Loading...
HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 35 I. ...[- (CJ!5 ') City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 35 To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5/17/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Install temporary striping at north end of project per attached Letter No. 93 and Change Order Request No. 34. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $4,353.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price drli~1I fe- Cofl,J trvdl(J~ CiJ. By' ~OR C(IfYt!4U- ~/cdtk. Date: ~/t/as ACCEPTED BY: RECOMMENDED BY: eer p,~ect~~ Cost $7,448,458.00 $141,658.00 $7,590,116.00 $4,353.00 $146,011.00 $7,594,469.00 P.M. Percentage Initial 1.90% ~ 1.96%~ Date 7-6 -LJ5 ~ /27hs Date )' / // ...........O.f...G/.'(........o.. ....L..J. .............. Li ". . .."'~. ,,'r.O' ! "...;"., ;; "':'" \" f (j l (J, '.. ~~~..:-L \ : : '''''';'' J: : * .O'H' _ __ . * . \...:...>:::::::..:.:.:.~<.) ([itpof <!Pilrop ,/ Planning Division Enginee~ng Division Building, Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT 7351 Rosanna Street, Gilroy, CA 95020 (408) 846-0440 FAX: (408) 846-0429 (408) 846-0450 FAX: (408) 846-0429 (408) 846-0430 FAX: (408) 846-0429 (408) 846-0290 FAX: (408) 846-0429 o January 31,2005 Granite Construction Company P.O. Box 720 Watsonville, CA 95077 ATTN: Mr. Steve Walter Letter No. 93 RE: Santa Teresa Boulevard Widening Project No. 04-CDD-128 Revised Striping at North End of Project You are directed to implement the attached temporary striping plan at the north end of the project. This plan moves the northbound left turn pocket closer to the Sunrise Drive intersection and transitions the southbound traffic lane into the existing striped median. The revised striping plan is intended to provide room to construct additional pavement between Station 86+00 and 88+00 during Phase 1, which will provide greater flexibility for the transition to Phase 2. This work is to be performed as soon as possible and will be paid at force account. If you have any questions, please do not hesitate to contact me at (408) 846-0410. Sincerely, 02J-J Charles J. Krueger Resident Engineer cc: City Engineer Kristi Abrams, Senior Civil Engineer Don Dey, Transportation Engineer Michael F. Goodhue, Senior Civil Engineer Steven E. Beams, Engineering Technician/Inspector "First In Service to the Community" . ..::_ ..----l i N , . (f _-.-i z a - I-- r." V) z <( ~ .... ~ ('f) ~ III S! V) ~ II) \l , ~.~ <:J~~ (J \I) C\J ~} "'~ , .. ~>.... ,~ loT a ~ III - S! z ~ ~ V) Z <( a::: \- , C) (J ('I) 1- I I ;:\ ~ I \ COR Granite Construction Company Monterey.Bay Branch 580 West Beach Sfreet . Watsonville, CA 95076 Santa Teresa Blvd WideningProject Office . Phone: 408-846-9257 Fax: 408-846-9330 CHANGE ORDER REQUEST COR JVU1W'BER: 737-034 Pro.iect: Santa Teresa Boulevard Widening Pro.iect Projec.f No: 04-CDD-128 From: J'Vfike Berg - Project Engineer To: Cha"'ie Kruegel' - Resident Engillce.. . Cit)" of Gih'oJ 7351 Rosanna St.'eet Gilroy, CA 95020 Date: March L 2005 cc: Subject: Revised Striping @ North End of Project Charlie, Please find attached daily extra work .'eports for the revised stl"iping completed at the nOl1h end of the pl"Oject fl'om appl"Oximately station 82+00 to 90+00. The lump sum amount requested is -8;4,572.17. $1353 / 'I,GRAnlTE mnSTRUCnDll CDI11PAI1Y S~E DATE PERFORMED 2/2/2005 WORK PERFORMED BY GRANITE CONSTRUCTION COMPANY DESCRIPTION OF WORK . . Revised striping @ north end of project DAilY DETAil BilliNG DATE OF REPORT 3/1/2005 GCCO JOB NO. 201737 Geeo ceo NO. 299529 MA TERIAL CHARGES MATERIAL SUPPLIER . MATERIAL DESCRIPTION UNITS UNIT COST EXT I Linear Options Inc Striping Revision @ North 1.00 $4,354.45 -$4,2&4.46 TOTAL MATERIAL: $4,354.45 1/158/ SUMMARY ST LABOR ONLY: $0.00 TOTAL EQUIP: $0.00 OT LABOR ONLY: $0.00 TOTAL MA TL: 4/-1-5.BI $.4,354.45 EQUIP OVERHEAD: 0% $0.00 TOTAL LABOR: $0.00 MATL OVERHEAD: 5% $217.72 207.2.9 ST LABOR BURDEN: 0% $0.00 TOTAL EQUIP AND MATLW/OVERHEAD: $4,sn.17 OT LABOR BURDEN: 0% $0.00 TOTAL LABOR + BURDEN: $0.00 4353./0 SUBSISTENCE $0.00 TOTAL LABOR, EQUIP & MATL W/OVERHEAD: $4,572.17 LABOR OVERHEAD: 0% $0.00 0% $0.00 TOTALLABOR+BURDEN+OVERHEAD: $0.00 TOTAL DETAIL BILLING: $4,572.17 .$ 4353. /0 GRANITE REPRESENTATIVE ACCEPTED FOR PAYMENT ElMO: 588 Page 1 of 1