HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 31 &; .'; ,.^ ...) '\ 1,_ ....." I City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 31 To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5/17/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Remove landscaping and regrade at northwest corner of Santa Teresa BoulevardIF irst Street, per attached Change Order Request No. 44. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. arM I 't., (L;II;f/rUvitO/1'~. ONTRACTOR Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $7,448,458.00 $127,254.00 $7,575,712.00 $1,817.00 $129,071.00 $7,577,529.00 P.M. Percentage Initial 1.71%M 1.73% M I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $1,817.00 Date: 6/t/as- By: atV~;tU.. ~ 6/i/o~ Date RECOMMENDED BY: 7 ~ . () ~-:J- ACCEPTED BY: Date COR Granite Construction Company Monterey Bay Branch 580 West Beach Street Watsonville, CA 95076 Santa Teresa Blvd Widening Project Office 'Phone: 408-846-9257 Fax: 408-846-9330 CHANGE ORDER REQUEST COR NU.MBER: 737-044 Project: Santa Teresa Boulevard Widening Project Project No: 04-CDD-128 To: Charlie Kmeger - Resident Engineer City of Gih"Oy 7351 Rosanna Street Gilroy, CA 95020 From: Mike Berg - Project Engineer Date: ApIiI 4, 2005 cc: Subject: Oak Tree Corner Grading. Charlie, Please find attached extl'a work l'epol1 for the work involved with grading the comel' lot located at the oak tree corner from station 20+00 to 22+00 on the west side of Santa Teresa Boulevard. The lump sum amount I'equested is $ 1,817.00. 'I. GRAniTE mnSTRUCTIII1 mnJIIIIY s~ DATE PERFORMED 3/3/2005 WORK PERFORMED BY GRANITE CONSTRUCTION COMPANY DESCRIPTION OF WORK Demo & haul off existing landscape from sta: 20+00 to 22+00 DAILY DETAIL BILLING DATE OF REPORT 3/30/2005 GCCO JOB NO. 201737 GCCO cco NO. 299529 LABOR CHARGES NAME CRAFT ST HRS ST RATE oT HR5 OT RATE NOTE SUBSISTANCE EXT B. Burns OE 4.00 $38.78. 0.00' $0.00 $O.QO $155.12 M. Valle CPT 5.00 $33.74 0.00 $0.00 $0.00 $168.70 J. Limon CPT 0.00 $0.00 0'.50' $46.14 $0'.00' $23.0'7 A. Cernokus FRM 3.00' $50.64 0.0'0' $0.00 $0'.00 $151.92 M. Krieg ENG 6.00' $47.63 0'.0'0 $0'.0'0' $0'.0'0' $285.78 . TOTAL SUBSISTANCE: $0'.0'0' TOTAL LABOR: $784.59 EQUIPMENT CHARGES , EQUIP NO. DESCRIPTION REG HRS REG RATE OT HRS OT RATE Att Rate EXT 0'8.549 JD41DG BACKHOE I LOR 5.0'0' $27.50' 0'.0'0' $0'.0'0' 0'.0'0' $137.50' 03.3137 PUP TRAILER 8 YO 4.00' $10.0'0' 0'.0'0' $0'.0'0' 0'.00 $40'.0'0' 03.929 TILTBED TRAILER 14 TON 1.00 $17.0'0' 0'.00' $0'.0'0' 0'.0'0' $17.0'0' 0'4.423 FLATBED DUMP 2 TN 1.0'0' $17.0'0' 0'.0'0' $0'.00' 0'.0'0' $17.0'0 0'6.2262 PICK-UP 3.00 $12.0'0' 0'.0'0' $0'.0'0' 0'.0'0' $36.0'0' 04.335 10 YO DUMP 4.0'0' $36.00 0.0'0 $0.00 0.00 $144.0'0 TOTAL EQUIPMENT: $391.50 MATERIAL SUPPLIER Pacheco Pass Landfill MATERIAL DESCRIPTION Dump Fees UNITS UNIT COST 1.0'0' $88.0'0 TOTAL MATERIAL: EXT $88.00 $88.0'0 SUMMARY ST LABOR ONLY: $761.52 TOTAL EQUIP: $391.50 OT LABOR ONLY: $23.07 TOTAL MA TL: $88.00 EQUIP OVERHEAD: 15% $58.73 TOTAL LABOR: $784.59 MATlOVERHEAD: 15% $13.20 ST LABOR BURDEN: 18% $137.07 TOTAL EQUIP AND MATLW/OVERHEAD: $551.43 OT LABOR BURDEN: 15% $3.46 TOTAL LABOR + BURDEN: $925.12 SUBSISTENCE $0.00 ITOTAL LABOR, EQUIP & MATL W/OVERHEAD: $1,781.84 LABOR OVERHEAD: 33% $305.29 BOND COST 2% $35.64 TOTALLABOR+BURDEN+OVERHEAD: $1,230.42 TOTAL DETAIL BILLING: $1,817.48 GRANITE REPRESENTATIVE ACCEPTED FOR PAYMENT EWID: 637 Page 1 of 1