Loading...
HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 06 ([itp of ~ilrop Planning Division Engineering Division Building, Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT 7351 Rosanna Street, Gilroy, CA 95020 (408) 846-0440 FAX: (408) 846-0429 (408) 846-0450 FAX: (408) 846-0429 (408) 846-0430 FAX: (408) 846-0429 (408) 846-0290 FAX: (408) 846-0429 CHANGE ORDER NO.6 To contract for: Santa Teresa Boulevard Widening Project Project No. 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5/17/04 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work: Upgrade Signal Interconnect Cable from PE #19 to PE #89 as indicated in attached Letter No.2 dated July 16,2004. The unit price for Bid Item No. 148 is revised from $3.00/LF to $3.94/LF. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $4,794.00 b~\1'6 ~t-J C,o. B~ Dare/.??4?6f Original Contract Price: $7,448,458.00 (40,964.00) $7,407,494.00 Previous Change Orders: TOTAL TO DATE: This Change Order: 4,794.00 $7,412,288.00 Revised Contract Price: Pr9ject Engine ~CD~ City Engineer I ,I'll:> 0 Date Jtoc ~ ~~ ld.- - (}..(Y 01 Page 1 of 1 "First In Service to the Community" s ~tt!' of ~tlro!, COMl\IUNITY DEVELOPlVlENT DEPARTMENT 7351 Rosanna Street, Gilroy, CA 95020 Planning Division Engineering Division Building, Life & Environmental Safety Division Housing & Community Development (408) 846-0440 (408) 846-0450 (408) 846-0430 (408) 846-0290 FAX (408) 846-0429 FAX (408) 846-0429 FAX (408) 846-0429 FAX (408) 846-0429 Granite Construction Company P.O. Box 720 Watsonville, CA 95077 ATTN: Mr. Steve Walter Letter NO.2 RE: Santa Teresa Boulevard Widening Project No. 04-CDD-128 Signal Interconnect Cable As stated in Section 86-4.1 of the Technical Specifications, the signal interconnect cable shall be #19 A WG, twisted, shielded cable conforming to REA-PE #19. PE #19 cable is typically used for aerial applications. PE #89 is recommended for underground applications, as will be the case on this project. Please provide an itemized lump sum cost proposal for furnishing PE #89 signal interconnect cable in lieu ofPE #19. If you have any questions, please do not hesitate to contact me at (408) 846-0410. 2LL:1 Charles 1. Krueger (;7' Resident Engineer cc: Rick Smelser, City Engineer Don Dey, Transportation Engineer Michael F. Goodhue, Senior Civil Engineer Kristi Abrams, Senior Civil Engineer