HomeMy WebLinkAboutGranite Construction - Santa Teresa Blvd. Widening Project - Change Order No. 80
City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408) 846H0450; Fax (408) 846-0429
CHANGE ORDER NO. 80
To contract for: Santa Teresa Blvd, Widening Project, Project No, 04-CDD-128
Contractor:
Granite Construction Company
Contract Date:
5/17/2004
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
This change order provides for the following:
_ Repair unsuitable subgrade on the west side of Santa Teresa Boulevard at Welburn, Mantelli and First Street per
attached Change Order Request No.4 7,
- Deduct cost for lime treatment of unsuitable subgrade areas identified above,
- Deduct cost for Lithochrome Color Hardener and Color Wax eliminated from PCC sidewalks and
driveways,
The total cost for the changes identified above is $37,000,
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this
Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full
satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change
Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of
efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives
any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with
the Extra Work.
By:
Original Contract Price
Previous Change Orders
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost
$7,448,458,00
$586,053.00
$8,034,511.00
$37,000,00
$623,053,00
$8,071,511.00
P,M,
Percentage Initial
7,87% ~
8.36% M
I (We) agree to make the above change
subject to the terms ofthis Change Order
for the NET INCREASE of $37,000.00
-')"1-06
ACCEPTED BY:
"'\ - ~,- O-b
Date
., /7., 7/1) (,
Date
6/28/2006
COR
Granite Construction Company
Monterey Bay Branch
580 West Beach Street
Watsonville, CA 95076
Santa Teresa Blvd Widening Project Office
Phone: 408-846-9257
Fax: 408-846-9330
CHANGE ORDER REQUEST
COR lVUJ1BER: 737-047
Project: Santa Teresa Boulevard Widening P."oject
Project No: 04-CDD-128
To:
Chal"lie Kl1leger - Resident Engineer
Cit)' of Gih"oJ
7351 Rosanna Sh"eet
Gilt-oJ, CA 95020
From: Mike Bcrg - Pr~ject Enginecr
Datc: April 18. 2005
cc:
Subject: Unsuitable Subgrade"
Cha"'ie,
Please find attached extra wOI"k reports for wOI.k involved with repairing the unsuitable subgrade at Welbum,
Mantelli and First Street. The attached extra wOI.k bills represent work completed from December 10th, 2004 to
January 1'\ 2005.
The lump sum amount requested is $ 50,588.00.
F<ECEIVED
EP\1
~:: l "A
\18
H'J ;J
.......
<0 0 0 0 I'"- I'"- LO (!) 0 <0 0 0 0 .....
0 (!) 0 <0 <'! C\l ~ <0 'o:t' C') 00 00 00 0
<<l 0 <0 LO C\l C\l <0 c:i ~ 'o:t' -.t .... ,..: ....: .......
-
0 -.t C') I'"- <0 (J) I'"- ~ 0 C\l 'o:t' 00 00 00
l- I'"- LO (!) LO C\l LO LO I'"- <0 U) U) 1.1) IJ.:>
{,'} {,'} w Q Q Q D1
C') C') (J) <0 'o:t' 'o:t' ~ &
{,'} {,'} {,'} {,'} {,'} ~ U) U) U)
{,'} tho tho tho
t5 t5
CO CO
11l a. a. c: ....
- E E M
c: .... ....
CO 0 0 ::l 'i
::! t) t) ..c ....
4i 0 ....
1: "E o?l o?l N 0
11l @) .Joo: .Joo: 3: I-
'0 CO 11l
0 co x >- ::l t) t) 11l @) "C
.... 'E 11l c: e 0 ::l c:
0 .... c:
.8> ::l 11l e
D. ~ c: - > r.5 r.5 11l .Joo:
::l 'S > t) (!)
11l <:{ ';:: ';:: 0
.. (J) o?l > CO ..c ..c <( ....
- <:{ .J::. c: CO CO c: 11l
CO 11l .... -- --
m: 11l .- ~ ::l .... (J)
.... c:: ii3 ..c tV tV c:: ::l CO N
- 0:::::: 11l 4i t) t) 'cti ..c ..c N
11l - a. CO CO 4i U)
- c: ~ .... '0
~ E c: CO 0 0.. 0.. 0 ~ c: m
..:lI: 11l ::! Ui co m
~ E @) ai ai .J::. N
0 c: ~ t) @) '0
tV @) '0 '0 c:
0 ~ t) -.t (J) co co 11l tV ';::
(J) x tV .... .... .... OJ
co '0 c: - gg u.. :0 0
- .... tV CO 'E 0 CO 11l
0 co
.... 11l 1:: 0.. ::l ::l ~ - OJ
c: CO .... ~ (J) (J) '5
a. :.c t) r.5
l! 0 g> (J) ~ E tV tV (ij (J)
:;:; - :0 :0 c: .;::
'x en - c: co 1il ::l ..c
11l 11l c: 11l .... co co c: co
'i: tV E - :l: :l: tV --
.. ;;:= E E (ij ::l ::l -
(.) 11l (J) (J) o?l co ;;::
>C tV :;:: - > co
III - tV t) 11l c: c: ....
Q) co ::l t) E ::l ::l tV co ~
III c OJ tV tV - t)
'0 > X X co x
~ "0 co 0 1il 11l 11l > tV 11l
11l .J::. tV E ::l ..c ..c co ..c t)
> - .... '.... t) co
I 0 a. 11l '0 ::l ::l X ::l
E 0.. CJ) 0::: <:{ CJ) C/) W CJ) a:
~ "C
c: Q)
E
fa ~
0 -q- -q- 'o:t' 'o:t'
D. 't 0 0 0 0 LO LO LO LO LO LO
Q) 0 0 0 0 0 0 0 0 0 0
C\l N C\l C\l 0 0 0 0 0 0
E a.. ...... ...... ...... ...... ~ C\l N ~ C\l C\l
0 LO LO 0 ...... ...... ...... ......
Q) ~ ~ ~ ~ ..... <lO (J) 0 ~ -.t
- ...... -- -- ~ ~ ~ N N ~
0 <<l C\l C\l C\l N -- -- ...... -- ......
C ~ ~ ~ ~ ~ ~ ~ ~ ~ .....
U Q)
-
c: <<l
C LO LO LO LO LO LO LO LO LO LO
0 1:: 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 C\l N N C\l C\l N C\l ~ C\l N
.- -- -- -- -- -- co -- -- ......
.. 00 00 00 00 00 00 <0 <0 <0
Q) ~ ..... ..... ..... ..... ..... ..... ~ ~ .....
U a:: ;;:;: ~ ~ ;;:;: ~ -- ~ -- ...... --
'o:t' -.t 'o:t' 'o:t'
:I c
.. LO (!) I'"- <0 (J) 0 ..... N C') 'o:t'
(J) (J) (J) (J) (J) 0 0 0 0 0
.. s.. ~ .- .- C\l N N N N
tn Q)
.Q
c: E N
::::J N
U)
0 Z m
0 m
(.) N
()
()
G.)
.. I-
Q)
.- .Q .....
c: E M
1.0 .....
ftI <:) ::::J ....
<:) Z 0
N
.. ~ .Q
Ol
" ....... 0
~ 'I