HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 64 h / ( City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 64 To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5/17/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Perform additional conform grinding per attached Change Order Request No. 95. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $8,926.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price 6raat~ Co/!OfruvioYJ' Co/VlfC/l.j ;1 ~c;OR By: ~~ Date: oZ/!hlo~ ~~ S0~M ACCEPTED BY: RECOMMENDED BY: eer Projoct~ 1/11/2006 Cost $7,448,458.00 $315,513.00 $7,763,971.00 $8,926.00 $324,439.00 $7,772,897.00 P.M. Percentage Initial 4.24% k:J 4.36% ~ 2/1"7 015 Date Date 21i~;;t Date 2-~?j" , Date CO'R. . . .Granite Construction Company. Monterey Bay Branch 580 West Beach Street Watspnv\lIe, CA 95076 San~ Teresa Blvd Widening Project Office . Phone: 40a-846-~257 Fax: 408-846-9330 CHANGE ORDER REQUEST . . COR JV(J,lfBER: 737-()95 Project: 'SantaTeresa Boule,'ard Wideliing Proje.ct Project No: .04-CDD-128 To: Charlie Kl11eger - Resident Engineel' City of Gilroy 7351 Rosanna Street. Gilroy, CA 95020 From: Mike Berg - Project Enginccr Date: November 30, 2005 cc: Subject: Additional ConfOI'm GI'inding. Charlie, Please find attached extra work reports for the additional conform grinding requested by Steve Beams. This change order l-equest I'epl'esents work completed on Thursday October 6th, 2005. The lump sum amount requested is S 9,-4J9.88. ~ 8126' J f')r- ""1\ rD ... r- ,. ,- r .'_ (.I ;~. J ,.."i, ~"jV:]O;( E~V-:L ::ER.\NG i I I I I I I , I I L- 'IGRlHTE . COI1STRUCTllll CIJITIIIIIY SN:E . . 1922 DATE PERFORMED 10/6/2005 WORK PERFORMED BY ..' GRANITE CONSTRUCTION COMPANY DESCRIPTION OF WORK . Conform grind additional locations EXTRA .WORK BilliNG DATE OF REPORT 11/18/200 GCCO JOB NO. 201737 GCCO cco NO. 299552 LABOR CHARGES NAME CRAFT ST HRS ST RATE OT HRS OT RAT-a:: NOTE . SUBS.ISTANCE EXT F... Arriaga CPT .8.00 $41.88 0.00 $0;00 . $0.00 $335.04 J. Garcia CPT 8.00 $34.39 0.00 $0,00 $0.00 $275.12 F. Huerta CPT 8.00 $34.39 0.50 $45.84 $0.00 $298.04 J . Limon . CPT 8.00 $35.34 1.00 $47.26 $0.00 $329.98 R. Salsedo PILE 8.00 $47.41 0.00 $0.00 $0.00 $379.28 S. Johnson TMS 8.00 $39.78 0.00 $0.00 $0.00 $318.24 TOTAL SUBSISTANCE: $0.00 TOTAL LABOR: $1,935.70 EQUIPMENT CHARGES EQUIP NO. DESCRIPTION REG HRS REG RATE OT HRS OT RATE Att Rate EXT 08.308 JD210E 4X4 SKIPLOADER 8.00 $29.00 0.00 $0.00 O.OC $232.00 04.1027 CONE TRUCK 8.60 $19.00 0.00 $0.00 O.OC $161.60 06.1616 PICKUP 9.00 $12.00 0.00 $0.00 0.00 $108.00 06.2248 PICKUP 8.00 $12.00 0.00 $0.00 O.OC $96.00 04.951 10 YO DUMP TRUCK 8.00 $41.00 0.00 $0.00 O.OC $328.00 -- TOTAL EQUIPMENT: $925.50 MA TERIAL CHARGES MATERIAL SUPPLIER MATERIAL DESCRIPTION UNITS UNIT COST EXT Granite Construction Company Cold Mix Asphalt 10.43 $52.50 $547.58 Fonseca McElroy Grinding Compa Grinder Rental 1.00 $3,060.00 $3,060.00 A-1 Sweeping Service Sweeper Rental 1.00 $437.50 $437.50 TOTAL MATERIAL: $4,045.08 SUMMARY ST LABOR ONLY: $1,865.52 TOTAL EQUIP: $925.50 OTLABOR ONLY: $70.18 TOTAL MA TL: $4,045.08 EQUIP MARK-UP: 15% $138.83 TOTAL LABOR: $1,935.70 MATL MARK-UP: 15% $606.76 ST LABOR SURCHG 18% $335.79 TOTAL EQUIP AND MATLW/MARK-UP: $5,716.16 OT LABOR SURCHG 15% $10.53 TOTAL EQUIP AND MATLW/MARK-UP: $5,716.16 TOTAL LABOR + SURCHARGES: $2,282.02 TOTAL LABOR,SURCHGEW/MARK-UP: $3,035.09 SUBSISTENCE $0.00 TOTAL LABOR, EQUIP AND MATL W/MARK-UP: $8,751.25 , LABOR MARK-UP: 33% $753.07 LESS FLAGGING: 0% $0.00 BOND COST 2% $175.02 ADDTL LABOR MARK- TOTAL LABOR+SURCHGE+SUBSIS+MARK- $3,035.09 GRAND TOTAL FOR EXTRA WORK: $8,926.27 ACCEPTED FOR PAYMENT GRANITE REPRESENTATIVE EWID: 346 Page 1 of 1