Loading...
HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 25 ~")'" I' :; (.'1'\ II I I .f'". ......, ,-8 .~.. '. '. _ _.1 ; ~~J ~~.~ City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 25 To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5/17/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies fOlWarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work Description of Work Restake curb and gutter at northwest and southwest corner ofWelburn Avenue/Santa Teresa Boulevard per attached Change Order Request No. 42. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $827.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $7,448,458.00 $86,762.00 $7,535,220.00 $827.00 $87,589.00 $7,536,047.00 P.M. Percentage Initial 1.16% ~ 1.18% ~ By: 5445' ACCEPTED BY: 5-s- .O'{ Date Date s- / '1),5 Date COR Granite Construction Company Monterey Bay Branch 580 West Beach Street Watsonville, CA 95076 Santa Teresa Blvd Widening Project Office Phone: 408-846-9257 Fax: 408-846-9330 CHANGE ORDER REQUEST COR NUMBER: 737-042 Project: Santa Teresa Boulevard Widening Project Project No: 04-CDD-128 To: Charlie Kl1leger - Resident Engineer City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 From: Mike Berg - Project Engineer Date: March 29. 2005 cc: Subject: C&G Restaking @ Welburn Ave. Chal"lie, Please find attached exh'a wOI'k repol1 and invoice from California Constt'uction SUI"Veying for the curb and gutter I"estaking at Welburn Avenue. Additional staking was necessal"y at the return after Verizon's utilities were relocated. The lump sum amount requested is $ 827.00. f ~ . , I GRAnITE CDnSTRUCDll r........... SIN:E LUll.... CI 1922 DATE PERFORMED 2/3/2005 WORK PERFORMED BY GRANITE CONSTRUCTION COMPANY DESCRIPTION OF WORK C&G restaking @ Welbum Ave. due to Verizon Conflict DAilY DETAil BilliNG DATE OF REPORT 3/29/2005 GCCO JOB NO. 201737 GCCO cco NO. 1 California Construction Survey MATERIAL DESCRIPTION Restaking @ Welburn UNITS UNIT COST 1.00 $787.50 TOTAL MATERIAL: EXT $787.50 $787.50 SUMMARY ST LABOR ONLY: $0.00 TOTAL EQUIP: $0.00 OT LABOR ONLY: $0.00 TOTAL MATL: $787.50 EQUIP OVERHEAD: 0% $0.00 TOTAL LABOR: $0.00 MATL OVERHEAD: 5% $39.38 ST LABOR BURDEN: 0% $0.00 TOTAL EQUIP AND MATLW/OVERHEAD: $826.88 OT LABOR BURDEN: 0% $0.00 TOTAL LABOR + BURDEN: $0.00 SUBSISTENCE $0.00 TOTAL LABOR, EQUIP & MATL W/OVERHEAD: $826.88 LABOR OVERHEAD: 0% $0.00 0% $0.00 TOTALLABOR+BURDEN+OVERHEAD: $0.00 TOTAL DETAIL BILLING: $826.88 GRANITE REPRESENT A TIVE ACCEPTED FOR PAYMENT EWID: 621 Page 1 of 1 I. Invoice I Granite Construction 580 W. Beech Street Watsonville CA 95076 California Construction Surveying, Inc. 2801 Airport Dr., Suite 202 . Madera, CA 93637 Phone 209-761-6658 Santa Teresa-Re-stake Curb and Gutter @ Welburn Int. Professional services from Februarv 3. 2005 to Februarv 3. 2005 Professional Personnel Land Surveyor Rodman Totals Total Labor Outstanding Invoices Number 0000093 Total Hours 4.50 4.50 9.00 Rate 95.00 80.00 March 1, 2005 Project No: 04007.30 Invoice No: 0000116 Amount 427.50 360.00 787.50 787.50 Total this invoice $787.50 Date 1/18/05 Balance 262.50 262.50 Total now due $1,050.00 ~~M~: ~ ~iJ~ ~ gr. ~. I"H MON1trltY af.\Y . '.\:..\!.1 GRANITE CONSTRllCtiON COMPANY California Construction Surveying, Inc. Federal Tax 10 # 20-1085121