Loading...
HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 46 ~..!..('>... , -' (...)\ .' '~, ;:15:' -...L .... ,.:,}. ,1 ~.l ~ ~.~~.~:*; ,'~." . ....... - . ....... ..., City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 46 To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5/17/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Modify Internally Illuminated Street Name Signs per attached Letter No. 123 and Change Order Request No. 60. Sign lettering shall be Series E per Caltrans Standard Specifications. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $8,089.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $7,448,458.00 $205,932.00 $7,654,390.00 $8,089.00 $214,021.00 $7,662,479.00 P.M. Percentage Initial 2.76% ot-t 2.87% b-J.. Gra~lIk UnJfr&-71o'; ~r BY~ Ct/;~e- 5a/<o~ Date: 07/;/1/6 ACCEPTED BY: /0 -3.0~~ Date RECOMMENDED BY: 'tiS' 7/3010J Date 8/29/2005 .........O......f...G.~........... .,~ I/~.. .....~(JJF..................~. 0..... ...,.., .~. -,;'" ! (j ::'-, I , ~II} -- \ l\: i< 'J ,:J ...................................... ([itl' of <!9tlrol' .. Planning Division Engineering Division Building, Life & Environmental Safety Division. Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT 7351 Rosanna Street, Gilroy, CA 95020 (408) 846-0440. FAX: (408) 846-0.429 (408) 846-0450 FAX: (408) 846-0429 (408) 846-0430 FAX: (408) 846-.0429 (408) 846-0290 FAX: (408) 846-0429 April 18,2005 Granite Construction Company P.O. Box 720 Watsonville, CA 95077 A TTN: Mr. Steve Walter Letter No. 123 RE: Santa Teresa Boulevard Widening Project No. 04-CDD-128 Internally Illuminated Street Name Sign Changes Please provide a cost proposal to correct the Internally Illuminated Street Name Signs at the Welbum Avenue & Mantelli Drive intersections on Santa Teresa Boulevard to match the signs at First Street and Longmeadow Drive. The sign modifications are as follows: Santa Teresa BoulevardlWelbum Avenue Replace two 6' sign assemblies which currently read "Santa Teresa" with 8' sign assemblies reading "Santa Teresa Blvd" Change two sign panels which currently read "Welbum" to read "Welbum Ave" Santa Teresa Boulevard/Mantelli Drive Change two sign panels which currently read "Santa Teresa" to read "Santa Teresa Blvd" Change two sign panels which currently read "Mantelli" to read "Mantelli Dr" If you have any questions, please do not hesitate to contact me at (408) 846-0410. Sincerely, ~4 Charles 1. Krueger O' Resident Engineer cc: City Engineer Kristi Abrams, Senior Civil Engineer Don Dey, Transportation Engineer Michael F. Goodhue, Senior Civil Engineer Steven E. Beams, Engineering Technician/Inspector '. "First In Service to the Community" CO'R' . Granite Construction Company Monterey Bay Branch 580 West Beach Street Watsonville, CA 95076 Santa Teresa Blvd Widening Project Office Phone: 408-~9257 Fax: 408-846-9330 CHANGE ORDER REQUEST COR NUMBER: 737-060 Project: Santa Teresa Boulevard Widening Project Project No: 04-CDD-128 To: Charlie Krueger - Resident Engineer City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 Sent Via Fax: 408-846-0429 From: Steve Walter - Project Manager . Date: June 21. 2005 cc: Subject: Illuminated Street Name Sign Quotation. Charlie, Please find below our proposal in response to your "letter number .123". Giacalone Electrical Services (see attached quote) GCCO MarkuD (10%) TOTAL $7,353.41 $ 735.34 $8,088.75 The total lump sum amount requested for this work is $8,089.00. R :'') ENG\ F')I'NG ..__l ... 1 . GIACALONE ELECTRICAL SERVICES, INC. . (408) 842-9655 * FAX (408) 842-5285 . Lfc #: C10/A 540448 CO/WO#: 14 REVISION: . COMPANY: Granite Construction ADDRESS: 580 West Beach St. CITY, ST, ZIP Watsonville, CA 95077 OFFICE: FAX: MOBILE: (831) 763-6100 (831) 763-6121 (831) 750-0400 SUPERINTENDENT DAYS TO COMPLETE WORK Tim Atkins ASAP GESI JOB NUMBER DATE 599-1 June 27, 2005 GESI JOB NAME REQUESTED START DATE Santa Teresa Widening ASAP JOB LOCA nON REQUESTED COMPLETE DATE Gilroy, CA ASAP REQUESTED BY: Steve Walter I Charlie Krueger QTY MATERIAl. PRICE UM AMOUNT . .... . ..~"(~ "I t' ....~.}'In~~..... . ., 2 8' Sign "Santa Teresa Blvd" $97~.00 $1,950.00 At Welburn Ave Change two 6' illuminated street signs to 8' signs 4 6' Panels "Welburn Ave" $145.00 $580.00 reading "Santa Teresa Blvd"Change 4 sign panels to say "Welburn 4 8' Panels "Santa Teresa Blvd" $185.00 $740.00 Ave". At Mantelll change 4 sign panels to say "Santa Teresa Blvd" 4 6' Panels "Mantelli Dr" $145.00 $580.00 and change 4 sign panels to say "Mantelll Dr". ii/i) ,.x;'" I ,"::'ril r;,,;,:~..;;...i 1[:) AMOUNT '''lOIl.' Basket Truck ~.. 12.00 EA 1--1 $'35.00 $420.00 SUBTOTAI.-OTHER $420.00 15.00% MARKUP - OTHER $63.00 TOTAL-OTHER $483.00 'if....) '.2 ....;;..,;i;ii " '".,: I;,...t!~;;t;n; ; ",,,,UU" , Electrician 12.00 EA 1 $71.85 $862.20 Laborer 12.00 EA 1 $42.81 $513.72 SUBTOTAL - MATERIALS $3,850.00 SUBTOTAL-LABOR $1,375.92 8.25% TAX - MATERIALS $317.63 18.00% MARKUP. LABOR $247.67 15% MARKUP - MATERIALS $625.14 33.00% SURCRG - LABOR $454.05 TOTAL - MATERIALS $4,792.77 TOTAL - LABOR $2,077.64 Signature TOTAL LABOR $2,077 .64 TOTAL MATERIALS $4,792.77 TOTAL EQUIP/OTHER $483.00 7~ 1tfJ4 I TOTAL> $7,353.41 By signing this work order, you are only acknowledging that the material, labor, equipment and other quantities and hours are accurate and have been completed. Pricing of this work order will be done according to contract / service rates by the main office. I here by acknowledge the satisfactory completion of the above described work.