HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 73
City of Gilroy
Engineering DMsion
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO. 73
To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128
Contractor:
Granite Construction Company
Contract Date:
5/17/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
. to him as his authority to proceed with the work.
Description of Work
. Pay material costs for two precast catch basins that were eliminated per attached Change order Request No,
108.
. Remove and replace temporary asphalt concrete ramp at Station 88+00 per attached Change Order Request No.
111.
. Dispose of material from previous extra work that was temporarily stockpiled in the staging yard per attached
Change Order Request No. 112.
. Replace signs shown on plans to be reused per attached Change Order Request No. 113.
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by
this Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $4,224.00
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$7,448,458.00
$359,014.00
$7,807,472.00
$4,224.00
$363,238,00
$7,811,696.00
P.M,
Percentage ~
4,82%dd.."
4,88% ~
By:
RECOMMENDED BY:
ACCEPTED BY:
~= 4
Project En6 . .
3/612006
COR
Granite Construction Company
Monterey Bay Branch
580 West Beach Street
Watsonville, CA 95076
Santa Teresa Blvd Widening Project Office
Phone: 408-846-9257
Fax: 408-846-9330
CHANGE ORDER REQUEST
COR NUMBER: 737-108
Project; Santa Teresa Boulevard Widening Project
Project No: 04-CDD-128
From: Mike Berg - Project Engineer
To:
Charlie Kroeger - Resident Engineer
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
Date: February 6, 2006
cc:
Subject: Non-Returnable Catch Basin Material.
Charlie,
With regards to your letter No. 53 changing the catch basin description on the project plans, please find attached
invoice for two extl'a precast catch basins that we were unable to return to our supplier.
The lump sum amount requested is $ 1,11 7.00.
, .
r
:')&RAnTE
mnsTRUCnon
rftl'l'M'lflltl I SINCE
LUll..... CI 1922
DATE PERFORMED
10/13/2004
WORK PERFORMED BY
GRANITE CONSTRUCTION COMPANY
DESCRIPTION OF WORK
Unreturnable precast catch basins
EXTRA WORK BilliNG
DATE OF REPORT
2/6/2006
GCCO JOB NO.
201737
GCCO cco NO.
205101
MATERIAL SUPPLIER
Groeniger & Company
MATERIAL DESCRIPTION
P2436 CB WI Rebar 3.5
UNITS UNIT COST
2.00 $476.30
TOTAL MATERIAL:
EXT
$952.60
$952.60
SUMMARY
ST LABOR ONLY: $0.00 TOTAL EQUIP: $0.00
OT LABOR ONLY: $0.00 TOTAL MATL: $952.60
EQUIP MARK-UP: 15% $0.00
TOTAL LABOR: $0.00 MA TL MARK-UP: 15% $142.89
ST LABOR SURCHG 18% $0.00 TOTAL EQUIP AND MATLW/MARK-UP: $1,095.49
OT LABOR SURCHG 15% $0.00 TOTAL EQUIP AND MATLW/MARK-UP:
$1,095.49
TOTAL LABOR + SURCHARGES: $0.00 TOTAL LABOR,SURCHGEW/MARK-UP: $0.00
SUBSISTENCE $0.00 TOTAL LABOR, EQUIP AND MATL W/MARK-UP: $1,095.49
LABOR MARK-UP: 33% $0.00 LESS FLAGGING: 0% $0.00
BOND COST 2% $21.91
ADDTL LABOR MARK-
TOTAL LABOR+SURCHGE+SUBSIS+MARK- $0.00 GRAND TOTAL FOR EXTRA WORK: $1,117.40
ACCEPTED FOR PAYMENT
GRANITE REPRESENTATIVE
EWID: 386
Page 1 of 1
COR NUMBER: 737-111
Granite Construction Company
Monterey Bay Branch
580 West Beach Street
Watsonville, CA 95076
Santa Teresa Blvd Widening Project Office
Phone: 408-846-9257
Fax: 408-846-9330
.COR
CHANGE ORDER REQUEST
Project: Santa Teresa Boulevard Widening Project
Project No: 04-CDD-128
From: Mike Berg - Project Engineer
To:
Charlie Krueger - Resident Engineer
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
Date: Febl1lary 24, 2006
cc:
Subject: Temporary AC Ramp.
Charlie,
Please find attached extra work report for the removal and replacement of the cold mix ramp at station 88+00.
The lump sum amount requested for this extra work is $ 738.00
R-E- -AE:
- . \,; i:,
FEB 2 2Q06
ENGiNEERiNG
'I&RAIlITE
CDnSTRlICTDl
r........... I SIM:;E
L,gl.... CI 1922
DATE PERFORMED
12/1612005
WORK PERFORMED BY
GRANITE CONSTRUCTION COMPANY
DESCRIPTION OF WORK
Remove & replace cold mix ramp @Sta: 88+00
EXTRA WORK BilliNG
DATE OF REPORT
111612006
GCCO JOB NO.
201737
GCCO cco NO.
299552
LABOR CHARGES
NAME CRAFT ST HRS ST RATE OT HRS OT RATE NOTE SUBSISTANCE EXT
M. Finlen OE 2.00 $44.76 0.00 $0.00 $0.00 $89.52
M. Verissimo PILE 2.00 $50.27 0.00 $0.00 $0.00 $100.54
R. Valle 2.00 $35.34 0.00 $0.00 $0.00 $70.68
TOTAL SUBSISTANCE: $0.00 TOTAL LABOR: $260.74
EQUIPMENT CHARGES
EQUIP NO. DESCRIPTION REG HRS REG RATE OT HRS OT RATE Att Rate EXT
08.1097 7100 BACKHOEILDR 4 X 4 2.00 $40.00 0.00 $0.00 0.00 $80.00
04.159 2 TN FLATBED 2.00 $19.00 0.00 $0.00 0.00 $38.00
06.1948 FORD PICKUP .75 TON 2.00 $12.00 0.00 $0.00 0.00 $24.00
TOTAL EQUIPMENT: $142.00
MATERIAL SUPPLIER
Granite (201) Plant to Job
MATERIAL DESCRIPTION
Cold Mix Asphalt
UNITS UNIT COST
2.50 $52.50
TOTAL MATERIAL:
EXT
$131.25
$131.25
SUMMARY
ST LABOR ONLY: $280.74 TOTAL EQUIP: $142.00
OT LABOR ONLY: $0.00 TOTAL MATL: $131.25
EQUIP MARK-UP: 15% $21.30
TOTAL LABOR: $260.74 MA TL MARK-UP: 15% $19.69
ST LABOR SURCHG 18% $46.93 TOTAL EQUIP AND MATLW/MARK-UP: $314.24
OT LABOR SURCHG 15% $0.00
TOTAL EQUIP AND MA TLW/MARK-UP: $314.24
TOTAL LABOR + SURCHARGES: $307.67 TOTAL LABOR,SURCHGEW/MARK-UP: $409.21
SUBSISTENCE $0.00 TOTAL LABOR, EQUIP AND MATL W/MARK-UP: $723.44
LABOR MARK-UP: 33% $101.53 LESS FLAGGING: 0% $0.00
BOND COST 2% $14.47
ADDTL LABOR MARK-
TOTAl LABOR+SURCHGE+SUBSIS+MARK- $409.21 GRAND TOTAL FOR EXTRA WORK: $737.91
GRANITE REPRESENTATIVE
ACCEPTED FOR PAYMENT
EWID: 375
Page 1 of 1
. . >
COR
Granite Construction Company
Monterey Bay Branch
580 West Beach Street
Watsonville, CA 95076
Santa Teresa Blvd Widening Project Office
Phone: 408-846-9257
Fax: 408-846-9330
CHANGE ORDER REQUEST
COR NUMBER: 737-112
Project: Santa Teresa Boulevard Widening Project
Project No: 04-CDD-128
From: Mike Berg - Project Engineer
To:
Charlie Knteger - Resident Engineer
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
Date: February 27, 2006
cc:
Subject: Material Disposal.
Charlie,
Please find attached extra work report for the removal of additional matelial from our staging yard to a
permanent dumpsite.
The lump sum amount requested for this extra work is $ 1,056.00
l="E. B <,i 9. 20. O. 6.
, i.J ',J
E' 'r>~" '~r-RING
NviNtt: ·
0 m en en en -
"i 0 0 ~ e e ....
- m r--: CO cO cO 0
0 ~ 0 10 10 10 .....
I- r- (") e~ e~ e_ Q)
~ ~ .... .... .... OJ
~ ~ ~ &
::::l 0-
"C
0 E
.... ::::l
CIl "C .....
Cl 0 C')
t:: .... .....
:a .... .... iU
1: t:: Q) e ...
'1:: t:: N 0
.... I-
Cl 0
0 ai u 'tJ
t:: ~ C
a. 0 l!
:;:; "C C)
a. :a ctI
"C CI.l
~ ctI E
- Cl 10
0 t:: e
CIl ..2 e
~ "C E e
~ ctI Q
~ ... ..2 e ....
0
0 ;: Cl -
II)
>- CI.l
- '0 0 ~
..... ....
c: <! "C
1! 0 W t::
.;::l 10 ctI
"'5 II)
'i: .0
~ ctI ::::l
(,) .c. ....
UI - .c;
-
Q) 0 CIl
1&1 c ~ "'5
ctI
"C .c;
. ctI ::::
0
>t ....I 0
"
I: Q)
" E
a. .g (t)
Q) (t) 0
E c.. 0 0
0 ~
Q) ~ 0
0 - ~ .....
<<I .....
0 N N
U Q)
-
C <<I
0 (t) (t)
0 ~ 0 0
0 0
0 ~ N
.- .....
.. ~ r- l"-
N ~
c.) --
N N
::I g
~ r- eo
eo eo
.. ... (") (")
en Q)
.0
I: E 10
~ Q
e
0 Z e
0 e
U ....
u
u
C>>
.. ...
Q)
.- .0 .....
Ceo E M
.....
l!~ ~ ....
Z e
N
r-..: .0
(:)~ 0
-,
. .
COR
Granite Construction Company
Monterey Bay Branch
580 West Beach Street
Watsonville, CA 95076
Santa Teresa Blvd Widening Project Office
Phone: 408-846-9257
Fax: 408-846-9330
CHANGE ORDER REQUEST
COR NUMBER: 737-113
Project: Santa Teresa Boulevard Widening Project
Project No: 04-CDD-128
From: Mike Berg - Project Engineer
To:
Charlie Krueger - Resident Engineer
City of Gilroy
7351 Rosanna Street
Gilroy, CA 95020
Date: March 2, 2006
cc:
Subject: Signing Changes.
Charlie,
Per your request please find attached letter from Statewide Safety & Signs Inc. for the additional sign changes
I'equested in youl'letter #191. Statewide is requesting an additional $ 1,193.27 for the additional cost.
Statewide Safety & Signs Inc.
GCC Markup ( 10% )
TOTAL
$ 1,193.27
$ 119.33
$ 1,312.60
The lump sum amount requested for this extra work is $ 1,313.00
MAR 0 3 2006
. ~~/~!/~~~b ~~:~~
ft:J /00"';;1';;100
~IHIL"~~~ ~MI ~J.
.. .
S...ATEWlDE
Safety & Signs, IDe.
. ,
FAX COVERSHEET
To:
Steve / Mike
From: Dan Nicholas - Fairfield Branch
Company: Granite
PIIges:
including this sheet
Faxe
406-847.9330
Date: 3/112006
Re:
Santa Teresa Blvd
cc:
CJ urgent I:j For R-'ew [J Please Camment D Pteaee Reply
D ...... RecycIIt
. Comments:
This is the additional cost for furnishing the sign panels and posts that were installed to
replace the existing signs that were supposed to remain in place or to be relocated,
Additional cost - $1,193.27
1 ea - R7/ N-marker
2ea - R81/ R818
Sea - G7
3ea - R2(45)
5ea - R18-2
12ea - 4 x 4 x 12 Redwood post
If you ,have any questions please call me.
Thank you,
~
Dan Nicholas
0 0 0 rgJ
13755 Blaisdell Place 522 Lbadon LaDe 323 Commercial Street 130 Grobric Court
Poway, CA 92064 Nipomo, CA 93444 SaD Jose, CA 95112 Fair&eld, CA 94533
(858) 679-7292 (805) 929-5070 ' (408) 993-9770 (707) 864--9952
FAX(8S8) 679-7117 FAX(BOS) 929-5786 FAX(408) 993-9773 FAX(707) 864-9956