HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 03 03.5 f <!eitp of ~ilrop . COMMUNITY DEVELOPMENT DEPARTMENT 7351 Rosanna Street, Gilroy, CA 95020 Planning Division Engineering Division Building, Life & Environmental Safety Division Housing & Community Development (408) 846-0440 FAX: (408) 846-0429 (408) 846-0450 FAX: (408) 846-0429 (408) 846-0430 FAX: (408) 846-0429 (408) 846-0290 FAX: (408) 846-0429 CHANGE ORDER NO.3 To contract for: Santa Teresa Boulevard Widening Project Project No. 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5/17/04 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work: Color concrete, brick pattern, near Welburn Bridge (see attached back-up). All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change Original Contract Price: subject to the terms of this Change Order for the NET INCREASE of$8,853.00. Previous Change Orders: Grall/Ie Censrac~' TOTAL TO DATE: ~o tractor '-7 " '" I /.._ / This Change Order: By: . ~ Date~/PS Revised Contract Price: $7,448,458.00 (56,720.00) $7,391,738.00 8,853.00 $7,400,291.00 1/'7/oS ~~ /" (-d-8"'CJ City Engineer Page 1 of 1 "First In Service to the Community" " . ......'"t, November 2:--2004 I GRAnITE, . [OnSTRUCTlon COmPAny Sl~ Mike Goodhue Public Works Director City of Gilroy 7351 Rosanna St Gilroy, CA 95020 408.846.0400 (phone) 408.846.0500 (fax) Re: Cost Proposal for Color Concrete - Brick Pattern Near Welburn Bridge Dear Mr. Goodhue, Seope of Work: This Cost Proposal includes the following: Remove approximately 330 sf of sand material at present site location, and replace with 4" of Color Concrete with the brick pattern. This work needs to be scheduled during our concrete operations at Oak Commons or Santa Teresa Boulevard. General Exclusions: 1. Over-excavation and/or recompaction due to unsuitable ground conditions; this will be paid as extra work. 2. Handling. and/or removing of any hazardous materials. Total Lump Sum Price "'" $ 8,853.00 We appreciate the opportunity to submit our proposal for this work. Sincerely, GRANITE CONSTRUCTION COMPANY .,...,.....;:.. ."",.7 ....'~.,.. / J'''/ ~,'-' ,.~>; .c ./::~..../ .-:-;t..'=-<-e/ ~~ .-,...,,/'~~.,r. Joe.!-~ez, Project Engineer Monterey Bay Branch P.O. Box 720. Watsonvillej CA ,95077 (831) 763-6100 FAX (831) 763-6121