HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 50 . City of Gilroy Engineering Division 7351 Rosanna St., Gilroy. CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 50 To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5/17/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Replace existing conduit and pullboxes at Welburn Avenue, Mantelli Drive and Longmeadow Drive per attached Change Order Request No. 69. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. P.M. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $6,485.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost Percentage Initial $7,448,458.00 rJ 1 $223,583.00 3.00%~, $7,672,041.00 $6,485.00 ~J I $230,068.00 3.09% ~ $7,678,526.00 tfra~lIk /t:;~1kY) '~Itf~ ~R By: Date: /1 /r;lll~ 61~!ok ACCEPTED BY: eer proj~t6= ~ II /1..-Y/b~ Date 10/512005 COR Granite"Construction Company Monterey Bay Branch 580 West Beach Street Watsonville, CA 95076 " Santa Teresa' Blvd Widening Project Office Phone: 408-846-9257 Fax: 408-846-9330 . CHANGE ORDER REQUEST COR NUMBER: 737-069 Project: Santa Teresa Boulevard Widening Project Project No: 04-CDD-128 To: Charlie Kl1leger - Resident Engineel. City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 From: Mike Berg - Project Engineer Date: August 12, 2005 cc: Subject: Replacement Conduit & Boxes. Charlie, Please find below Giacalone Electrical Services breakdown for the replacement of existing conduit and boxes at various locations throughout the project. Giacalone Electrical Services (see attached) GCCO MarkuD 00%) TOTAL $ 5,895.00 $ 589.50 $ 6,484.50 The total lump sum amount requested for this work is $ 6,485.00 ,,..,,\ ! t,; ." Giacalone DESIGN * CONSULTING * INSTAllATION * . SERVICE ELECTRICAL SERVICES. INC. LICENSE NO. 540448 6300 MONTEREY ROAD * GILROY, CAUFORNIA 95020, * Office: (408) 842-9655 * Fax: (408) 842-5285 Date: August 03, 2005 Job# : 599-1 Company: Granite Construction Attn : Steve Walter Job: Santa Teresa Widening Project Scope Of Work: Replace OLC runs Office : 'Fax: Mobile: (408) 846-9257 (831) 763-6121 (831) 750-0400 From: Tim Atkins Mobile Phone: (408) 591-1364 * * Change Order * * The below prices are for the replacement of existing conduit and boxes. The locations in the field did not correspond with locations on the plans. The existing conduit and boxes were located in the new street and therefore had to be replaced. After discussions with the city it was concluded that it would be better to replace the OLC conduit rather than use one of the quad-duct conduits. Due to time constraints GESI has installed the boxes and conduit. DLC work on the south east side of Mantelli Dr. 200 LF 1 1/2 Sch. 40 OLC conduit @ $7.00 = $1,400.00 2 EA #5 Concrete Pull Boxes and Lids @ $500.00 = $1,000.00 DLC work on the south east side of Welburn Ave. 285 LF 1 1/2 Sch. 40 OLC conduit @ $7.00 = $1,995.00 2 EA #5 Concrete Pull Boxes and Lids @ $500.00 = $1,000.00 1 DLC Work on the south east side of Longmeadow Dr. EA #5 Concrete Pull Box and Lid @ $500.00 = $500.00 NOTES: 1) Bid based on prevailing wage rates. 2) Bid based on 8 hour work days Monday - Friday. Overtime is extra. Total: $5,895.00 Accepted Signature I Title Date * * PLEASED SIGN AND FAX BACK APPROVED COPY TO TIM ATKINS @408-848-1130 * *