HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 62
City of Gilroy
Engineering Division
7351 Rosanna 51., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO. 62
To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128
Contractor:
Granite Construction Company
Contract Date:
5/17/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be retwned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Form and grade handicap ramps at the driveway at Station 27 + 46.7 per attached Change Order Request No. 82 and
perrorm miscellaneous extra work per attached Change Order Request No. 92.
All requirements of the original Contract Docwnents shall apply to the above work except as specifically modified by
this Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $4,058.00
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$7,448,458.00
$306,040.00
$7,754,498.00
$4,058.00
$310,098.00
$7,758,556.00
P.M.
Percentage Initial
4.11%~
&rtJ~J/k UJt1S1rttdJO/1' Co,
CONTRACTOR
By: ~~ Date: 01 /t>3Io~
C!arULa- ~d'i.
4.16%M
ACCEPTED BY:
14/f;~
Date
RECOMMENDED BY:
{- ~ - t::> r:;.
Date
City
proi0
/ /r/o~
Date
12127/2005
~COR
COR NUMBER: 737-082
Granite Construction Company
Monterey Bay Branch
580 West Beach Street
Watsonville, CA 95076
Santa Teresa Blvd Widening Project Office
Phone: 408-846-9257
Fax: 408-846-9330
CHANGE ORDER REQUEST
Project: Santa Teresa Boulevard Widening Project
Project No: 04-CDD-128
To:
Charlie Kl1leger - Resident Engineer
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
From: Mike Berg - Project Engineer
Date: October 31,2005
cc:
Subject: Vanni Property Ramps.
Charlie,
Please find attached T &M billing for the work involved with forming and grading the two handicap ramps at the
Vanni Property.
The lump sum amount requested is $ 1,723.00.
~(;EJVED
1 2005
~NQINEERING
1:
o
CL
.
II:
~
o
-
l!
..
><
III
.
>t
c:
"
CL
E
o
u
c:
o
.-
..
u
i!
..
..
c:
o
U
.
.. ~
__ CD
J:lI
C::g E
l! ~ ~
,,~~
<.0 <.0 N N N
'ii ~ 'V CO CO CO ~
- cri ~ N N N ....
0 ~ to N N N 0
~ ..... 1O 1'0:. ,...~ ,...~ ~
.....- fA- - - - Q)
fA- - - - Ol
~
~
~
o
;:
-
o
c
o
;i
'lE:
C)
II)
CD
o
"0
CD
E
~
.g
CD
Q.
S
ftI
o
is.
ftI
o
t:::
o
&!
e
~
CD
J:lI
E
::s
Z
;n
cJ
(,)
~
CD
a.
e
.~ i
ai >- en
> ~ N
1;j g..
f/) ...
a. a.
E .c
m c:
... m
CD >
"0 ....
m m
... f/)
CJ)a.
"0 E
c: m
m ...
E E
... ...
o 0
LL LL
10 10
o 0
o 0
C:!C:!
10 <.0
..... .....
-- --
m m
10 10
00
o 0
C:!C:!
10 10
N C:!
00
..... .....
I'- to
..... ...-
('t')('t')
!
en
en
~
....
CO')
,...
-
o
N
,...
CO')
,... ..
- ii
o ...
N ~
"0
C
t!
C)
COR NUMBER: 737-092
Granite Construction Company
Monterey Bay Branch
580 West Beach Street
Watsonville, CA 95076
Santa Teresa Blvd Widening Project Office
Phone: 408-846-9257
Fax: 408-846-9330
COR
CHANGE ORDER REQUEST
Project: Santa Teresa Boulevard Widening Project
Project No: 04-CDD-128
To:
Charlie Krueger - Resident Engineer
City of Gih"Oy
7351 Rosanna Street
Gilroy, CA 95020
From: Mike Berg - Project Engineer
Date: November 16, 2005
cc:
Subject: Miscellaneous Extra Work.
Charlie,
Please find attached daily extra work reports for forming the additional tree wells at First Street, abandoning the
manhole at the South Morey Channel and excavating the additional soft spots before lime treatment.
The lump sum amount requested for this extra work is $ 2,335.00
RECEIVED
NOV 1 6 Z005
ENGINEERING
.
IiRAllTE
ronsTRUCTlDll
romPIIIY W
DATE PERFORMED
8/30/2005
WORK PERFORMED BY
GRANITE CONSTRUCTION COMPANY
DESCRIPTION OF WORK
Form & grade additional tree wells in 10' sidewalk @ 1ST Street
EXTRA WORK BilliNG
DATE OF REPORT
11/151200
GCCO JOB NO.
201737
GCCO CCO NO.
299547
LABOR CHARGES
NAME CRAFT ST HRS ST RATE aT HRS OT RATE NOTE SUBSISTANCE EXT
~ . Gonzales CPT 8.00 $34.39 0.00 $O.OG $0.00 $275.12
r . Vasquez TMS 8.00 $39.41 0.00 $0.00 $0.00 $315.28
. Spencer FRM 2.00 $49.30 0.00 $0.00 $0.00 $98.60
.
TOTAL SUBSISTANCE: $0.00 TOTAL LABOR: $689.00
EQUIPMENT CHARGES
EQUIP NO. DESCRIPTION REG HRS REG RATE OT HRS OT RATE Att Rate EXT
04.1105 1.25 TN SUPERDUTY 2.00 $17.90 0.00 $0.00 0.00 $35.80
04.797 1.25 TN FLATBED 8.00 $17.90 0.00 $0.00 0.00 $143.20
TOTAL EQUIPMENT: $179.00
SUMMARY
ST LABOR ONLY: $689.00 TOTAL EQUIP: $179.00
$0.00 TOTAL MATL: $0.00
OT LABOR ONLY: EQUIP MARK-UP: 15% $26.85
TOTAL LABOR: $689.00 MATL MARK-UP: 15% $0.00
ST LABOR SURCHG 18% $124.02 TOTAL EQUIP AND MATLW/MARK-UP: $205.85
OT LABOR SURCHG 15% $0.00
TOTAL EQUIP AND MATLW/MARK-UP: $205.85
TOTAL LABOR + SURCHARGES: $813.02 TOTAL LABOR,SURCHGEW/MARK-UP:
$1,081.32
SUBSISTENCE $0.00 TOTAL LABOR, EQUIP AND MATL W/MARK-UP: $1,287.17
33% $268.30 LESS FLAGGING: O"k $0.00
LABOR MARK-UP: BOND COST 2% $25.74
ADDTL LABOR MARK-
I TOTAL LABOR+SURCHGE+SUBSIS+MARK- $1,081.32 GRAND TOTAL FOR EXTRA WORK: $1,312.91
GRANITE REPRESENTATIVE
ACCEPTED FOR PAYMENT
EWID: 343
Page 11)f 1
. .
iRAnTE
~
DATE PERFORMED
6/3/2005
\NORK PERFORMED BY
GRANITE CONSTRUCTION COMPANY
DESCRIPTION OF WORK
Subexcavate 1 foot deep in unsuitable subgrade for additonal
EXTRA WORK BilliNG
DATE OF REPORT
11/15/200
Gceo JOB NO.
201737
Geeo ceo NO.
299540
LABOR CHARGES
NAME CRAFT ST HRS ST RATE OT HRSloT RATE NOTE SUBSISTANCE EXT
Cemokus OE 3.00 $50.64 o.GOI iO.OO $0.00 $151.92
. 0.001
Farrell OE 3.00 $47.63 $0.00 $0.00 $142.89
.
TOTAL SUBSISTANCE: $0.00 TOTAL LABOR: $294.81
EQUIPMENT CHARGES
::QUIP NO. DESCRIPTION REG HRS REG RATE I OT HRS OT RATE Att Rate EXT
2.324 14G BLADE 1.00 $56025l 0.00 $0.00 0.00 $55.25
8.906 950E 4 YO LOADER 3.00 $41.00 0.00 $0.00 O.Oel $123.00
16.1452 FORD PICKUP 3.00 $12.00 0.00 $0.00 0.00 $36.00
16.2262 FORD PICKUP .75 TON 3.00 $12.00 0.00 $0.00 0.00 $36.00
-~-_._---_. --
TOTAL EQUIPMENT: $250.25
SUMMARY
ST LABOR ONLY: $294.81 TOTAL EQUIP: $250.25
$0.00 TOTAL MATL: $0.00
OT LABOR ONLY:
$294.81 EQUIP MARK-UP: 15% $37.54
TOTAL LABOR: MATL MARK-UP: 15% $0.00
ST LABOR SURCHG 18% $53.07 TOTAL EQUIP AND MATLW/MARK-UP: $287.79
OT LABOR SURCHG 15% $0.00 TOTAL EQUIP AND MATLW/MARK-UP:
$287.79
TOTAL LABOR + SURCHARGES: $347.88 TOTAL LABOR,SURCHGEW/MARK-UP:
$462.67
SUBSISTENCE $0.00 rrOTAL LABOR, EQUIP AND MATL W/MARK-UP: $750.46
33% $114.80 LESS FLAGGING: 0".4 $0.00
LABOR MARK-UP: BOND COST 2% $15.01
ADDTL LABOR MARK-
TOTAL LABOR+SURCHGE+SUBSIS+MARK- $462.67 GRAND TOTAL FOR EXTRA WORK: $765.47
ACCEPTED FOR PAYMENT
GRANITE REPRESENTATIVE
EWID: 344
Page 1 of 1
iRArlTE
nnSTRUCTIon
'nn'II"IIII'IY SINCE
.UlIIrIIII 1922
DATE PERFORMED
1 on/2005
WORK PERFORMED BY
GRANITE CONSTRUCTION COMPANY
DESCRIPTION OF WORK
Abandon manhole @ South Morey Channel
EXTRA WORK BilliNG
DATE OF REPORT
11/15/200
GCCO JOB NO.
201737
Gceo CCO NO.
299553
LABOR CHARGES
NAME CRAFT ST HRS ST RATE OT HRS OT RATE NOTE SUBSISTANCE EXT
0.50 $42.41 0.00 $0.00 _.-.C"....-_
Maczo FRM $0.00 $21.21
.
Martinez LBR 0.50 $35.34 0.00 $0.00 $0.00 $17.67
.
Gutteriez LBR 0.50 $39.41 0.00 $0.00 $0.00 $19.71
.
Vargas LBR 0.50 $39.41 0.00 $0.00 $0.00 $19.71
.
TOTAL SUBSISTANCE; $0.00 TOTAL LABOR: $78.29
EQUIPMENT CHARGES
:QUIP NO. DESCRIPTION I REG HRS I REG RATE OT HRS OT RATE Att Rate I EXT I
6.2033 FORD PICKUP. 75 TON 1 0~$12.00 0.00 $0.00 0.00/ $6.00 I
6.1279 FORD .75 TON PICKUP 0.50 $12.00 0.00 $0.00 0.00 $6.00
- - -- .-.~.~ ----- -----
. TOTAL EQUIPMENT; $12.00 I
MATERIAL CHARGES
MATERIAL SUPPLIER MATERIAL DESCRIPTION UNITS UNIT COST EXT
;ranite Rock Company 5.5 Sack Concrete 1.00 $99.59 $99.59
TOTAL MATERIAL: $99.59
SUMMARY
ST LABOR ONLY: $78.29 TOTAL EQUIP: $12.00
$0.00 TOTAL MA TL: $99.59
OT LABOR ONLY:
$78.29 EQUIP MARK-UP: 15% $1.80
TOTAL LABOR: MA TL MARK-UP: 15% $14.94
ST LABOR SURCHG 18% $14.09 TOTAL EQUIP AND MATLW/MARK-UP: $128.33
OT LABOR SURCHG 15% $0.00 TOTAL EQUIP AND MATLW/MARK-UP:
$128.33
TOTAL LABOR + SURCHARGES: $92.38 TOTAL LABOR,SURCHGEW/MARK-UP:
$122.86
SUBSISTENCE $0.00 TOTAL LABOR, EQUIP AND MATL W/MARK-UP: $251.19
33% $30.48 LESS FLAGGING: 0% $0.00
LABOR MARK-UP: BOND COST 2% $5.02
ADDTL LABOR MARK-
TOTAL LABOR+SURCHGE+SUBSIS+MARK- $122.86 GRAND TOTAL FOR EXTRA WORK: $256.21
~RANITE REPRESENT A TIVE
ACCEPTED FOR PAYMENT
"WID: 345