Loading...
HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 11 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 11 To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5/17/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Partial construction and demolition of 18" x 36" CUIb inlets at catch basin locations 31 and 35 per attached Change Order Request No. 18. Section 01035-4.0 of the Contract Documents shall not apply to Bid Item No. 87. The revised quantity for Bid Item No. 87 is 5 each. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $4,718.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $7,448,458.00 -$8,115.00 $7,440,343.00 $4,718.00 -$3,397.00 $7,445,061.00 Percentage -0.11% 0.06% -0.05% ~=ONCOMPANY By:," ~ Date: oa/{};z!o:s ACCEPTED: 3-3.0) d~) gin r ProjectE~ Date 3/7-1 Q S Date ; "~COR 4; Granitei nlnstruction Company Monterey day Branch 580 West Beach Street Watsonville, CA 95076 . Santa Teresa Blvd Widening PrOject Office Phone: 408-846-9257 Fax: 408-846-9330 CHANG~ ORDER REQUEST COR NUMBER: 737-018 Project: Santa Teresa Boulevard Widening Project Project No: 04-CDD-128 To: Charlie KllIeger - Resident Engineer City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 From: Mike Berg - Project Engineer Date: . November 16,2004 cc: Subject: Catch Basin #31 & #35 Charlie, In regards to letter #62, please see attached cost proposal for the partial construction and demolition of the 18" X 36" curb inlets at catch basin locations 31 & 35. 1. Demo Existing catch basins 2. Construct 18" X 36" catch basins , ,; $2,689.00 $4.029.07 Total Amount 56,718.81 1>1; 7/BOO AJreecl f/7/oS- If you have any questions regarding this matter please call (408) 846-9257. I"" .~ ~.: i, NO V ?- 2 l i] 4