CHANGE ORDER NO. 60
To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128
Contractor:
Granite Construction Company
Contract Date:
5/17/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be retwned
to him as his authority to proceed with the work.
Description of Work
Remove existing landscaping, grade and place aggregate base tor new sidewalk on Mantelli per attached Letter No.
161 and Change Order Request No. 88.
All requirements of the original Contract Docwnents shall apply to the above work except as specifically modified by
this Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $10,234.00
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$7,448,458.00
$291,843.00
$7,740,301.00
$10,234.00
$302,077.00
$7,750,535.00
P.M.
Percentage Initial
3.92% M
4.06% ~
0rantl-e ~fr-tu-nf)'1 ~ 1:"
CONTRACTOR
By~ Dote 0/ /03/IJ6
C/4r"MU- $4/uJd4..
~~~
Construction Manag .
RECOMMENDED BY:
Ja-~6
Date
City E .
Proj~t~;2J
Date
ACCEPTED BY:
12/1212005
/~ .
//
QCitp of ~ilrop
. Planning Dhtision .
.' Engineering Division
Building, Life & Environmental Safety Division
Housing & Community Development
COMMUNITY DEVELOPMENT DEPARTMENT
.7351 Rosanna Street, Gilroy, CA 95020 .
(408) 846-0440 FAX: (408) 846-0429'
(408) 846-0450 FAX: (408) 846~0429
(408) 846-0430 FAX: (408) 846-0429
(408) 846-0290 FAX: (408) 846-0429
July 26, 200.5
Granite Construction Company
P.O. Box 720
Watsonville, CA 95077
A TTN: Mr. Steve Walter
Letter No. 161
RE: Santa Teresa Boulevard Widening Project No. 04-CDD-128
Additional Sidewalk on Mantelli Drive.
You are directed to construct a meandering sidewalk on the north side of Mantelli
Drive west of Santa Teresa Boulevard as shown on the attached drawing. This will
require removal of the existing landscaping in this area. Plans for irrigation and
landscaping will be provided at a later date, but sleeves are to be installed prior to
sidewalk construction.
Costs for removal of existing landscaping, grading and installation of irrigation
sleeves will be paid at force account. Sidewalk construction will be paid on Bid Item
No. 63.
If you have any questions, please do not hesitate to contact me at (408) 846-0410.
Sincerely,
~~~J JLc;--
Resident Engineer
cc: City Engineer
Kristi Abrams, Senior Civil Engineer
Don Dey, Transportation Engineer
Michael F. Goodhue, Senior Civil Engineer
Steven E. Beams, Engineering Technician/Inspector
"First In Service to the Community"
'--'/COR
COR. NUMBER: 737-088
Granite Construction Company
Monterey Bay Branch
580 West Beach Street
Watsonville, CA 95076
Santa Teresa Blvd Widening Project Office
. Phone: 408-846-9257
Fax: 408~846-9330
CHANGE ORDER REQUEST
Project: Santa Teresa Boulevard Widening Project
Project No: 04-CDD-128
To:
Charlie Kl1leger - Resident Engineel'
Cityof Gilroy
1351 Rosanna Street
Gilroy, CA 95020
From: Mike Berg - Project Engineer
Date: November 3,2005
cC:
Subject: Finish Base Rock for New Sidewalk @ Mantelli.
Charlie,
Please find attached extra work reports for the additional work involved with preparing the grade at Mantelli for
new concrete.
The lump sum amount requested is $ 10,234.00.
RECEIVED
NDV .t Z005
ENGINEERING
.....
N m ~ m m 0 0 0 ......
'ii ~ ~ C") ~ ~ N N N 0
0 ...,. m ..0 ...,. ~ ~ ~
'0 ~ CO I'- m <0 CO) CO) CO)
l- N.. N.. 0 0 1.0 N N N (I;>
~ 0 0 0 OJ
~ 1.0 ~ N ~
~ ~ ~ ~ "'" "'" "'"
~ ~ ~
,..
CO)
,.. 'ii
"'"
0 ...
1:: N 0
~
0 'tJ
c:
~ ~ ~ ~ ~ e
A 1 1 al Cii Cii (!)
" ~ ~ ~
Q)
'0 '0 '0 '0 '0
a= '(ji '(ji '(ji '(ji '(ji 10
~ ~ ~ ~ ~ ''It
10
-f Q) en
of c:: c:: c:: c:: c:: en
.... .... .... .... .... N
0 0 0 0 0 0
.... .... .... .... ....
0 ~ Q) dJ dJ dJ dJ
::::l ::::l ::::l ::::l ::::l
- '0 c:: c: c: c: c:
Q) Q) Q) dJ dJ
c: > > > > >
! 0 <( <( <( <( <(
;::; Qi Qi Qi Qi Qi
'C ... ... ... ... ...
.. c:: c:: c:: c:: c::
Co) al al al al al
. UI ::!: ::!: :! :! ::!:
CI)
III 0 ~ ~ ~ ~ ~
al al al al al
0. 0. 0. 0. 0.
I ~ ~ ~ ~ Q)
l0-
a.. a.. a.. a.. a..
~ "
I: CI)
E
&I ~
A .g 1.0 1.0
CI) 1.0 1.0 1.0 0 0
0 0 0 o 0
E ~ 0 0 0 ~~
CI) ~ ~ ~ m .....
0 - ~ C") ~ NC")
<<S -.. -.. -..
0 co co co co co
U CI)
-
I: <<S
C 1.0 Lt) Lt) 1.0 Lt)
0 1:: 0 0 0 0 0
0 0 0 0 0
0 N ~ ~ ~ ~
.- -..
.. C") ~ C") C") C")
CI) -.. -.. -.. -..
U 0:: ~ ..... ~ ~ ~
~ ~ ~ ~ ~
! Q ...,. 1.0 <0 co m
C") C") C") C") C")
.. ~ C") C") C") C") C")
eft CI)
.c
I: E 10
::1 ~
1.1)
0 Z en
0 en
U N'
U
U
"
.. ~
CI)
.- .c ,..
1:1.0 E CO)
,..
fig ::1 "'"
Z 0
...~ N
.c
,,~ 0
..,