CHANGE ORDER NO. 42
To contract for; Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128
Contractor;
Granite Construction Company
Contract Date:
5/17/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Separate broken cement treated base and asphalt concrete from the trench spoils excavated during the installation of
storm drain Line D per attached Change Order Request No. 54.
All requirements of the original Contract Documents shall apply to the above work except as specifically
modified by this Change Order. The contract time shall not extend unless expressly provided for in this
Change Order.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $5,508.00
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$7,448,458.00
$178,069.00
$7,626,527.00
$5,508.00
$183,577.00
$7,632,035.00
P.M.
Percentage Initial
2.39% ~
2.46% ~
B' Date: ~tp/5/as-
CltJ~ ;)~JA.
ACCEPTED BY:
8~4/b5
Date
j'd5.LJS
Date
ngmeer
~~~
~ LI$-. S '(Y\ ~) ~ vL 8 - 2.. )' - 0 )'
Date
g/L.-SI..s
Date
7/18/2005
..~'.
COR'.
Granite Construction Company
Monterey Bay Branch
. 580 West Beach Street
Watsonville, CA 95076
Santa Teresa Blvd Widening Project OffIce
Phone: 408-846-9257
Fax: 408-846-9330
CHANGE ORDER REQUEST
COR NUMBER: ..737-054
Project: Santa Teresa Boulevard Widening' Project .
Project No: 04-CDD-128
To:
Charlie Krueger - Resident Engineer
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
From: Mike Berg - Project Engineer
Date: June 16, 2005
cc:
Subject: Separate CTB & AC From Trench Spoils.
Charlie,
Please find attached extra work reports for the work involved with separating out the broken CTB and AC
from the trench spoils that were discovered while installing the storm drain at line D.
The lump sum amount requested is S 5,"".88 f 5508
"/
i-'r;~
!)
r" 1\ ! ,....
CIII._
!!\..'f~
~ ~ \~ U
~ III~ .....
't-I~o~ .....
i 0
~''''':~..t .....
0 .00 ~. ~ &
~ ~ ~~~ rf
. Vi
~
....
f')
....
... !
1: 2 0
~
"
0 c
I!
a. C)
.I !!l!!l!!l!!l
'[ '[ '[ '[ II)
en en en en ,.,
"5"5"5"51
t i! c c c c eft
E ~ ~ ~ N
~ ..... ..... .....
I E E E E
'0 ,g,g,g.g
c ma::amm
i ~~~t-
! 0000
a<<Sa<<SolJa<<S
'C 0000
~ Co) <(<(<(<(
c! s s s s
III l! l! l! l!
ftS ftS ftS ftS
Q.Q.Q.Q.
. Jjc7jJj~
>t I
&:
. t@ It) It)
a. t. 10 ~8 0
0 0
E 0 Ot:! t:!
.8 ~t:!o ....
co.... ....
0 . -.... - -
C 10 10 10 It)
U G>>
I: 1ii
c
0 1:: 10 10 U') 10
0 0 0 0
0 0 0 0
.- NNN~
.. ~ t: t: t: t::
U co CO COCO
e e U') co ....... co
10 10 10 10
.. .. N N N N
.. .!
e II)
&: ,.,
;:, II)
0 Z en
0 en
u. N
(.)
(.)
..
.. ..
G>>
.- .Q ....
&: .10 e ,.,
....
'.8 ;:, ...
z 2
..~ .Q
,,~ 0
..,
"ATE
~rTD1
~SIM:E
A.R I rill." 1922
DATE PERFORMED
5/4/2005
WORK PERFORMED BY
GRANITE CONSTRUCTION COMPANY
DESCRIPTION OF WORK
Separate AC & CTe from trench spoils
EXTRA WORK BilliNG
DATE OF REPORT
6n/2005 '
GCCO JOB NO.
201737
GCCO CCO NO.
299535
LABOR CHARGES
NAME CRAFT ST HRS ST RATE OT HRS OT RATE NOTE SUBSISTANCE EXT
K. Cooper LBR ~ $4&.59 1.00 $62.84 $0.00 't62.84 $154.82
D. Flores OE 3.00 $47.63 0.00 $0.00 $0.00 $142.89
TOTAL SUBSISTANCE: $0.00 TOTAL LABOR: $296.91
EQUIPMENT CHARGES
EQUIP NO. DESCRIPTION I REG HRS I REG RATE OT HRS OT RATE Att Rate EXT
08.499 7100 BACKHOEILDR 4 X 41.. . ... 3.00 J.. $38.00 0.00 $0.00 0.00 $114.00
04.1101 1.25 TN SUPERDUTY _l __~~~~___ $17.00 0.00 $0.00 0.00 17 .61.88
TOTAL EQUIPMENT: 13 J "185.89
2.05.73
SUMMARY
ST LABOR ONLY: "!34.8~ /4-2.8Cf TOTAL EQUIP: /3/ S165.9&-
OT LABOR ONLY: .$62.84 62,84- TOTAL MATL: $0.00
$24.15 /9.t5
205.73 EQUIP MARK-UP: 15%
TOTAL LABOR: $296.91 MATL MARK-UP: 15% $0.00
ST LABOR SURCHG 18% ~ 25.72 TOTAL EQUIP AND MATLW/MARK-UP: 15().65--f188.T5
OT LABOR SURCHG 15% ~ ~.~3
TOTAL EQUIP AND MATLW/MARK-UP: /5().6S "189.75'"
TOTAL LABOR + SURCHARGES: 240.88 $3........,.. TOTAL LABOR,SURCHGEW/MARK-UP: 320.37 .....3..
SUBSISTENCE $0.00 TOTAL LABOR, EQUIP AND MATL W/MARK-UP:+7/.02. $653.2t
LABOR MARK-UP: 33% -$114.89 7&1.4<1 LESS FLAGGING: 0% $0.00
BOND COST 2% t:t.4Z $13.96
ADDTL LABOR MARK-
TOTAL LABOR+SURCHGE+SUBSIS+MARK- $ .&3..... GRAND TOTAL FOR EXTRA WORK: -'6&&.28
320,37
480. 44
GRANITE REPRESENTATIVE
ACCEPTED FOR PAYMENT
EWID: 255
Page 1 of 1
City of Gilroy
Engineering DMsion
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO. 42
To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128
Contractor:
Granite Construction Company
Contract Date:
5/17/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Separate broken cement treated base and asphalt concrete from the trench spoils excavated during the installation of
storm drain Line D per attached Change Order Request No. 54.
All requirements of the original Contract Documents shall apply to the above work except as specifically
modified by this Change Order. The contract time shall not extend unless expressly provided for in this
Change Order.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $5,654.00
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$7,448,458.00
$178,069.00
$7,626,527.00
$5,654.00
$183,723.00
$7,632,181.00
P.M.
Percentage Initial
2.39% ~
2.47% U
6-rMJ'k (};Mfr~o/l ,4.
~
By:
e/arbr&.e... Sa/:odA.
Date: 01 /If /os-
ACCEPTED BY:
/ Q I J /65
Date
RECOMMENDED
7/13/2005
"~COR
COR NUMBER: 737-054
Granite Construction Company
Monterey Bay Branch
580 West Beach Street
Watsonville, CA 95076
. Santa Teresa Blvd Widening Project Office
Phone: 408-846-9257
Fax:" 408-846-9330
. CHANGE ORDER REQUEST
Project: Santa Teresa Boulevard Widening Project
Project No: 04-CDD-128.'
To:
Charlie Krueger - Resident Engineer
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
From: Mike Berg - Project Engineer
Date: June 16,2005
cc:
Subject: Separate CTB & AC From Trench Spoils.
Charlie,
Please find attached extra work reports for the work involved with separating out the broken CTB and AC
from the trench spoils that were discovered while installing the storm drain at line D.
The lump sum amount requested is S 5,6'4.88 -$ ~ b 54
Ef\;
"'4G
,. ::\1 .
0- ilia .,...
~I It) ~ m .....
~ ~ 0 '\""" 0
~ ~ -<i .,...
C") N Q)
I- N. 'O:t. C") Ol
~'\"""N ~
~ ~ ~ ~
~
....
C")
....
... 'ii
2 ..
1:: 0
f-
'C
0 c
t!
A C)
. !!l!!l!!l!!l
'0 '0 '0 '0
~ Q.Q.Q.Q. ."
III III III III C")
.s::. .s::. .s::. .s::. ."
o 0 0 0 en
~ ~ c c c C eft
.. Cb Q) Cb CD N
~ '- L.. '- ....
...., ..... ... .......
; E E E E
.. .g .g .g .g
0
c co co co CO
0 ..... ..... ..... .....
l! ;; u u u u
~ ~ ~ o(l
.. 'I: ~ () () ()
C,) <( <( <(
. (I)
t! jg jg jg jg
III ~ ~ ~ ~
tV tV lU tV
a.Q.Q.Q.
. CD CD CD CD
CJ)CJ)CJ)C/)
>t "
I: ~
&I t@ It) It)
A CD It) It) 8 0
0 0 0
E Q. 0 0 ~ ~
.! ~ ~ ,0 '\"""
~ ~ ~ ~
0 II -- --
c It) It) It) It)
u .
I: c
0 1:: It) It) It) It)
0 0 0 0
0 0 0 0 0
.- N N N N
.. CD t: t: t: t:
U ~ <0 <0 <0 <0
e c
- It) <0 ....... 00
It) It) It) It)
.. .. N N N N
.. .!
E ."
I: C")
:s ."
0 Z eft
0 eft
U N
CJ
CJ
.
.. ..
CD
.- J:2 ....
1:10 ~ C")
....
l!~ ...
z 2
<Ci J:2
,,~ 0
..,