HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 75
City of Gilroy
Engineering DMsion
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846-0450; Fax (408) 846-0429
CHANGE ORDER NO. 75
To contract for: Santa Teresa Blvd. Widening Project, Project No. 04-CDD-128
Contractor:
Granite Construction Company
Contract Date:
5/17/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
perfonn additional landscaping work at Longmeadow Drive and Mantelli Drive per attached Change Order Request
No, 116.
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by
this Change Order, The contract time shall be extended by ten (10) working days.
(; rafl'- It, Cofl5+("~1tD~ CohffMt
J) OCONTJAC'~R
BY:~~
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$7,448,458.00
$369,339.00
$7,817,797.00
$21,399.00
$390,738.00
$7,839,196,00
P.M.
Percentage Initial
4.%%~
5.25%~
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $21,399.00
ACCEPTED BY:
Date: OS/o:zlo~
5-IS-a
Date
\\'-" ~ b--
5-\'5-01.
Date
J/~/ 6b
Date
4/612006
GRANITE CONSTRUCTION Fax:4088428658
Mar 31 '06
8:06
P.02
COR
CHANGE ORDER REQUEST
COR NUMBER: 737-116A
Granite Construction Company
Monterey Bay Branch
580 West Beach Street
Watsol1ville, CA 95076
Santa Teresa Blvd Widening Project Office
Phone: 408-846-9257
Fax: 408~846-9330
Project: Santa Teresa Boulevard Widening Project
Project No: 04..CDD-128
To:
Cbarlie Krueger - Resident Engineer
City or Gilroy
7351 Rosanna Street
Gilroy, CA 95020
From: Mike Berg - Project Engineer
Date: March 14, 2006
cc:
Subject: Additional Landscaping Pricing.
Charlie,
Please find below B&B's pricing for the extra work requested by the City of Gill"Oy. An additional 15 working
days are requested for the performance of this work. The following price includes the installation of the phone
line conduit at Longmeadow. This change order request sball replace COR #116.
B&B Landscaping
A. Longmeadow extra work per Letter #212
B. Mantelli extra work (Includes Phone Conduit @ Longmeadow)
Gee MarkuD ( 10% )
TOTAL
$ 2,453.40
$ 17,000.00
$ 1.945.34
$ 21,398.74
The lump sum amount requested for this extra work is $ 21,399.00