HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 52 City of Gilroy Engineering DMsion 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 52 To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5/17/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies fOlWarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Furnish and install root barrier per attached Change Order Request No. 77 A and Letter No. 189 dated October 5, 2005. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. Consideration oftime adjustment will be deferred until receipt of a Time Impact Analysis in accordance with Section 01310-6.0 of the Contract Documents. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $15,681.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $7,448,458.00 $234,663.00 $7,683,121.00 $15,681.00 $250,344.00 $7,698,802.00 P.M. Percentage ~ 3.15%~ 3.36% d-J{ 6rtl/l,f~ ~~~:4/1' tb"'{PN7Y ~OR By: Date: 1/ Jg / !to- ClareACL 3a~~ ACCEPTED BY: /~ 2J)~ Date II/z- r ~f Date 11/3/2005 'COR. CHANGE .oRDER REQUEST COR NU;WBE/J: 737-077 A Granite C.onstruction .Company Monterey Bay Branch . 580 West Beach Street Watsonville, CA 95076 . Santa Teresa Blvd Widening Project Office Phone: 408-846-9257 . Fax: 408-846-9330 Project:. Santa Te."esa Boulevard Widening P."oject Project No: 04-CDD-128 To: Charlie Krtiege.. - Resident Enginee.. City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 From: Mike Berg - Project Engineer Date: October 11. 2005 cc: Subject: Revised Root Ba....ie.. Cost P..oposal. Charlie, Please find below ou.. ..evised p..ice to install mot ba....ie.. at the 53 oak t..ees specified along with 5 t..ees at the cu..b side. This cost p..oposal shall take the place of COR #77. B&B Landscape Cont..acto..s Inc. (see attached) GCCO Ma..kup (10%) TOTAL $ 14,255.00 $ 1.425.50 $ 15,680.50 The total lump sum amount requested for this work is $ 15,681.00 . -) 10/10/2005 07:46 4085738343 8&8 LANDSCAPE PAGE 01/01 B&B October 10, 2005 Granite COIl!;tructiol1 Co. Attcntion: Stcve Walter Project: Santa Teresa Blvd. Widening We have received a copy of the letter from the City of Gilroy regardIng the 18" root barrier installation. We will install the barriers at all of the Oak trees, (53) trees on both sides and at (5) trees at the curb side. III sections ($I05.00/section) Install the barriers between the electrical boxes & concrete Total Change Order Request $11.655,00 2.600.00 $14.~S5J!O The City's Jetter states that only the 36" box trees require the tree toot barriers. Does this mean none of the remaining trees will get root barriers? Or do we follow the detail on Drawing PL-2? Please Jet me know. If YOll bave any questions please contact my office. Thank you, B & B LANDSCAPE CONTRACTORS, INC. ~/~- Relnll'Okf'Bnml1 Vice President ~ RB~.l1l1 Tr~ll~lmttecl viA fAX Page I of 1 450 Phelan Ave. San Jose,CA 95112.2504 (408) 573-9430 Fax(408).673-8343 ConttactorsLic.352633' .'1' ';"" 'I", ..., I', qcitp Qf ~ilro!, COMlVlUNITY DEVELOPlVIENT DEPARTMENT 73S I Rosanna Street. Gilroy. cA 95020 Planning Division Engineering Divis.ion Building, Life & Environmental Safety Division Housing & Community Development (408) 846-0440 FAX: (408) 846-0429 . (408) 846-0450 FAX: (408) 846-0429 (408) 846-0430 FAX: (408) 846-0429 . (408) 846-0290 FAX: (408) 846-0429 . October 5, 2005 Granite Construction Company P.O. Box 720 Watsonville, CA 95077 ATTN: Mr. Steve Walter Letter No. 189 RE: Santa Teresa Boulevard Widening Project No. 04-CDD-128 Root Barrier Cost Proposal We are in receipt of Change Order Request No. 77 dated October 4, 2005 providing a cost proposal for furnishing and installing root barrier per RFI #41. We have determined that only the 36" box trees require root barrier. There are 53 trees in the median that will require root barrier on both sides, and 5 trees on the west side that will require root barrier adjacent to the curb. Please proceed with installation of 18" root barrier. A change order will be issued in the amount of $15,681.00. This includes the cost to remove and reinstall the electrical boxes in the' median. If you have any questions, please do not hesitate to contact me at (408) 846-0410. Sincerely, ~:-j )I~~ Resident Engineer cc: City Engineer Kristi Abrams, Senior Civil Engineer Don Dey, Transportation Engineer Michael F. Goodhue, Senior Civil Engineer Steven E. Beams, Engineering Technician/Inspector "First In Service to the Community"