HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 59 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 59 To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5/17/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upoo acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Remove and replace channel driveways per attached Letter No. 003 and Change Order Request No, 87. All requirements of the original Contract Docwnents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $5,596.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $7,448,458.00 $286,247.00 $7,734,705.00 $5,596.00 $291,843.00 $7,740,301.00 P.M. Percentage ~ 3.84% J.J.. & rl1lll te CofkSfnu:/ttM' ~My .4 ?IN,^C~OR BY:~ Date: (// /03/0..6 ~/4rM.U- S~dA 3.92% ~ ACCEPTED BY: !'4-/f;& Date RECOMMENDED BY: I-&-~t; Date 1 E'eer ~Oj~ I/S/~b Date 12/1212005 C IT Y COrTn'Unit y OF GILROY Development Department Engineer ing Division 7351 Rosanna Street Gil roy, CA 95020 Phone (408) 846-0450 Fax (408) 846-0429 www.cLgil r oy ,ca.us August 10, 2005 Granite Construction Company P.O. Box 720 Watsonville, CA 95077 ATTN: Steve Walter Letter No. 003 RE: Santa Teresa Boulevard Widening Project No. 04-CDD-128 Commercial Driveway Approaches at the South and North Morey Channels After reviewing the grading details on sheet 11 of 113 (DT6), it has been determined to eliminate and remove the commercial driveway approaches (Item 33 of the Construction notes) at the South and North Morey Channels. The removal of the driveway approaches will eliminate the 8.33% slope in the sidewalk and eliminate the depression in the curb and gutter. The curb and gutter and sidewalk are to be per City of Gilroy standard detail STR-16. All other items including the removable guard rail, gates, etc., are to be per plan. Listed below are the fallowing locations: 1). Sta. (54+50.50) South Morey Channel 2). Sta. (55+14.50) South Morey Channel 3). Sta. (72+28.50) North Morey Channel 4). Sta. (72+91.00) North Morey Channel Cost for rework resulting from this change will be paid on a time and material basis. If you have any questions, please do not to hesitate to contact me at (408) 846-0450. Sincerely, Steven E. Beams Engineering Technician / Inspector City of Gilroy cc: Richard G. Smelser, City Engineer (via email) Kristi A. Abrar,ns, City of Gilroy Development Engineer (via email) Don Dey, City of Gilro.y Transportation Engineer (via email) Michael F. Goodhue', City of Gilroy Senior Civil Engineer (via email) Charlie Krueger, Ghiradelli Associates, Resident Engineer (via email) G: \Comdev\Eng\Santa Teresa\Asst. Resident Englne~r\letters\Commerclal Driveway Approaches ./COR COR NUMBER:- 737-087 -. Granite Constr~ction Company ..' Monterey Bay Bral)ch 580 West Beach Street Watsonville, CA 95076 Santa Teresa Blvd Widening Project Office Phone: 408-84'6-9257 Fax: 408-846-9330 CHANGE ORDER REQUEST ProJect: Santa Teresa Boulevard Widening Project Project No: 04-CDD~128 To: Chal"lie Knleger - Resident Engineer City of Gilroy . 7351 Rosanna Stl;eet . Gilroy, CA 95020 Prom: Mike Berg - Project Engineer Date: . November 3,2005 cc: Subject: Remove & Replace Channel Driveways. Charlie, Please find attached extra work reports for the additional work involved with removing and replacing four channel dl'iveways. The lump sum amount requested is $ 5,596.00. RECEIVED ENGINEERING ...... 0> ..-- 0> ll) 'lit 'lit 'lit ~ 'ii <P ..-- ..-- ~ ~ co co 0 - N 'It ci CO II) at> at> ...... 0 0> CO 0> N en en en Q) l- ll) <0_ ('I) 0> 11)_ II) II) OJ fR- ..-- tt fR- II) an an ~ fR- ~ ~ ~ 'ii .... '0 C e C as Ol .r:. Q) ..... t.) '- C? @ oc'j ..... 'i Q) .... III ~ 0 ... 1:: N Q Q) ... .r:. t.) t.) C "Cl 0 as 0 c: e t.) f! a. Q. :::: Q. 0 C) I>> as :; >. ~ as as ~ .r:. U> oc'j C> 'lit > oc'j C> II) ~ "C '0 0 oc'j en ~ '0 as 0 en .2 - N 0 '- 0 - :::l iii 0 ; 3: 0 u. - >. ...J U. .... '- as 0 ...J 0 Q) ~ 0 It) E ..-- ('I) s::: E > Q. 0. ! 0 'C: 'C: 'C: ;; as '0 'lii 'lii .r:. 'C ~ 'ii oc'j oc'j .. t.) C U as C .r:. .r:. .c tIl ..... as .!!! III ~ oc'j .r:. c: 'c III 'S t.) ;;:: ;;:: ~ 0 ..: ..: E :::l :::l I Q) 0 0 en 0 a.. a.. >t "D I: G) CI E a. .g It) It) It) It) G) 0 0 0 0 0 0 0 0 E ll. ~ N ~ ~ -- G) 0 ..... It) <0 0 - ..-- ..... ..... ..-- <<l -- -- -- -- 0 co co co co U s I: <<l 0 0 1:: ll) It) It) ll) 0 0 0 0 0 0 0 0 0 .- ~ ~ ~ ~ .. ~ 0> 0> en en fJ -- -- -- -- en en en en ! 0 0 ..... N ('I) ..... ..... ..... ...... .. ... C') C') C') C') .en G) ,Q I: E U> 'lit ::;J II) 0 ? en 0 en U N U u .It .. ... i_ .8 ..... 1:1.0 E C? ..... Cl8 :s .... z 0 ..~ N ,Q O~ 0 -,