\.-_GJ:", :q- ~1.
Ct1::U> \...ju~'
. () ,
CfJ'r'JN:vc...-t ......v')
"'1.,.j.~OI~.
I U L_. \
t.>JLrt Lt1'O:: We etc. r
....."..OF. '(ii;--' ",
.,.'. -\~.. '....1'0'
/' ~.....,., ::;;.\ -L ".
,0,... rr~' :
; .-. ::~:A~::iJ;;;i!l_ --" i * ~
' '* "~'''' i ,"'C./ ;
. " "l"~". _._,
\'" """.,.:~ ;~::::.;~.."..':-'
",. ..........
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 950
Phone (408)846-0450; Fax (408) 846
To contract for: Monterey Streetscape Improvement Project, Phase III
Project No. CML-5034(OI2), City Project No. 06-CDD-I 19
Contractor: Golden Bay Construction, Inc. Contract Date:
2/21/2006 ,
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
Thc City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Dcscriotion of Work
Rcmove and replace concrete band at back of sidewalk at various locations per attached Change Order request Nos.
GHC/CG/227
GHC/CG/232
GBC/CG/265
GBC/CG/297
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
Hy signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are
in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of
efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any
right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the
Extra Work.
I (We) agree to make the above change
suhject to the terms of this Change Order
for the NET INCREASE of $32,043.07
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$4,130,554.75
$409,874.44
$4,540,429.19
$32,043.07
$441,917.51
$4,572,472.26
P,M.
Percentage Initial
9.92% ~
1O.70%~
CONTRACTOR
Hy:
Date:
ACCEPTED BY:
Project Engineer
Date
RECOMMENDED BY:
12/19/2006
06-CDD-119
Change Order No. 11
,-'
d~~mmm~~ golden ~QY
, construction,
.
Inc.
--- general engineering contractors
5 October 2006
GBC/CG/227
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Remove Sidewalk at Monterey and Fifth Change Order Request
Mr. Krueger:
The following change order request is for the removal and disposal of the one (1) foot
wide concrete sidewalk at the buildings on the east and west sides of Monterey and Fifth
Streets of the subject project as directed by the City of Gilroy through RFI #079. This
work was performed on a force account basis on 11 September 2006 and 16 September
2006. The total amount due for this work is $2,03430 (see attached Force Account
Summary Sheets 065 and 068 for further detail).
Please process a change order in the amount of $2,03430 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
. , Inc.
3826 depot road, hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
;(';iJE~.
i.'-',m. ~"'\
* *'
In ;)
~~~
Rattd Very High in
-~UUDmm~~~ golden ~QY .
~T . construction, Inc.
"11ft
"- general engineering contractors
5 October 2006
GBC/CG/232
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-II9
Removal and Disposal of Concrete Band Change Order Request
Mr. Krueger:
The following change order request is for the removal and disposal of the one (1) foot
concrete band adjacent to the Ashford's Heirloom's building on the west side of
Monterey of the subject project per RFI #079. This work was performed on a force
account basis as directed by the City of Gilroy on 27 September 2006. The total amount
due for this work is $56012 (see attached Force Account Summary Sheet 078 for further
detail).
Please process a change order in the amount of $56012 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
,/
1150 east 19th avenue · san mateo, california 94403
650/655-3900 · 650/655-3901 fax · license #451401
;.j0fEs;..."
m' -'
'..",,"1'\
* *,
i",~)
'!!"!J5'Y;
;?ard VelY J-1~~h in
, '
--'
j~mmm~~~ golden ~QY
.;, II !!L - construction inc.
,~ . ,
w;~ general engineering contractors
26 October 2006
GBC/CG/265
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Demo, Form and Pour Curb Near Chips & Salsa Change Order Request
Mr. Krueger:
The following change order request is for demolishing, forming and pouring the curb
near Chips & Salsa and the EI Charito Market of the subject project. This work was
performed on 13 October 2006 and 14 October 2006 through a force account basis as
directed and marked by the City of Gilroy. The total amount due for this work is $1,80795
(see attached Force Account Summary Sheet 094 and 095 for further detail).
Please process a change order in the amount of $1,80795 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank: You
Golden Bay Construction, Inc.
~~/-----~-
_/~
1150 east 19th avenue · san mateo, california 94403
650/655-3900 · 650/655-3901 fax · license #451401
(..'~,JJEsr:t~
\c~~
~x.!.-~~
f?u<,d ~ery Hith in
~~mmm~~~ golden ~QY .
~:JI ~ construction, Inc.
'''':~~ general engineering contractors
I~ECEIVED
21 November 2006
'I t) Ii 2 IZ 06
ENGINEERING
GBC/CG/297
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project. Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Demo, Form and Pour Concrete Band Change Order Request
Mr. Krueger:
The following change order request is for demolishing, forming and pouring the one (1)
foot concrete band between the back of the sidewalk and the face of the buildings in
various locations of the subject project. This work was performed on 14 October 2006,
19 October 2006, 21 October 2006, 25 October 2006, 26 October 2006, 27 October 2006,
28 October 2006 and 30 October 2006 through a force account basis as directed by the
City of Gilroy in RFI #079 and letter GBC/CG/250. The total amount due for this work is
$27,6402l (see attached Force Account Summary Sheets 096, 099, 100, 106, 109, 111,
113, 116, and 118 for further detail).
Please process a change order in the amount of$27,6402l to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
3826 depot road. hayward, california 94545
5101783-2960. 5101783-2971 fax
/(\'.Ej),
:.em "'.p\
'* ~\
,r>. ~ '0
-'f_~':~
R{j[,.j ~~r)' High In
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO. 12
To contract for: Monterey Streetscape hnprovement Project, Phase ill
Project No. CML-5034(012), City Project No. 06-CDD-119
Contractor: Golden Bay Construction, Inc, Contract Date:
2/21/2006
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
This change order provides for the following:
-Sawcut and remove pavement on Martin Street to conform to new curb and gutter
elevation per attached Force Account Swmnary Report No. 47.
-Additional costs for placement of 3/4" AC base course and 1/2" AC surface
course per attached change order request Letter No. 216.
-Place aggregate base at the northeast corner of Monterey Street and Lewis Street
per attached Change Order request Letter No, 229,
-Remove and replace section of existing PCC pavement on Lewis Street per attached
Change Order request Letter No. 231.
-Repair "Business Open" sign at the southwest corner of Monterey Street and
Third Street per attached Change Order request Letter No. 235.
-Install flagpole holders in brick area per attached Change Order request Letter No. 259.
-Remove curb, gutter and sub-slab and construct driveway approach on east side
of Monterey Street at Station 10+83.88 per attached Change Order request Letter No. 260.
-Procure cutback per attached Change Order request Letter No. 261.
-Remove four "Business Open" signs and deliver to the City corporation yard per attached
Change Order request Letter No. 262.
-Furnish and install plywood ramps in the sub-slab area per attached Change Order
request Letter No. 264.
-Remove and replace sidewalk at the northwest corner of Monterey Street and Fifth Street
per attached Change Order request Letter No. 294.
-Furnish and install signs on Martin Street per attached Change Order request Letter No. 295.
-Construct concrete median on Monterey Street north of Fourth Street per attached
Change Order request Letter No. 298.
-Revise irrigation controller per attached Change Order request Letter No. 299,
All requirements of the original Contract Docwnents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
2/2/2007
06-CDD-119
Change Order No. 11
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with
this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption,
loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby
waives any right to claim any further cost and time impacts at any time during and after completion of the Contract
associated with the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $33,247.73
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$4,130,554.75
$441,917.51
$4;572,472.26
$33,247.73
$475,165.24
$4,605,719.99
CONTRACTOR
By:
Date:
ACCEPTED BY:
Date
RECOMMENDED BY:
Project Engineer
2l2I2oo7
06-CDD-119
P.M.
Percentage Initial
10.70% 'J:l
11.50%dd..
Change Order No. 11
10 ...
~ Si
.... 1'01
at ~
III ClO
U ,...
"E~
i,!!.
III >><
.c J!
" 0
III CO
e ~
- .
o C')
Q.CO
Gl ,...
" 0-
CO ...
1'01 10
ClO -
C') CD
c
o
.c
Q.
U
I:
..
c
.2 f
..0
u-
::s ~
.. ~
..-
en 6
c Co)
OCD
u.5
~
~~
as !
.0'0>>
I: ;
Q)-
"Ol!
-~
o c
0>>&
88
00
fONN
,.....0........
;:!;Sl~~
~ ~ ~
c(c(
0)0
NM
E
.S2
e
o
U
~
ai
.ca
>-
III
~
"
III
e
B
l!!
u
e
8
-
o
-
III
o
10
N
>-
j!
III
E
'x
e
0.
0.
III
Q)
>
o
E
~
"
e
III
:;
~
III
III
.E
III
~
8
ai
'1::
B
III
E
'0
e
III
j
o
e 0.
o :i
13 E
lii.5 iii
0)11I e
Gl e 0
;;;, 0 E
>-::2 0 '0
W ~ .!!! iV' ~
>-.- 't: ID
Q) 0 III e
lii'O.s::G) ~
C 0:2 IX:
o~..:o 0
::EO::EO ~
LL
o
Z
o
j::
0..
a:
o
CI)
w
o
~
a::
c(
:::IE
:::IE
::)
en
to-
Z
::)
o
o
o
c(
w
o
a::
o
La.
C
.2
1ii
>
Q)
Qj
,g.
lii
==
;;;,
0)
"
e
III
€
;;;,
u
~
e
.9
-
'... ..... 0 N co ... 0) 10 10 1010 0
;; Z N I co co 0) co 10 10 ,... ,...,... 0 or-
0 cO r.ri , ai , r.ri I , , I , I , , I , , ....: I N I N N N"": . N 10
(ij co 0 ,... ,... N ..,. 0) co co ClO 10
" ..... M ..,. ....C') 1'01 .
Z N
w 0
i' E
;::---- or-
..
~W ~~ ~~ W~ ~~ ~~ ~W ~~ ~~ ~~ ~~~ ~ or-
N 0 a; 0) .:..:.:..: .:.i i&i .. .. .. ..
L 0) 0) <ft.';f!.?ft. ..J..J..J..J
W cO N ai ....: Wo ~ ~~~~
~ 000
> ~ ~ 10 C') t') IX: IX: 000 0 0000
~ ~ ~ 00 ('I)Nr.ri .,..
IDID ........N ~ ~~~~
:S:s IX: IX:~..J::'::
@@@ 0 OZo(IX: . .
'..",., W ... N N N ~~ ID IDWo::O -I
" IX: 00 ~~o.. :s :5::Ew~
::::> Ww Wo~ e:!;(~ <(
ii, 0 ~b !iib ~~ ~~ ~~ ~~ ~b ~6 ~I- IX: IX: WW::':: ::)~CI) I-
J: Wo Wo Wo Wo Wo ee Ooa:: a -
IX:lX:i W ..J e
...1...1 0(
~~I ~~ ~~IX: (3 I-
00 000 W
~~ IX:IX:ID 0.. e
~~:s w
e ~ Z
~ 0 Ww
LL III IX: IX: 0 ~
~ III 00 ~
0 ::E e 5 ~CO 11/2- IDID ~
- III ... ... :s:s C)
'..,'.. :5 E ! l!! l!! ,
E l!! 0 0 ~
! .Q .Q Z I-
Gl 0 III III 0
OLL 0 ...I ...I 0 0::
ID
< ( UJ1/Yafe/la / ) ~ e
w
4' ~ ~ n.
W e 0 e W
:c 0
,.' ::E 0 e " 0::
0) III U e
~ III E "ii Gl
ai >- ::E ::E
::E ~ .s:: .9 ;
5 0.
ij' >- Q) e fitl
31 € III (j
52 0 III
> ..., ...,
,J, Z ~~:5~~ COCOfO ",:) ~ Z Z Z 8z Z 0 00
... 10 ,... 0 00
0 ~~~R~ , , , , , "":0"": , 0 , 0 I . I , 0 '0 . 0 , 0 NN
< (ij (ij (ij (ij 0_ (ij
C') 10 co "N~ ""w ..,. ..... 10
.ffi ..... C') t') Z Z Z NZ Z N N
W W W W ~~
~ i~:; 5 5 5 5 5
,j" ~ ~~~~~~~~~~ ~~~ - w ~ ~-~ ~ ~ ~ ~~
ii' = << a:- IX: ~ a:-
.~ ~~~::~ .:.i:l.li.:.i IX: .:.i:l.li.:.i .:.i :l.li.:.i
W c(oc( W W W ~:o~ W W W ~ :o~
~ oo"':r.ri"": ~1l)1-' m ID m ID ID m
NNIl)C')"" 0.....0 ::E :E :E 0"'0 :i :E :E 0 @o
; ~ @~ ~ ::::> ~ ~ @~ ~ N~ ~ ti o..~
~wwww 1D0..~ Z Z Z 1D0.....I Z ~z Z ~::.::
~~z ~::::>c( ::::>
i,L ..., w W W w,...w W w ,a::
0 w I W 0 0 0 W , a: 0""0 0 ::'::0
c( ~lit:::E g 5 ~ ...I::'::w 5 5 ~ ::.:: a::~
>cO' zIX:o.. c(IX:~ a:: ~~
i ~ wi- > ffiii c,~ ~ ~
0 ::E ~ ~ ~ W
0.. 0 0,- - ::::i
iF. S W i; i .1' ~ c(
'~ W 0
~ 0 ii. D ::::i
.,.,..0 W W
<'. c( 0..
'." U ~
ii W W
.ur, 0.. a::
~ .....NNNN I ~ 0
W W ~
i:~ a:: 0
~.'I:: ~ ~
W 0000...1 , U' 0 0 ~
;; 8 NNNM~ ,',0 S ~ Z
I I N lO 0
NNr--OM 'g13
t"O ..........N !z 0
;' III Gl m
],; O)W 0 ::::>
W t:~IX:::EZ ..., e >- 0 W
::.:: w...l~ = III m
i ~~~~~ ;;;, ~ ~
iF. ~i W
III 0
i' W ::.::::.::~~z wa::
Gl-
~ ooa:: 0 e ;;;,
.:'; ~~IX:::E~ "'. _ u
IX:IX:O~IX: >.~
" 0 ~~...I ~ III III
.: IDW
;, Z lii I
..'.. Q) E I"~ ~ Z W W t,r. I s W W
i'; 0 0 E ::EZ ::EZ ::EZ ::EZ
j:: .s:: c(o ~~ ~~ c(o ~~
.>0: III
0.. 1515liJ:lii zj:: Zj::
r; 0:: 2 2 CD .2 'ii ; IX: 0.. IX:e: IX:e: ;. a:: e: IX:e: a::e:
< 0 ~~0"3~ ....0 a: 85 o IX: i', 0 IX: o IX: o a::
W ,00 00 J 00 00 00
W ~~r;::~~
0 ZW ZW ZW /ZW ZW zw
:S5C~o ww ww ~~ WW ~~ WW
~~...,J:..... >0 >0 >, > 0 >0
.
.
~~mmm~~~ golden ~QY
construction,
.
Inc.
_ general engineering. contractors
29 September 2006
Sent Via Fax & Hand-Delivered
OCT 0 L1 Z005
GBC/CG/216
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Asphalt Type Change Order Request - RFI #094
Mr. Krueger:
Per the City of Gilroy's request through the response to RFI #094, the following cost
breakdown is being submitted to justify the additional $1,25000 required for placing
multiple asphalt types at the subject project. The Contract Documents require that W'
asphalt concrete be used for the entire section of paving on Monterey Street. The City of
Gilroy required through RFI #090 that 0/,." asphalt concrete is to be placed as a base
course with a surface course using W' asphalt concrete.
The purchase price of the asphalt concrete is the same for the W' and 0/,." mixes. The
additional cost is a result of additional coordination, inefficiencies and material losses.
Paving operations are expected to take approximately four (4) days to complete. Both
types of asphalt concrete will be placed within each day. Additional coordination of
trucking will be required to ensure that each type is brought to the site at the proper
time(s). Inefficiencies will result from the need to possibly place and compact an
additional lift of asphalt since the base course will be 3-W' thick leaving a smaller section
of surface course at l-W' (see RFI #094 response). Working two different types of
asphalt concrete also negatively affects production. The total amount of each asphalt
type needed on a daily basis is more difficult to accurately calculate when multiple mixes
are used. There will undoubtedly be material waist of each type of asphalt daily due the
inability to accurately calculate the exact amount of material needed daily.
A change order lump sum amount of $1 ,25000 is required to account for the losses stated
above. If the aforesaid change order request is acceptable, please sign the attached page
indicating acceptance of this change order request in its entirety and directing Golden
Bay Construction to proceed with the additional work. A timely response to this change
order request is needed as paving operations will begin on Monday - 09 October 2006.
3826 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
, .
'.
29 September 2006
City of Gilroy (GBC/CG/216)
Page 2 of2
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, Inc.
v-
, Cortese
Proif Manager
~~
Charles \i KrIA~f?f'
Print Name
/O/S-/bb
Date
10 ...
~ ~
. N
at .:,
.. ClO
U ,...
i~
!~
.c J!
-
" 0
<<I CD
2 ~
'0 c:,
Q.CD
II) ,...
" S
CD ...
~ !!.
C') .
C
o
.c
0.
()
C
-
c
.2 I!
..0
CJ-
::s g
...t:
..c
en 0
c u
OCD
CJ .5
..
~Q)
as !
.om
c i
CI)-
'at!
- Q)
o c
0>>&
88
00
fONN
0'" ...
..... . G) 4D
CON.Q.Q
01>>00
NUU
NOO
NC')
00
>-
a::
c(
:IE
:IE
::)
en
....
z
::)
o
o
o
~
w
o
a::
o
La.
.:..:.:..:
wo
IX: a::
00
IDID
:s:s
~~
00
~ Ww
~~~~~o~~~~~~~~~~~~~~~o~o
....wow wowowowowowowo
...1...1
~~
~~
cD
co
cti
co
+
o
.....
co
.....
.0'
It)
.....
(") ,...
. ..,.
oi I ..,j-
..... N
..... .....
co
C')
cD'
.....
...
III
Ci5
1ii
>-
III
~
.;::
"
..
'lil
.5:
.9
fO
..,.
ai
t')
~
N
":
...
co
ai
C')
o
~
~
(")
C')
(")
1
Gl
~
'0
e
III
.Q
III
iii
.Q
;;;,
III
tL g
~ I'd
o:E_c...
c: tU ,g
Gl E l!
E I!! Gl
~~~
...
l!!
o
.Q
III
...I
!
o
.Q
III
...I
...
Gl
=::
;;;,
0)
'0
C
III
€
;;;,
U
Gl
e
o
Gl
-=
-
o
Gl
III
8. cD
.!!l Iii;
" ...
" Gl
c=::
III Gl
~-
~ .~
Gl Gl
... 0.
'5:
~1l
:J.!!
.9~
III l!?
1ii
8 ~
tit)
';6 E~
1ii
E 8
-g-g
III III
Gi B
~.!!!
0.0.
c -
III Gl
E"
li t!
c
~.s
:0 Sl
~C(
It::
"3
~
~
III
o
o
c:
.!!!
~
e
o
l!?
...
o
:c
u
"ii
:E
.s::
0.
Gl
III
o
...,
NIl)COCOC')N
co N 0) 0 C') 10
~ct~~8gj'
.......... .....
C') (") (") C') C') (")
w~~a::zo..
::.::~~w::::>:E:Eo..
c(GlSGlSwa::o...lO
:E~~O~O~~
w::.::::.::~zOa::o
WOOIX:O~:EO
cC~::::>IX:::::>""':E~
O..J a:: a:: 0 a:: 0 c( c(
~~...I~OJ:W
::it::
IX:
o
~
LL
o
Z
o
j::
0..
a:
o
w
w
o
.s::
U :=
.!! III
:(w
... Gl
Gl....
Q) E l!!
'E E g
;;;, III 0
~J:O
Gl
o Gi
ZCOzOz
Q:;Q~Q
w..,. W loW
z z Z
w w w
~ ~ ~
~0~~~~0~~
a:: a:: IX:
w w w
~"i~ ~
~13::::> ~
z~z z
Wc(W w
212 2
gwg g
z z z
co
r--
cO'
co
0)
"":
~
C')
...
l!?
o
.Q
III
...I
c
o
0)
GI
..
:E
"ii
;;;,
0)
~
r-- fO C')
(") ..... 10
..,:cti"":
Il)COC')
10 CD
..:J~.:..i
~:o~
0.....0
~ @~
mo..~
::::>~z
w , w
~::':::E
zIX:o..
w<(-
:E:E~
0.. 0
- W
~
o
w
'0
(II
.Q
.....
,
)(
.!!
c
:i:
u
E
III
Gl
'0
;;;,
(j
,5:
~
co C')
..... N
ci I ..
co r--
.....
0~~
'#.~';fl.
000
000
ctiNr.O
..........N
@@@
~~o..
WO::::>
ww::'::
00IX:
IX:IX:~
c(c("'"
J:J:a::
000
IX:a::lD
~~:s
IX: a::
00
IDID
:S~
co...,...
r--fOC')
octi..,:
0) ..... 0
.:.i:l.li.:.i
~:o~
0.....0
~ @~
1D0.....I
~~c(
W , 0::
...I::'::w
c(IX:~
ffi~~
!;(
:E
r--
.....
r::
co
M""
10 C')
...:..'
C')O
10...
~
.:.i
~
o
~
IX:
o
ID
:s
.:.i.:.i.:.i.:.i
~~~~
0000
~~~I-
IX:I-..J::'::
OZc(IX:
IDwo::O
-c:&w3:
...10..1-
--Cl-
~"",fI)
0"-
W ...I
c(
~
0..
~
e
~
~
z
o
o
ID
~
fI)
a::
w
ID
:i
::::>
z
w
o
5
>
~
IX:
Ml
:E
~
z
w
o
g
~
CD
o
.
CO')
or-
CD
..
or-
.,..
-I
<(
l-
e
l-
e
z
~
C)
~
e
n.
w
a:=
~~
.:.i :l.li .:.i
~ :0 ~
o @o
~o..~
~ ~::.::
w ~ IX:
::.:: IX: ~
~i~
~ ~
~ c(
::::i 0
c( w
U ~
w Us
~ a::
Us ~
a:: 0
~ ~
~ ~
~ 0
z m
o ::::>
o w
m
~
w
d~moom~~~ golden ~QY .
construction, Inc.
-- general engineering contractors
r'~"" F'
o L i ~;: ~ 2.0C~5
26 October 2006
GBC/CG/260
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Curb, Gutter & Driveway Approach Change Order Request
Mr. Krueger:
The following change order request is for demolishing, grading, forming and pouring the
curb, gutter and the driveway approach to the back of the brick sub-slab on the east side
of Monterey Street at Station 10+83.88 of the subject project. This work was performed
on 02 October 2006 and 03 October 2006 through a force account basis as directed bl the
City of Gilroy through City letter #78. The total amount due for this work is $,6,52.29 (see
attached Force Account Summary Sheet 081 and 086 for further detail). $3".651. 15
$3~651,75
Please process a change order in the amount of $6,52296 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, In
3826 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax
.,..---:
n~m~~~~~~~ golden ~QY .
construction, Inc.
- general engineering contractors
r, .""~""
! i; I
,--''-' '
i..
26 October 2006
GBC/CG/259
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Flagpole Holder Installation Change Order Request
Mr. Krueger:
The following change order request is for the installation of flagpole holders in various
locations of the subject project. This work was performed on a force account basis as
directed by the City of Gilroy on various dates in August and September 2006. The total
amount due for this work is $1,69836 (see attached Force Account Summary Sheet 090
for further detail).
Please process a change order in the amount of $1 ,69836 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, Inc.
3826 depot road, hayward, california 94545
510/783-2960. 510/783-2971 fax, license #451401
~h golden bay .
construction, Inc. EOE/AA
--- general engineering contractors
OCT 1 0 2006
5 October 2006
GBC/CG/235
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Repair Sign at Third Street Change Order Request
Mr. Krueger:
The following change order request is for the repair of the sign at Third Street of the
subject project. This work was performed on a force account basis as directed by the
City of Gilroy on 21 September 2006. The total amount due for this work is $40253 (see
attached Force Account Summary Sheet 072 for further detail).
Please process a change order in the amount of $402~0 compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golde Bay Construction
3826 depot road. hayward, california 94545
510/783-2960 . 510/783-2971 fax. license #451401
~~~ golden ~QY .
construction, Inc. EOE/AA
-- general engineering contractors
5 October 2006
OCT 1 0 2006
GBC/CG/229
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Place Aggregate Base at Lewis and Monterey Change Order Request
Mr. Krueger:
The following change order request is for the placement and compaction of aggregate
base in the sidewalk area behind the curb and gutter northeast of Lewis and Monterey
Streets of the subject project. This work was directed by the City of Gilroy in RFI #077
and performed on a force account basis on 15 September 2006. The total amount due for
this work is $1,OOoll (see attached Force Account Summary Sheet 066 for further detail).
Please process a change order in the amount of $1 ,00oD- to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, Inc.
~
3826 depot road. hayward california 94545
510/783-2960 . 510/783-2971 fax. license #451401
~~m~~~~ golden ~QY .
construction, Inc.
-- general engineering contractors
5 October 2006
OCT 1 0 Z006
GBC/CG/231
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Remove and Replace Section of Roadway at Lewis Change Order Request
Mr. Krueger:
The following change order request is for the removal and disposal of approximately 200
square feet of roadway section, as well as, the placement and compaction of twelve (12)
inches of aggregate base east of Lewis Street at the subject project. This work was
performed on a force account basis as directed by the City of Gilroy on 19 September
2006. The total amount due for this work is $1,85193 (see attached Force Account
Summary Sheet 070 for further detail).
Please process a change order in the amount of $1 ,85193 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, Inc.
3826 Depot Road, Hayward, CA 94545
510-783-2960-510-783-2971
License: 451401
II) ...
~ ..
at
J "
.
C')
CD ClO
U ,...
-e s
...
t !!.
. >><
.c .!
-
" 0
. CD
e at
1'01
15 ~
Q. ClO
. ,...
" S
II) ...
1'01 !!!.
ClO
CO') Ii
c
0
.c
0.
u
c:
-
c:
.2 !
..0
u-
::I g
.. ..
..-
en S
c U
OQ
u.E
..
~CD
as !
.0,&
c i
CD-
'tJl!
_ CD
o c
0>>&
>
a::
c(
:IE
:IE
::)
en
t-
z
::)
o
o
o
c(
w
o
a::
o
La.
[",. co fO
0 8
I 0
" fO N N
0 ... Ii
co N Gl
co .Q .Q
0 0) 0 ~
N t)
N 0 0
C') fO
0 0
IX: IX: 0 w
w w w !;(
m ID :E
:E :E IX: 0
~ ::::>0 ~
Z ZLL
~ m IX: 0
0 W 0..
0 ..., 0.. W
0.. 0 w IX:
w m ~
IX: 0
z;
0
,~
~
a:
e
u..
~
1+.
0
w
.~
0
0::,
0..
C')
Q)
III
III
.s::
0..
.l!l
c
" .
E
~
e
0.
.E c
0
II) 13
0. ... 2
~ . 1ii
.l!l 0)
II) c
Q) ;;;, 0
! ~ ... 0
::.:: iU'
US e Q)
>-= 't: ID
l!!0 aJ e
Gl- .s:: GI
_ 0 0
S~ '0
~ o.
:EO 0
w >- >-
:i: ID In
c( 0 0
Z W w
t N :E
a:: a: IX:
w w 0 0
..., Z J: LL
0 ~ ~ a::
IX: ~ w
0.. c( Q.
II)
-=
c
o
co
,...
""
CD
==
~
~
o
&
.Q
III
Iii
,
.Q
;;;,
III
~
15
Gl
-=
'0
.>t:
()
III
.Q
Q)
-=
.9
"fi
aJ
e
0.
0.
III
>-
III
~
'1:
'0
'0
e
III
CD
==
;;;,
0)
.e
;;;,
u
G)
-=
...
::lI
o
0.
'0
e
III
E
.e
.9
III
1iiui
8~
_C')
III co
";:: +
GlO
1ii.....
E.!!
'Ow
iti
j !
oB
g-S
1lI:i:
E-
_ 0
~~
,8.
~=
c( II)
~
a::
~
11.
o
Z
o
i=
0..
a:
o
W
w
o
,.---
ZN co ..,. N N fO 10 0 ... HI" I
0"": Ol co (") (") co 10 ... 10
, ai . r.O , 0 . 0 , , , , . , , . . cD , r.O , ... .0 .'.', . . (of)
(ij~ 0) 0) co ClO co ..... 10 10 II)~ .
z'" ..... .... ... .... co ..... N N. ~N <\1
w ... ~ :~
5 !{)
,
.' U') U') U') U') ~- U') ~ U') U') U') U') U') U') ~ U') U') ~ U') U') U') _ U') ~ ----
w~ 0) fO ClO co .:..:.:..: .:.i [ .:i.:.i.:i.:i
0) 0) 0 0 '#.<fe.'#.
~fO ai cD r.O r.O wo 000 ~ ~;!~;!
~~ ..,. ..,. ..,. -.t IX: IX: 000 ~ ,.'.
U') ~ U') U') 00 ('I)Nr.O 0000
mm ......... N ~~~~ .,..
:s:s IX: IX:~..J:lC:
@@@ 0 OZc(IX: ,
~~ m IDW-O . .
WN -.t ..,. ..,. ..,. :s :5~ffi~ -I
IX: 00 ~~o..
~ Ww WO~ .~ o..~~ <(
0 IX: a:: ww::':: SoCCm
J: ~~ ~~ ~b ~~ ~~ ~~ ~~ ~b ~~ 55 00IX: ,ill( o~- I-
wo wo wO wo wo wO WO IX:1X:c( E w ...I e
0::. ...1...1 c(c(:E == ~
0 ~c( J:J:a:: :l 0 I-
~ o~ 000 m; w
~~ a::a::lD ~ 0.. e
Ii: e e c e ~~:s 2 ~ z
0 0 0 0 0 ~
~ :l III III III a:: IX:
III III III 00 W ~
O~ c :E :E :E IDm 0:: 0
III ... - - .... :s:s ~ C)
e E e c e e
G) G) G) G) ~
E l!! 0 E E E z
.Q ~
. 0 III Gl Gl G) 0
011. ...I 0 0 0 0
m
:J e
,g U) n.
CD
:0 N .Q W
'. W C III e ~
:E 0 0) E N ~ ('!')~f' 0::
0) "ii .. l!!
c( III 0 III > E \0 .'0 f' ('l')
I Z .. IX: ;;;,
:E e a:: III -: r::<$~
I III 8 IX:
5 .Q .9 ~
B "C "C e ..... t"~
t) III
III 0 II) ;;;,
'..' :> w :i: m ...,
Z COfOfO 0......... Z 0 Z I Z Iii I Z Z Z
co.....,... ..,...,.co 0
0 ~.n('l) . , . . , , , m~ci 0 0 0 0 , 0 , Q , Q , , , ,
(ij ..,.coco 0C')..,. (ij an (ij (ij (ij W W
Z N N Z Z Z Z Z Z
W W W W " W W W
~ 5 5 ~ , 5~ ~ ~
w w WU') w~
_U')~U')U')~U')U')U')~ U') U') _ U') ~ ~ _U')~ c. U') --
~a;~ .:.i:l.li.:.i a: 1i: a: .:.i:l.li.:.i " ~ a: 1i: .:.i :l.li.:.i
w ~:o~ w w w ~:o~ w w w ~ :o~
~ cioo m m m ;;, ID m ID
NNN 0.....0 :i :E :E 0"'0 :i :i :i: 0 @~
~ @~ ::::> ~ ~ ~ ~ @~ ~ ~ ~ ~
~ww 1D0..~ Z Z Z 1D0.....I Z Z Z ~::.::
~::::>z co ~~c( ~
..., w w ..,. w w w w W ~IX:
I 0 W . W 0 0 N 0 W , 0:: 0 0 0 ~~
c( ~::':::i: ~ 5 ~ ...I::'::w g g ~ ::.::
za::o.. c(IX:~ ~ IX:
b w~- > a:ic( 0:: 0 :E ~
:E ~ ~ ~ w :E 0 ~ ~ ~ W
0.. 0 i ~., ::::i
5 w ~ c(
~ 0 .,.. W 0
0 w !!" ::::i w
,ti c( 0..
U (/)
.... ..J U w en
z c( W 0.. IX:
W ~ '0:: a:.' W 0
~ W N -.t-.r .. (j; ~
0..' !! c at a::
:; 0
'w 0 ~
e. E e ...
III w 000 1lI Q 0 ~
0 (\INN 0. I ~ Z
0 ' , , )( 0
NNN II)
0 .... ..... ..... B .... ~ 0
- rIi Z Z ID
GI ~ 0 0 ~
.:0: G) 0 W
w t:1:1: III c 11 0
::.:: 1ii 0 m m
c( GlSGlSGlS .:0 u :J: ::::>
:i ~~~ c fI) W
Gl %8
- 15~ ,
W ::.::::.::::.:: o ;;;, 11'0
W 000 .-: of)
:s~::::>~ 'E ~ SIl)
O~~~ aJ-
>-:E 0('1)
Z w w w w w w
0 :EZ :EZ :i:Z ::EZ ::EZ :EZ
j:: c(0 c(0 c(0 c(0 c(0 c(0
e:15~15 Zj:: Zj:: Zj:: zi= Zj:: Zj::
a:: 2 ;;;, ;;;, a::Q: a::Q: IX:e: IX:e: IX:e: IX:e:
~~~~ o IX: o IX: o IX: o IX: o IX: o IX:
~~~~ 00 00 00 00 00 00
ZW ZW ZW ZW ZW zw
555 ww ww ww ww ~~ ww
>0 >0 >0 >0 >0
()-..
'0
<:I;i
t'f)
~
,
<:\1
"
~~mmm~~~ golden ~QY
construction,
.
Inc.
-- general engineering contractors
26 October 2006
n"T
Ul, i
;
I.
GBC/CG/261
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Cutback Procurement Change Order Request
Mr. Krueger:
The following change order request is for procuring the cutback for installation in the
sub-slab areas of the subject project. The City of Gilroy directed Golden Bay
Construction to perform this work on a force account basis through RFI #089. Golden
Bay Construction procured the cutback on 02 October 2006 to have it available for
installation starting on 03 October 2006. Golden Bay Construction was directed to install
plywood ramps instead of the cutback in the weekly project meeting on 03 October 2006.
Again, this change order request is for the procurement of the cutback only. The total
amount due for this work is $1,80574 (see attached Force Account Summary Sheet 087
for further detail). Please advise if the City of Gilroy would like the cutback at their
corporation yard or if Golden Bay Construction is to dump the material.
Please process a change order in the amount of $1 ,805 74 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, Inc.
3826 depot road. hayward, california 94545
510/783-2960.510/783-2~71fax
~~mmm~~ golden ~QY
construction,
.
Inc.
-- general engineering contractors
eCT
{
26 October 2006
GBC/CG/262
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Sign Removal Change Order Request
Mr. Krueger:
The following change order request is for removal of the "Business Open" signs from
outside the project limits, delivery to the corporation yard, dismantling of the frames and
disposal of the lumber from the subject project. This work was performed on a force
account basis as directed by the City of Gilroy on 12 October 2006. The total amount due
for this work is $94442 (see attached Force Account Summary Sheet 091 for further
detail).
Please process a change order in the amount of $94442 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, Inc.
3826 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax
,
d~~mmm~~ golden ~QY
construction,
.
Inc.
-- general engineering contractors
r, "'<~ C' r
UL!
26 October 2006
GBC/CG/264
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Plywood Ramp Installation Change Order Request
Mr. Krueger:
The following change order request is for the procurement and installation of the
plywood ramps in the sub-slab area of the subject project. lIDs work was performed on
10 October 2006, 11 October 2006, 13 October 2006 and 18 October 2006 through a
force account basis as directed by the City of Gilroy through City letter #80. The total
amount due for this work is $3,33499 (see attached Force Account Summary Sheet 089,
092, 093 and 098 for further detail).
Please process a change order in the amount of $3,33499 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, Inc.
Cortese
Pr dect Manager
3826 depot road. hayward. california 94545
510/783-2960. 510/783-2971 fax. license #451401
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO. 13
To contract for: Monterey Streetscape Improvement Project, Phase III
Project No, CML-5034(012), City Project No. 06-CDD-1l9
Golden Bay Construction, mc, Contract Date:
Contractor:
2/21/2006
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
This change order provides for the following:
- Perform additional electrical work per attached change order request Letter No. 335.
- Route quad duct conduits into streetlight pullboxes per attached change order request Letter No. 337.
- Revise banner pole foundations per attached change order request Letter No. 338,
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with
this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption,
loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby
waives any right to claim any further cost and time impacts at any time during and after completion of the Contract
associated with the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $24,846,04
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
P,M.
Cost Percentage Initial
$4,130,554.75 J J
$475,165,24 11.50%..Qt:1
$4,605,719.99
$24,846,04 rJ _\
$500,011.28 12.11%~
$4,630,566,03
CONTRACTOR
By:
Date:
RECOMMENDED BY:
ACCEPTED BY:
Date
2/15/2007
06-CDD-119
Change Order No. 13
dO.~ golden ~QY .
construction, Inc.
- general engineering contractors
RECEf\/cD
16 January 2007
I^, f,i 1 "'f 20'Y7
0r.l'J , LiJ (
r"""'"
GBC/CG/335
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Signal Electric Extra Work Change Order Request
Mr. Krueger:
The following change order request is for Signal Electric Construction performing
various extra work items per the direction of the City of Gilroy at the subject project. The
work was performed on a force account basis as directed on 18 November 2006, 20
November 2006,21 November 2006,22 November 2006 and 28 November 2006. The
total amount due for this work is $14,41399 (see attached Force Account Summary Sheets
135 thru 139 for further detail).
Please process a change order in the amount of $14,41399 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Constructio
3826 depotr<>ad . hayward, california 94545
SlOng3-2960. fax 510/783-2971 . license #451401
~~~~~~~ golden ~QY .
construction, Inc.
-- general engineering contractors
R. ,r'=!"'t,.,..,,.,
........: ::-=:. "i _"".' ~,
.~._",=,-"".;"J[.".".t
29 January 2007
!f-. f. ~ ':~ -:--
,.) .1-.;;:\ L' .::-
GBC/CG/337
E.,.. ",
-[\0.. ,~
\. ""~-
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
REVISED Pull Box Modifications Change Order Request
Mr. Krueger:
The following REVISED change order request is for the pull box modifications made at
the subject project. This change order request supersedes the original change order
request submitted though letter GBC/CG/303 dated 29 November 2006. The total
amount due for this additional work is $6,22125 (see attached correspondence from Signal
Electric Construction for further detail).
Please process a change order in the amount of $6,22125 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Cons
Cortese
Proj ct Manager
3826 depot road. hayward, california 94545
510/783-2960. fax 510/783-2971 . license #451401
01/22/2007 15:25
, -.
4089294985 ~'~,. """,1;",' -;.-: SIGNAL ELECTRIC
-
PAGE 01/02
:' .' :~~: '~-'~
SIGNAL;Et:CCT:RlC~CONSTRUCTION INC
408 929-4900 X-23 FAX 929-4905
FAX TRANSMITTAL
~'-'''~'R''.~-\'::.'"'"F' C
. ,'''''',Y'':'''. ... ." .
.' . .
:./
DATE 1-22-07
FROM BRIAN GREEN~,X4J,,~.:;.f',:'
NO/PAGES -2- 0 0- ~-
Job # 2611 RFC # 4 Street Lighting
boxes B1 # 104 (REVISED)
TO; Golden Bay Construction
ATTN; Brian Cortese
- FAX; 510 783-2971
..' .".
.oF.
0" ....\.
Dear Brial1,
...... ""'?" ,
.....',{~.~..... ..:j
.........~.,...~ '..,' .
We have had an opportunity to set the N-36 with an extension and route the q,uad duct
into the street Ughting boxes. This changes the scope of our BI # 119 which ori.gin.ally
had no extension and only the street lighting conduit penetrating box. We are now
terminating 2- quad duct and installing an extensiqn. I.bave prepared an EWT for
additional work required. Please adjust Bll 19 to reflect change in. scope of work.
:" .ar' ::.:':.:l.
Revised to reflect no extensioic;~'itill~iJr red~ced accordingly. See EWT for revised
Bnakdow~ .
$ 237,00.00 added to original BI #104 $4,00.00 to new price of S 637.00 per
box or a change order for $ 25 X $ 237.00 = 5,9~.OOo(lnd pay 25 Pull box item # 104.
--:-:
.' ,
~. ~~_:r ;r.~.:;.. .~~~'?~
S incerel.y ,
~f
Brian Greene
~. ,....?;..).
,", ~"'~~"~~'Y'l.~;::.~"'~~" ....
~~~millm~~ golden ~QY
construction,
.
Inc.
-- general engineering contractors
R=C~E~\/ED
30 January 2007
;. '.' c~, ""C
, . - .
1--,. ~ t,[ _
GBC/CG/338
E>\i .::~, ~ ~< b=~~\~ R \ <)
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
REVISED Banner Pole Foundations Change Order Request
Mr. Krueger:
The following REVISED change order request is for the additional work associate with
the banner pole foundations at the subject project. This change order request supersedes
the original change order request submitted though letter GBC/CG/307 dated 30
November 2006. The total amount due for this additional work is S3,59~20 (see attached
correspondence from Signal Electric Construction for further detail). This amount is in
addition to the bid item units paid through Bid Item # 125. .$ i 2.. /0, 80 '
Please process a change order in the amount of $5,5792U to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Cons
3826 depot road. hayward, california 94545
510/783-2960. fax 510/783-2971 . license #451401
'. f'.
01/29/2007 14:59 4689294905
SIGNAL ELECTRIC
PAGE 61/62
SIGNAL ELEqRIC CONSTRUCTION INC
408929-49"00 X-23 FAX 929-4905
FAX TRANSMITTAL
R.F .C.
DATE 1-29-07
FROM BRIAN GR.EENE X23
NO/PAGES -2-
Job # 2611 RFC # 10 Banner
foundation revision ( Revised 1-2.9-07 )
TO; Golden Bay Construction
ATTN; Brian Cortese
FAX; 510315-3175
Dear Brian,
I have prepared 2 breakdowns to show the cost differential between the Banner pole
foundation shown on original plan and the revised foundation that would accommodate
actual bolt circle of Banner pole. We had to hire outside drilling company and cost
and quantity due to larger foundation and subsequent haul away of dirt.
Revised Banner Foundation $ l-996.0e ~b'8 5
Original Bannel" Foundation $ < 728.00 >
Cost difference per foundation $ i ,268.00 957
4 Banner Foundations @ $~.OO is $ S,an.56 3,82.8
'157
Sincerely,
Brian O.reene
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO. 14
To contract for: Monterey Streetscape Improvement Project, Phase III
Project No. CML-5034(012), City Project No. 06-CDD-119
Golden Bay Construction, Inc. Contract Date:
2/21/2006
Contractor:
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
This change order provides for the following:
-Install irrigation service at Lewis Street per attached change order request Letter No, 309.
- Reimbursement for the premium portion of the overtime costs for labor per attached change order request Letter No. 315.
- Refurbish and install six trash receptacles per attached Letter No. 97 and change order request Letter No, 322.
- Construct sidewalk and handicap ramp at the northeast comer of Monterey /Fourth Street per attached change
order request Letter No. 329. TIris work is being paid at force accoWlt instead of on the bid items since it was
directed to be perfonned separate from the other work in this area.
- Modify curb at back of sidewalk at the northeast comer of Monterey/Fifth Street per attached change
order request Letter No, 331,
- Furnish and install copper pipe from the irrigation boxes to the streelights per attached change order request Letter No. 332,
- Furnish and install additional signs on Martin Street per attached change order request Letter No, 333.
- Replace sidewalk removed on the north side of Fourth Street due to the WldergroWld conflicts encoWltered
during installation of the electrical service conduit per attached change order request Letter No. 334.
- Reimbursement for the premium portion ofthe overtime costs for labor per attached change order request Letter No. 336.
2/15/2007
06-CDD-119
Change Order No. 14
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with
this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption,
loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby
waives any right to claim any further cost and time impacts at any time during and after completion of the Contract
associated with the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $36,006.36
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$4,130,554.75
$500,011.28
$4,630,566.03
$36,006,36
$536,017.64
$4,666,572.39
Percentage Initial
12,ll%~
12.98% -cl:J
CON1RACTOR
By:
Date:
RECOMMENDED BY:
Project Engineer
Date
ACCEPTED BY:
2/15/2007
06-CDD-119
Change Order No, 14
~~mmm~~~ golden ~QY
construction,
.
Inc.
--- general engineering contractors
06 December 2006
Hand-Delivered
RECEIVED
DEe 0 6 Z006
ENGiNEERING
GBC/CG/309
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Lewis Irrigation Service Change Order Request
Mr. Krueger:
The following change order request is for installing a water service to the irrigation
controller at the northeast comer of Lewis Street at the subject project. The price to
install the two-inch (2") service and backflow preventer, including the items of work per
the attached proposal from Pacific Underground Construction is $10,97500. Please note
that this price does not include replacing the surface roadway section or any sidewalk and
curb and gutter. It is not possible to determine the extent of restoration needed for these
items until the actual service work is completed. Golden Bay Construction will replace
the roadway section, sidewalk, curb and gutter on a force account basis. These costs will
be in addition to the aforesaid lump sum amount for installing the service itself.
Please review this change order request and comment on its acceptability at your earliest
convenience. The work can not be scheduled until acceptance of this change order
request is received. Neither Golden Bay Construction nor Pacific Underground
Construction will be responsible for any potential delays to the project that may result
from the additional service work and/or approval of this change order request.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Constru~c.
/-,/
//
3826 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax
..
~ "'~CIP'ID
..A1!' UNDIERIiIRDUND
... g DDNI!ITRUDTIDN
Lie. ..23419 .
1817 STONE AVE. . SAN JOSE, CA95125-1311 ·
(408) 9n-1655 .
FAX (408) 977-1659
Golden Bay Construction, Inc.
3826 Depot Road
Hayward, Ca 94545
Attn: Brian Cortese
Ph: 510-783-2960 Fx: 510-783-2971
Re: Monterey Streetscape Phase 3 - City of Gilroy
- Irrigation Service at Lewis Street
December 5,2006
Scope of Work
Install irrigation service at Lewis Street as requested. Tap existing main, install 2" service and 2"
backflow prevention device, connect to ex stub at property line. Price includes saw cutting of
existing surface. Surface restoration excluded. (Installed by others) Price excludes all permits,
bonds, fees, surface restoration, engineering and layout, shop drawings, compaction testing,
concrete sidewalk! curb & gutter replacement.
2" service @ Lewis 1 LS @ $ 9,975.00
d~~mmm~~ golden ~QY .
~~Ul M=r construction, Inc.
'~ ~ general engineering contractors
f"H: r' r: i \ w: P
t\ i..-. ..d~ j \! C LI
13 December 2006
ENGINEERING
GBC/CG/315
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Premium Cost for Acceleration Change Order Request
Mr. Krueger:
The following change order request is for the premium cost expenses incurred by R&M
Paving (project asphalt paving subcontractor) associated with the acceleration work
performed on overtime at the subject project as authorized by the City of Gilroy. The
total amount due for the fgremium expenses incurred by R&M Paving associated with the
asphalt paving is .$6,618 (see attached correspondence from R&M Paving for further
detail). $2.0B6.~1-
'2..086.44-
Please process a change order in the amount of $6,6181& to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, Inc.-.
------
~.
/
,/
/-,//
,:;;::13'ri Cortese
Pr ect Manager
3826 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax
C~.,\f ::'if:,:
,~Q<;)/
Il '/~!-t:/ /"
,',,'/[,/ V;'I")' Ji;,l;h ;1.
( ... ...'.,".f'..';....
R&M
PAVING
INVOICE
980 Ames Avenue
Milpitas. CA 95035
Mailing Address:
P.O. Box 360799
Milpitas, CA 95036
(408) 946-2974
(800) 246-2974
(408) 946-8029 Fax
Contractors License
456578
No. 8579
To:
Golden Bay Construction
3826 Depot Road
Hayward, CA 94545
Attn: Brian Cortese
Date: December 5, 2006
Contract No.:
Job: 5578
Description: Amount
SERVICES RENDERED:
Overtime Invoice
Please see attached for breakdown.
JOB LOCATION:
Monterey Streetscape Improvement
Phase 3
City of Gilroy
DATE COMPLETED:
10/9 - 10/12/06
Lc:thtDl' j~((,c'AaJe /2 %'
L ahOl" /Vlt:jrk'uf' 2. 5~~
1411~35'
)
/70.32-
317.12
1"-"
I Please pay this amount. "'-,
:-10 st.atement will he issued,
$/;987.01
$ €',=0S.:::.e--
Terms: Net 30 days from date of job complet.ion. A service charge of 1 ~~,% per mont.h will be charged on all past due accounts,
~
h~J:,a. L~ ~)l~D'~t;-,l:; tz:~:~rJ~L;k;1;;,UlEl[~i;_,Z-.;
f.e. Bu;: 36iJ7111}, I"ihillali, eA 95G36-07l..
Ifm A.mils AiHlilUG. Mlipltas. ell DSil3E;
(4DV) fl46-2{l7~" (8001 21611-2!!74c (406) il1/v-('2:::U tc;..;,
Contractors LIcense _S6578
Employees Who 'Vorked Overtime at Monterey Streetscape
Name ,,, ork Classification
Eddie Venancio Teamster
Carlos Topete
Laborer
Eleazar Borrayo Laborer
Jorge Borrayo Laborer
Jose Preciado Laborer
Victor Borrayo Laborer
William Neu Laborer
Michael Neu
Luis Magallon
Alex Bargas
Lynn Zehr
Robert Neu
I I : i
" \. , /
I~t/
('
Owner
Laborer
Operating Engineer
Operating Engineer
Owner
Dates of \V ork
Hourly Rate
$24.48
OT Houri)' Rate
A
$49.13
10/9 - 10/12/06
(il) 32 hours 2.1-. 6f; (Zi~ 11.5 hour~ 283. 4- Ei
1019 - 10/12/06
$23.89
@31.5 hours iI. '75
1019 - 10/12/06
$23.89
@ 31.5 hours II /J 5"
$24.89
@ 31.5 hours J 2.15
$23.89
@ 3] hours iI. <J 5
$24.89
@ 31 hours /2.45
$26.87
@ 24 hours i3.44-
$33.89
(~? 32 hours i6.15
$23.89
(a; 24 hours II. q5
10/9 - 10/12/06
1019 - 10/12/06
1019 - 1 0/12/06
10/9 - 10/11/06
1019 - 10/12/06
1 0/9 - 1 0/11/06
1019 - 10/12/06
$32.75
@ 3].5 hours l6.36
$33.89
@', 32 hours i6.95
$33.89
1019 - 10/12/06
10/9 - 10/12/06
$35.84
@ 9 hours i 0 '7.5"5
$35.84
@ 10 hours JJ 9.50
$37.34
@ 9 hours ) 12 . {} 5"
$35.84
@ 5.5 hours 6573
$37.34
@5.5 hours 6"8. 48
$40.31
@]O hours 134.40
A- $50.84
(~I'j;:6'llOur~ 67.80
$~~5.84
(({ 5.5 hours 65.73
$49.13
~l) 6.5 hours 106.+7
$50.84
0~ 8.5 hours J4-/f.08
(d 32 hours /6. q5 (ii 8,5 hour,~ j 41. 08
$50.84
$/1J1,3~
i
<!eftp of ~fltOp
Planning Division
Engineering Division
Building, Life & Environmental Safety Division
Housing & Community Development
COMMUNITY DEVELOPMENT DEPARTMENT
7351 Rosanna Street, Gilroy, CA 95020
(408) 846-0440
(408) 846-0450
(408) 846-0430
(408) 846-0290
FAX: (408) 846-0429
FAX: (408) 846-0429
FAX: (408) 846-0429
FAX: (408) 846-0429
December 21, 2006
Golden Bay Construction, Inc.
3826 Depot Road
Hayward, CA 94545
ATTN: Mr. Brian Cortese
Letter No. 97
RE: Monterey Streetscape Improvement Project, Phase III
Refurbish & Install Trash Receptacles
We are in receipt of Letter GBC/CG/322 dated December 18,2006 providing a cost
proposal to refurbish and install the salvaged trash receptacles as requested in Letter
No. 89 dated November 28,2006. The trash receptacle at the northwest corner of
Monterey/Fourth Street is eliminated. Therefore, only six trash receptacles need to
be refurbished. The two salvaged trash receptacles in Golden Bay's yard on
Eigleberry Street are acceptable for refinishing. The other four are on Monterey
Street and have been marked with orange flagging. Please deliver the unused
salvaged trash receptacles to the City corporation yard on Seventh Street.
A Change Order will be issued in the amount of $2,850.
If you have any questions, please do not hesitate to contact me at (408) 846-0410.
Sincerely,
~!
Charles J. Krueger
Resident Engineer
cc: City Engineer
Don Dey, Transportation Engineer
Laurie Loveless, Engineering TechnicianlInspector
"First In Service to the Community"
~~mmm~~~ golden ~QY .
construction, Inc.
_ general engineering contractors
Rcrp\!r::n
.L"',h...! '....w
18 December 2006
Sent Via Fax & Hand-Delivered
DEe 2 0 2006
E'" ""
~ r< H':~
':; ~ ,.p>1:.;~
i~v
GBC/CG/322
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Refurbish Trash Cans Change Order Request
Mr. Krueger:
The following change order request is for refurbishing seven (7) of the salvaged trash
receptacles at the subject project per City letter #89. The refurbishment process will be
as follows:
1. Sandblast trash receptacle.
2. Chemical treatment of the surface.
3. One (1) application of zinc epoxy primer.
4. Two (2) applications of "green" powder coating.
The total amount to refurbish the seven (7) trash receptacles as stated above is $3,32500
($47500 each trash receptacle). This price includes pick-up/delivery and installation of
the trash receptacles. Powder coating paint to be a "close", but not exact, match to the
original color of the trash receptacles.
Please review this change order request and comment on its acceptability at your earliest
convenience. The refurbishment process will take approximately three (3) weeks to
complete once approval of this change order request is received. This change order work
will not be subject to the terms of the Contract and no liquidated damages and/or any
other damages will be assessed to Golden Bay Construction should the trash receptacles
not be installed prior to the current Contract completion date.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, Inc.
riffil Cortese
Pr9ject Manager
3826 depot road. hayward, california 94545
510/783-2960. fax 510/783-2971 . license #451401
~~m~~ golden ~QY .
construction, Inc.
___ general engineering contractors
i 1\ i,! 1 'i ') r I'
Jt-',,'~ e L~
16 January 2007
Ii\:
GBC/CG/329
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Construct Sidewalk and Handicap Ramp at Fourth Street Change Order Request
Mr. Krueger:
The following change order request is for grading, compacting subgrade, forming and
pouring the sidewalk and handicap ramp on the east side of Monterey Street opposite
Fourth Street at the subject project. This work was performed on 15 November 2006 and
20 November 2006 as directed by the City of Gilroy through City letter #83 and RFI
#109. The total amount due for this work is $3,17~ (see attached Force Account
Summary Sheets 125 and 133 for further detail).
Please process a change order in the amount of $3, 17~ to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, Inc.
3826 depot road. hayward, califomia 94545
510/783-2960. fax 510/783-2971 . license #451401
~m~~ golden ~QY .
construction, Inc.
-- general engineering contractors
R
r:
16 January 2007
1-'\
v'
1 ry
J.. .
GBC/CG/331
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Fifth Street Parking Lot Work Change Order Request
Mr. Krueger:
The following change order request is for demolishing, forming, pouring and backfilling
the curb in the Fifth Street parking lot of the subject project. This work was performed
on 15 November 2006, 16 November 2006 and 17 November 2006 as directed by the
City of Gilroy. The total amount due for this work is $2,51639 (see attached Force
Account Summary Sheets 126, 128 and 131 for further detail).
Please process a change order in the amount of $2,51639 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, Inc.
3826 depot road. hayward, california 94545
510/783-2960. fax 510/783-2971 . license #451401
- m1lJill~~~~ golden ~QY
construction,
.
Inc.
-- general engineering contractors
16 January 2007
J,t.!~ 1 7
'J ('; !-..-
LG~j i
GBCICG/332
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Installation of Copper Pipe Change Order Request
Mr. Krueger:
The following change order request is for procuring and installing copper pipe from the
irrigation boxes to the streetlights throughout the subject project. This work was
performed on 26 October 2006, 27 October 2006, 08 November 2006, 10 November
2006 16 November 2006 and 17 November 2006 as directed by the City of Gilroy in City
letter #72 and RFI #107. The total amount due for this work is $4,62oll (see attached
Force Account Summary Sheets 112, 114, 123, 124, 127 and 132 for further detail).
Please process a change order in the amount of $4,62oll to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction
Cortese
Pr ~ect Manager
3826 depot road. hayward, california 94545
510/783-2960. fax 510/783-2971 . license #451401
~m~~ golden ~QY
construction,
.
Inc.
__ general engineering contractors
R
JP'.t\J 1 7 2007
16 January 2007
GBC/CG/333
'x;i! ~-.. ~ ,,_,-_ ~ \ti ~-fi!
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Additional Sign Work Change Order Request
Mr. Krueger:
The following change order request is for procuring, and installing the additional signs at
Martin Street of the subject project. This work was performed on 07 December 2006 and
16 December 2006 as directed by the City of Gilroy in City letter #90 and RFI # 115. The
total amount due for this work is $1,49438 (see attached Force Account Summary Sheets
143, 145 and 147 for further detail).
Please process a change order in the amount of$1,49438 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change onler for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, Inc.
ri Cortese
Pro' ct Manager
3826 depot road. hayward, california 94545
510/783-2960. fax 510/783-2971 . license #451401
~~mmm~~~ golden ~QY
construction,
.
Inc.
--- general engineering contractors
i\. td ~1 7 ~L)'"~ -
0t'"~:'~ v
16 January 2007
GBC/CG/334
""p~ \..........~f
~)-
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Repair of Sidewalk Area for P~E Service Conflicts Change Order Request
Mr. Krueger:
The following change order request is for preparing sub-grade, placing and compacting
aggregate base, installing dowels and pouring sidewalk where the sidewalk was removed
for the PG&E service conflicts on the north side of Fourth Street of the subject project.
This work was performed on 30 November 2206 and 01 December 2006 as directed by
the City of Gilroy. The total amount due for this work is $1,58354 (see attached Force
Account Summary Sheets 140 and 141 for further detail).
Please process a change order in the amount of$1,58354 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction c.
3826 depot road. hayward, califomia 94545
510/783-2960 . fax 510/783-2971 . license #451401
'~mm~~ golden ~QY
construction,
.
Inc.
__ general engineering contractors
16 January 2007
!^~.) 1"
,-; /-\ ;\~ . -,
GBC/CG/336
'" ""-" ~ ~ '".
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Premium Cost for Acceleration Change Order Request
Mr. Krueger:
The following change order request is for the premium cost expenses associated with the
acceleration work performed on Saturday at the subject project as directed by the City of
Gilroy through letters GBC/CG/282, 287, 306, 310 and 316. This is a progress payment
request of the acceleration work and is for work performed on 11 November 2006, 18
November 2006,02 December 2006,09 December 2006 and 16 December 2006. The
total amount due for this work is $6,70 III (see attached Force Account Summary Sheets
129, 130, 142, 144 and 146 for further detail).
Please process a change order in the amount of $6,70 III to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank. You
Golden Bay Construction
Cortese
Pro ect Manager
3826 depot road. hayward, california 94545
510/783-2960. fax 510/783-2971 . license #451401
I ~ ,'/
It' i ~
City of GUroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO. 15
To contract for: Monterey Streetscape Improvement Project, Phase III
Project No, CML-5034(012), City Project No. 06-CDD-119
Golden Bay Construction, Inc. Contract Date:
Contractor:
2/21/2006
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
This change order provides for the following:
- Provide power to irrigation controller per attached change order request Letter No, 340.
- Perform additional work per attached change order request Letter No, 352,
All requirements of the original Contract Docmnents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with
this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption,
loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby
waives any right to claim any further cost and time impacts at any time during and after completion of the Contract
associated with the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $9,981.08
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$4,130,554.75
$536,017.64
$4,666,572.39
$9,981.08
$545,998.72
$4,676,553.47
Percentage Initial
l2,98%M
13.22% >>
CONlRACTOR
By:
Date:
ACCEPTED BY:
RECOMMENDED BY:
Date
5/24/2007
06-CDD-119
Change Order No. 15
'~mm~~~~ golden ~QY .
';r-< ~ construction, Inc.
-=-:~ general engineering contractors
08 February 2007
, . " .~
ti 'L,=L~~i \~I.~ v
GBC/CG/340
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-S034 (012) City Project #: 06-CDD-119
Irrigation Controller Conduit & Wire Change Order Request
Mr. Krueger:
The following change order request is for the additional work associated with installing
conduit and wire to the irrigation controller at the subject project. The total amount due
for this additional work is $5Soilll plus the unit rate under Bid Item #109 for all conduit
installed (see attached correspondence from Signal Electric Construction for further
detail).
i
Please process a change order in the amount of$55oilll to compensate for the afores~id
additional work. The amount of conduit installed will be billed through the next monthly
progress billing under Bid Item #109. Unless notified otherwise, Golden Bay
Construction will assume that the City of Gilroy is in agreement with this change order
request and a change order for the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Construction, Inc.
~~
/'
3826 depot road. hayward, california 94545
510/783-2960. fax 510/783-2971 . license #45140]
/~m:s,'J E s/:.r.",
'f,;' '*
. I
': >'~~}_!-~~~:
Sllff-;
~u~mmm~~ golden ~QY .
;tFIIi~I!l~; construction, Inc.
C"'l~'"..J,.;.- general engineering contractors
18 April 2007
Hand-Delivered
GBC/CG/352
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Various Items Change Order Request
Mr. Krueger:
The following change order request is for performing additional work at the subject
project as directed by the City of Gilroy through City letters 106 and 109. Items included
in this change order request are:
City letter 106- Items 1,4,5,6,7,8,9,10,11 & 13
... City letter 109- Second Bulleted Item
The total amount due for this work is $9,431 08 (see attached Force Account Summary
Sheets 148 thru 155 for further detail). Remaining items included in City letters 106 and
109 will be billed once received from subcontractors.
Please process a change order in the amount of$9,431 08 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You ___----
,.----'
Golden Bay Con~lOn, Inc.
I _,/
r"~"_"/////
X.
/,
/'/. .
// I
/Bri~ Cortese
projrct Manager
3826 depot road. hayward, california 94545
510/783-2960 . fax 510/783-2971 . license #451401
/_m'0l-ES;';r.f;'
<: :;
./c"" ,~o
-.J.I_fY":
.','::I,d:,';-r}h'I)J;/1
'I,,/(Im," .~,.'f/.'r;"ftl{,:n
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
,') f (;"i;', .....
"\ ....- '" 1>0"
" <,.,.~:,.,..,(....
le ~d "II -;-~~'"""'._ ~ .
~:.:~.,~"~ - ) *.!
'iIII~~_. ...:
:::::. ..' .
"
CHANGE ORDER NO. 15
To contract for: Monterey Streetscape hnprovement Project, Phase III
Project No, CML-5034(012), City Project No, 06-CDD-119
Golden Bay Construction, Inc, Contract Date:
Contractor:
2/21/2006
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work,
Description of Work
This change order provides for the following:
- Provide power to irrigation controller per attached change order request Letter No. 340,
- Perform additional work per attached change order request Letter No, 352,
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with
this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption,
loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby
waives any right to claim any further cost and time impacts at any time during and after completion of the Contract
associated with the Extra Work.
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$4,130,554,75
$536,017.64
$4,666,572.39
$9,981.08
$545,998.72
$4,676,553.47
Percen~e 7 I
12,98%~
13.22%~
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $9,981,08
CON1RACTOR
By:
Date:
ACCEPTED BY:
5/24/2007
06-CDD-119
Date
S- '2-4-/07
Date
Change Order No. 15
.,.,.~'"......~~...... "
.: ::;;F...b1i ^ "'"
~.- ,rrO
' ">, -'. .4'
, : I "II r;-:;,-yl~" .
. :::"":':IJ1"'!~;*!
~" ,:
., ---;7'
, . f!"
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO. 16
To contract for: Monterey Streetscape Improvement Project, Phase ill
Project No. CML-5034(012), City Project No. 06-CDD-119
Contractor: Golden Bay Construction, Inc, Contract Date:
2/21/2006
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor, All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
This change order provides for the following:
- Install seal coat and striping per attached change order request Letter No, 359,
- Furnish and install two Opticom Modules per attached change order request Letter No. 361.
- Furnish and install a pedestrian countdown head at the northwest comer of Monterey/Fifth Street
per attached change order request Letter No, 362.
All requirements of the original Contract Docwnents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and acc6rd, and are accepted as payment in full, for any and all costs and expenses associated with
this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption,
loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby
waives any right to claim any further cost and time impacts at any time during and after completion ofthe Contract
associated with the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $37,864.80
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$4,130,554.75
$545,998,72
$4,676,553.47
$37,864.80
$583,863,52
$4,714,418.27
Percentage Initial
13,22% M.
14.14%~
CON1RACTOR
By:
Date:
RECOMMENDED BY:
Date I
tllf 07
ACCEPTED BY:
Date
"
.
Inc. EOElAA
--- general engineering contractors
r"~;~~~~.
.h ;.-.
21 May 2007
Hand-Delivered
MAY 2 1 2007
E~ ~~'~~ ._~~L:t\~~\G
GBC/CG/359
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Seal Coat & Striping Change Order Request
Mr. Krueger:
The following change order request is for installing the seal coat and striping per letter
GBC/CG/356 and City letter #119 at the subject project. The total amount due for this
change order request is $34,56514 broken down as follows:
Part-A: Fog Seal Credit
Credit for not installing fog seal: <$1 ,52dL<>
Part-B: Seal Coat & Crack Filling
The total amount due for the application of the seal coat is $13,20000 (66,000SF @
$~/SF). The total amount due for the crack filling is $90000 (300LF @ $300/LF). The
total amount due for Part-B is $14,10000.
Part-C: Striping & Changes
The total amount due to remove ~ortions of the existing striping and re-stripe according
to the latest revisions is $12,1 ocr (includes $80000 deduct for not installing the
handicap signs). The total amount due to re-Iayout the striping is $3,00000. The total
amount due for Part-C is $15,10000.
Part-D: Traffic Control
The total amount due for traffic control is $3,30000.
Part-E: Changeable Message Sign
The total amount due for the procurement, rental and removal of the two (2) changeable
message signs is $3,58514 (see Force Account Summary Sheets 157 and 157for further
detail).
3826 depot road. hayward california 94545
510/783-2960 . 510/783-2971 fax. license #451401
. '. '
21 May 2007
City of Gilroy (GBC/CG/359)
Page 2 of7
Please process a change order in the amount of$34,56514 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
H
Thank You
Golden Bay Cons
ri Cortese
Pro ect Manager
. ..;.-:-"
d~~mmm~~ golden ~QY
construction,
.
Inc.
_ general engineering contractors
R""l=Cof:I\!!=n
. \~ i.=t t- ~iiI::::d'
23 May 2007
Sent Via Fax & Mail
MAY 2 4 2007
EN'8
GBC/CG/361
f';"
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Opticom Modues Change Order Request
Mr. Krueger:
The following change order request is for installing two (2) additional Opticom Modules
at Fifth Street and Monterey Street of the subject project. The total amount due for this
work is $2,81589 (see attached Force Account Summary Sheet 158 for further detail)
Please process a change order in the amount of $2,81589 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You ,0' ~
Golden Bay Con~, Inc.
Cortese
Proj ct Manager
'~
3826 depot road. hayward, california 94545
510n83-2960. 510/783-2971 fax. license #451401
.
'/./, .
. ~~mmm~~~ golden ~QY
construction,
.
Inc.
_ general engineering contractors
RECEI\!E[';:
23 May 2007
Sent Via Fax & Mail
MAY 2 4: 2007
EIJ
GBC/CG/362
11',1
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Pedestrian Countdown Head Change Order Request
Mr. Krueger:
The following change order request is for installing one (1) new pedestrian countdown
head at Fifth Street and Monterey Street of the subject project. The total amount due for
this work is $48377 (see attached Force Account Summary Sheet 159 for further detail)
Please process a change order in the amount of $483 77 to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Cons
~
3826 depot road. hayward, california 94545
510/783-2960. 510/783-2971 fax. license #451401
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO. 17
To contract for: Monterey Streetscape Improvement Project, Phase ill
Project No. CML-5034(012), City Project No, 06-CDD-119
Contractor: Golden Bay Construction, mc, Contract Date:
2/21/2006
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
This change order provides for the following:
_ Perform additional irrigation work per attached change order request Letter No, 341,
_ Credit for reduction in irrigation sleeves per attached change order request Letter No. 372,
_ Perform additional survey monument work per attached change order request Letter No. 380.
- Credit for elimination of thermoplastic traffic striping,
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with
this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption,
loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby
waives any right to claim any further cost and time impacts at any time during and after completion of the Contract
associated with the Extra Work.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $5,782.83
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$4,130,554,75
$583,863.52
$4,714,418,27
$5,782,83
$589,646.35
$4,720,201.10
Percentage Initial
14,14% ~
14.28%M
CONTRACTOR
By:
Date:
RECOMMENDED BY:
ACCEPTED BY:
,~ ..
~~OO~rnm~h golden ~y .
construction, Inc.
-- general engineering contractors
RECEIVED
FEB 0 9 Z007
08 February 2007
ENGINEERING
GBC/CG/341
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
,t Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (0 12)City Project #: 06-CDD-119
City Letter #104 & GBC/CG/330 Change Order Request Clarification
Mr. Krueger:
Golden Bay Construction is in receipt of City letter # 1 04 dated 01 February 2007 denying
the irrigation change order request submitted through letter GBC/CG/330 regarding the
subject project. Quality Landscape Service (project irrigation and landscaping
subcontractor) has issued clarification regarding the change order request's work. The
change order request is for the additional work required to add a separate mainline for the
stub-outs to the streetlights (see attached correspondence from Quality Landscape
Service). The total amount due for this work is $6,967.83. (please reference letter
GBC/CG/330 for back-up information).
Please process a change order in the amount of $6,967n to compensate for the aforesaid
additional work. Unless notified otherwise, Golden Bay Construction Will assume that
the City of Gilroy is in agreement with this change order request and a change order for
the work is forthcoming.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Cons
Cortese
Proj ct Manager
3826 depot road. hayward, california 94545
510/783-2960 . fax 510/783-2971 . license #45140]
dffiIDh ~:~~:~c~:~, inc.
general engineering contractors
RECEIVED
AUG 0 8 2007
ENGINEERING
06 August 2007
Sent Via Fax & Mail
GBC/CG/372
II
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Irrigation Sleeve Credit Change Order Request
Mr. Krueger:
The following change order request is to credit the City of Gilroy for the changes made to
the irrigation sleeves at the subject project. The total credit for the reduction in the
irrigation sleeves is <$2,30000>.
Please advise if the aforesaid credit amount of <$2,30000> is acceptable to the City of
Gilroy.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Cons
Cortese
Pro' ct Manager
3826 depot road. hayward. california 94545
510n83-2960. 510n83-2971 fax. license #451401
~m~rnm~h golden ~QY '.
construction, Inc.
_ general engineering contractors
29 November 2007
Sent Via Fax & Mail
RECEIVED
NOV 3 1 2007
ENGINEERING
GBC/CG/380
City of Gilroy
Engineering Division
Attn.: Mr. Charlie Krueger, Resident Engineer
II 7351 Rosanna Street
Gilroy, CA 95020-6197
Subject: Monterey Streetscape Improvement Project, Phase III
Federal Project #: CML-5034 (012) City Project #: 06-CDD-119
Survey Monuments Change Order Request
Mr. Krueger:
The following change order request is for the additional survey monument work at the
subject project. This change order request includes installing one (1) new monument at
intersection of Sixth Street and Monterey Street in the approximate location provided on
the plan sheet by the City of Gilroy. The monument will be constructed in accordance
with City of Gilroy Standard Detail STR-28. This change order request also includes the
additional compensation reqUired to re-Iocate the original monument reference points that
were located within the one-foot concrete bands adjacent the buildings replaced on force
account. The total amount due for this change order request is $6.115f1!.
Golden Bay Construction is proceeding with the aforesaid change order request work
based on the City of Gilroy's email approval of the cost. The survey crew will perform
field ,work next week, followed by creating the corresponding maps with submission to
the County of Santa Clara shortly thereafter. Physical installation of the monuments will
hopefully take place in January 2008 given the upcoming holiday season and the
corresponding County of Santa Clara schedule. Please issue a contract change order to
compensate Golden Bay Construction for the additional work.
Please feel free to contact me at (510) 783-2960 x229 should you have any questions.
Thank You
Golden Bay Constructi~.
~~
-./.
/,H'- Cortese
Pr . ect Manager
3826 depot road. hayward. california 94545
510n83-2960. 510n83-2971 fax. license #451401
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO. 18
To contract for: Monterey Streetscape Improvement Project, Phase III
Project No. CML-5034(012), City Project No. 06-CDD-119
Contractor: Golden Bay Construction, Inc. Contract Date:
2/21/2006
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Repair damage to seat wall, wall cap and bricks under bench at the southwest comer of the Monterey Street/Fifth Street intersection caused by the traffic accident on
July 7, 2007. This work is to be performed on a force account basis, at a total cost not to exceed $4,000.00, This additional work will not affect or extend the
completion date for the project, or the warranties for any portions of the work except that performed pursuant to this change order. In addition, payment shall be
made for this change order regardless of disputes or alleged rights to damages or setoffs by the City with respect to any other items of work or matters. Contractor
shall not be charged liquidated damages or working days for performance of this work. Retention shall not be withheld for this work, and payment for this work shall
be made by the City promptly in the ordinary course of business,
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss
of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with
the Extra Work.
\...; -~ ~i ~~\"~uc.,'-W,~.
CONTRACTOR
y:'1:>\2-\~ ~~~E: Date: tllot-^..A\2--o9,
~~:r-cL, MA..J
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$4,130,554.75
$589,646.35
$4,720,201,10
$4,000.00
$593,646.35
$4,724,201.1 0
Percentage Initial
14.28% ~
I (We) agree to perform the work described in this
Change Order on a force account basis at a total
cost NOT TO EXCEED $4,000,00
l4.37%~{
RECOMMENDED BY:
ACCEPTED BY:
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO. 19
To contract for: Monterey Streetscape Improvement Project, Phase III
Project No. CML-5034(012), City Project No. 06-CDD-I 19
Golden Bay Construction, Inc. Contract Date:
2/21/2006
Contractor:
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Clean and/or reconnect awning drain at 7550 Monterey Street. This work is to be performed on a force account basis, at a total cost not to exceed $3,000.00. This
additional work will not affect or extend the completion date for the project, or the warranties for any portions of the work except that performed pursuant to this
change order. In addition, payment shall be made for this change order regardless of disputes or alleged rights to damages or setoffs by the City with respect to any
other items of work or matters. Contractor shall not be charged liquidated damages or working days for performance of this work. Retention shall not be withheld
for this work, and payment for this work shall be made by the City promptly in the ordinary course of business.
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contra.ctor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this
Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss
of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with
the Extra Work.
I (We) agree to perform the work described in this
Change Order on a force account basis at a total
cost NOT TO EXCEED $3,000,00
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$4,130,554.75
$593,646.35
$4,724,20 ],] 0
$3,000.00
$596,646,35
$4,727,201.10
Percentage Initial
]4,37% M
]4.44%~
~
y: ~ ~~-VO~
'""?<z~~ ~
Date: Cl(o /-^.A~
RECOMMENDED BY:
L
ACCEPTED BY:
Date