HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 68 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 68 To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5/17/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be retmned to him as his authority to proceed with the work. Description of Work Construct concrete pad under soundwall at Lerma Lane per attached Change Order Request No. In and adjUst eccentric cone for sanitary sewer manhole south of Longmeadow Drive per attached Change Order Request No. 99. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. 6fa()ll~ ~fr{/&IzO/1' &n/cJ(// CONTRACTOR By ~~"'k Dale O;{/l6/0~ Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $7,448,458.00 $324,703.00 $7,773,161.00 $3,244.00 $327,947.00 $7,776,405.00 P.M. Percentage Initial 4.36% cL1 4.40010 d-.1 I (yVe) agree to make the above change subject to the tenus of this Change Order for the NET INCREASE of $3,244.00 ACCEPTED BY: Date ~117/D' RECOMMENDED BY: Date 1/31/2006 COR Granite Constriiction Company. Monterey Bay Branch 580 West Beach Street Watsonville, CA 95076 Santa Teresa Blvd Widening Project Office Phone: 408-846-9257' . .fax: 408-846-9330 CHANGE ORDER REQUEST COR JVU;WBER: 737-097 '. Project: . Santa Teresa Boulevard' Widening Project Project No: 04-CDD-128 To: Charlie Kroeger - Resident Engineer City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 From: Mike Berg - Project Engineer Date: December 5. 2005 cc: Subject: New Pad @ Lerma Lane. Chal"lie, Please find attached invoices for the work involved with building a new concrete pad at Lerma Lane. The lump sum amount requested is $1,904.00. .....r=f"'r=p "'~D ~'~r""~ ,~,<?, ~!} '\ ,,".,.,.~.., 'j">,, ~ \: ~h_,"" rll {~ \,...; i '~ "'J ~ \J 1:: o A at ~ ~ .. o - t! .. )C III I ~ I: CI A E o u c o .- .. c.) :I .. .. fA I: o U at .. .- I:LO Cl8 ..~ ,,~ 0> 0> " " .,.. " (ij I,() ~ C"! N N ..... - I'- <<> ~ ..; ..; 0 0 0>. a 0 0 .,.. l- I,() C") (1)_ ~ en Q) tI} .,... - - - OJ tI} iIt- 4A- iIt- & ~ o ~ .... o c: o ~ "C (J II) CI) o " CI) E ... .g CI) a. CI) - <<S o CI) - <<S o t= o CI) ~ o ... CI) .0 E ~ z o u u ... CI) .0 E ~ Z .0 o ..., ll) ll) c c CCl CCl -I -I CCl CCl ~ E ll) .... -I ~ @@) S -c ll) CCl 10 t3 Cl. 10 C .... 10 o ~ en (.) 0 (I) Cl.N ~ alJ c ~ o ll) - '0. -c ll) CCl _ Cl. ~ Cl. (.) ~ c Cl. 8 ~ Cl. 'S ~ (.) c ~ ~ (/) (3 LO I,() a a a a ~ ~ a 0> ..- -- -- ..- ..- ..- ..- I,() I,() a a a a ~ ~ ~ ~ N N ..- .,... N I,() I,() C") C") 10 10 10 (I) en N .... C') " ..... o N " M " - C; o .... N 0 .... "C c:: e C) CHANGE ORDER REQUEST COR ;'VU;WBER: . 737-099 Granite Construction Company . Monterey Bay Branch 580 West Beach Street Watsonville, CA 95076 Santa Teresa Blvd Widening Project Office Phone: 408-846-9257 Fax: 408-846-9330 COR.. Project: Santa Ter-esa Boulevard Widening Project Project No: 04-CDD-128 From: Mike Berg - Project Engineer To: Charlie Kroeger - Resident Engineer City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 Date: December 6, 2005 cc: Subject: Adjust Eccentric S.S. Manhole Cone. Charlie, Please find attached extra work report for the work involved with adjusting the sanitary sewer cone into the gutter pan. The lump sum amount I'equested is $1,340.00. RECEIVED Cd I" 1';!1J '1IiRAlllTE .' CDnSTRlICTDI . rftI"I"II"WBIY SIM:E . ............ '1922. DATE PERFORMED 10/3/2005 WORK PERFORMED BY GRANtTE CONSTRUCTION COMPANY DESCRIPTION OF WORK . Excavate &.adjust S.S. Manhole cone out of curb alignment EXTRA WORK BilliNG . . DATE OF REPORT 12i6/2005 GCCO JOB NO. 201737 GCeO 9CONO. 299550. LABOR CHARGES NAME CRAFT 5T HRS ST RATE aT HRS aT RATE NOTE . SUBSISTANCE EXT A. Cemokus FRM 1.00 $51.80 1.00 $69.19 .$0.00 $120.99 M. Knudsen ENG 5.50 $48.79 0.00 . $0.00 . $0.00 $268.35 C. Lopez LBR 5.50 $35.34 0.00 $0.00 $0.00 $194.31 TOTAL SUBSISTANCE: $0.00 TOTAL LABOR: $583.71 EQUIP NO. DESCRIPTION REG HRS REG RATE aT HRS aT RATE Att Rate EXT l06.2262 FORD PICKUP. 75 TON 2.00 $12.00 0.00 $0.00 0.0 $24.00 08.319 DEERE 21 OLE 4X4 SKIPLO 5.50 $40.00 0.00 $0.00 0.00 $220.00 04.159 2 TN FLATBED 5.50 $19.00 0.00 $0.00 0.00 $104.50 TOTAL EQUIPMENT: $348.50 SUMMARY ST LABOR ONLY: $514.52 TOTAL EQUIP: $348.50 OT LABOR ONLY: $69.19 TOTAL MA TL: $0.00 EQUIP MARK-UP: 15% $52.28 TOTAL LABOR: $583.71 MATL MARK-UP: 15% $0.00 ST LABOR SURCHG 18% $92.61 TOTAL EQUIP AND MATLW/MARK-UP: $400.78 OT LABOR SURCHG 15% $10.38 TOTAL EQUIP AND MATLW/MARK-UP: $400.78 TOTAL LABOR + SURCHARGES: $686.70 TOTAL LABOR,SURCHGEW/MARK-UP: $913.31 SUBSISTENCE $0.00 TOTAL LABOR, EQUIP AND MATL W/MARK-UP: $1,314.08 LABOR MARK-UP: 33% $226.61 LESS FLAGGING: O"k $0.00 BOND COST 2% $26.28 ADDTL LABOR MARK- TOTAL LABOR+SURCHGE+SUBSIS+MARK- $913.31 GRAND TOTAL FOR EXTRA WORK: $1,340.36 ACCEPTED FOR PAYMENT GRANITE REPRESENTATIVE EWID: 353 Page 1 of 1