City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO. 33
To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128
Contractor:
Granite Construction Company
Contract Date:
5/17/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work
Description of Work
. Upgrade #5 interconnect boxes shown on Drawing No. SIC-2 to #6 boxes.
. Install extensions on all interconnect boxes and install #7E boxes for all Quad Duct street crossings per
attached letter No. 64.
. Install Quad Duct and street light conduit side-by-side with 30" minimum cover.
. The unit price for Bid Item No. 147 is revised from $4001EA to $6801EA All #6E and #7E interconnect boxes
will be paid under Bid Item No. 147 at the revised unit price.
All requirements of the original Contract Documents shall apply to the above work except as specifically
modified by this Change Order. The contract time shall not extend unless expressly provided for in this
Change Order.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $8,960.00
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$7,448,458.00
$130,986.00
$7,579,444.00
$8,960.00
$139,946.00
$7,588,404.00
P.M.
Percentage Initial
1.76% ttJ
1.88% ~
/::tp.1ctJ I'(€ C~~~ ('~~i
NTRACTOR
ACCEPTED BY:
Date: ?III as-
By:
RECOMMENDED BY:
leg'or;-
_. Date
7/tlr/o r
Date
. .....O......f.....G.............
.' /1 '.
..,~" .......... (A .....
/' ~.......... ~...<~ 0\'"
:(j:c -~.-~~
: : LJ,! II l.d!J..!ill,~..... ~
i I ~": ;";1 ..").\ i
! * :. ........ - - .: * :
\ - \ It", !ci~:lf . I
~ -z- '. wV .~.": R :
". 00 ...... . {f-" ~ !
... +'"" ..... ..... 't. ...
'. 0 ......... ".'
". R C0..
..... /irEo i\;\1\\!- .....
-. ...........~..........
<!eitp of ~ilrop ,
Planning Division
Engineering Division
Building, Life & Environmental Safety Division
Housing & Community Development
COMMUNITY DEVELOPMENT DEPARTMENT
7351 Rosanna Street, Gilroy, CA 95020
(408) 846-0440
(408) 846-0450
(408) 846-0430
(408) 846-0290
FAX: (408) 846-0429
FAX: (408) 846-0429
FAX: (408) 846-0429
FAX: (408) 846-0429
November 12,2004
Granite Construction Company
P,O. Box 720
Watsonville, CA 95077
ATIN: Mr. Steve Walter
Letter No. 64
RE: Santa Teresa Boulevard Widening Project No. 04-CDD-128
Quad Duct Pull Box Clarifications
The pull boxes for the Quad Duct are to be installed as follows:
Pull boxes for the Quad Duct street crossings shall be #7E per RFI 17. All other
Quad Duct pull boxes shall be #6E instead of #6 and shall be installed at 200'
maximum spacing. All Quad Duct, including street crossings, shall enter and exit on
the short side (north and south end) of the pull box.
If you have any questions, please do not hesitate to contact me at (408) 846-0410.
?2JLcI
Charles J. Krueger
Resident Engineer
cc: City Engineer
Don Dey, Transportation Engineer
Michael F. Goodhue, Senior Civil Engineer
Steven E. Beams, Engineering Technician/Inspector
"f=irc:.t In .C::t:>n/if"t:> tn tht:> r.nmml mitv"