Loading...
HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 69 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 69 To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5/17/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work Description of Work Furnish and install two new MAS 3 section heads on the Pole C mast arm at the Santa Teresa Boulevard/Longmeadow Drive intersection per attached Change Order Request No. 100. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not ex1end unless expressly provided for in this Change Order. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $2,380.00 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $7,448,458.00 $327,947.00 $7,776,405.00 $2,380.00 $330,327.00 $7,778,785.00 P.M. Percentage Initial 4.40% ~ G ,aa/le to/k5f~ud;O/7' ~dJ;r:;7 CONlRACTOR By ~ Dale 0;;1/;':/06 4.43% ~ ACCEPTED BY: ProjectF~ L- /1 7 It> f:, Date RECOMMENDED BY: 1/31/2006 COR Granite Construction Company Monterey Bay Branch 580 West Beach Street Watsonville, CA 95076 Santa Teresa Blvd Widening Project Office Phone: 408-846-9257 Fax: 408-846-9330 CHANGE .oRDER REQUEST COR NUMBER: 737-100 Project: Santa Teresa Boulevard Widening Project Project No: 04-CDD-128 To: Charlie Krueger - Resident Engineer City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 From: Mike Berg - Project Engineer Date: December 22, 2005 cc: Subject: New MAS 3 Section Heads. Charlie, Please find attached quote from Giacalone Electrical Services to install two new MAS 3 section heads on the north bound mast arm at Longmeadow drive. Giacalone Electrical Services (See Attached) GCC Markup ( 10% ) TOTAL $ 2,163.63 $ 216.36 $ 2,379.99 The lump sum amount requested is $ 2,380.00 1~/20/2005 17:55 4088481130 GIACALONELIGHTS PAGE 01/03 SUPERINTeNDENT DAYS TO COMPLETE WORK Rick Herzog ASAP GESI JOB NUMBER DATE 599-99 December20,200S GESI JOB HAlliE REQUESTED START DATE Santa Teresa Wldenina ASAP JOB LOCAll0N REQUESTED COMPLETE DATE Gilroy, CA ASAP GIACALONE ELECTRICAL SERVICES. INC. (408) 842.9655 · FAX (408) 842.5285 L1C,,; Ci0/A 540448 co~ 'I ; 3,Z REVISION: WO,: COMPANY; Granite Construction ADDRESS: 580 WlP5t Beac;h Sl....t CITY, ST, ZIP Watsonville. CA 95077 REQUESTED BY: StP.1I4l1 Waite,.. OFFICE: FAX: MOBilE: (831) 16:H100 (0:)1) 783-41121 (831) 150-41400 1 EA $825.00 Install Mo\S 3 secllon HNd On M.SI Arm .. QTY" ".:':i,:\.~.,,'!'lW:;::':<'::':~iE~!:~l:"::;,~:'~~L3ii,~?)J.;::~W~~:\~i\::t~i \;~,:: :;:~,~~~::~::' ,;.tt~W;;~:\i.J.;~~;$}'!~VJ.;~:::~'~t~~~~~:~~~~~)::;;r:~~:~~~;;:"i~:':' ... ....:~ 12" M^S a 8Ee 0.11 (LED' 12" MAS 3 SEe ArroYf (LED) A:ZS,.OO 58l6.oo EA $126.00 .- ~~~;~(~l,~~~i~:~\~~~'~!" :. ..::::~_~, \:~.ftl'f~i;~'!:\:i Service Truck 1.00 EA 1 115.00 515.00 Backhoe e.4 1 U6.00 SUBTOTAL. OTHER 515.00 16.00% MARKUp. OTHER 52.25 TOTAL. OTHER $11.25 .i',~;r1.(t~~lt~~!~~~~-~'~.(..;':~~~w;~~~\ ~p.~~~~, C::~~~.."~ .~~.:~~.~~ ~;.\{.~~.!r,:~ ;\\,~~~,"':~t~,:..'::'" 171.85 elKmc:lan (Reg TIIMI 1.00 fA 1 571.85 Opel'llOr fReg TIIM) EA 1 SSI.23 Labo.", fReg nn",) ~ 1 S8Z.81 . EllIC1rIclen (Ol) EA 1 S,07.n O__r lOT} EA 1 H7.3O ....borer fO" EA 1 584..21 SUaTOTAL-LABOR SUBTOT.4L. MATERIALS $ 1,650.00 18.00% M.4RKUP - LABOR 8.l5"''' TAX - MATERIAl!i:. 113C.13 15.00,," MAftKU~ . LABOR 15% MAJU(UP - MATE~IALS SU7.50 33.00% SUACRG - lABOR TOTAL. MATERIALS 52.0]:11::\ TOTAL. LABOR 8y algn,n" this work order, ~ lire only ackllOWledglng mallhe materIal. lebor, eqUipment Slid other QUillnlilies and haUl'll aM lICCura" and h:we bCCIl compleled, Pnc:lng ",r Udll WllIll order will bo done accan:Jing to contnld I service rale& by Ihe maIn office. '/1.115 $12.13 Il7." 1112.11 TOTAL LAIIOft $112.7. TOTAL MATERIALS $2,033.63 TOTAL EQUIP/OlliER 117.2G Thank You J TOTAl. ,.. '2,'.'.83 Signature I ~... by BCI(IIOWledge the 1I81ltfKiory completion of the .bo~ de.crlbed wor1l.