Loading...
HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 67 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 67 To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5117/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City ofGiJroy properly filled out. Upon acceptance by the City, the Contractor's copy will be retmned to him as his authority to proceed with the work. Description of Work Provide two changeable message boards for the traffic shift on 10/24/05 per attached Change Order No. 96. Request All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. 0rc:lf}tfe Cmsf,ud1O/l'tom/a/l( A fON'rAC~OR By: ~ Date: 0,;2/16;0& C! tfrVt.cL- (:Ja fc()J 4. Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $7,448,458.00 $322,650.00 $7,771,108.00 $2,053.00 $324,703.00 $7,773,161.00 P.M. Percentage Initial 4.33% ~ I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $2,053.00 4.36% ~ RECOMMENDED BY: 2- ACCEPTED BY: eer Proj~tEn~ ~ Date L.. /1 ? !tJ' Date 1/31 !2006 COR CHANGE ORDER REQUEST COR N'UiJ/BER: '737-096 Project: Santa Teresa Boulevard Widening Project Project No: 04-CDD-128 To: . Chal"lie Kl"Ueger - Resident Engineel' City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 Subject: Changeable Message Board Rental. Charlie, Granite Construction Company Monterey Bay Branch 580 West Beach Street Watsonville, CA 95076 Santa Teresa Blvd Widening Projec( Office .. Phone: 408-846-9257 .' Fax: 408-846-9330 From: Mike Berg - Project Engineer Date: December 1. 2005 . cc: Please find attached invoices for the rental of the two changeable message boards required for the traffic shift on Santa Teresa. The lump sum amount I'equested is $ 2,053.00. RECEIVED Ut-!,O ;'005 NEERING 'lliRAIlITE CDnSTRlICTIIIl CDI11IWIY ~E DATE PERFORMED 10/17/2005 WORK PERFORMED BY GRANITE CONSTRUCTION COMPANY DESCRIPTION OF W.ORK Changeable Message Board Rental . . EXTRA WORK BilliNG . DA Tr; OF REPORT . 12/1/2005.' GCCO JOB NO. 201737 GCCO ceo NO. 1 MA TERIAL CHARGES MATERIAL SUPPLIER MATERIAL DESCRIPTION UNITS UNIT COST EXT. Granite Construction Company 'Message Board #4 19.00 $50.00 $950.00 Granite Construction Company Message Board #6 16.00 $50.00 $800.00 TOTAL MATERIAL: $1,750.00 SUMMARY ST LABOR ONLY: $0.00 TOTAL EQUIP: $0.00 OT LABOR ONLY: $0.00 TOTAL MA TL: $1,750.00 EQUIP MARK-UP: 15% $0.00 TOTAL LABOR: $0.00 MATL MARK-UP: 15% $262.50 ST LABOR SURCHG 18% $0.00 TOTAL EQUIP AND MATLW/MARK-UP: $2,012.50 OT LABOR SURCHG 15% $0.00 TOTAL EQUIP AND MATLW/MARK-UP: $2,012.50 TOTAL LABOR + SURCHARGES: $0.00 TOTAL LABOR,SURCHGEW/MARK-UP: $0.00 SUBSISTENCE $0.00 IrOTAL LABOR, EQUIP AND MATL W/MARK-UP: $2,012.50 LABOR MARK-UP: 33% $0.00 LESS FLAGGING: 0% $0.00 BOND COST 2% $40.25 ADDTL LABOR MARK- TOTAL LABOR+SURCHGE+SUBSIS+MARK- $0.00 GRAND TOTAL FOR EXTRA WORK: $2,052.75 GRANITE REPRESENTATIVE ACCEPTED FOR PAYMENT EWID: 350 Page 1 of 1