CHANGE ORDER NO. 46
To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128
Contractor:
Granite Construction Company
Contract Date:
5/17/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Modify Internally Illuminated Street Name Signs per attached Letter No. 123 and Change Order Request No. 60.
Sign lettering shall be Series E per Caltrans Standard Specifications.
All requirements of the original Contract Documents shall apply to the above work except as specifically
modified by this Change Order. The contract time shall not extend unless expressly provided for in this
Change Order.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $8,089.00
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$7,448,458.00
$205,932.00
$7,654,390.00
$8,089.00
$214,021.00
$7,662,479.00
P.M.
Percentage Initial
2.76% ot-t
2.87% b-J..
Gra~lIk UnJfr&-71o'; ~r
BY~
Ct/;~e- 5a/<o~
Date:
07/;/1/6
ACCEPTED BY:
/0 -3.0~~
Date
RECOMMENDED BY:
'tiS'
7/3010J
Date
8/29/2005
.........O......f...G.~...........
.,~ I/~..
.....~(JJF..................~. 0.....
...,.., .~. -,;'"
! (j ::'-, I , ~II} -- \
l\: i< 'J ,:J
......................................
([itl' of <!9tlrol'
.. Planning Division
Engineering Division
Building, Life & Environmental Safety Division.
Housing & Community Development
COMMUNITY DEVELOPMENT DEPARTMENT
7351 Rosanna Street, Gilroy, CA 95020
(408) 846-0440. FAX: (408) 846-0.429
(408) 846-0450 FAX: (408) 846-0429
(408) 846-0430 FAX: (408) 846-.0429
(408) 846-0290 FAX: (408) 846-0429
April 18,2005
Granite Construction Company
P.O. Box 720
Watsonville, CA 95077
A TTN: Mr. Steve Walter
Letter No. 123
RE: Santa Teresa Boulevard Widening Project No. 04-CDD-128
Internally Illuminated Street Name Sign Changes
Please provide a cost proposal to correct the Internally Illuminated Street Name
Signs at the Welbum Avenue & Mantelli Drive intersections on Santa Teresa
Boulevard to match the signs at First Street and Longmeadow Drive. The sign
modifications are as follows:
Santa Teresa BoulevardlWelbum Avenue
Replace two 6' sign assemblies which currently read "Santa Teresa" with 8' sign
assemblies reading "Santa Teresa Blvd"
Change two sign panels which currently read "Welbum" to read "Welbum Ave"
Santa Teresa Boulevard/Mantelli Drive
Change two sign panels which currently read "Santa Teresa" to read "Santa
Teresa Blvd"
Change two sign panels which currently read "Mantelli" to read "Mantelli Dr"
If you have any questions, please do not hesitate to contact me at (408) 846-0410.
Sincerely,
~4
Charles 1. Krueger O'
Resident Engineer
cc: City Engineer
Kristi Abrams, Senior Civil Engineer
Don Dey, Transportation Engineer
Michael F. Goodhue, Senior Civil Engineer
Steven E. Beams, Engineering Technician/Inspector
'.
"First In Service to the Community"
CO'R'
. Granite Construction Company
Monterey Bay Branch
580 West Beach Street
Watsonville, CA 95076
Santa Teresa Blvd Widening Project Office
Phone: 408-~9257
Fax: 408-846-9330
CHANGE ORDER REQUEST
COR NUMBER: 737-060
Project: Santa Teresa Boulevard Widening Project
Project No: 04-CDD-128
To:
Charlie Krueger - Resident Engineer
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
Sent Via Fax: 408-846-0429
From: Steve Walter - Project Manager .
Date: June 21. 2005
cc:
Subject: Illuminated Street Name Sign Quotation.
Charlie,
Please find below our proposal in response to your "letter number .123".
Giacalone Electrical Services (see attached quote)
GCCO MarkuD (10%)
TOTAL
$7,353.41
$ 735.34
$8,088.75
The total lump sum amount requested for this work is $8,089.00.
R
:'')
ENG\
F')I'NG
..__l ...
1 .
GIACALONE ELECTRICAL SERVICES, INC.
. (408) 842-9655 * FAX (408) 842-5285
. Lfc #: C10/A 540448
CO/WO#:
14
REVISION:
. COMPANY: Granite Construction
ADDRESS: 580 West Beach St.
CITY, ST, ZIP Watsonville, CA 95077
OFFICE:
FAX:
MOBILE:
(831) 763-6100
(831) 763-6121
(831) 750-0400
SUPERINTENDENT DAYS TO COMPLETE WORK
Tim Atkins ASAP
GESI JOB NUMBER DATE
599-1 June 27, 2005
GESI JOB NAME REQUESTED START DATE
Santa Teresa Widening ASAP
JOB LOCA nON REQUESTED COMPLETE DATE
Gilroy, CA ASAP
REQUESTED BY: Steve Walter I Charlie Krueger
QTY MATERIAl. PRICE UM AMOUNT . .... . ..~"(~ "I t' ....~.}'In~~..... .
.,
2 8' Sign "Santa Teresa Blvd" $97~.00 $1,950.00 At Welburn Ave Change two 6' illuminated street signs to 8' signs
4 6' Panels "Welburn Ave" $145.00 $580.00 reading "Santa Teresa Blvd"Change 4 sign panels to say "Welburn
4 8' Panels "Santa Teresa Blvd" $185.00 $740.00 Ave". At Mantelll change 4 sign panels to say "Santa Teresa Blvd"
4 6' Panels "Mantelli Dr" $145.00 $580.00 and change 4 sign panels to say "Mantelll Dr".
ii/i) ,.x;'" I ,"::'ril r;,,;,:~..;;...i 1[:) AMOUNT
'''lOIl.'
Basket Truck ~.. 12.00 EA 1--1 $'35.00 $420.00
SUBTOTAI.-OTHER $420.00
15.00% MARKUP - OTHER $63.00
TOTAL-OTHER $483.00
'if....) '.2 ....;;..,;i;ii
" '".,: I;,...t!~;;t;n; ; ",,,,UU" ,
Electrician 12.00 EA 1 $71.85 $862.20
Laborer 12.00 EA 1 $42.81 $513.72
SUBTOTAL - MATERIALS $3,850.00 SUBTOTAL-LABOR $1,375.92
8.25% TAX - MATERIALS $317.63 18.00% MARKUP. LABOR $247.67
15% MARKUP - MATERIALS $625.14 33.00% SURCRG - LABOR $454.05
TOTAL - MATERIALS $4,792.77 TOTAL - LABOR $2,077.64
Signature
TOTAL LABOR $2,077 .64
TOTAL MATERIALS $4,792.77
TOTAL EQUIP/OTHER $483.00
7~ 1tfJ4 I TOTAL> $7,353.41
By signing this work order, you are only acknowledging that the material, labor, equipment
and other quantities and hours are accurate and have been completed. Pricing of this work
order will be done according to contract / service rates by the main office.
I here by acknowledge the satisfactory completion of the above described work.