Loading...
HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 33 f!!tE () "" , - <)"'" II I ~. .... ,_Ei /L. . . : .'! _ ! 1 ~.~ *' ~'''''~ j ...... '"' City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 33 To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5/17/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work Description of Work . Upgrade #5 interconnect boxes shown on Drawing No. SIC-2 to #6 boxes. . Install extensions on all interconnect boxes and install #7E boxes for all Quad Duct street crossings per attached letter No. 64. . Install Quad Duct and street light conduit side-by-side with 30" minimum cover. . The unit price for Bid Item No. 147 is revised from $4001EA to $6801EA All #6E and #7E interconnect boxes will be paid under Bid Item No. 147 at the revised unit price. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $8,960.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $7,448,458.00 $130,986.00 $7,579,444.00 $8,960.00 $139,946.00 $7,588,404.00 P.M. Percentage Initial 1.76% ttJ 1.88% ~ /::tp.1ctJ I'(€ C~~~ ('~~i NTRACTOR ACCEPTED BY: Date: ?III as- By: RECOMMENDED BY: leg'or;- _. Date 7/tlr/o r Date . .....O......f.....G............. .' /1 '. ..,~" .......... (A ..... /' ~.......... ~...<~ 0\'" :(j:c -~.-~~ : : LJ,! II l.d!J..!ill,~..... ~ i I ~": ;";1 ..").\ i ! * :. ........ - - .: * : \ - \ It", !ci~:lf . I ~ -z- '. wV .~.": R : ". 00 ...... . {f-" ~ ! ... +'"" ..... ..... 't. ... '. 0 ......... ".' ". R C0.. ..... /irEo i\;\1\\!- ..... -. ...........~.......... <!eitp of ~ilrop , Planning Division Engineering Division Building, Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT 7351 Rosanna Street, Gilroy, CA 95020 (408) 846-0440 (408) 846-0450 (408) 846-0430 (408) 846-0290 FAX: (408) 846-0429 FAX: (408) 846-0429 FAX: (408) 846-0429 FAX: (408) 846-0429 November 12,2004 Granite Construction Company P,O. Box 720 Watsonville, CA 95077 ATIN: Mr. Steve Walter Letter No. 64 RE: Santa Teresa Boulevard Widening Project No. 04-CDD-128 Quad Duct Pull Box Clarifications The pull boxes for the Quad Duct are to be installed as follows: Pull boxes for the Quad Duct street crossings shall be #7E per RFI 17. All other Quad Duct pull boxes shall be #6E instead of #6 and shall be installed at 200' maximum spacing. All Quad Duct, including street crossings, shall enter and exit on the short side (north and south end) of the pull box. If you have any questions, please do not hesitate to contact me at (408) 846-0410. ?2JLcI Charles J. Krueger Resident Engineer cc: City Engineer Don Dey, Transportation Engineer Michael F. Goodhue, Senior Civil Engineer Steven E. Beams, Engineering Technician/Inspector "f=irc:.t In .C::t:>n/if"t:> tn tht:> r.nmml mitv"