Loading...
HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 26 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 26 To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5/17/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Relocate existing fire hydrant at Station 82 + 00 per attached Change Order Request No. 43 and Letter No. 84 dated January 10, 2005. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $2,109.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $7,448,458.00 $87,589.00 $7,536,047.00 $2,109.00 $89,698.00 $7,538,156.00 P.M. Percentage Initial 1.18% ~ 1.20% tk-{ b~\'t6 Co.JS~cno.J COM.?~ CTOR ..1 By: ~ ~~ Date: l! /wk- d!t2~11U- ~i~ 5A~s Date ACCEPTED BY: 5 -5-' -G '5 Date s 5757'0) Date ;-/4/os Date Project Engineer COR Granite Construction Company Monterey Bay Branch 580 West Beach street Watsonville, CA 95076 Santa Teresa Blvd Widening Project Office Phone: 408-846-9257 Fax: 408-846-9330 CHANGE ORDER REQUEST COR NUMBER: 737-043 Project: Santa Teresa Boulevard Widening PI'oject Project No: .04-CDD-128 To: Charlie Krueger - Resident Engineer City of Gill"OY 7351 Rosanna Street Gilroy, CA 95020 From: Mike Berg - Project Engineer Date: March 30, 2005 cc: Subject: Fire Hydrant Relocation @ Station 82+00. Cha.-Jie, Please find attached extra wOI'k repol1 and material invoices (01' the work involved with relocating the existing fire hydrant at station 82+00. The lump sum amount requested is $ 2,109.00. 'I GRAniTE 'mnSTRUCTIIIl CDITAIIY ~E . DATE PERFORMED 1/31/2005 WORK PERFORMED BY GRANITE CONSTRUCTION COMPANY DESCRIPTION OF WORK Relocate fire hydrant @ station 82+00 DAilY DETAil BilliNG DATE OF REPORT 3/30/2005 GCCO JOB NO. 201737 GCCO cco NO. 299525 LABOR CHARGES NAME CRAFT ST HRS ST ~ATE OT HRS OT RATE NOTE SUBSISTANCE EXT B. Cooper CPT 4.00 $34.44 0.00 $0.00 $0.00 $137.76. K. Cooper CPT 4.00 $45.59 1.00 $62.84 $0.00 $245.20 L. Cortes-Ramirez CPT. 8.00 $34.44 0.00 $0.00 $0.00 $275.52 B. Cavanagh ENG 4.00 $49.11 0.00 $0.00 $0.00 $196.44 TOTAL SUBSISTANCE: $0.00 TOTAL LABOR: $854.92 EQUIPMENT CHARGES EQUIP NO. DESCRIPTION REG HRS REG RATE OT HRS OT RATE Att Rate EXT 08.399 JD710D BACKHOE / LOR 4.00 $38.00 0.00 $0.00 0.00 $152.00 06.1128 PICK-UP 4.00 $12.00 0.00 $0.00 0.00 $48.00 04.1101 SUPER DUTY 1.25 TN 5.00 $17.00 0.00 $0.00 0.00 $85.00 06.1128 PICK-UP 4.00 $12.00 0.00 $0.00 0.00 $48.00 TOTAL EQUIPMENT: $333.00 MATERIAL CHARGES MATERIAL SUPPLIER MATERIAL DESCRIPTION UNITS UNIT COST EXT Granite Rock Company Concrete Material 1.00 $192.69 $192.69 Groeniger & Company Pipe Material 1.00 $86.23 $86.23 Compressor/Jackhammer Jackhammer 1.00 $21.20 $21.20 TOTAL MATERIAL: $300.12 SUMMARY ST LABOR ONLY: $792.08 TOTAL EQUIP: $333.00 OT LABOR ONLY: $62.84 TOTAL MA TL: $300.12 EQUIP OVERHEAD: 15% $49.95 TOTAL LABOR: $854.92 MATL OVERHEAD: 15% $45.02 ST LABOR BURDEN: 18% $142.57 TOTAL EQUIP AND MATLW/OVERHEAD: $728.09 OT LABOR BURDEN: 15% $9.43 TOTAL LABOR + BURDEN: $1,006.92 SUBSISTENCE $0.00 TOTAL LABOR, EQUIP & MATL W/OVERHEAD: $2,067.29 LABOR OVERHEAD: 33% $332.28 BOND COST 2% $41.35 TOTALLABOR+BURDEN+OVERHEAD: $1,339.20 TOTAL DETAIL BILLING: $2,108.64 GRANITE REPRESENT A TIVE ACCEPTED FOR PAYMENT EWID: 636 Page 1 of 1 ./' > QCftp. of ~flrop. COMMUNITY DEVELOPMENT DEPARTMENT 7351 Rosanna Street. Gilroy. CA 95020 Planning Division Engineering Division Building, Life & Environmental Safety Division Housing & Community Development (408) 846-0440 FAX: (408) 846-0429 (408) 846-0450 FAX: (408) 846-0429 (408) 846-0430 FAX: (408) 846:0429 (408) 846-0290 FAX: (408) 846-0429 January 10, 2005 Granite Construction Company P.O. Box 720 Watsonville, CA 95077 ATTN: Mr. Steve Walter Letter No. 84 RE: Santa Teresa Boulevard Widening Project No. 04-CDD-128 Fire Hydrant Revision at Station 82+00 The existing fire hydrant on the west side of Santa Teresa Boulevard at Station 82+00 is to remain in it's present location instead of being relocated to the east side of the road as shown on Sheet 57 of the contract plans. The hydrant is to be adjusted to maintain 3' clearance from the soundwall. In addition, a 6' wide concrete walkway is to be placed from the curb to the fire hydrant as shown on the attached detail. This revision will result in a reduction in quantity for Bid Item Nos. 99 and 100. Additional costs for this change will be paid at force account. If you have any questions, please do not hesitate to contact me at (408) 846-0410. Sincerely, ~I Resident Engineer cc: City Engineer Kristi Abrams, Senior Civil Engineer Don Dey, Transportation Engineer Michael F. Goodhue, Senior Civil Engineer Steven E. Beams, Engineering TechnicianJInspector "First In Service to the Community"