HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 27 &;35 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 27 To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5/17/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies fOlWarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Furnish and install new conduit, conductors, cable and pullboxes for the traffic signal system at the intersection of Longmeadow Drive and Santa Teresa Boulevard per attached Change Order Request No, 26. With this change, all conduit, conductors, cable and pullboxes associated with the traffic signal system at this intersection shall be new. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. Consideration of time adjustment will be deferred until receipt of a Time Impact Analysis in accordance with Section 01310-6.0 of the Contract Documents. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $20,269.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $7,448,458.00 $89,698.00 $7,538,156.00 $20,269.00 $109,967.00 $7,558,425.00 P.M. Percentage Initial 1.20% ~ 1.48%M dt'tiI1lfe tmofrach(;V1 tom,l'o'7 ij;;Z1R By: "'-t Date: /llaJ/ as- ejal'eAce- 5::tkDdPt. RECOMMENDED BY: JJ/q/o5 Date 1/ -tJO~) Date II 't'tlJ Date II l. 1-/ oS Date COR . Granite Construction Compa.ny Monterey Bay Branch . 580 West Beach Street Watsonville, CA 95076 . Santa Teresa Blvd Widening Project Office Phone: 408-846~9257 Fax: .40S-84~-9330 CHANGE ORDER REQUEST COR NUltIBER: . 737-026 Project: . Santa Teresa Boulevard Widening Proj~ct Project No: 04-CDD-128 To: Charlie Krueger - Resident Engineer City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 From: Steve Walter - Project Manager Date:. Januaf) 17, 2005 cC: Subject: Longmeadow Drive Signal Changes Charlie, As discussed in our December 9,2004 please find attached breakdown of the additional costs associated with the traffic signals at the intersection of Longmeadow Drive and Santa Ten..'Sa Boulevard. Additional Cost (per attached letter) GCCO 10% Markup TOTAL SI8,753.36 S 1.875.34 $20,268.70 The total lump sum amount requested for this work is $20,269.00 r ~ j'" ,. : , , ~~ .J GIACALONE ELECTRICAL SERVICES, INC. . (408) 842-9655 * FAX(408) 842-5285 L1C #: C10/A 540448 COR#: WO#: 7 NIA REVISION: . 2 COMPANY: Granite Construction ADDRESS: 580 West Beach Street CITY, ST, ZIP Watsonville, CA 95017' OFFICE: FAX: MOBILE: (831) 763-6100 (831) 763-6121 (831) 750-0400 SUPERINTENDENT DAYS TO COMPLETE WORK Tim Atkins ASAP GESI JOB NlIMBER DATE 599-99 Ja.nuary 7,2005 GESI JOB NAME REQUESTED START DATE .Santa Teresa Widening ASAP JOB LOCATION REQUESTED COMPLETE DATE Gilroy, CA ASAP. REQUESTED BY: Steve Walters QTY MATERIAL PRICE UM AMOUNT DESCRIPTION OF WORK 300 3" SCH 40 Conduit $1.05 LF $315.00 Remove & replace signal wire @ Longmeadow. Replace conduit 20 3" SCH 40 Cupllng (b/q 25) $0.83 EA $16.50 run #9 & #4. Box location 6 Is In the street. Box @ location B Is 12 3" Bell Ends $4.11 EA $49.32 In the handicap ramp. 12 3" - 90 x 12" SCH 40 Bend (STD) $8.25 EA $99.00 18,150 #14 THW - SOLID SPRIAL STRIPES $0.05 LF $816.75 1,330 #10 THW - SOLID $0.11 LF $139.65 2,750 #8 THW - STRANDED $0.18 LF $495.00 EQUIP I OTHER HRS UNIT QTY RATE AMOUNT 1,315 OPTICOM CABLE - TRAFFIC SIGNALS $1.43 LF $1,873.88 Service Truck 12.00 EA 1 $15.00 $180.00 1 PVC Gray Glue $5.70 EA $5.70 Backhoe 22.00 EA 1 $26.00 $572.00 4 #6 Boxe - Lid Marked: Traffic Signal $96.25 EA $385.00 Horizontal Boring Mach. 8.00 EA 1 $165.00 $1,320.00 1 #6 Lid Marked: Traffic Signal $16.35 EA $16.35 Vac.Tank 8.00 EA 1 $26.00 $208.00 SUBTOTAL-OTHER $2,280.00 15.00% MARKUP - OTHER $342.00 TOTAL-OTHER $2,622.00 LABOR HRS UNIT QTY RATE AMOUNT Electrician 12.00 EA 6 $71.85 $5,172.94 Operator 30.00 EA 1 $58.23 $1,746.92 Laborer 6.00 EA 4 $42.81 $1,027.41 . SUBTOTAL - MATERIALS $4,212.15 SUBTOTAL-LABOR $7,947.28 8.25% TAX - MATERIALS $347.50 20.00% MARKUP-LABOR $1,589.46 15% MARKUP - MATERIALS $683.95 17.00% SURCRG-LABOR $1,351.04 TOTAL - MATERIALS $5,243.59 TOTAL-LABOR $10,887.77 Signature I here by acknowledge the satisfactory completion of the above described work. TOTAL LABOR $10,887.77 TOTAL MATERIALS $5,243.59 TOTAL EQUIP/OTHER $2,622.00 7~1t_ 1 TOTAL> $18,753.36 By signing this work order, you are only acknowledging that the matenal, labor, equipment and other quantities and hours are accurate and have been completed. Pricing of this work order will be done according to contract / service rates by the main office. .