HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 16
r!frE. < ";~: .....
, .' ') .
" fu -'L-\
",..:, ' .. . - ,
~h"'..!.::'" *1
,.r: ;
~,;;.,.'"lE;. . i
........ .
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO. 16
To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128
Contractor:
Granite Construction Company
Contract Date:
5/1 7/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work
Description of Work
Perform additional sawcutting of the South Morey Channel concrete wall per attached Change Order Request No.
21.
All requirements of the original Contract Docwnents shall apply to the above work except as specifically
modified by this Change Order. The contract time shall not extend unless expressly provided for in this
Change Order.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $3,816.00
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost Percentage
$7,448,458.00
$51,600.00 0.69%
$7,500,058.00
$3,816.00
$55,416.00 0.74%
$7,503,874.00
0lM..JI'lC Co.JS"T~c:..110tJ C.v.
,ttONTRACTOR
By:-IAJ~ Date: o3/:?~/as-
ACCEPTED BY:
3~
Date
RECOMMENDED BY:
· wn=~
',z
Project Engineer
2 vj-
.J!2..r/oS
Date
COR
CHANGE ORDER REQUEST
COR NUMBER: 737-021
Project: Santa Teresa Boule,,'ard Widening Project
Project No: '04-CDD-128
To:
Charlie Krueger - Resident Engineer
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
Subject: Wall Sawing
Charlie,
Granite Construction Company
Monterey Bay Branch
580 West Beach Street
Watsonville, CA 95076
. Santa Teresa Blvd Widening Project Office
Phone: 408-846-9257
Fax: 408-846-9330
From: Steve Walter - Project Manager
Date:' December 29. 2004
cC:
Per your "letter number 12" please find attached original quotation and actual invoice for the work performed cutting
the additional wall thickness of the south morey channel u-channel \vall. The plans showed the wall being 7" thick but
the actual thickness of the wall was 18" to 22" thick.
The original quotation for the saw cutting at the south morey channel was $2,578.00. The amount allocated for cutting
approximately 100 LF of 7" thick vertical waU was 52,100.00.
The actual cost for the wall sawing was $5,569.20.
calculation of this amount.
Actual Cost
Ori2inal Quote
Difference
Additional WaJJ Sawing (per attached)
GCCO markup (l 0%)
TOTAL
The lump sum amount requested is $3,816.20
Please see attached invoice and invoice breakdown for the
$5,569.20
52.100.00
$3,469.20
$3,469.20
$346.92
$3,816.20
,>..)
l
! I~ ~':
,)
l " "
t,_~ a' "';
..F{ING
LUlv'lbAhlJU
.rAX: 4UoYoo~jLb
['Alrt. 1
\o(uv I'" IIVI" " ~v"v...
Lombardo Diamond Core Drilling C ,1any. Inc.
2225 De La Cruz Blvd., Santa Clara CA 95050-3063
40an27-7922 1:1 fax: 988-5326 "J email: dennis@lombardodrilling.com
QUOTED TO: Granite Construction
t)E.,)&S Cfl.L,.(408)- q~6-1411.
JOB NAME: City of <3i1roy - Sa.nta Theresa
Gilro CA
CON~IRMINC. DUMP SITE:
Nil . NO
WATER ._....__ FT. 0 poweR......... FTO
TRUCK TO WORK DISTANce
HEIGHT TO WORK FEET
OUR SCAFFOLD ....NO..:.___HEIGHT
NO
INSIDE WORK I
PLASTIC REQUIRED
VACUUM REQUIRED
EXTRA MAN REQUIRED
OVERTIME NEEDED
YES
~
o
PERSON REQUeSrlNG BID OFFICE PHONE:
Steve Walter
FAX NUMBER JOB PHONE:
PilON(: QIJOT:
00 IlLUI:"RIN r
F.SIIMA1.",ONI.V BIDDING ON:
o ~1E'ID
VEl<JHC"riON
TO GO ON:
ACCEPTeD WITHIN 60 DAYS
QUOTED BY:
DenniS E ZIelke
SPECIAL EQUIPMENT I INSTRUCTIONS
.~ dry.. ' '. .' . , ,., ". ".' .~... : . 'DESCRIPTION . , " ' ..' . UNIT PRICE'
, '. " .,., I' ,. ..., ,'. . ' . .'
Provide Equipment and Labor for the Following Scope :
Wall Saw approximately 100 Lf horizontally of 7" pce Precast Vault wall.
Wall Saw approximately 8 U vertically of 12- pce Precast Vauh. headwall
~ .
Price Is based on faxed1akeoff sheets and telephone conversations wlSteve
regarding ~pe, accesS and site conditions. Granite will provide access to
inside of vault for Lomabrdo's equipment and personell. All Confined space
entry monitoring, training. etc by others. if required. Price is for wall sawcut only,
removal of spoils by others.
* 2 '00 C9 "Fof.- vJ~
, .
s.w.a.~ C:a AT1'IlCtWJ)
LUMP SUM FOR THIS PROJECT:
fF~~r;[Q)
f;XCLUSIONs:
UnlessspeciftcaJly included above, Lombardo exclUdes. layout, dust control,
waterlslurry contlol, shoring. traffic control, protection of adjacent surfaces or
flnishes, 8CQ8SS to elevated surfaces. overtime. ~ndby time, sizes or
thicknesses in excess of what ~ quoted and damage to structures or utilities
under, in, around or mounted to the work area.
LOMBARDO WILL NOT BE RESPONSIBLE FOR LAYOUT, OR DAMAGE TO BURIED STRUCTURES OR UTILITIES.
CCEPTED BY: SUBMITTED BY
SIGNATURE: SIGNATURE: De'IIIi$f-.'. Zie~
DATE: ._____............~~:~_._......-.- DATE: 513f2004 .
PRICES SUBJECT TO CHANGE IF CONDITIONS ON JOB VARY FROM THIS QUOTATION. WE ASSUME NO RESPONSIBILITY FOR LAYOU1. .
4~/~J/~~~~ ~~.~~
"'UU~UU..J...I..U
L.UtYIDj-;/,;UU
/'04\;;I/,:, oJ-'-/"".I.
Lombardo Diamond Core DriDing CompanYt In.c.
2225 Do La Cruz Blvd., Santa Clara CA 95050-3063
4011727-7?'-2 . fu: 988-.5326 . emaiJ: ~riDiDl!',~
Granite Construction
AttD: Steve Walter'
Re: WaUsawing
Fx: 831/763.6121
Ray Vald.ez
Senior Betimator / P.M.
Conaere Core D.rilling · Wall aad Slab SawiJw . DaaoIiIioIl and IUIDlJ\'a1 . Asphalt and Tta8k: l.oq>> Sawtn,
CALIfORNIA CONTRACTORS LICENSE' 272315
, --, --, ---. -.. -.....
l-'-JI.I.....HI 'Jo.,I'-J \,.IUI'I... .i..'l'\, J.l.-I-U
1--,-h.JL
Lombardo Diamond Core Drilling Company, Inc.
2225 De La Cxuz Blvd.. Santa Clara CA 950S0-3063
40Sn27-7922 · fa,,: 988-5326 . e.mail: rvaidez(Qllornbardodrilline.~m
Granite Constniction
Attn: Steve Walter
Re: waUsawiog breakdown
Skve,
Hope this helps.
1 each 10' vertic~ flush cut x 12" deep
1 each 32' cut x 12" to 14" deep
1 each 12' cut 00 curved mcline :x: 13" deep
1 each 5' cut x 13" deep
1 each 5' cut x 13" deep at top of ramp
1 each 60' cut x 20" to 22" deep
1 each 24' cut x 20" deep
1 each 13' cut x 18" deep
The total amount comes to
A 150/. discount was given to this job
The total amount due is
Fax 831/ 763-6121
~y.1'b'Ttc\...
/510 !>I%,.
00
(P,55t -
<Q5l. ~/
$ 360.00
$ 1,248.00
$ 514.80
$ 195.00
$ 195.00
$ 4,410.00 1
$ 1,440.00
$ 702.00
$ 9,064.80
< $ 1,359.72>
$ 7,705.08
.
\O~L- ~~IS (D~~
Concrete Core Drilling · Wall and Slab Sawing · Demolition and RemovaJ . Asphalt and Traffic Loop Sawing
CALIFORNIA CONTRACTORS LICENSE 1/ 272385
Lombardo Diamond Core Drilling Co., Inc.
CALIFORNIA CONTRACTORS LICENSE #272385
2225 DE LA CRUZ BLVD. M
SANTA CLARA, CA 95050-3063
ra 4081727-7922
c-..- FAX 408/9'8-532' . . SA
INVOICE
.", .
CUSTOMER #: 00418
INVOICE #: 38833
lNVOIc;E DATE: 08112104
D4e oA~O$i11104
,..... '
LJ",.,
DESCRiPTION
QUANTITY
PRICE
AMOUN'
08/05/04 ~L SAWING - CIC STORM DRAIN
1 - 10' VERTICAL FLUSH CUT. UP CUT. X 12- CIC WALL
1 CUT TABLE TOP STYLE 32' X 14-12" C/C FLOOR
OF STORM ORAl N
SET TRACK AND ANCHORS IN STANDING WATER. REQUIRED
SETTING TRACK AND ANCHORING 1 PIECE AT ^ TIME.
1 CUT (CONTINUATION OF 32' ABOVE) UP CURVED
INCLINE. RIPPED STEAL 12' X 13" INCLUDED
C<Jo1PLETE PACK IN AND OUT
08/06/04 1 SLAB CUT 5' X 13" CUT IN 2-3" OF STANDING
WATER CIC FLOOR (HEAVEY STEEL)
1 SJAR CUT 5' X l~" IOCATFO TCJ> OF RAMPS e/f. FIRS
1 \tW...L SAW CUT 50' X 20 -22" HORIZONTAL CIC WALL
~YOUT FOR u~ OF MGLE BRl'LKET (6)-3 TMCK
COVER 12'. SHIM & BOLT UP BRAKETS
08/09/04 WALL SAWING
1 HOfUIQNTAL C/C ~L 24' X ~O.
l~IZdNTAL GIC ~L. CUTWlTH ~ 00rI4 AND
U~.f ~t.~,. BAAKETS '. (~) 3. TRACK 13' X 18.~
OR/DS/Oll TetrAI
08/06/04 TOTAL PR~.-\"'^" m~l'PRV.
08/09/04 TarN.. BATCH PAMNTIIPRV.
1St DISCOUNT THIS JOB ONLY
OMBARDOWORK.POLlCIES:
,1 '.., )" . ,
W~acc&pt"o,respo"sibllity for layout
.""'... e. B.. ..cce.... ......I>t."... .0. .1i.llblliW.... fO.f any...dB....m.,. 8. g. '.8 to... b....ur...i..e d.. CO"duitf~f3.. .'. w. ood. .. ,.b..... e,. ams. or.foot/n9.. .concealed. Inot u. nder
;"corCkf::~r. ,i~:~~~c:~~~~~ea~~~~g'::I~I.~_._IK..'~'
A.Iji'."~ .......,08......... Po....".. ....., ....,'..." ... ,.., u'.. ..9.. '.... ..., ..
....I'!~~e . Q~~,to il}speptt"~ d~ge~!ldrElP~riltor lllfbl~thlnepaJ($:priO~to acceptinganybaC~ charges. ...
'J~I~.i:'~!l!!,it ....~~0r~;;;k.:::..'..~'.f;;.;;....:t'<t;:'?;JHy:,i~,<'!i ,.,.,.'. . .. ..1. .
fi~n~~h~rg~;~t'1.5.0/0,l>er.mo?\h (W~ArR) wlU.be cha'rge~9nallliCco~ntsnotpald within 30 days.
urchaser, sh'alloav.anv Attornevs fees incurred In colla sums due hereunder: .
~. ~...t~~.~..,.i.:......~..~
D .. , 1.\)\)'
f>.U~\. . ~'/t ~
~~~
?,l??R
4,800.0
2,142.0
-1.359.7
7..705.0
NET DUE:
. , ,.~, ,".' ,c''-;
\
\