HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 77 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 77 To contract for: Santa Teresa Blvd. Widening Project, Project No, 04-CDD-128 Contractor: Granite Construction Company Contract Date: 5/17/2004 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Perform additional landscaping and irrigation work at Oak Tree Comer and Longmeadow Drive per attaehed Change Order Request No. 119. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order, The contract time shall be extended by five (5) working days, By: Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $7,448,458.00 $399,327,00 $7,847,785,00 $8,466,00 $407,793,00 $7,856,251,00 P,M, Percentage Initial 5,36% ~ 5.47% ~ I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $8,466.00 Date: OS!O;<./Ob 0-/5 ,06 ACCEPTED BY: Date c CO-- f\- C\ir' Lr- City Engineer ~j~t~ )-1 j-O b Date S- k/ W; Date 411712006 GRANITE CONSTRUCTION Fax:4088428658 Apr 5 '06 13:32 P.02 COR CHANGE ORDER REQUEST COR NUMBER: 737-119 Granite Construction Company Monterey Bay Branch 580 West Beach Street Watsonville, CA 95076 Santa Teresa Blvd Widening Project Office Phone: 408-846-9257 Fax: 408-846-9330 Project: Santa Teresa Boulevard Widening Project Project No: 04-CDD-128 To: Charlie Krueger - Resident Engineer City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 From: Mike Berg - Project Engineer Date: April 5, 2006 cc: Subject: Additional Landscaping & Irrigation Pricing, Char1ie~ Please find attacbed 8&B pricing for the extra work requested by the City of Gilroy in Letter No. 207. An additional 5 working days are requested for the performance of this work. B&B Landscaping A, 1st Street Driveway & Oak. Corner Extra work B. Repair Lawn @ 1st Street C. Longmeadow Park Strip Extra Work GCC Markup ( 10% ) TOTAL $ 3,182.00 $ 2,774,00 $ 1,740,00 S 769.60 $ 8,465.60 The lump sum amount requested for tbis extra work is S 8,466.00 B&B CikHN11 c. CUNS fRUCTION Fax:4088428658 Apr 5 '06 13:33 P.03 Granite Construction Gilroy Job Trailer Attn: Mike Berg / Steve Walter Project: Santa Teresa Blvd. Widening Proposal for miscellaneous landscape and irrigation work. The ittea on Santa. Teresa and First Street at the driveway and the Oak tree. Relooate the apartment sign with 2 new posts and hardware.................. .$950.00 12 hours labor to regrade the area........ ....... ..... .... ... ... ....................$816.00 2 hours labor to adjust the 3 valve boxes... ................................. ......$136.00 Add 4 new sprinklers............................................................ ....$260.00 4 flats English Ivy groundcovers..,.. .................................. ..... .... ...$180.00 6 ou. yds. mulch at the entire Oak. tree area...... __. n............... .......... ....$39Q.OO 6 hours foreman supervision and pickup materials... .........,.. ...............$450.00 1r()~I..................................................................................S:5,l~.~ Repair the lawn at the corner on First Street damaged by P. G. & E., based on 300 sq. ft. Irrigation work has been completed by B & B. 4 homs foreman. ............ t. t .......".. ......"..... ... ... ... .., ....... ......... ......... ......$300.00 16 hours labor......... ......... ............ ...... ..... ................... ........ ....$1,088.00 6 pop-up sprinklers with pipe and fittings.............. ............... ......,......$150,00 8 hours labor to re-grade and soil prep..... ............. ............ ......... ......$544.00 4 hours labor install sodded lawn..................... . .............. ........... ....$272.00 4 hours foreman supervision and pickup materials... .................. ...... ....$300.00 300 sq. ft. sodded lawn,...........,. ..,.. ................. ....................... ....$120.00 Total....... ...... ............ ..................... ...................... ...... ............... .52,774..00 The two sides on Longmeadow park strips and at the service gate. 16 hours labor to re-grade and soil prep. .................................. ......$1,088.00 11 - 5g Raphiolepis Ovata........... ......... ................................... ...$242.00 5 - 5g Coprosma Kirkii.......... .... ............................. '_' ""'''''''''' ...$110.00 4 hours foreman supervision and pickup materials..................... ........ .$300.00 Total..... ....,..... ..... ..... .... ...... ............. ..... .................................. .SI,740.00 Very Truly Yours, , B & B Landscape Contractors, Inc., Reinhold Brunn RB: mw 450 Phelan AVe. San Jose, CA 95112-2504 (408) 573-9430 Fax (408) 573,8343 Contractors Uc. 352633