Loading...
HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 21 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 r!f1tE";) "~.\ 't.~j .... ;, .4.'- ~ I It L. ~ ..:':':~ 1 ~ -,1,: ~..,... i "'.....:..,.~ t ~:::::; . CHANGE ORDER NO. 21 To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5/17/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Pay premium time for petforming contract work on Saturday, 11/20104, per attached Change Order Request No. 32. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost Percentage $7,448,458.00 $71,928.00 0.97% $7,520,386.00 $617.00 $72,545.00 0.97% $7,521,003.00 I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $617.00 b~t..h~ C~~1\~ Co. By'. )'riT~R ~ Date:~3/;r/tO RECOMMENDED BY: ACCEPTED BY: 3A-1-~S- Date /" \. , nwn:<, AN Project Engineer - - -----J Date ! COR . Granite Construction Company Monterey Bay Branch 580 West Beach Street Watsonville, CA 95076 Santa Teresa Blvd Widening Project Office Phone: 408-846-9257 Fax: 408-846-9330 / v. CHANqE ORDER REQUEST COR NuMBER: 737-032 Project: Santa Teresa Boulevard Widening Project P.-oject No: 04-CDD-128 To: Chal"lie Kroegcl' - Resident Engineer Cit)" of Gilro)" 7351 Rosanna Street Gilroy, CA 95020 From: Mike Berg - Project Engineer Date: Februat) 18,2005 cc: Subject: Ovel1ime Difference. Charlie, Please find attached daily extra work reports for the overtime difference involved with making finish Subgrade at the intersection of Longmeadow Avenue on Saturday 11/20/04. The lump sum amount requested is $617.41. p r: r;"" ! '.'~.': P ! :,~ ,j en5 [' . .k) . I .a'IDTE . nSTRlICTDI i Y SIN:E ,.. 1922 . DATE PERFORMED 11/20/2004 WORK PERFORMED BY GRANITE CONSTRUCTION COMPANY DESCRIPTION OF WORK . Overtime Difference for work completed @ Longmeadow on DAilY DETAil BilliNG DATE OF REPORT 211812005 GCCOJOBNO. 201737 GeCO ceo NO. 202114 LABOR CHARGES NAME CRAFT ST HRS ST RATE aT HRS aT RATE NOTE SUBSISTANCE EXT Medina ENG 9.50 $17.12 .$0.00 $162.64 Murphy ENG 8.00 $16.48 $0.00 $131.84 Limon LBR 0.50 $11.67 $0.00 $5.84 England LBR 4.00 $10.54 $0.00 $42.16 Bums TMS. 4.50 $11.84 $0.00 $53,28 TOTAL SUBSISTANCE: $0.00 TOTAL LABOR: $395.76 SUMMARY iT LABOR ONLY: $0.00 TOTAL EQUIP: $0.00 )l LABOR ONLY: $395.76 TOTAL MATL: $0.00 EQUIP OVERHEAD: 15% $0.00 TOTAL LABOR: $395.76 MATL OVERHEAD: 15% $0.00 ;T LABOR BURDEN: 18% $0.00 TOTAL EQUIP AND MATLW/OVERHEAD: $0.00 IT LABOR BURDEN: 15% $59.36 TOTAL LABOR + BURDEN: $455.12 UBSISTENCE $0.00 TOTAL LABOR, EQUIP & MATL W/OVERHEAD: $605.31 ABOR OVERHEAD: 330,," $150.19 BOND COST 2% $12.11 TOTALLABOR+BURDEN+OVERHEAD: $605.31 TOTAL DETAIL BILLING: $617.41 ~NITE REPRESENTATIVE ACCEPTED FOR PAYMENT ): 561 Page 1 of 1