CHANGE ORDER NO. 3
To contract for: Gilroy Crossing Offsite Improvements City Project No
Contractor: Pavex / Graniterock Construction Contract Date:
11 -CDD -183
2/22/2011
This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and
Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon
acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work.
Description of Work
As per the revised plans (4- 16 -12) Pavex is to demo the existing westerly landing and ramp. Place AB, form, prep and pour
new ADA ramp on the West end of project. Pavex to build the median island on NB offramp as stated in RFI #12 from the
structural engineer. Pavex is being requested to conform the existing EB sidewalk (on the bridge) at the angle point to the
sidewalks standard width. Prime & Paint 1/4" steel plate. Pavex has been directed to pack non - shrink grout underneath the
existing light pole near the new western ADA ramp. Night differencial for Aparico concrete. Add additional curb (6) and
drainage system at existing signal equipment racks. Place and compact AB in islands in 2 locations. Install 7 ea
construction area signs. Night closures traffic controll. To demo sidewalk corner, build new ADA ramp with truncated domes,
to relocate existing utility at 7th & Eigleberry. Identifiying and marking locations and depths of existing utilities. Additonal
surveying. Cedits for deleted work: $34,800.
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein
are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with
this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption,
loss of efficiency and any and all other direct and /or indirect costs or expenses associated with the Extra Work and hereby
waives any right to claim any further cost and time impacts at any time during and after completion of the Contract
associated with the Extra Work.
► All Extra Work authorized under this Change Order
must be billed separately from the original contract. All
bills for work done under this Change Order shall
reference this Change Order No. 3.
I (We) agree to make the above change subject to the
terms of this C,4ange Order for a NET INCREASE not to
exceed $15,033.imk".
CONTRACTOR
Bv:Kad Philbovitch, Area
RECOMMENDED BY:
ACCEPTED BY:
—t
A�City dministrator j
Id
Cost Percentage Initial
Original Contract Price
$248,844.00
Previous Change Orders
$40,138.75 16.13%
Total to Date
$288,982.75
This Change Order
$15,033.20
Total Change Orders to Date $55,171.95 22.17%
Revised Contract Price $304,015.95
SEP 2 8 2012
7 Date:
�v
Dat
ioli2 /l2
r Date
Date '
10 1A, I2—
lh D to
n� ti
1W
Graniterock
GENERAL ENGINEERING CONTRACTOR . LICENSE #22
PAVEX CONSTRUCTION DIVISION
September 26, 2012
City of Gilroy, Public Works Department
7351 Rosanna Street
Gilroy, CA 95020
Attn: David Stubchaer
Senior Civil Engineer
Re: Gilroy Crossing Offsite Improvements, Project No. 11 -CDD -183
Pavex Job No. 4162
Subj: LTO -23 — Supplemental Information Requested for Final Compensation
Mr. Stubchaer,
Per Ron Barri's request, Pavex is providing a breakdown for the credits associated with this
project.
Bid Item #6 Irrigation - $24,859.00 credit due to the contract item being deleted.
Bid Item #10 Adjust Utility - $4,941.00 credit due to the contract item being deleted.
Bid Item #25 Retaining Wall and Guard Rail - $5,000 credit due to deduction in guard rail
quantity already guard rail had been fabricated.
Total Credit for the above mentioned bid items = $34,800.00
All these credits will be included in Change Order #3. Pavex expects the total of Change Order
#03 to be $49,833.20 - $34,800.00 = $15,033.20. However, this is contingent on Bid Items #6,
10, and 25 paid in full under the base contract and the credit for the deleted items will be
included into Change Order #03.
Pavex expects the total of CCO #01, CCO #01a, CCO #02, and CCO #03to equal $84,141.39. This
total includes the deductive credits mentioned above.
Should there be any questions, please feel free to contact me (408) 590 -1767.
Sincerely,
Graniterock Company
Pavex Construction Division
N C64
Matt Christie
DAILY EXTRA WORK REPORT
City Of Gilroy cost code: 940103
Contractor Job: 4162 - Gilroy Crossing Off Site Imp ;Report
work Performed BY: Pavex Construction
Description of work; Construction Area Signs
Change Order 002
Billing Number 24.0
Date 6/05/2012
Perform Date 5/31/2012
_- -- - - - - -- _ -- 1-=
Material /Specialist Work/Lump Sum or Unit Price Payment
Labor Charges -__ --
Invoice No. Invoice Date Vendor Name / Invoice Description Units Unit Price __Extended j
_
Mot 1428030667 5/31/2012 Statewide Safety! Project Signs 1.000 LS 1,260.42 1,260.42 j
I
�I
i
I
I
Equipment Charges
i
Material Charges
Subtotal 1,260.42
j MU 15.00% 189.06
I
Material Total 1,449.48
Activity Total 1,449.48
i
I
i
i
I
- - - - -- — — - -�
I gal Total + 1449.48
I
Page 1
NTS Universal Bill Form 010704 cvv JWWI -c
STATEWIDE SAFETY& SIGNS CUST0NER#: 00105
LiceOs$#S23O94 INVOICE �: 142803067
130 Gnobric Court
INVOICE DATE: O1131/12
Fairfield, CA 94533 �
rRuFFIcSwFM &sma«nS phU/U7.8G4g952 * Fax 707.864.9956 DUE DATE: 03/01/12
�
PLEASE SEND REMITTANCE TO: OUR JOB NO '� 6N1 03
PO Box 52VV|Irvine, CA 82616
OVVNERPROJ. NO.
BILL TO: T.PROJ.NC). 4162
GRANITE ROCK CO. O8APAVEX �� \�` '� � ` ^ � GILROY CROSSINGS #41G2
350 TECHNOLOGY DR. ' 16 KB 1O1
� � - � y�1y UU
P.O. BOX 50001 i| ^ [/ G|LRDYCRD8G|NG
WATSONVILLE, CA 9 5077-5001
[u — |
CURRENT
PREVIOUS
CURRENT
UNIT
CURRENT
CONTRACT
BILLED
BILLING
BILL
BILLING
|TEk8NO. DESCRIPTION AIVITIUN|T
AK0T/UN!T
UNITS
RATE
AMOUNT
WORK PERFORMED 1117112
UOl CONSTRUCTION AREA SIGNS $
(7 SIGNS PER PLAN SHEET DE01) L3
002 TYPE III BARRICADE $
[A
003 SPECIAL ALUMINUM SIGN $
SF
TOTALS:
1.415,00
1.0 0.60 14I6.00 849.00
274.62
3.0 3.00 91.54 $ 274.62
1316.80
I2.0 12.00 11,40 $ I38.80
� I 'cov."L
NET DUE: S 1.260.42
"
^
DAILY EXTRA WORK REPORT
City Of Gilroy
Contractor rob: 4162 - Gilroy Crossing Off Site Imp
cost code: 940101
Change Order
Billing
ing Number
003
20.0
Work Performed By: PaVeX Construction
Date
6/04/2012
Description of work: Utility Location With Cruz Bros.
Perform Date
6/03/2012
Labor Charges
Craft ID Employee Name
RT Hrs
OT Hrs Subs Units RT Rate
OT Rate
Subs Rate
Extended
Labor Charges
RT Labor 488.80
L01 OE SUP2 CS Gebhart
8.00
1.00 61.100
79.220
568.02
Equipment Charges
OT Labor
79.22
Equipment ID Description
RT Hrs
OT Hrs RT Rate
OT Rate
Delay Factor
Extended
E01 15904 3/4 Ton Utility Truck
9.00
19.980
179.82
JS.W al Labor
568.02
Material/Specialist Work/Lump Sum or Unit Price Payment
Subsistence
0.00
Invoice No. Invoice Date Vendor Name/ Invoice Description
Units
Unit P '
Extended
Other Expenses
0.00
Mot 25393 5/02/2012 Cruz Brothers Locators / Locate And Mark Utilities
1.000 LS ---:"f0.00
1,160.00
MU 25.00%
142.01
Labor Total
710.03
Equipment Charges
Subtotal
179.82
MU 15.00%
26.97
Equipment Total
206.79
Material Charges
Subtotal
1,160.00
MU 15.00%
174.00
Material Total
1,334.00
s
Activity Total
2,250.82
Bill Total +
2,250.82
Page 1
NTS Universal Bill Form 010704 1- wroucn - twwns.corn
. /fm
CJ?UZ III OMERS LOCA TORS INC. INVOICE
DA IT lots;,
.
1�1 of!" i id!cl CA 9i007
-5`212) 12 2 il 9'.
(i RA N 1 H: R (A'K ('0
;i4)% X0001
I i 'A 1) 5 Wi -1
AT
RAI 1A)CA FION
I lwy ],;?
I lwy 152 Fast FAItlovapass
Gilroy ("A
C ra
931 -700 -0079
T
11AU111M.11 C )l
; ".vlc 1•d cal? iNX 639 1 00 I IWY 1522 F, MITOVFRPAS9
I)! Y 11,111, 1 IW)
and Mork I it*hk
111, 1'.' d lvl- Iff
I 1-:1vd 1,1111c Frow 11ort to Porl
bo:n a plt-nsurc xvorkliq_� With YOU!
TFIRNIS
Net 30
QI Y R Al i
6 145.00
2I 145-00
N 1 i'Ll
'vki(W\j 1
19000
�1c�(lz
Total X1,16000
__j .
Project Name: Gilroy Crossing Offsite Improvements
FIELD ORDER
('ity Of Gilroy
7387 Rosanna Street
Gilroy, CA 95020
>'•1ELD ORDER NO. t
l'roieet Name: C;IROY CROSSINC; 0I SITF IMPROVE64ENTS
("ontnact Date: 02/22/2011
Ib Contractor: (Iranite Rock Company d.b.a Pavex Construction Division
Address: 41 1 Walker Street
Watsonville, CA 95076
Project No: 11 -C DD- 183
4125/12
DES(•RI]ITION OF WORK:
Duc to the re- design of tits Gilroy (Tossing Project (directed by the C(.)ti), Pavex is hereby given direction to re-
survey the project as per the new design. This includes workim; with Cruz lirolhers locating and identifyinY,
unmarked C'altrans utilities and trallic loops that potholing.
Lstim:ucd Acliusumonl
01•Contract Sum:
Mott Mirri / I'M --
(Nano oCConstruction Mamwerfl•ide - typed or printed)
(Signature)
Date: _ - 4/2 1!2012
Ky L NlfLean / Project h'tana�cr
(Nance of Contrucior Representatives Title -typed or printed)
(Signature)
Date: _—
Estimated Adjustment
of ('ontract Tinte: 0
Note: 177is Fietil Or-(4•r frill he srgrrrsedell hI, enr ullowellic udjrrsnurn! or a ('11(ill �e Under that wi /1 inc ucle lire
scope of the c huingw in the Work untl wtv ac•lual c e#uslmews of lire Contract Sum.
I Ili rlrluB) I I nnrte
I
W`kll
r
L
1
t ui �-y. •iiA
t Y
� tt
l'
DAILY EXTRA WORK REPORT
City Of Gilroy cost coat: 940100
Contractor Job: 4162 - Gilroy Crossing Off Site Imp
work Performed By: Bestors Engineers, Inc. (For Pavex Construction)
Description of work: Topo Survey For Redesign
This Bill Has Been Plugged with No Details
Billing Number 25.0
Report Date 6/05/2012
Perform Date 6/04/2012
Labor Charges
Equipment Charges
Material Charges
Activity Total 2,200.00
Subcontract Markup
SC 10.00% 220.00
Bill subtotal 2,420.00
Bill Total + 2,420.00
Page
com
W
_ -- BESTOR EAGINEERS, INC.
CIVIL ENGINEERING - SURVEYING - LAND PLANlV1IUG
-�- 9701 BLUE LARKSPUR LANE, MONTEREY, CALIFORNIA 93940
(931) 373 -2941 • SALINAS 424 -7681 • FAX 649 - 4118
irIVOiCE NO. 4703
1(� GRANITE ROCK PAVEX
411 Walker Street
Watsonville, CA 95076
Attn: Accounts Payable
PO.JCONTRACT NO.
PROJECT:
Gilory Crossing
Construction Stakinc
Pavex Job #4162
W.O.6892.00
DATE: 11 Apr 2012
For piotess,onai services rendered and reimbursable expenses incurred M in March 2012 as follows:
DESCRIPTION
Extra Work #1: Set nails and recorded elevation at sawcut line. Prepared exhibit of record elevations.
ITEM
Agreed
Amount
% Complete
Total
Previously
Invoiced
Amount Due
Extra Work #1
$2,200.00
r
100%
$2,200.00
. ',1+ 1
$0.00
$2,200.00
I
i
I
I�
i
THIS INVOICE IS FOR PROFESSIONAL SERVICES RENDERED AND IS DUE UPON RECEIPT.
AFTER 30 DAYS, A SERVICE CHARGE WILL BE MADE AT A RATE OF 1 112% PER MONTH.
Total Clue in full
$2,200.00
65 YEARS OF PROVIDING QUALITY ENGINEERING /SURVEYING SERVICES
nAILY EXTRA WORK REPORT
City Of Gilroy
Contractor Job: 4162 - Gilroy Crossing Off Site Imp
work Perfonned By: Pavex Construction
Description of work: Traffic Control For Night Closures Due To Redesign 6/25/12 - 6/27/12, 7/6/12, 8/23/12, & 8/24/12
Material /Specialist Work/Lump Sum or Unit Price Payment
Invoice No. Invoke Date Vendor Name / Invoice Description _
Units _
Unit Price
Extended
M01 1428034119 6/29/2012 Statewide Safety / Traffic Control
_ 1.000 LS
5,300.00
5,300.00
Moe 1428034426_ 7/20/2012 Statewide Safety / Traffic Control
1.000 LS
1,450.00
1,450.00
M03 35953 8/22/2012 D &M Traffic Services, Inc. / Traffic Control 8/23/12 & 8/24/
_ 1.000 LS
2,890.00
2,890.00
Change Order 018
Billing Number 557.0
Report Date 8/23/2012
Perform Date 6/25/2012
Labor Charges
Equipment Charges
Material Charges
Subtotal 9,640.00
j MU 15.00% 1,446.00
Material Total 11,086.00
Activity Total 11,086.00
Bill Total + 11,086.00
Page
l�
STATEWIDE SAFETY & SIGNS
License# 523594 CUSTOMER #: 9,,) 1
F77 INVOICE #: 14" 10, 3 12 6
130 Grobric Court Zu
Fairfield, CA 94533 INVOICE DATE: 071 ") 0.11
TRAFFIC SAFETY & SIGNS Phn 707.864.9952 * Fax 707.864.9956 DUE DATE: 06`',91
PLEASE SEND REMITTANCE TO: OUR JOB NO.:
PO Box 5299; Irvine, CA 92616
BILL TO: OWNER PROD. NO.
IS PROD. No. 4162
GRANITE ROCK CO.DBA PAVER COt
350 TECHNOLOGY DR., ILROY CROSSINGS #4162
iMull- 27 wy 101
P 0 BOX 50001 i.; , L; I bILROY CROSSING
iNATSONVILLE, CA 95077-5001
ITENI NO. DESCRIPTION
401'T "FRI
T -1 5 r
MI
TOTALS:
CURRENT PREVIOUS
CONTRACT BILLED
AMT/UNIT AMT/UNIT
V
L I k "0 0
CURRENT
BILLING
UNITS
UNIT
BILL
RATE
CURRENT
BILLING
AMOUNT
4162. tO3() - I't 0 0 14 4 1,4 So . vo ti c I t -5 0 fil
NET DUE:
BILL TO: OWNER PROJ. NO.
PROJ. NO. " 162
GRANITE ROCK CO, DBA PAVEX COI
1,011-ROY CROSSINGS
n T E. Cl- 0GY D R
PC) BOX 50('110 1
GILROY CROSSING
",t'v'A T 8 0 N' V! 1 L E, GA 950 0 5 0 01 1
ITEM NO. DESCRIPTION
TOTALS:
CURRENT PREVIOUS
CONTRACT BILLED
AMT/UNIT AMT/UNIT
q jj c
CURRENT UNIT
BILLING BILL
UNITS RATE
NET DUE
CURRENT
BILLING
AMOUNT
J1
STATEWIDE SAFETY & SIGNS
License# 523594
130 Grobric Court
IN VOICE 91
Fairfield, CA 94533
TRAFFIC sArETY & SIGIVS
Phn 707.864,9952 ' Fax 707.864,9956
MOICE DATE:
DUE D ATIE:
PLEASE SEND REMITTANCE TO:
OUR JOB
PO Box 5299; Irvine, CA 92616
BILL TO: OWNER PROJ. NO.
PROJ. NO. " 162
GRANITE ROCK CO, DBA PAVEX COI
1,011-ROY CROSSINGS
n T E. Cl- 0GY D R
PC) BOX 50('110 1
GILROY CROSSING
",t'v'A T 8 0 N' V! 1 L E, GA 950 0 5 0 01 1
ITEM NO. DESCRIPTION
TOTALS:
CURRENT PREVIOUS
CONTRACT BILLED
AMT/UNIT AMT/UNIT
q jj c
CURRENT UNIT
BILLING BILL
UNITS RATE
NET DUE
CURRENT
BILLING
AMOUNT
08/2812012 TH 5:10 FAX 4084361675 UM TRAFFIC
845 Reed Street
p n Santa Clara., Ca. 95050
Phone: 1- 800 - 953 -2636
Bill To
PAVER CONSTRUCTION
120 GRANITE ROCK WAY
SAN JOSE, CA 95136
Ship To
GIRLOY
10TH ST.
1.01 OVERPASS
001/001
Invoice
Date Invoice #
8/22/2012 35953
P.O. Number
Terms
Rep
Ship
via
F.Q.B.
Project
11-CDD -183
2% 10 Not 30
RUC
8/22/2012
OUR TRUCK
Quantity
Item Code
Description
Price Each
Amount
I
2
1
TRAFFIC CONT...
OVERTIME 2 PE...
TRAFFIC CON'f---
2 PERSON TRATT7C CONTROL 8 -23 -12
OVERTIME, 2 PEOPLE
2 Pevsc7N TRAFFIC CONTROL 8.24 -12
Sales Tax
1,295.00
150.00
1,295.00
8.3 75%
1.295.00
300.00
1,295.00
0.00
Total S2.890.00
GENERAL ENGINEERING CONTRACTOR - LICENSE #22
PAVEX CONSTRUCTION DIVISION
September 27, 2012
City of Gilroy, Public Works Department
7351 Rosanna Street
Gilroy, CA 95020
Attn: David Stubchaer
Senior Civil Engineer
Re: Gilroy Crossing Offsite Improvements, Project No. 11 -CDD -183
Pavex Job No. 4162
Subj: LTO -17 — Westbound ADA Ramps Extra Costs
Mr. Stubchaer,
Please see below breakdown for the following extra costs incurred for the westbound ADA ramp.
Please issue a change order to Pavex for the following work;
EWB#
Date
Description
Cost
41.0
6/29/12
Demo existing ram
$588.24
39.0
7/2/12
Make subgrade and deep section
for ADA ram
$3,287.33
40.0
7/3/12
Place AB and prep for pour of
ADA ram
$1,491.73
33.0
7/5/12
Adjust westbound ADA ramp per
COG Operations Manager David
Stubchaer
$773.93
42.0
7/24/12
Aparicio Costs to Reset forms
$395.46
Totals
1 $6,536.69
Should there be any questions, please feel free to contact me (408)590 -1767.
Sincerely,
Graniterock Company
Pavex Construction Division
N ov�
Matt Christie
Project Engineer
Cc: Nova Partners
DAILY EXTRA WORK REPORT
City Of Gilroy
Contractor Job: 4162 - Gilroy Crossing Off Site Imp
work PeAormed By: Pavex Construction
Description of work: Demo Existing Westbound Ramp
016
cost code: 940016
Labor Charges
Craft ID Employee Name
RT Hrs
OT Hrs Subs Units RT Rate OT Rate Subs Rate
1.01 CIE SUP1 DG Plummer
2.00_
_ 64.250
L02 LBSP ML Toccalini
2.00
_ 44.940_ _
_LBR _
L03 LBR LBF85 M Cecena
2.00
47.900
Equipment Charges
Equipment ID Description
RT Hrs
OT Hrs RT Rate_ OT Rate Delay Factor
E01 16331 Ford F450 Pick Up
2.00
_ 25.040 —
- --
--- - - - -- -- -
E02 15006 3/4 Ton Pickup
- - - --
2.00
19.980 _
E03 15807 3/4 Ton Pickup
2.00___
__ 19.980
E04 16437 Air Compressor 185 CFM
2.00
-----M010 _
Change Order
016
Billing Number
41.0
Report Date
7/25/2012
Perform Date
6/29/2012
Labor Charges
Extended I RT Labor
314.18
128.50
89.88 11 OT Labor
0.00
95.80
Subtotal Labor
314.18
Extended Subsistence
0.00
5_0.08 1 Other Expenses
0.00
39.96 MU 25.00%
78.55
39.96 Labor Total
392.73
40.02
Equipment Charges
Subtotal
170.02
MU 15.00%
25.49
I Equipment Total
195.51
Material Charges
Activity Total 588.24 1
Bill Total + 588.241
Page ?
DAILY EXTRA WORK REPORT
City Of Gilroy
Contractor Job: 4162 - Gilroy Crossing Off Site Imp
work Performed By. Pavex Construction
Description of Work Make Subrgade And Deep Section For ADA Ramp
Change order
Billing Number
Report Date
Perform Date
016
39.0
7/25/2012
7/02/2012
Labor Charges
Craft ID _ Employee Name
1-01 OE OE4 A Andrade
RT Hrs
5.00
OT Hrs Subs Units RT Rate
59.860
OT Rate Subs Rate_
Extended
299.30
Labor Charges
RT Labor
1,697.35
L02 OE SUP1 DG Plummer
5.00
_
1.00 _ 64.250
_
83.135
_404.39
OT Labor
83.14
Loa OE OE4 JR Bravo
5.00
_ 59.860
_ 299.30_I
_
L04 LBR LBF85 M Cecena _ _
5.00
49.300
_
_
246.50
Subtotal Labor
1,780.49
L05 LBR LBSP ML Toccalini
5.00
46.340
-_ _
231.70 j
Subsistence
0.00
_
LOB OE OE4 J Mick -
5.00
59.860
_
299.30
Other Expenses
0.00
Equipment Charges
Equipment ID Description
RT Hrs
OT Hrs RT Rate
OT Rate Delay Factor
Extended
I
MU 25.00%
Labor Total
445.15
2,225.64
_
E01 16331 Ford F450_Pick Up
5.00
25.040
1.25.20
--
-
E02 15721 F150
5.00
19.980
99.90
Equipment Charges
_
E03 15807 3/4 Ton Pickup
6.00
_ 19.980
_
119.88
1 Subtotal
°k
750.00
112.51
_
E04 15006 3/4 Ton Pickup
5.00
19.980
99.90
Mu 15.00
!Equipment
_
E05 16608 Mini Excavator Cat 305C
4.00
_
36.850
_
147.40
Total
862.51
E06 14049 John Deere Loader 210 _
E07 14317 Bomag 100AS Roller 39"
2.00
2.00
_ 46.160
_ 32.700
92.32_-
65.40
Material Charges
1 subtotal 173.20
-
Material /Specialist Work/Lump Sum or Unit Price Payment
Invoice No. Invoice Date Vendor Name / Invoice Description
Units_ Unit Price
_ Extended
MU 15.00%
25.98
Mot _ United Rentals ! Water Buffalo Rental
_
1.000 LS 173.20
173.20
Material Total
199.18
- -- - - -
-- -
- - - - -- - - - - --
_�
j Activity Total
I
3,287.33
I
i
i
I
Bin Total + - - --
_
3,287.33
Page 1
NTS Universal Bill Form 010704
0 United` * RSC
Rentals EaulGm9nfRanial
L, N S rL 97 -31 >67�
� tpt:
4J GILROY CROSSING
�� 10TH ST
x:152,2?.
® GILROY, CA 95020
LOCATION #051
37 TARP CIRCLE
SALINAS, CA 93901
831- 422 -7411 831 -422 -5991 FAX
III I I III 11111111 1111111111111111111111 IN
h� Office: 408 - 574 -1400 Cell: 831 -970 -0206
PAVEX CONSTRUCTION CO CA
INVOICES MAILED WEEKLY TO
KATHY AND DIANA
SAN JOSE, CA 95136
_ 4't` i..31 <i�l. .•37_ _Di_S CY1Ft i. On-
Mini um
:338:'H +l;A'CER TANK 'FRAILER 500 GAL
Make: 4y!,lE, Ncdel: EXP -500 -5
Serial: 1W9,I'W1324GL342:iO2
CC:�MEII ,`NOTES.
CONTA.0 :: DWAYNE PLUMBER
CELLO: X331 -97i; -0206
A C1. EA -HTVG Ci;A.P• ^E WILL APPLY TO EQUIPMENT RETURNED WITH EXCESSIVE
CONCRETE, A,:P, /oR PAIN•P. CUS'T'OMER IS RESPONSIBLE FOR ALL
Di,d,'.AC >E TN�LUD'ING TIRES. THERE WILL BE AN ADDITIONAL CHARGE FOR
i�I1S�;IN�; i%'YS. A CHARGE WILL BF APPLIED TO ALL UNITS NOT
RETURNED FULL OF FUEL
i
RENTAL AGREEMENT
-1_103599910
Customer Number 415006
Agreement Date 6/ ?_5/12
Rental Out 6/25/12 8:41 Tall
Scheduled In 7/02/12 8:41 AX
Job Location: 10TH ST, GILRCY
Job Number
212
P.O. Number
4162
(Ordered By
DWAYNE PLUMBER
Written By
UR051JG2
Salesperson
8057
Day Week 4 Week Fstlmated Am.! :,
1CC.00 526.00 1121.00
Rental Subtotal:
F NVTRONMCNTAI CHARGE' f I u l a s t t �t t� a , ui r L 1 cha,gn wh+.tr rs nas+grucf to rernver Un ta;l -s deoct an 1 tl rucl expenxux to+ the nar•u!a,4 n1Mia41nyl and dispus,n4 of wasto T in fu is. ha"'o-o ,us
c,usts .s r� .+, l a yuv, ,.,r,.r i +w ,];rlu.l -)u FUEL F ,o! to no: n:.iutlo feaarnl, slate m beat axc so la><ns.
OPTIONAL RENTAL PROTECTION PLAN
NOTICE FOR RENTAL OF A MOTOR VEHICLE: THIS CONTRACT OFFERS, FOR AN ADDITIONAL CHARGE, A DAMAGE WAIVER TO LIMIT YOUR FINANCIAL RESPONSIBILITY FOR DAMAGE TO OR THEFT OF THE MOTOR
VEHICLE. BEFORE DECIDING WHETHER TO PURCHASE THE DAMAGE WAIVER, YOU MAY WISH TO DETERMINE WHETHER YOUR OWN INSURANCE AFFORDS YOU COVERAGE FOR DAMAGE TO OR THEFT OF THE MOTOR
VEI!ICLE AND THE AMOUNT OF TILE DEDUCTIBLE UNDER YOUR OWN INSURANCE COVERAGE. THE PURCHASE OF THIS DAMAGE WAIVER IS NOT MANDATORY AND MAY BE WAIVED OR DECLINED.
!HE RENTAL PROTECTION PLAN IS NOT INSURANCE! Tho Reh:al Prot no Pan Is oiry ovad o to cl-d bmnwrcial Cuslomets. Upon accapkny the opUona: Ronlai Piofoctoo Pan cusloole, lyroe9 To pay a v! tj ogoal 1J
14 k u! tl cl L:! 7 - ,ve,aa ay Ire Ra 1 1 I . 1 uun P.un In shoo as sat Im1h m Addondum 1 to iho Rental Atgroornonl Untied apreas to waive coitam elai•ns for accidental einmayu tour tha :It oI
such .v vu ,•d L ,,, I, .ur.l t i�u,. i+,q !u ,7 n"rna .n-vr ,:a<fui isu C..slon+ur ranian s able lu, all c7har damayus and wss due to thofl as set loth in Ilro ccndlhonx founU +n Sachun 5;D) nl Addendum t to Il+v Reruai Ayloomanl f
on nu- 'I r I T' nt. Cot ( A i, to Iha to m5 -,I Cool t VI s cut .uu OJ - IInS wnlal a9rooll -11 I.) Ayteax fltat Tho equ pn•onI IS nt the ConiLlwn ox slatad on Ilia CUnd.IWn •npm'(s) (s) Agranx to
e t n s a " "f t'...s G t al R r P t f Pon . apt Iblc. and ;x; AUlli —LOS L +dud l0 U t ge C rstomm x cwdd card Oste 1 above m on lilo d oPpucab :'o Customer also ackoow.edyux Ihat it is fully fan• ita, w9h Tho
vu;,r� u ! ..i ..I ule v �,.p nn i u 1 has orurv, u V.0 oqu p and n y „ud work+ny over, tb) ar, sa t, burro ins. (c) all operalol manuals and (a) all nmtlulachu er s labulnteo data !or the bT the protactivo sys!nm oqu+pn+unl I+s:ad
'1MER SIGNATURE
DATE CUSTOMER NAME PRINTED UNITED RENTALS REPRESENTATIVEIDELIVERED BY DATE
A LARGER FONT COPY OF THE TERMS AND CONDITIONS IS AVAILABLE UPON REQUEST.
Da rte.= 7
DAILY EXTRA WORK REPORT
City Of Gilroy
Change Order
016
Contractor Job: 4162 - Gilroy Crossing Off Site Imp
!Report
Billing Number
40,Q
Work Performed By: Pavex Construction
Date
7/25/2012
Description of Work: Place AB_ And Prep For Pour Of ADA Ramp
- -- -
-_ �-
Perform Date
7/03/2012
_ _
Labor Charges -
-
- --
- --
-
Labor Charges
Craft ID Employee Name
RT Hrs
OT Hrs Subs Units RT Rate OT Rate
Subs Rate
Extended
- --
RT Labor
732.58
_ - - - -__ _- - - - --
L01 OE OE4 A Andrade_--
2.00
-_ _ -- 59.860
119.72 _)
__
1-02 OE OE4 JR Bravo
2.00
59.860
119.72
OT Labor
0.00
L03 OE OE4 - J Mick - - -
2.00
_
_ - _59.860
_
119.72
_
L04 LBRAP APPR2 MO Garcia San
2.00
26.820
53.64
Subtotal Labor
732.58
_
L05 LBR LBF85 M Cecena _ _
_
2.00
_ _
- 49.300 -
98.60
Subsistence
0.00
LOB OE SUP1 DG Plummer - - -__
2.00
64.250
128.50
Other Expenses
0.00
-
L07 LBR LBSP ML Toccalini
2.00
46.340
92.68
11 MU 25.00%
183.15
Equipment Charges
Labor Total
915.73
Equipment ID
RT Hrs
OT Hrs RT Rate OT Rate
- -
Delay Factor
-
Extended
i
_Description
E01 15721 F150 - - - --
2.00
19.980
39.96
; Equipment Charges
- - -- - - -- --
E02 16331 Ford F450 Pick Up
--
2.00
-- - - - --
25.040
- - -- - - - -- -----------------
50.08
1 Subtotal
- - - - --
E03 15807 3/4 Ton Pickup
-
2.00
19.980
--
--
39.96
-
Mu 15.00 a
49.14
E04 15006 3/4 Ton Pickup
2.00
19.980
39.96
Equipment Total
376.82
_
E05 14049 John Deere Loader 210_ _
2.00
----.-----46.160
9_2.32
r Material Charges
E06 14317 Bomag 100AS Roller 39"
100
- _ 32.700 ___
_
-_ 65.40_1
Subtotal
173.20
_
Material /Specialist Work/Lump Sum or Unit Price Payment
Mu 15.00%
25.98
Invoice Invoice Date Vendor Name/ Invoice Description
- Units
_U_ nit Price
Extended
_ _
Mot United Rentals / Water Buffalo Rental
- _ 1.000 LS _
_173.20
173_20 Material Total
199.18
'I Activity Total
1,491.73
Bill Total + 1,491.73
Page
-- EWBiIm
0 United!` + MCI
Rentals Equipment Aenlal
_i11i NTS 7;.- 87311:.%7;
I •.;l( t
4J GILROY CROSSING
U3) 10TH ST
x:15,19.
41
p GILROY, CA 95020
LOCATION 11051
37 TARP CIRCLE
SALINAS, CA 93901
831- 422 -7411 831 -422 -5991 FAX
111111111111 IT 1111111111111111 1111
1-31 Office: 408 -574 -1400 Cell: 831 -970 -0206
N PAVEX CONSTRUCTION CO CA
INVOICES MAILED WEEKLY TO
KATHY AND DIANA
iSAN JOSE, CA 95136
__- - -- —
4 lion
-- -- E Mi. nimusl Da
i 8'E 'N'A ER 7'ANY. 'TRAILER 500 GAL
IJ'Y1.JL Model: EXP -5U0 -S
`ie L-ia 1545'1 PI Lit i6L392502
CC:•;h! FI':'. ,� .' :JOT;!.:, .
CELL$; £31- 57u -U24G
A C1: .b.'" U C:`A4jZ 3F ;;ILL APPLY TO rQUIPMF.NT RETUi2NED WITH EXCESSIVE
:!`T, 314TCRETL, Wa:'lOii PAIN':'. CUS'T'OMER iS RESPONSIBLE FOR ALL
J .AI,:A< >E TNC'LUDING TIRES. • t! I'HERE WILL, fi API ADDITIONAL CHARGE FOR
taISS1IJ!; Kl - :YS. A FUEL CHARGE 1`11LL BF APPLIED TO ALL UNITS NOT
RETUFNED FULL OF FUEL
RENTAL AGREEMENT
J_ _1.03599910
Customer Number 415006
jAgreement Date 6/25/12
!Rental Out 6/25/12 8:41 tai.;
!Scheduled in 7/02/12 8:41 AI11
Job Location: 10TH S.', GILRCY
Job Number 212
P.O. Number 4162
(Ordered By DWAYN1•E P:,UMHER
Written By UR051JG2
Salesperson 8057
4 Wee;
160.00 526,00 :121.CCI
Rental Subtotal:
Est !mated Are,..'
LNVIRONMENTAI CHARGE'. 5 '1. t t L . al '111 l' d, "I -t"d— d—g.ud Ta fet'PU.r brl led dl t afld expo-fle I., It'. lrar•dLN Ilianapy d,t d dISpU11111J a( W;1)le pralle:,IS, IIa'o�.:]V5
I'. rl..l .uf . 1-0 v 1 pasts .s li N14 n FUEL I "I.I,I 0,,og la nu, n:Jrxto red ... I slat.. ,; I ... I e _ lazes
— I -NAL flLN IAL VHUTECTION PLAN - -
NOTICE FOR RENTAL OF A MOTOR VEHICLE! THIS CONIRACT OFFERS, FOR AN ADDITIONAL CHARGE, A DAMAGE WAIVER TO LIMIT YOUR FINANCIAL RESPONSIBILITY FOR DAMAGE TO OR THEFT OF THE MOTOR
VEHICLE BEFORE DECIDING WHETHER TO PURCHASE ]HE DAMAGE WAIVER, YOU MAY WISH TO DETERMINE WHETHER YOUR OWN INSURANCE AFFORDS YOU COVERAGE FOR DAMAGE 10 OR THEFT OF THE MOTOR
VFIIICLE AND THE AMOUNT OF ITIE DEDUCTIBLE UNDER YOUR OWN INSURANCE COVERAGE. THE PURCHASE OF THIS DAMAGE WAIVER IS NOT MANDATORY AND MAY BE WAIVED OR DECLINED,
THE RENTAL PROTECTION PLAN IS NOT INSURANCE! Tf. HeW.1 Prot r P-- -$y to Proct Irontnf I—I Cuel.mets. Upon a cot .:n; Iho opbonn' Ronlal Plol -L- P; Cuslornor agraus to Pay a r.I_V. oq.al to
14 F uVfl s ll a l r II r v. I 1 y t . Rn lal p ulaUro P. I rat on, as sot lodh of Atlualtd— 1 to Iho R-I.i Alpootnartl. Unalod agrees lu walla Caltam rlal•ns (al acc:dantol damage to or fled of
Coal -lnlur romans' able tar alt other demay.s and 1-5,1- !o ;null as set forth in Iho eonddwns fund of Sueh.rl 5!B) of Addandurl I la Iho Rerdal Agreement
e. U' .'t 111 a u. Cu t : ( A l - s Ti Iho Ic a o ^d �c nu 1 5 cur ta,nod e• this -,,let agwonwn! _x} AUruos that It•o oqo Pmont Is n the Crxpld elf 06 etntad an the CmW han'almritsT (F) Agree. to
t -s a I:T:. Gr al R 1 P I 1 1 r a p;. -Tt IL. 1 (x) Auth-zes C.1 I.d 1 c1 'I ge Cuslomor s ..ad, aid Itstod ebova or on lilo, 'I 4P;1k0b a Costunwr also ack,,.., ages that It Is fully (a "dl the
- Iz -r 111A ,.,1 ,:I nf, v.IL p 1 , , , 1 has .1-10 ,ar Ury ultu p I and n g,,.d —king ordor, (b) al, saloty b II 1•.ns. Tel all opolal nfaa-ls, and (d) all manuhlct.11 ar s tabuiateu data lot tho for !ho protective system aqu pl ora Irs!aa
TIMER SIGNATURE
DATE CUSTOMER NAME PRINTED UNITED RENTALS REPRESENTATIVE /DELIVERED BY DATE
A LARGER FONT COPY OF THE TERMS AND CONDITIONS IS AVAILABLE UPON REQUEST.
D,q 7
DAILY EXTRA WORK REPORT
City Of Gilroy
Contractor Job: 4162 - Gilroy Crossing Off Site Imp
work Performed By: Pavex Construction
Description of work: Adjust West -Side ADA Ramp Per COG Operations Manager David Stubchaer
Change Order
Billing Number
Report Date
Perform Date
016
33.0
7/2Q/2012
7/05/2012
Labor Charges
Craft ID Employee Name ______RT
Hrs_
OT Hrs Subs Units RT Rate
OT Rate Subs Rate Extended
Labor charges
RT Labor 379.64
L01 OE OE4
A Andrade
1.00
59.860
59.86
L02_LBR LBF85
_
M Cecena
2.00
49.300
_
98.60
oT Labor
83.14
X03 OE SUP1
DG Plummer
_
2.00
1.00_ 64.250
83.135 _ _ 211.64 j
L04 LBR LBSP
_
ML Tocc_a_lini
2.00
46.340
92.68 I
Subtotal Labor
462.78
_ _
Equipment Charges
Equipment ID Description
RT Hrs
OT Hrs RT Rate
OT Rate Delay Factor Extended
Subsistence
Other Expenses
0.00
0.00
Eot 15721
—
F150
1.00
__
19.980
_ _ 19.98 !
MU 25.00%
115.70
E02 16331 —
_
Ford F450 Pick Up
- ---- - - - - --
2.00
- --
25.040
- -- - -
50.08
- --
Labor Total
578.48
Eo3 15807
E04 15006
3/4 Ton Pickup _ _ _
3/4 Ton Pickup
3.00
2.00
19.98_0
19.980
59.94_'
39.96
Equipment Charges
- --
- -,_ --
- - - - -
-- -- —
Subtotal
MU 15.00%
Equipment Total
169.96
25.49
195.45
Material Charges
I
I
it
Activity Total
773.93
i
III
I
Bill Total +
773.93
i
Page 1
NTS Universal Bill Form 010704 crvioucn - cwains.com
DAILY EXTRA WORK REPORT
City Of Gilroy
Contractor Job: 4162 - Gilroy Crossing Off Site Imp
Work Performed BY: Aparico Concrete (For Pavex Construction)
Description of Work_Aparicio Reset Forms For Westbound ADA Ramp -_
Change order 016
Billing Number 42.0
Report Date 7/25/2012
Perform Date 7/24/2012
_
This Bill Has Been Plugged with No Details
Labor Charges
I
I
I
i
Equipment Charges
i
Material Charges
I
I
Activity Total 359.51
I
Subcontract Markup
SC 10.00% 35.95
i
I
Bill subtotal 395.46
I
i
Bill Total + 395.46
Page 1
NTS Universal Bill Form 010704
Work Performed by:
DAILY EXTRA WORK REPORT
C. APARICIO CEMENT CO.
Job#: 11008
Date Performed: 7/3/2012
PAVEX
Description of Work: 10TH ST GILROY -RESET FORMS FOR WHEELCHAIR RAMP ON SOUTH SIDE OF 10TH ST A T 101 ONRAMP SB,
STA 44 +55.57 TO 44 +68.08 - PER DIRECTION OF CITY OF GILROY
EQUIP.
1EQUIPMENT
OT /Delay
HOURS
HOURLY
EXTENOEO
LABOR
HOURS
HOURLY
EXTENDED
NO.
Factor
RATE
I AMOUNTS
❑
RATE
AMOUNTS
2AXL
DUMP TRUCK #72
1
RT
0
$ 44.53
$
0
P. AMEZCUA
RT
0
$
OT
$
$
OT
S
S
2AXL
FLATBED TRUCK #55
1
RT
0
$ 4d 53
$
0
A. DELGADO
RT
2
S 44.09
$ 88.18
OT
-
$
OT
$ -
S -
0
BACKHOE #9
1
RT
0
$ 40.36
$
0
M. ESPINOSA
RT
0
$
C` t
$ -
S
OT
$
$
22 -25
TRANSPORT TRAILER
1
RT
0
$ 5.75
S
0
M.FERREL
RT
0
$
$
r" T
$ -
$
OT
$
$
00-06
PICKUP TRUCK 940
2
RT
$ 1710
$
0
R. JAUREGUI
RT
0
$
OT
$ -
$
OT
$
$ -
00-06
PICKUP TRUCK #78
1
RT
$ 17 10
$
0
U. MARTINEZ
RT
0
$
$ m
OT
IS
$
OT
$
$ -
0
0
RT
S
$
0
J ROMO
RT
2
$ 51.31
S 102.62
OT
S
$
OT
S -
$ -
0
0
RT
S
$
0
H.URENO
RT
0
$
OT
S
S
OT
S
S -
0
0
1
RT
$
$ -
0
J. URENO
RT
1
$ 49.1'
$ 49.11
OT
$
$
OT
S -
0
0
1
RT
$
$
0
R URENO
RT
0
S
OT
$
$
OT
$ -
S
0
0
1
RT
$
$
0
M.SOLTERO
RT
0
S
OT
$
$
OT
$
$
0
0
RT
0
$
$
OT
$
is -
MATERIAL and/or WORK DONE BY SPECIALISTS
Descript -or,
No. Units
Unit Cost
Amount
Sub -Total Labor RT
Labor Surcharge RT
11%
$ 239.91
$0.00
$ 26.39
$000
Sub -Total Labor OT
Labor Surcharge OT
11%
$ -
$0.00
$
$000
Subsistence
$0.00
L11TOTAL
COST OF LABOR $ 26&.30
FUEL SURCHARGE
S0.00
2% OF EQUIP FEE
$0.00
$0.00
OTAL COST OF EQUIPMENT, MATERIALS AND WORK $
Is
351/6 MARK -UP ON LABOR COST S 93.21
15%6 MARK -UP ON EQUIP. MATERIAL AND WORK COST -
TOTAL THIS REPORT $ 359.51
1108- 01.xis
C. Aparicio Cement Contractor
506 Phelan Avenue
San Jose CA 95112 -2506
408 286 -4580
License: 267391
Billed To: Pavex Construction
411 WALKER STREET
WATSONVILLE CA 95076
Due Date: 08/16/2012
Description
EXTRA WORK
Terms: 30DY
10TH ST, GILROY:
RESET FORMS FOR WHEELCHAIR RAMP ON SOUTH
SIDE OF 10TH ST AT 101 ON RAMP SB
STA 44 +55.57 TO 44 +68.06 - PER CITY OF GILROY
Invoice
Invoice#: 11008 -EW 1
Date: 07/17/2012
Project: GILROY CROSSING OFFSITE IMPROV
GILROY CA 95020
Quantity Price
1.0000 359.510000
Invoices are due and payable 30 days from date of invoice. Please make
checks payable to C. Aparicio Cement Contractor, Inc.
Thank you for your prompt payment!
Ref#: 4162
Amount
359.51
Invoice Total:
359.51
Retention:
35.95
Amount Paid:
0,00
Amount Due
323.56
Project Name: Gilroy Crossing Offsite Improvements
City Of Gilroy
7387 Rosanna Street
Gilroy, CA 95020
FIELD ORDER
FIELD ORDER NO. 11
Project Name: GIROY CROSSING OFFSITE IMPROVEMENT
Contract Date: 02/22/2011
To Contractor: Granite Rock Company d.b.a Pavex Construction Division
Address: 411 Walker Street
Watsonville, CA 95076
DESCRIPTION OF WORK:
Project No: 11 -CDD -183
7/5/]2
Pavex is being directed by City of Gilroy Operations Manager David Stubchaer to deviate from the approved
drawings (7/15/12) and change the approach to the west -side ADA ramp. (Sheet 13 / detail E) The new approach is
more direct and pedestrian friendly.
Estimated Adjustment Estimated Adjustment
of Contract Sum: of Contract Time: 0
Ron Barri / PM
(Name of Construction Manager/Title - typed or printed)
LIM
(Signature)
Date: 7/5//2012
Matt Christie / Project Manager
(Name of Contractor Representative/Title - typed or printed)
(Signature)
Date:
Note: This Field Order will be superseded by an allowance adjustment or a Change Order that will include the
scope of the change in the Work and any actual adjustments of the Contract Sum.
Attachment: none
DAILY EXTRA WORK REPORT
City Of Gilroy
Contractor rob: 4162 - Gilroy Crossing Off Site Imp
Work Performed By: Pavex Construction
Description of work: Sawcut, Demo And Set Up Traffic Closure In Median Island
cost coda: 940013
change order
ing Number
Billing
Date
Perform Date
:e/id
52.0
8/20/2012
8/13/2012
Labor Charges
Craft ID Employee Name
RT Hrs OT Hrs Subs Units
RT Rate
OT Rate
Subs Rate
Extended
Labor Charges
RT Labor 1,877.60
Lot OE SUP1
DG Plummer
8.00 1.00
64.250
83.135
597.14
Lot OE OE4
A Andrade
8.00
59.860
478.88
OT Labor
83.14
Loa OE SUP1
V Aguilar
8.00
64.250
514.00
Loo LBR LBSP
ML Toccalini
8.00
46.340
370.72
Subtotal Labor
1,960.74
Equipment Charges
Equipment ID Description
RT Hrs OT Hrs
RT Rate
OT Rate
Delay Factor
Extended
Subsistence
Other Expenses
0.00
0.00
E01 16338
Ford F250
8.00
19.980
159.84
MU 25.00%
490.19
E02 15721
F150
8.00
19.980
159.84
Labor Total
2,450.93
E03 15807
3/4 Ton Pickup
8.00
19.980
159.84
E04 15006
3/4 Ton Pickup
8.00
19.980
159.84
Equipment Charges
Eos 14049
John Deere Loader 210
1.00
46.160
46.16
Subtotal
759.22
E06 16608
Mini Excavator Cat 305C
2.00
36.850
73.70
Mu 15.00%
113.90
Material/Specialist Work/Lump Sum or Unit Price Payment
Invoice No. Invoice Date Vendor Name / Invoice Description
Units
Unit Price
Extended
Equipment Total
873.12
Material Charges
Mot T160601
8/19/2012 Graniterock Company / 10 Wheeler
5.750 H
85.00
488.75
Subtotal
1,640.29
M02 27101765
8/19/2012 White Cap / Bolts For Form
1.000 LS
7.94
7.94
MU 15.00%
246.04
Mas IN0071155
8/13/2012 Del Sacco Diamond Core & Saw, Inc. / Sawcutting
1.000 LS
391.25
391.25
Mao INV31561
8/16/2012 El Camino Machine & Welding / Steel Form For Sidewalk Tie In
1.000 LS
579.15
579.15
Material Total
1,886.33
M05
United Rentals / Water Buffalo Rental
1.000 LS
173.20
173.20
Activity Total
5,210.38
Bill Total +
5,210.38
Page
NTS Universal Bill Form 010704 cry roucn - cvwximcom
120 Granite Rock Way
San Jose, CA 95136
Tel: (408) 574.1400
Fax: (408) 385 349
Job k: _ Date: r NT DAY
Gran'otertmk.
--- N6 - -R-7 -R • I ICENSE 922
EXTRA WORK FORM
Page i of �
NfT Billing i _._. .... _ -
CCO N
- - 01?N RM. QNG I
SU &' T W TH F S PAVEX CONSTRUCTION DIVISION Task Code:
........ ...
Ju{J INut"4. ....._.. - . .- .._....... _.._. ......._ _..... .. .. ...,,.
'CABOR CHARGES I HOURS
._..
LABOR CHARGES HOURS
Emp'.oyee Number Name
Class ST OT
Emplcy+ ti{1m er
Name
Class
ST OT
}J I i jj i
clu,
[/t{
�f%,i''fs r*`LV �"�` ♦fffj 11 K(/j f /1n may{) _!
-
EQUIPMENT CHARGES
HOURS
t iF r - ='�T G't,ar' ES
�-
_HOURS
Move lnic,�t Equipment Nurnoer Desv phon
Description
ST OT
1, ffc
MAT RIALSrTRUilCeKsIcNr'G
dATERiALSfTRUCKING
Tag Vendor
Descripuon Cty u0M
t an Orr UOM
, i , Verttor p
As an authorized representative _ 1 am authorizing Granite Rock Company d.b.a. Pavex Construction Division to perform
extra work on a time and m rial bas' is w n addition to any contract quantities or items. /
i/ N t
Approval by owner's representative _ Date _. _ Graniterock's Representative ���r i -.. ; , Date
Whse•PE Y000W• owner Pink - Supervisor Cod - eaok LVVY(001CC Serial „y, �t �i„�_; -. [:,
DEL SEcco
D I n M 0♦ D
coal.. 6 SA%k, INC
4t�
3'
31739 Knapp Ntrcct
tlayward, California
94544 -7828
'I -cl (510) 475 -6313
/.irrn -rK #538,746
PAVEX CONSTRUCTION
120 GRANITE ROCK WAY
SAN JOSE. CA 95136
• r
PAVER CONSTRUCTION
NORTH 1011TENTH STREET
GILROY, CA
PAGE 1
80723 357 DIANA J013#4162
811312012 Net 15, 2% Fir Chrg thereafter JG FLATSAW
SERVICE TYPE I FS ! + IiOURLY 7.75 135.00 000 $37125
Flat Saw Service
Notes: 135 L_F- X 11" DEEP ASPHALT SLAB
20.00 0.00 520.00
FS LUMP 100
Fiat Saw Service
Not05: FUEL SURCHARGE
Sales Total
3391.25
Invoice No
IN0071155
invoice Date
811412012
Shipper D
S0011160
Order Type
Service Invoice
Customer ID
. PAYEX -
• r
PAVER CONSTRUCTION
NORTH 1011TENTH STREET
GILROY, CA
PAGE 1
80723 357 DIANA J013#4162
811312012 Net 15, 2% Fir Chrg thereafter JG FLATSAW
SERVICE TYPE I FS ! + IiOURLY 7.75 135.00 000 $37125
Flat Saw Service
Notes: 135 L_F- X 11" DEEP ASPHALT SLAB
20.00 0.00 520.00
FS LUMP 100
Fiat Saw Service
Not05: FUEL SURCHARGE
Sales Total
3391.25
Shipping 8 Handlau3
0.00
Misc. Charges
0.00
Tax Total
0.00
$391.25
Less Paid Amount
0.00
�11 f• -
$391.25
El Camino
Machine & Welding, LLC
296 EL CAMINO REAL SOUTH R E v E PR 758-8309
SALINAS. CALIFORNIA 93901 -4511 FAX (831) 758 -1448
" 1061
OORPOflATE OfFlOVE
SOLD TO'. Graniterock
P.O. Box 50001
Watsonville. CA 95077
Please remit to:
P.O. Box 7458
Spreckels, California 93962 -7458
INVOICE
INVOICE: IN031561
INVOICE DATE. Aug 16, 2012
P.O ie: PAVEX 4162 GILROY
WORKORDER 8: 50051
TERMS Net 30
DUE DATE: Sep 15.2012
DESCRIPTION
QUANTITY
PRICE
AMOUNT
FABRICATION LABOR & MATERIAL
1
540.00
540.00
Fabricate sidewalk reinforcement mounting plate per customer
instruction and drawing
Subtotal 540.00
FABRICATION LABOR AND ALL MATERIALS ARE TAXABLE.
Total Sales Tax 39.15
REPAIR AND INSTALLATION LABOR ARE NOT TAXABLE: A CURRENT RESALE CARD
MUST BE ON FILE FOR ALL RESALE ACCOUNTS.
TOTAL: 579.15
ALL BILLS ARE DUE AND PAYABLE WHEN PRESENTED.
Thank you
A FINANCE CHARGE OF 1 12% PER MONTH (18% EFFECTIVE ANNUAL RATE)
WILL BE ADDED TO ACCOUNTS 30 DAYS PAY DUE.
Customer Original
0 United' H 4. 5C.
Rentals Eo~&&
LOCATION #051
77 TARP CIRCLE
SAL,Tx", CA 93901
531-422-7411 831-422-5481 11-1
01 OILROY CROSSING
4J
_H
CA I 10TH s,r
l
x: 1.52!1..
p 1 GILROY, CA 95020
1`3 Office: 408-574-1400 Cell: 831-970-0206
141 PAVER CONSTRUCTION CO CA
INVOICES MAILED WEEKLY TO
00I AND DIANA
M SAN JOSE, CA 95136
81
RENTAL AGREEMENT
_J_I03599910
Customer Number 41.0n
�Agreement Date ('12511-
iRental out 9: 41. A:-1
Scheduled In I A:,:
jJob Location; IOTH ST, ;!1,rvy
Job Number 212'
P.O. Number 1162
jOrdered By 1.1.1 BER
'Written By U.Ru51jG2
Salesperson w;,j -1
DZI y
-k
L
1` AILER 51,�O
Nnf_icl F.yp
r-,- Fwivr-irrn, PR'.TRNET WTTH 1-.j,7n1,17,_Z1
FOR A1.11.
ri!-: AY A!)T1T1TT,--.j:j!. r-11.
L ii,x
........ ..
7
1401 ICL f OR RL% TAI. Or A MOTOR VIJW:CL: INS 4;UNIRAC- OFFERS. rt* AN ADDITIONAL ClaRtA. A DAMAGE WAIVER TO 1,1111" YOUR INANCu
t"It(i UtFORI, UCCVIWI�tt 114LU TO 011FICHA.-�11 114r 'IAMAGF WAIVkR. YOU MAY WISH To QETERMjNv WMIGER YOUR OWN INSURANCE FOR OAMAdE TO
LNCLIL AND ItIl %M(Mi#IT (,N TOIE EEL4l SURANCE AFFORCS YOU COVERAGE FOR UAMAGE V "It IMF I OF THE MUIOR
1) OR 1.1111 OF ME UOT.,,
I ItIL.0, IONIA 9 YOUR OWN PISURANCP COVERAGE. 114 PURCHASE OF III* "MACE WAIVE#, IS NOT MAIII 1 .11 All NAY BE -AIVIO OR (MCLwro,
M HEN? At F'Ro?r r F'O" P1 A P. 411 Mi'MAUCk t ^ i i t ✓. YaJ sh ,
h..-I U..I"f tip.- u
d
"a —q—
'w
PI.-4 II bl go it I'M Ir.
SIG14
DA I[ CUSTOMER NAME PRINKI) UNIIILD RENTALS REPRESENTATIVE 'Dk LIVERED By DATE
A FONT
COPY OF THIF rFnk-IS AND COND, I;ON-S
IS AVAII AftF JPON' REOLIEST
Graniterock • Crystal Enterprise
Customer: Pavex Const Intracompany
R378AA Intracompany, Job Cost report. Only trans. not
Project Manager: Matt Christie
exp. to JDE. (Project Manager vs Contractor Admin.)
Job: 4162
CustomerJobName: Gilroy Crossing Off Site Imp
Printed: 812012012 8:01:39AM
Description: Intrabranch Sales by Customer by Job by Account Code (Transactions not exported to JOE)
Date range selected:
No daterange. Display all transaction not exported to JOE
$-
S-
5.75
5.75
Customerls Selected:
02525
Souse Branch selected:
All
Graniterock.
Job selected:
All
JobNOS # selected:
Ticket. Product. Freight Add`1 Sol" Tax Gross Oleo Sale Price Lookup:.. Nand
Branch Date Number [JobNOS #] Job ii Description Qty NOM Prim $ And Qty IUOM Prim It Amt Truck rharg e. Rah Amt.... AIM 7 OW"a JobNOS Rim tick Pd-O
Matt Christie
811312012 4162.6025.004010
710 8113112 7160601 [560876] 4162 [TWOHj Ten Wheeler Off Haul
SubTotals for Product Code [TWOH] Ten Wheeler Off Haul 5.75 HR
SubTatalsfor Account Code 4162.6025.004010
8/1312012 Branch UOM Dsecription
Total Qty
710 HR ITWOH] Ten Wheeler Off Haul 5.75
Total 5.75
SubTotals for Job 4162
( N Fll)P:,YTl,U,PR0PKM 0Pl4RAtiTF.R0I'li
$ - 5.75 HR $ 85.00 $ 488.75 GX29924 $ - - % $ - $ 488.75 S $ 85.00 $ -
Total S Amount
Freight Cry
$-
S-
5.75
5.75
$ 48815 0.00 $ • $488.75
$ 488.75 0.00 $ - S 488.75
S Amoun[ $ Amount $ Amount $ Amount
$488.75
$468.75 S• $488.75
$ 485.75 S • S • $ 485.75
DAILY EXTRA WORK REPORT
City Of Gilroy
Contractor Job: 4162 - Gilroy Crossing Off Site Imp
work Performed By: Pavex Construction
Description of work: Placed Baserock In Median Island After Forms Went Up
cost code: 940013
Change order
Biting Number
Report Date
Perform Date
013
54.0
8/23/2012
8/15/2012
Labor Charges
Craft ID Employee Name
RT Hrs OT Hrs Subs Units
RT Rate
OT Rate Subs Rate
Extended
Labor Charges
RT Labor 312.47
Lot OE SUP1 V Aguilar
2.00
64.250
128.50
Lot OE OE4 A Andrade
2.00
59.860
119.72
OT Labor
0.00
L03 OE SUP1 DG Plummer
1.00
64.250
64.25
Equipment Charges
Equipment ID Description
RT Hrs OT Hrs
RT Rate
OT Rate Delay Factor
Extended
Subtotal Labor
Subsistence
312.47
0.00
E01 16338 Ford F250
2.00
19.980
39.96
Other Expenses
0.00
E02 15721 F150
2.00
19.980
39.96
MU 25.00%
78.12
E03 15807 3/4 Ton Pickup
1.00
19.980
19.98
Labor Total
390.59
Material/Specialist Work/Lump Sum or Unit Price Payment
Invoice No. Invoice Date Vendor Name/ Invoice Description
Units Unit Price
Extended
Equipment Charges
Mot United Rentals / Water Buffalo Rental
1.000 LS 173.20
173.20
Subtotal
99.90
MU 15.00%
Equipment Total
14.98
114.88
Material Charges
Subtotal 173.20
MU 15.00% 25.98
Material Total 199.18
Activity Total 704.65
Bill Total +
704.65
Page
NTS Universal Bill Form 010704 ovv roucrr - cvvwns.cum
DAILY EXTRA WORK REPORT
City Of Gilroy
contractor Job: 4162 - Gilroy Crossing Off Site Imp
Work Performed By: Aparico Concrete (For Pavex Construction)
Description of work: Form, Pour Median Island At NB 101 Offramp
Change order 013
Billing Number 64.0 Report Date 8/29/2012
Perform Date 8/28/2012
This Bill Has Been Plugged with No Details
Labor Charges
Equipment Charges
Material Charges
Activity Total 2,048.63
Subcontract Markup
Sc 10.00% 204.86
Bill Subtotal 2,263.49
Bill Total + 2,263.49
Page
NTS Universal Bill Form 010704 EWTOUch - EV101I13.com
I %
DAILY EXTRA WORK REPORT Job #: 11008 -05
Date Performed: 8/16/2012
Work Performed by: C. APARICIO CEMENT CO.
Description of Work: ADDITIONAL WHEELCHAIR RAMPS AT NORTHBOUND 101 OFFRAMP TO EAST 10TH ST
EQUIP.
NO.
EQUIPMENT
OT /Delay
Factor
HOURS
I
HOURLY I
RATE
EXTENDED _fT
AMOUNTS
LABOR
HOURS
I
HOURLY I
RATE
EXTENDED
AMOUNTS
2AXL
DUMP TRUCK #72
1
RT
OT
0
$ 44.53
$ -
$ -
$ -
0
P. AMEZCUA
RT
OT
2
$ 44.09
$ -
$ 68.18
$ -
2AXL
FLATBED TRUCK #55
1
RT
OT
0
$ 44.53
$ -
$ -
$ -
0
A. DELGADO
RT
OT
1
$ 44.09
$ -
$ 44.09
$ -
0
BACKHOE #9
1
RT
OT
0
$ 48.36
$ -
$ -
$ -
0
M. ESPINOSA
RT
OT
2
$ 44.09
$ -
$ 88.18
$
22 -25
TRANSPORT TRAILER
1
RT
OT
0
$ 5.75
$ -
$ -
$ -
0
M. FERREL
RT
OT
0
$ 59.62
$ -
$
$
00 -06
PICKUP TRUCK #40
1
RT
OT
2
$ 17.10
$ -
$ 34.20
$ -
0
R. JAUREGUI
RT
OT
0
$ 49.11
$
$
$
00 -06
PICKUP TRUCK #78
1
RT
OT
2
$ 17.10
$ -
$ 34.20
$ -
0
U. MARTINEZ
RT
OT
0
$ 44.09
$ -
$ -
$ -
0
0
1
RT
OT
$ -
$ -
$ -
$ -
0
J. ROMO
RT
OT
2
$ 51.31
$ -
$ 102.62
$ -
0
0
1
RT
OT
$ -
$ -
$ -
$ -
0
H. URENO
RT
OT
0
$ 49.11
$ -
$
$ -
0
0
1
RT
OT
$
$
$ -
$ -
0
J. URENO
RT
OT
2
$ 49.11
$ -
$ 98.22
$ -
0
0
1
RT
OT
$ -
$ -
$ -
$ -
0
R. URENO
RT
OT
0
$ 49.11
$ -
$ -
$ -
0
0
1
RT
OT
$ -
$ -
$ -
$ -
0
M. SOLTERO
RT
OT
0
$ 44.09
$ -
$ -
$ -
0
J. CARMONA
RT
OT
2
$ 44.09
$ -
$ 88.18
$
MATERIAL and/or WORK DONE BY SPECIALISTS
Description
No. Units
Unit Cost
Amount
Sub -Total Labor RT
Labor Surcharge RT
11%
$ 509.47
$0.00
$ 56.04
CONCRETE
5.00
CY
$113.25
$566.25
Sub -Total Labor OT
Labor Surcharge OT
11%
$ -
ARMORTILETACTILESURFACING
2.00
EA
$240.60
$481.20
$ -
$0.00
Subsistence
$0.00
ITOTAL COST OF LABOR $ 565.51
FUEL SURCHARGE
$68.40
2% OF EQUIP FEE
1 $1.71
1 $1.71
TOTAL COST OF EQUIPMENT, MATERIALS AND WORK $ 1,117.56
35% MARK -UP ON LABOR COST $ 197.93
15% MARK -UP ON EQUIP., MATERIAL AND WORK COST $ 167.63
TOTAL THIS REPORT $ 2,048.63
11008 -05
Project Name: Gilroy Crossing Offsite Improvements
City Of Gilroy
7387 Rosanna Street
Gilroy, CA 95020
FIELD ORDER
FIELD ORDER NO. 15
Project Name: GIROY CROSSING OFFSITE IMPROVEMENT
Contract Date: 02/22/2011
To Contractor: Granite Rock Company d.b.a Pavex Construction Division
Address: 411 Walker Street
Watsonville, CA 95076
DESCRIPTION OF WORK:
Project No: 11 -CDD -183
9/10/12
Pavex is follow the request and build the median island as stated in RFI #12 from the structural engineer. Moving
the west curb of the island, 2' to the east for better traffic clearances. Build the curb with an eased edge to match
the existing island.
Estimated Adjustment
Of Contract Sum:
Ron Barri / PM
(Name of Construction Manager/Title - typed or printed)
M
(Signature)
Date: 9/10H2012
Matt Christie / Proiect Manager
(Name of Contractor Representative /Title - typed or printed)
(Signature)
Date:
Estimated Adjustment
of Contract Time: 0
Note: This Field Order will be superseded by an allowance adjustment or a Change Order that will include the
scope of the change in the Work and any actual adjustments of the Contract Sum.
Attachment: none
DAILY EXTRA WORK REPORT
City Of Gilroy
Contractor Job:
Work Performed By:
Description of work:
4162 - Gilroy Crossing Off Site Imp
Pavex Construction
Demo, Graded, Rock, And Compact Curb Ramp At 7th & Eigleberry.
cost code: 940017
Remove Additional 18LF Of Sidewalk
Change Order
giving Number
Report Date
Perform Date
-0"
55.0
8/23/2012
8/20/2012
Labor Charges
Craft ID Employee Name
RT Hrs OT Hrs Subs Units RT Rate
OT Rate Subs Rate
Extended
Labor Charges
RT Labor 1,363.60
Lot OE OE4
A Andrade
8.00
59.860
478.88
X02 OE SUP1
DG Plummer
8.00 1.00
64.250
83.135
597.14
OT Labor
83.14
Loa LBR LBSP
ML Toccalini
8.00
46.340
370.72
Equipment Charges
Equipment ID Description
RT Hrs OT Hrs
RT Rate
OT Rate Delay Factor
Extended
Subtotal Labor
Subsistence
1,446.74
0.00
E01 15721
F150
8.00
19.980
159.84
Other Expenses
0.00
E02 15807
3/4 Ton Pickup
9.00
19.980
179.82
MU 25.00%
361.69
E03 15006
3/4 Ton Pickup
8.00
19.980
159.84
Labor Total
1,808.43
E04 14049
John Deere Loader 210
4.00
46.160
184.64
E05 16608
Mini Excavator Cat 305C
2.50
36.850
92.13
Equipment Charges
MateriallSpecialist Work/Lump Sum or Unit Price Payment
Invoice No. Invoice Date Vendor Name I Invoice Description
Units Unit Price
Extended
Subtotal
MU 15.00%
776.27
116.45
Mot
United Rentals / Water Buffalo Rental
1.000 LS 173.20
173.20
Equipment Total
892.72
Material Charges
Subtotal 173.20
Mu 15.00% 25.98
Material Total 199.18
Activity Total 2,900.33
Bill Total +
2,900.33
Page 1
NTS Universal i orm
e w I oucn - e werus. com
IM
PAVEX CONS7RUCTION CO -,A
INVOICES MAILED WEEKLY TO
KATHY AND DIANA
SAN JOSE, CA 95136
-"A I 'l; 'TAJI: '1'4AIL3P. BLcj
FXP-Sv-)
RENTAL AGREEMENT
- - - - L "05-99910
Customer Number 41SCOA
lAgreement Date
�Rental out 8
Scheduled in
I
iJob Location: GILRCY
Job Number :
,
P.O. Number -i
Ordered sy DWAYNE 7--
Written BY UR05 I jC-2
Salesperson .4
M I :1 lmul',
Dav
,reek
n
EXCES'St7E
-H ..
-,S FOR ALL.
AL J. 14E AV AL11.11TI—NA!, "'HARGi- Flo;
HAP:!.' A!.:. UN-rS
:t-1V1RO"?XVMTALC"AR4W
NU 41 #OR RENFAI 0' MOIM Vhl*�;LL- 1146rT
skPORE UeGAM1&GW1*TfR.N To rukoj X.CT.Or
VEO Ica IF %rkN3,;,= A" ADDITIONAL G-HARGE. A PAMAVE WAIVER To I MIT TOUR FINANCIAL RESPOHNIMLITY roR DAMAO& TO OR FHE�'j of TtIk Moron
41
YOU
k IM"R YOUR OWN WSURANCF'.. [;OVERAGE. MAY WIS" YOUR OWN WSURWE AFfORVS TOM COVERACE Fo
THE PUMC14ASEOP 710S OAAFAGE WAIVER 13 NOT MANDAJORy AND MAY RE A, RUAM%OLJQORTiRrTOfrj*UaIoR
1 ltfNtAL PWILCIAM P1 AN IS Not Ws,,IftAREkj VIE n OR D+cuNka
1.14x. H-
-77
Awf-,- "t,' U:
C"M—' "-d' f44—w. CL11L.- J."C ow., I Vwh b. 'q X,4, prp
"NUR SIGNATURE DAZE CUSTOMER NAME PRINTED -i'rLDRENTAIS�EP"EiEtiTATIVE.I.EL.VERE68Y OATE
A; ARC -R FONT. COPY OF THE TERMS AND CONDITIONS IS AVAR AOLL UPON REQUEST,
nited'
UW
Z-01CA7ZON 10SI
Oftnials ZZWo
37 TARP CIR.
SALIMS , CA $3901
ajl-422-7411
831-422-5901 FAX
4J 6i
--TLROY CROSSING
Cfi I
10TH ST
01
GILROY, CA 95020
k3
Office: 408 574-1400
Ce11: 831-970-0206
PAVEX CONS7RUCTION CO -,A
INVOICES MAILED WEEKLY TO
KATHY AND DIANA
SAN JOSE, CA 95136
-"A I 'l; 'TAJI: '1'4AIL3P. BLcj
FXP-Sv-)
RENTAL AGREEMENT
- - - - L "05-99910
Customer Number 41SCOA
lAgreement Date
�Rental out 8
Scheduled in
I
iJob Location: GILRCY
Job Number :
,
P.O. Number -i
Ordered sy DWAYNE 7--
Written BY UR05 I jC-2
Salesperson .4
M I :1 lmul',
Dav
,reek
n
EXCES'St7E
-H ..
-,S FOR ALL.
AL J. 14E AV AL11.11TI—NA!, "'HARGi- Flo;
HAP:!.' A!.:. UN-rS
:t-1V1RO"?XVMTALC"AR4W
NU 41 #OR RENFAI 0' MOIM Vhl*�;LL- 1146rT
skPORE UeGAM1&GW1*TfR.N To rukoj X.CT.Or
VEO Ica IF %rkN3,;,= A" ADDITIONAL G-HARGE. A PAMAVE WAIVER To I MIT TOUR FINANCIAL RESPOHNIMLITY roR DAMAO& TO OR FHE�'j of TtIk Moron
41
YOU
k IM"R YOUR OWN WSURANCF'.. [;OVERAGE. MAY WIS" YOUR OWN WSURWE AFfORVS TOM COVERACE Fo
THE PUMC14ASEOP 710S OAAFAGE WAIVER 13 NOT MANDAJORy AND MAY RE A, RUAM%OLJQORTiRrTOfrj*UaIoR
1 ltfNtAL PWILCIAM P1 AN IS Not Ws,,IftAREkj VIE n OR D+cuNka
1.14x. H-
-77
Awf-,- "t,' U:
C"M—' "-d' f44—w. CL11L.- J."C ow., I Vwh b. 'q X,4, prp
"NUR SIGNATURE DAZE CUSTOMER NAME PRINTED -i'rLDRENTAIS�EP"EiEtiTATIVE.I.EL.VERE68Y OATE
A; ARC -R FONT. COPY OF THE TERMS AND CONDITIONS IS AVAR AOLL UPON REQUEST,
DAILY EXTRA WORK REPORT
City Of Gilroy
Contractor Job: 4162 - Gilroy Crossing Off Site Imp
Work Performed By: Pavex Construction
Description of work: New Box For Wires At 7th Street
post code: 940017
Change Order
Billing Number
Report Date
Perform Date
017
56.0
8/23/2012
8/21/2012
Labor Charges
Craft ID Employee Name
RT Hrs OT Hrs Subs Units
RT Rate
OT Rate Subs Rate
Extended
Labor Charges
RT Labor 681.80
LUt OE SUP1 DG Plummer
4.00
64.250
257.00
Lot OE OE4 A Andrade
4.00
59.860
239.44
OT Labor
0.00
Los LBR LBSP ML Toccalini
4.00
46.340
185.36
Equipment Charges
Equipment ID Description
RT Hrs OT Hrs
RT Rate
OT Rate Delay Factor
Extended
Subtotal Labor
Subsistence
681.80
0.00
E01 15721 F150
4.00
19.980
79.92
Other Expenses
0.00
E02 15807 3/4 Ton Pickup
4.00
19.980
79.92
MU 25.00%
170.45
Eos 15006 3/4 Ton Pickup
4.00
19.980
79.92
Labor Total
852.25
Material/Specialist Work/Lump Sum or Unit Price Payment
Invoice No. Invoice Date Vendor Name / Invoice Description
Units Unit Price
Extended
Equipment Charges
Mot 166686 8/21/2012 Scotts Valley Sprinkler/ Box For Wires At 7th & Eigleberry
1.000 LS 41.61
41.61
Subtotal
239.76
MU 15.00%
Equipment Total
35.97
275.73
Material Charges
Subtotal 41.61
MU 15.00% 6.24
Material Total 47.85
Activity Total
1,175.83
Bill Total +
1,175.83
Page
NTS Universal Bill Form UIU7114 cvvWWI -
SCOTTS VALLEY SPRINKLER & PIPE SUPPLY, WAT.BRANCH
WATSONVILLE BRANCH
131 WALKER STREET
WATSONVILLE CA 95076
PHONE: (831) 728 -0446
WATSONVILLE STORE NOW OPEN 7 DAYS A WEEK
M -F 7:30AM-5PM SAT 8AM -5PM SUN 9AM -4PM
CURT NO: JOB NO: PURCHASE ORDER: REFERENCE: TERMS: CLERK:
1533 000 4162 PO # 4162 2% 10TH NET 11TH AH
DUE DATE: 9111/12 TERMINAL: 70
SOLD TO:
GRANITEROCK
P O BOX 50001
WATSONVILLE
831- 768 -2000
UGRNDIUG
CA 95077 -5001
SHIP TO:
PAGE NO 1
DATE I TIME:
8!21/12 8:44
RESALE NO: SY BBA 98- 045787
SALESPERSON: AH ART H
TAX: 004 CITY OF WATSONVILLE
INVOICE: 166686
LINE
SHIPPED
ORDERED
UM
SKU
DESCRIPTION
SUGG
UNITS
PRICE/ PER
EXTENSION
1
1
1
EA
F18
F -1 BOX 12 ROUND X 8 HIGH 33LB/8
36.95
1
21.20 /EA
21.20 C
2
1
1
EA
F18CLP
F -11F -8 CONC.LID "PLAIN" 9 LBS -3
26.95
1
17.24 /EA
17.24 C
or
U�J.D
'• AMOUNT CHARGED TO STORE ACCOUNT "
.83
TOT VVT: 42.00
IA]WCLt 30.44
NON - TAXABLE 0.00
SUBTOTAL 38.44
41.61
TAX AMOUNT 3.17
TOTAL 41.61
x'; k
eceived By
DAILY EXTRA WORK REPORT
City Of Gilroy
Contractor Job: 4162 - Gilroy Crossing Off Site Imp
Work Performed By: Pavex Construction
Description of work: Place AC At Lip Of Gutter To Plug Deep Section
change order
Billing Number
Report Date
Perform Date
017
59.0
8/27/2012
8/27/2012
Labor Charges
Craft ID Employee Name
RT Hrs
OT Hrs Subs Units RT Rate
OT Rate Subs Rate
Extended
Labor Charges
RT Labor 681.80
L01 OE SUP1 DG Plummer
4.00
1.00 64.250
83.135
340.14
L02 LBR LBSP ML Toccalini
4.00
46.340
185.36
OT Labor
83.14
Loa OE OE4 A Andrade
4.00
59.860
239.44
Equipment Charges
Equipment ID Description
RT Hrs
OT Hrs RT Rate
OT Rate Delay Factor
Extended
Subtotal Labor
Subsistence
764.94
0.00
E01 15721 F150
4.00
19.980
79.92
Other Expenses
0.00
E02 15006 3/4 Ton Pickup
4.00
19.980
79.92
MU 25.00%
191.24
E03 15807 3/4 Ton Pickup
5.00
19.980
99.90
Labor Total
956.18
E04 14049 John Deere Loader 210
4.00
46.160
184.64
Material /Specialist Work/Lump Sum or Unit Price Payment
Invoice No. Invoice Date Vendor Name/ Invoice Description
Units Unit Price
Extended
Equipment Charges
Subtotal 444.38
M01 1054019 8/27/2012 Graniterock Company / 3/4" AC
4.000 T 69.50
278.00
MU 15.00%
66.67
M02 Graniterock Company / 10 Wheeler
4.000 H 85.00
340.00
Equipment Total
511.05
Material Charges
Subtotal 618.00
MU 15.00% 92.70
Material Total 710.70
Activity Total
2,177.93
Bill Total +
2,177.93
Page 1
NTS Universal Bill Form 010704 ENrouch - EWBillls.com
DAILY EXTRA WORK REPORT
City Of Gilroy
contractor Job: 4162 - Gilroy Crossing Off Site Imp
Work Performed By: Aparico Concrete (For Pavex Construction)
Description or work: Additional ADA Ramp At 7th & Eigleberry, Additioanl 18LF S/W
Change order 017
Billing Number 65.0 Report Date 8/29/2012
Perform Date 8/28/2012
This Bill Has Been Plugged with No Details
Labor Charges
Equipment Charges
Material Charges
Activity Total 4,502.64
Subcontract Markup
Sc 10.00% 450.26
Bill Subtotal 4,952.90
Bill Total + 4,952.90
Page 1
NTS Universal Bill Form 010704 ewroucn - cwwns.com
f
DAILY EXTRA WORK REPORT Job #: 11008 -06
Date Performed. 8/22/2012
Work Performed by. C. APARICIO CEMENT CO.
Description of Work: ADDITIONAL WHEELCHAIR RAMPS, SIDEWALK, AND CURB & GUTTER (2 EA) INSTALLED AT 7TH AND E/GLEBERRY ST
EQUIP.
NO.
EQUIPMENT
OT /Delay
Factor
HOURS
HOURLY
RATE
EXTENDED
AMOUNTS
LABOR
HOURS
HOURLY
RATE
EXTENDED
AMOUNTS
2AXL
DUMP TRUCK #72
1
RT
OT
0
$ 44.53
$ -
$ -
$ -
0
P. AMEZCUA
RT
OT
8
$ 44.09
$ -
$ 352.72
$ -
2AXL
FLATBED TRUCK #55
1
RT
OT
0
$ 44.53
$ -
$ -
$ -
0
A. DELGADO
RT
OT
8
$ 44.09
$ -
$ 352.72
$
0
BACKHOE #9
1
RT
OT
0
$ 48.36
$ -
$ -
$ -
0
M. ESPINOSA
RT
OT
0
$ 44.09
$ -
$ -
$ -
22 -25
TRANSPORT TRAILER
1
RT
OT
0
$ 5.75
$ -
$ -
$ -
0
M. FERREL
RT
OT
0
$ 59.62
$ -
$ -
$ -
00 -06
PICKUP TRUCK #40
1
RT
OT
8
$ 17.10
$ -
$ 136.80
$ -
0
R. JAUREGUI
RT
OT
0
$ 49.11
$ -
$ -
$ -
00 -06
PICKUP TRUCK #78
1
RT
OT
8
$ 17.10
$ -
$ 136.80
$ -
0
U. MARTINEZ
RT
OT
0
$ 44.09
$
$ -
is -
0
0
1
RT
OT
$
$
$
$
0
J. ROMO
RT
OT
8
$ 51.31
$ -
$ 410.48
$ -
0
0
1
RT
OT
$
$
$
$
0
H. URENO
RT
OT
8
$ 49.11
$ -
$ 392.88
$ -
0
0
1
RT
OT
$ -
is
$
$
0
URENO
RT
OT
8
1
$ 49.11
$ -
$ 392.88
$ -
0
0
1
RT
OT
$
$
$ -
$
0
R. URENO
RT
OT
0
$ 49.11
$ -
$ -
$
0
0
1
RT
OT
$ -
$
$
$
0
M. SOLTERO
RT
OT
0
$ 44.09
$ -
$
$ -
0
0
RT
OT
0
$ -
$ -
$
is
MATERIAL and/or WORK DONE BY SPECIALISTS
Description
No. Units
Unit Cost
Amount
Sub -Total Labor RT
Labor Surcharge RT
11%
$ 1,901.68
$0.00
$ 209.18
CONCRETE
5.00
CY
$111.09
$555.45
Sub -Total Labor OT
Labor Surcharge OT
11%
$ -
ARMORTILE TACTILE SURFACING
2.00
EA
$300.74
$601.48
$ -
$0.00
Subsistence
$0.00
ITOTAL COST OF LABOR $ 2,110.86
FUEL SURCHARGE
$273.60
2% OF EQUIP FEE
$6.84
$6.84
TOTAL COST OF EQUIPMENT, MATERIALS AND WORK $ 1,437.37
35% MARK -UP ON LABOR COST $ 738.80
15% MARK -UP ON EQUIP., MATERIAL AND WORK COST $ 215.61
TOTAL THIS REPORT $ -4,602.64
11008 -06
r,ENERM CONTRACIOR • LICENSE 422
PAVER CONSTRUCTION DIVISION
mav S. 20 11
City of Gilroy, Public Works Department
51 Rosanna Street
Gilroy� ("A 95020
Attn: F)avld StUbchaer
scillor ("!-vit Eal
gineer
Re: Gilroy (11"rossing 011'site Improvements, Projec, No. I I -('DD-1 83
Yap ex Job No, 4162
Su j: Remobilization Cost
Mt-. StUbehaer,
Letter #1
As discussed in the pre construction meeting. we cannot proceed NvIth working on the
proiect as we had schedifled due to the lack ot'permits. As such, we have proceeded wO
construction in the areas where we could, 7"' Street and t'igleberry, Street. 'rhis conSITLIC[Ion shall
be completed no later than May 9, 2011
Additionally, we could not cornplete the handicap ramps. curt) and gutter in the
I
southeastem corner of the intersection at 7'" :street and Eigleberry Street due to a PGM," utility
conflict drat requires rcdes,
gii of'thal corner,
There "ill lie rernobilization costs to start our work again. 'I'liese costs will be l'onvarded
to the OtY of Gilroy tor reimbursement.
Please caH me at 831 .7WO094 ii you have any questions,
Sincerely,
Uran
, nerock Conipany dba P:IWX ('011SU'LICUL)n I)WiSiOn
Christopher Soriano
Project Engineer
Matt Christie
From: Karl Philipovitch
Sent: Tuesday, September 04, 2012 3:33 PM
To: Matt Christie
Subject: FW: Gilroy Crossing
From: David Stubchaer [ mai Ito: David.Stubchaer @ci.giIroy.ca. us]
Sent: Thursday, January 26, 2012 4:01 PM
To: Karl Philipovitch
Cc: Al Signorotti; 'James Kuhn'
Subject: RE: Gilroy Crossing
How does this sound?
1. Current project questions (101h St. sidewalk) — deal with Nova first. They look at pay requests, initial (or
otherwise recommend approval), and send on to me for payment. Nova is good at keeping the city in the
loop. If they have questions, they usually ask. We meet with them once a week usually.
2. Anything to do with delay from last project, extra concrete work we briefly talked about '(will ''have change order
for that), final access ramp at 7 1h & Eigleberry, go directly to me.
3. Any issues with Nova, come to me.
4. We will need to meet jointly with Nova about issues I had on the plans. If I recall correctly, I pointed them out in
our field visit, but it's been a while. I haven't really gone over them with Nova yet.
5. The city or Nova can prepare a change order, but the city must sign off on all change orders before they are
official.
6. My city cell phone number is (408)710 -8518
7. Al Signorotti is the inspector on the city side — he did the inspection for the Eigleberry sidewalk work. I may
refer some things to him. I expect he will be doing spot checking during construction as well.
Thanks, David
From: Karl Philipovitch [ mai Ito: kphilipovitch @Graniterock.com]
Sent: Thursday, January 26, 2012 1:19 PM
To: David Stubchaer
Cc: Kyle McLean
Subject: RE: Gilroy Crossing
David,
So should we address all changes, request for payment, authorization etc to you? We are happy to work with Nova in
the field but at this point all change requests will need to come from you. Thanks. KP
From: David Stubchaer [mailto: David. Stu bchaer@ci. gilroy.ca. us]
Sent: Thursday, January 26, 2012 12:41 PM
To: Karl Philipovitch
Subject: RE: Gilroy Crossing
Hi Karl. Point taken. The city did hire Nova Partners to act on behalf of the city, but it is still a city project. Nova
was hired mainly for 2 reasons: (1) This project involves federal funds which have more stringent requirements that a
locally funded project, and more paperwork, DBE, daily diaries, etc., which Nova will be addressing, and (2) The city does
not have the staff to meet those federal requirements.
I've seen emails regarding the utilities and detector loops in Caltrans right of way. I can see how that might affect the
start date, but hopefully Caltrans will address /respond quickly (hopefully, the noticed these issues when they reviewed
the plans and issued the permits — they are usually quite thorough).
Thanks, David
From: Karl Philipovitch [ mailto :kphilipovitch @Graniterock.com]
Sent: Thursday, January 26, 2012 12:17 PM
To: David Stubchaer
Cc: Kyle McLean
Subject: Gilroy Crossing
David,
We are glad just like you guys that we are close to beginning work again. A few things to discuss:
We are happy to work with Nova Partners but our contract is with the City of Gilroy. Please send us in writing that Nova
is the Cities authorized representative and has authority to proceed on your behalf. They were not involved in the first
phase of this project. Also there are several issues that Kyle is working on (mostly utilities with Caltrans) that may impact
the start date. We will review tomorrow and be in contact. Thanks. KP
Karl Philipovitch
Area Manager
Graniterock - Pavex Construction
kr)hilipovitch(a graniterock.com
Office 831 - 768 -2744
Cell 831 - 750 -0541
Fax 831 - 768 -2701
Christopher Soriano
L5/2012 10:34 AM#
Fri 4/2,212011 4M
'david,stub&aer@KjtyaNilroy.org
Karl Ph ilipovitch.; Br ant Edelman; AJ Signor gib - Ray Esping
a A
1W W
Nease 3dvise o n how th e cityw; o-u Id We to p ro cee i�-
R M-
RMI,
Christopher Soriano
Cranite Rook Company I
PavexConstruc-tion Divislo-
RAAKOOM 9,11 -79n n aqA I
DAILY EXTRA WORK REPORT
City Of Gilroy
contractor Job: 4162 - Gilroy Crossing Off Site Imp
Work Performed By: Pavex Construction
Description of work: Grout Light Pole As Direct By Field Order #17
Change Order
Bitting Number
Report Date
Perform Date
019
58.0
8/24/2012
8/23/2012
Labor Charges
Craft ID Employee Name
RT Hrs OT Hrs Subs Units
RT Rate
OT Rate Subs Rate
Extended
Labor Charges
RT Labor 681.80
L01 OE SUP1 DG Plummer
4.00 1.00
64.250
83.135
340.14
L02 OE OE4 A Andrade
4.00
59.860
239.44
OT Labor
83.14
L03 LBR LBSP ML Toccalini
4.00
46.340
185.36
Equipment Charges
Equipment ID Description
RT Hrs OT Hrs
RT Rate
OT Rate Delay Factor
Extended
Subtotal Labor
Subsistence
764.94
0.00
E01 15721 F150
4.00
19.980
79.92
Other Expenses
0.00
E02 15807 3/4 Ton Pickup
5.00
19.980
99.90
MU 25.00%
191.24
E03 15006 3/4 Ton Pickup
4.00
19.980
79.92
Labor Total
956.18
Material /Specialist Work/Lump Sum or Unit Price Payment
Invoice No. Invoice Date Vendor Name / Invoice Description
Units Unit Price
Extended
Equipment Charges
Mot 42546 8/21/2012 Graniterock Company / Masons Mix 80LB -
Grout For Light Base
1.000 LS 15.60
15.60
Subtotal
259.74
MU 15.00%
Equipment Total
38.97
298.71
Material Charges
Subtotal 15.60
MU 15.00% 2.34
Material Total 17.94
Activity Total
1,272.83
Bill Total +
1,272.83
Page 1
NTS Universal Bill Form 010704 crvr Ouch - crvanrs.com
Graniterock • Crystal Enterprise
Customer: Pavex Const Intracompany
R378AA Intracompany, Job Cost report. Only trans. not
Project Manager: Matt Christie
exp. to JDE. (Project Manager vs Contractor Admin.)
Job: 4162
CustomerJobName: Gilroy Crossing Off Site Imp
Printed: 8/23/2012 8:01:59AM
Description: Intrabranch Sales by Customer by Job by Account Code (Transactions not exported to JDE)
Date range selected:
No daterange. Display all transaction not exported to JDE
Customerls Selected:
02525
Souse Branch selected:
All
Graniterock.
Job selected:
All
JobNOS 0 selected:
Ticket Product. Freight Addl Sal Tax Lfross Dias saw farina Lookup'..:. Nand
Branch Dale Number IJ011403 M1 Job s Description txy NOM Price $ And City NOM Price S Amt Truck cttww Rif Amt Ant 4. etMw JobN08 Price lit Pdead.
Matt Christie
812112012 NEED TASKCODE
311B 8121/12 42546 [5608761 4162 11000656] Masons Mix 8OLS- 1000656 2.00 Sack $ 7.80 $ 15.60 - $ - $ - S - - % $ - $ 15.60 S
SubTotals for Product Code (10006561 Masons Mix BOLB- 1000656 2.00 Sack $ 15.60 $ . 0.00 4- $ 15.50
SubTotals for Account Code NEED TASKCODE $ 15.60 $ - 0.00 $ - $ 15.60
8/2112 01 2 Branch UOM Description Total Cry l Total $ Amount Freight Cry $ Amoun[ $ Amount $ Amount S Amount
j
311 B Sack 110006561 Masons Mix 801-&1000656 2.D0 $15.60 $15.60
Total 2.00 $15.60 S- III f• $15.60
SubTotals for Job 4162 $ 15.60 $ - S - $
(I)NF'IDENTLU PROPERT1 M GP VNITEROI'K
Project Name: Gilroy Crossing Offsite Improvements
FIELD ORDER
City Of Gilroy
7387 Rosanna Street
Gilroy, CA 95020
FIELD ORDER NO. 17
Project Name: GIROY CROSSING OFFSITE IMPROVEMENT
Contract Date: 02/22/2011
To Contractor: Granite Rock Company d.b.a Pavex Construction Division
Address: 411 Walker Street
Watsonville, CA 95076
DESCRIPTION OF WORK:
Project No: 11 -CDD -183
9/20/12
This field directive is for Pavex to pack non - shrink grout underneath the existing light pole near the new western
ADA ramp.
Estimated Adjustment
Of Contract Sum:
Ron Barri / PM
(Name of Construction Manager /Title - typed or printed)
By:
(Signature)
Date: 9/20//2012
Matt Christie / Project Manager
(Name of Contractor Representative/Title - typed or printed)
(Signature)
Date:
Estimated Adjustment
of Contract Time: 0
Note: This Field Order will be superseded by an allowance adjustment or a Change Order that will include the
scope of the change in the Work and any actual adjustments of the Contract Sum.
Attachment: none
1
DAILY EXTRA WORK REPORT
City Of Gilroy
Contractor Job: 4162 - Gilroy Crossing Off Site Imp
Work Performed By: Aparico Concrete (For Pavex Construction)
Description of work: Add Vertical Curb Around Electrical Light Boxes By N/B HWY 101 Offramp
Change Order
Billing Number 43.0
Report Date 7/30/2012
Perform Date 7/17/2012
This Bill Has Been Plugged with No Details
Labor Charges
Equipment Charges
Material Charges
Activity Total 2,326.61
Subcontract Markup
Sc 10.00% 232.66
Bill subtotal 2,559.27
Bill Total + 2,559.27
Page t
NTS UnIVBKal 01111 Form UIUM4 cvvruucn - cvvoms.currr
ZLV
C. Aparicio Cement Contractor
506 Phelan Avenue
San Jose CA 95112 -2506
4082864580
License: 267391
Billed To: Pavex Construction
411 WALKER STREET
WATSONVILLE CA 95076
Due Date: 08/23/2012
Fl iC��
:r,
Terms: 30DY
Invoice
Invoice* 11008 -EW3
Date: 07/24/2012
GILROY CROSSING OFFSITE IMPROV
GILROY CA 95020
Ref#: 4162
Description Quantity Price Amount
EXTRA WORK
ADD VERTICAL CURB AROUND ELECTRICAL
STREET LIGHT BOXES ON SOUTH SIDE OF 10TH ST
EAST OF HWY 101 OFF RAMP ADD TRENCH DRAIN
AT ELECTRICAL STRET LIGHT BOX CURB 1.0000 2,326.610000 2,326.61
SEE ATTACHED SPREAD SHEET
Invoices are due and payable 30 days from date of invoice. Please make
checks payable to C. Aparicio Cement Contractor, Inc.
Thank you for your prompt payment!
Invoice Total:
2,326.61
Retention:
232.66
Amount Paid:
0.00
Amount Due
2,093.95
DAILY EXTRA WORK REPORT Job#/: 11008
Work Performed by: C. APARICIO CEMENT CO. Date Performed., 7/17/2012 GILROY
Description of Work: ADD VERTICAL CURB AROUND ELECTRICAL STREET LIGHT BOXES ON SOUTH SIDE OF 10TH ST EAST OF HWY 101 CROSSING
OFF RAMP. ADD TPFNCH nAAiAl A =1 =91"MinAI a -rn�-rr ,
EQUIP.
NO.
2AXL
2AXL
0
22 -25
00-06
00-06
0
EQUIPMENT
DUMP TRUCK #72
FLATBED TRUCK #55
BACKHOE #9
TRANSPORT TRAILER
PICKUP TRUCK #40
PICKUP TRUCK 978
0
OT/Delay
Factor
1
1
1
1
1
1
HOURS
RT 0
OT
RT 3
OT
RT 0
OT
RT 0
OT
FOT T 3
RT 2
OT
RT
OT
HOURLY
RATE
$ 44.53
S
$ 44.53
$
S 48.36
S
$ 5.75
S
$ 17.10
S
S 17.10
$ -
$
S
EXTENDED
AMOUNTS
5 -
$
S 133.59
S
$
$ -
$
S
$ 51.30
$
S 34.20
$
$ -
$
0
0
0
0
0
0
0
LABOR
HOURS
HOURLY
RATE
EXTENDED
AMOUNTS
P. AMEZCUA
DELGADO
ESPINOSA
M. FERREL
R. JAUREGUI
U. MARTINEZ
J. ROMO
H.URENO
J. URENO
R.URENO
M SOLTERO
__L
J. CARMONA
RT
OT
1
S 44.09
$
S 44.09
$
RT
OT
RT
OT
2
0
$ 44.09
$ _
$ 88 -18
$
$ 44.09
S
$
$
RT
OT
3
$ 59.62
$
S 178.86
$
RT
OT
$ t9 1
S
$ 49.11
$
RT
OT
3
S 44.09
$
$ 132.27
$
RT
CT
3
$ 51.31
$ -
S 153.93
S
0
0
0
0
D
0
0
0
1
1
1
1
RT
OT
RT
OT
RT
OT
RT
O - -r
5 _
$
$
S
$
$
S
S
$
$
S
S
$
$
5
0
0
0
0
RT
OT
2
S 49.11
$ -
$ 98.22
$
RT
OT
2
$ 49.11
$
$ 98.22
$
RT
OT
RT
OT
1
0
I
$ 49.11
S
$ 44.09
S
S 49.11
$
S
S
0
RT
1
S 4911
$ 49.11
MATERIAL and/or WORK DONE BY SPECIALISTS
OT
$
S -
Descnp,ian
No Units
Unit Cost
Amount
Sub -Total Labor RT
S 941.10
TRENCH DRAIN WITH GRATES
3.00
METER
$115.26
$0.00
$345.78
Labor Surcharge RT
Sub -Total Labor OT
Labor Surcharge OT
11%
11%
S 103, 52
$
CONCRETE
Cy
$113.25
$226.50
$ _
$0.00
Subsistence
' -T
$0 00
OTAL COST OF LABOR $ 1 044 62
FUEL SURCHARGE 5219 09 2';. OF EQUIP FEE 55.48 $5.48
TOTAL COST OF EQUIPMENT. MATERIALS AND WORK
$ 796.85
35$, MARK -UP ON LABOR COST $ 385.62
15% MARK -UP ON EQUIP, MATERIAL AND WORK COST S 119.53
TOTAL THIS REPORT $ 2,326.61
11008- 03.xis
DAILY EXTRA WORK REPORT
City Of Gilroy
Contractor Job: 4162 - Gilroy Crossing Off Site Imp
Work Performed By: Aparico Concrete (For Pavex Construction)
Description of work: Night Premium For Night Pour As Required By City Of Gilroy (Aparcio Ohly)
Change order W
Billing Number 44,0
Report Date 7/30/2012
Perform Date 7/07/2012
This Bill Has Been Plugged with No Details
Labor Charges
Equipment Charges
Material Charges
Activity Total 898.68
Subcontract Markup
Sc 10.00% 89.87
Bill subtotal 988.55
Bill Total + 988.55
Page 1
NTS Universal Bill Form 010704 twroucn - cwwrrs.com
aI
C. Aparicio Cement Contractor Invoice
Phelan Avenue
San Jose CA 95112 -2506 A o e
408 286 -4580 „ Invoice* 11008 -EW2
v r Date: 07/17/2012
License: 267391
Billed To: Pavex Construction Project: GILROY CROSSING OFFSITE IMPROV
411 WALKER STREET
WATSONVILLE CA 95076 GILROY CA 95020
Due Date: 08/16/2012
Terms: 30DY
Reft 4162
Description Quantity Price Amount
EXTRA WORK
10TH ST GILROY - NIGHT POUR PREMIUM
AS REQUIRED BY CITY OF GILROY
Invoices are due and payable 30 days from date of invoice. Please make
checks payable to C. Apancio Cement Contractor, Inc.
Thank you for your prompt payment.!
1.0000 898.680000
898.68
Invoice Total:
898.68
Retention:
89.87
Amount Paid:
0.00
Amount Due
808.81
DAILY EXTRA WORK REPORT
Work Performed by: C. APAR /C10 CEMENT CO.
Description of Work: 10TH ST GILROY • NIGHT POUR PREMIUM, AS REQUIRED BY CITY OF GILROY
Job #: 11008
Date Performed: 7/712012
PAVEX
EQUIP.
NO.
EQUIPMENT
OT /Delay
Factor
HOURS
HOURLY
RATE
EXTENDED
AMOUNTS
❑
LABOR
HOURS
HOURLY
RATE
EXTENDED
AMOUNTS
2AXL
DUMP TRUCK #72
1
RT
OT
0
$ 44.53
$ -
$
$
0
P. AMEZCUA
RT
OT
8
$ 3.00
$ -
$ 24.00
$ -
2AXL
FLATBED TRUCK 1155
1
RT
OT
0
$ 44.53
S
$
$ -
0
A.DELGADO
RT
OT
8
$ 3.00
$ -
S 247
$ -
0
BACKHOE #9
1
RT
OT
0
S 48.36
S -
$
$
0
M. ESPINOSA
RT
OT
8
$ 3.00
S -
$ 24.00
$
22 -25
TRANSPORT TRAILER
1
RT
OT
0
$ 5.75
$ -
$
$
0
M.FERREL
RT
OT
0
$
$
$
$ -
00 -06
PICKUP TRUCK #40
1
RT
OT
$ 17,10
$ -
S
$
0
R. JAUREGUI
RT
OT
8
$ 300
$ -
$ 24.00
$
00 -06
PICKUP TRUCK #78
1
RT
OT
$ 17.10
S
$
is
0
U. MARTINEZ
RT
OT
0
$ -
$
$
$
0
0
1
RT
OT
$
$
$
$
0
J. ROMO
RT
OT
8
$ 3.00
$ -
$ 24.00
$ -
0
0
1
RT
QT
$
I $
S
$
0
H. URENO
RT
OT
8
$ 3.00
$ -
$ 24.00
$ -
0
0
1
RT
OT
$
$
$
$
0
J. URENO
RT
OT
8
$ 3.00
$
$ 24.00
$ -
0
0
1
RT
OT
S
$
$
$
0
R. URENO
RT
OT
8
$ 3.00
S -
$ 24.00
$ -
0
0
1
RT
OT
$
$
S
$
0
M.SOLTERO
RT
OT
8
5 300
E
$ 24.00
$ -
0
0
RT
OT
0
$
$ -
$
$ -
MATERIAL and/or WORK DONE BY SPECIALISTS
Description
No Units
Unit Cost
Amount
Sub -Total Labor RT
Labor Surcharge RT
11%
$ 216.00
$0.00
$ 23.76
CONCRETE PLANT OPENING SURCHG.
1.00
S500.00
$500.00
Sub -Total Labor OT
Labor Surcharge OT
11%
$ -
$0.00
$ -
$0.00
Subsistence
$0.00
ITOTAL COST OF LABOR $ 239.78
FUEL SURCHARGE
$0.00
2% OF EQUIP FEE
$0.00
$O.Ool
TOTAL COST OF EQUIPMENT, MATERIALS AND WORK $ 500.00
35% MARK -UP ON LABOR COST $ 83.92
159b MARK -UP ON EQUIP., MATERIAL AND WORK COST $ 75.00
TOTAL THIS REPORT 898.88
force account with rates.xls
DAILY EXTRA WORK REPORT
City Of Gilroy
Contractor Job: 4162 - Gilroy Crossing Off Site Imp
Work Performed By: Pavex Construction
Description of work: Paint EB S/W Tie In Form
Change order "3
Billing Number 61.0 Report Date 8/29/2012
Perform Date 8/28/2012
Labor Charges
Craft ID Employee Name
RT Hrs
OT Hrs Subs Units RT Rate OT Rate Subs Rate
Extended
Labor charges
RT Labor 321.25
L01 OE SUP1 DG Plummer
5.00
64.250
321.25
Equipment Charges
OT Labor 0.00
Equipment ID Description
RT Hrs
OT Hrs RT Rate OT Rate Delay Factor
Extended
E01 15807 314 Ton Pickup
5.00
19.980
99.90
Subtotal Labor 321.25
Subsistence 0.00
Other Expenses 0.00
MU 25.00% 80.31
Labor Total 401.56
Equipment Charges
Subtotal 99.90
MU 15.00% 14.99
Equipment Total 114.89
Material Charges
Activity Total 516.45
Bill Total + 516.45
Page f
NTS Universal Bip Form 010704
Zi
DAILY EXTRA WORK REPORT
City Of Gilroy
Contractor Job: 4162 - Gilroy Crossing Off Site Imp
Work Performed By: Aparico Concrete (For Pavex Construction)
Description of work: Add Sidewalk Conform And Install Iron Form At Eastbound Bridge Sidewalk Tie In
Change order 013
Billing Number 63.0
Report Date 8/29/2012
Perform Date 8/28/2012
This Bill Has Been Plugged with No Details
Labor Charges
Equipment Charges
Material Charges
Activity Total 515.25
Subcontract Markup
SC 10.00% 51.53
Bill subtotal 566.78
Bill Total + 566.78
Page 1
NTS Universal Bill Form 010704 twroucn - tvmirs.com
DAILY EXTRA WORK REPORT Job #: 11008 -04
Date Performed: 8/16/2012
Work Performed by: C. APARICIO CEMENT CO.
Description of Work: ADD SIDEWALK CONFORM AND INSTALL IRON SCUFF PLATE AT BRIDGE ABUTMENT
EQUIP.
NO.
EQUIPMENT
OT /Delay
Factor
HOURS
HOURLY
RATE
EXTENDED
AMOUNTS
LABOR T70URS
I HOURLY
RATE
EXTENDED
AMOUNTS
2AXL
DUMP TRUCK #72
1
RT
OT
0
$ 44.53
$
$
$ -
0
P. AMEZCUA
RT
OT
2
$ 44.09
$ -
$ 88.18
$ -
2AXL
FLATBED TRUCK #55
1
RT
OT
0
$ 44.53
$ -
$
$ -
0
A.DELGADO
RT
OT
0
$ 44.09
$ -
$
$ -
0
BACKHOE #9
1
RT
OT
0
$ 48.36
$ -
$
$ -
0
M. ESPINOSA
RT
OT
1
$ 44.09
$ -
$ 44.09
$ -
22 -25
TRANSPORT TRAILER
1
RT
OT
0
$ 5.75
$ -
$
$
0
M. FERREL
RT
OT
0
$ 59.62
$
$ -
$ -
00-06
PICKUP TRUCK #40
1
RT
OT
0
$ 17.10
$ -
$ -
$
0
R. JAUREGUI
RT
OT
0
$ 49.11
$ -
$ -
$ -
00 -06
PICKUP TRUCK #78
1
RT
OT
0
$ 17.10
$ -
$ -
$
0
U. MARTINEZ
RT
OT
0
$ 44.09
$ -
$ -
$
0
0
1
RT
OT
$
$
$ -
$
0
J. ROMO
RT
OT
2
$ 51.31
$ -
$ 102.62
$ -
0
0
1
RT
OT
$
$ -
$ -
$ -
0
H. URENO
RT
OT
0
$ 49.11
$ -
$ -
$ -
0
0
1
RT
OT
$
$ -
$ -
$ -
0
J. URENO
RT
OT
0
$ 49.11
$
$ -
$
0
0
1
RT
OT
$ -
$
$ -
$ -
0
R. URENO
RT
OT
0
$ 49.11
$ -
$ -
$ -
0
0
1
RT
OT
$ -
$
$ -
$ -
0
M. SOLTERO
RT
OT
0
$ 44.09
$ -
$
$ -
0
J. CARMONA
RT
OT
0.5
$ 44.09
$ -
$ 22.05
$ -
MATERIAL and /or WORK DONE BY SPECIALISTS
Description
No. Units
Unit Cost
Amount
Sub -Total Labor RT
Labor Surcharge RT
11%
$ 256.94
$0.00
$ 28.26
CONCRETE
1.00
CY
$113.25
$113.25
Sub -Total Labor OT
Labor Surcharge 0T
11%
$ -
$0.00
$ -
$0.00
r]
Subsistence
$0.00
OTAL COST OF LABOR $ 285.20
FUEL SURCHARGE
1 $0.00
2% OF EQUIP FEE
$0.00
$0.00
TOTAL COST OF EQUIPMENT, MATERIALS AND WORK $ 113.25
35% MARK -UP ON LABOR COST $ 89.82
15% MARK -UP ON EQUIP., MATERIAL AND WORK COST $ 16.99
TOTAL THIS REPORT $ 616.26
11008 -04
DAILY EXTRA WORK REPORT
City Of Gilroy
Contractor Job:
Work Performed BY:
Description of work:
4162 - Gilroy Crossing Off Site Imp
PaVeX Construction
Baserock Islands After Forms Had Been Set
Labor Charges
Craft ID Employee Name
L01 OE SUP1
V Aguilar
L02 OE OE4
_
A Andrade
Loa OE SUP1
_
DG Plummer
Equipment Charges
Equipment ID Description
E01 16338
Ford F250
E02 15721 - - --
- _
F150 -- - --
Eo3 15807
3/4 Ton Pickup
_
E04 16439
_
John Deere 21OLE Skip Loader__
Material /Specialist Work/Lump Sum or Unit Price Payment
Invoice No Invoice Date Vendor Name / Invoice Descri on
Mot
United Rentals / Water Buffalo Rental
RT Hrs OT Hrs
2.00
2.00_______
1.00
RT Hrs OT Hrs
2.00
2.00 _
1.00
2.00
cost code: 940013
RT Rate OT Rate Subs Rate
64.25_0_ -- -- -
59.860
64.250 -_- --
RT Rate __OT Rate Delay Factor
19.980
19.980
19.980 --
46.160
Units __ Unit Price
1.000 LS 173.20
Change Order
03T
Billing Number
66.0
Report Date
8/31/2012
Perform Date
8/15/2012
Labor Charges
Extended RT Labor
312.47
128.50
119.72 j OT Labor
0.00
64.25
Subtotal Labor
312.47
Extended j Subsistence
0.00
39.96 Other Expenses
0.00
39.96 MU 25.00%
78.12
19.98 j Labor Total
390.59
92.32
Equipment Charges
Extended Subtotal
192.22
173.20 Mu 15.00%
28.83
-' Equipment Total
221.05
Material Charges
Subtotal
173.20
MU 15.00%
25.98
Material Total
199.18
Activity Total
810.82
Bill Total + 810.821
Page t I
EWTouch - EWBills. com
Z5
) Granite Rock vmaV
mJose. CA 95136
31:(408)574'1*00 ~
,ax: (4on
— 0�H���� �����G�
�ou� � ��«on�v� ~°~,,."~ . ��.==
`��
Date: ' -- �
paoe�_c/
_��� _ ____N/! ^y om F mnommox u
opmorinmn: -��^ ' . �xvs:«��----~~^'~~'"°�"»swv �y oco# -----
_____ ___� ^^^"". ��'vmm>e -- �-- Task Code,
Fy. -�Iber
Name Class ST
Job Note-r
�
Description sz�
or
12 1
» ' � oascnpflon
��
I NO
r--------__�_____ / —T----
/ | —
----'------�--___+_
41
Vendor Uo.-vj
As an auth
onzed representative of
�xtra work on a time and material basis. - - - - - - - - - - - I am authorizing Granite Rock Company d.b.a.
work s in addition to any contract quantities or items. Pavex CorsINctio-I Divissior to rform
Date
Cold
OIL United* . RSC
Rentals EquirmidA84111
LOCATZOAr #051
37 TARP CZRCLE
SALIVAS CA 5390.
U31-422:7411 631-422-5981 vAx
I! ►1 III i Ill�lllliilllllllllllll� lllllllllllill I III
(0:
4J �j'ILROY CROSS.,'NG
Jll
1')7H ST
of GILRO'Y, CA 95020
1-3! -
Office: 408-:)74 1400 Cell: 831-970-0206
)41 PAVEX CONSTRUC'PION CO C-A
!1,Pj0ICF,S MAILED W_"!.:'KLY TO
KATHY :-.DID DIANA
SAN JOS17, CA 99136
IC„
RENTAL AGREEMENT
A 103 - 59991.0
Customer Number
Agreement Date
;Rental Out 6
'Scheduled in 1/1
;Job Location:
Job Number
P.O. Number
1Ordered By
,Written By
Salesperson
%
S 1�
ij I r
1 iA
7. Z
:L P,
M A "07"A 10ti 11115 CON INACT FOR AN AOUITICMAL CH)IRGE, A DAMAGC WAIVER TO it.
V, UL1,111, 1 •VHL 1111-H 11,11 tilt CIAMAUL WAPILk. YOU MAY WiSi; IT YOUR "I"ANCIAt RESPOMS1111101y I'OR DAMAnE 10 T,.R !HL, I
`3 DETERM'NU W"I'T"ER YOUR OWN INSURANCE AfIONUS YOU COVI RA,:E fCIN UAMA,.t IU IjR jill, 1 1); j CI f,TUH
.Fo,,;:, F .?.I) 1 I 06VUL11LILL UNDER YOUR 11 I-wR,Nrr COVERAGE. IlIt PURCHASE Of THIS DAMAGE WAIVER 15 NOT MAND^lwy A
NFAIL I1h1I)1`.1I7,1qQ`YP, .... ... .... AND MAY BE WAIVED OR FHFCLINITT,�
_'I 11 .,.! __ 4.6"!'. P_i C."t . ... . ....
.. ........ ! �"- '1 1
..... I .... ... P
4:.,:. Y
ji% 1. t., I t, vi T.V.
4—kR Sf*(.`NA I )—Rr Unit' CUSTOMER NAME PRINTfO
UNJILD Al-NTAIS REPRESENTAtIVEtULLIVERFC; BY DATE
OF T-;! 7r1%`I'_; AND
iS A'/Ail -61 f, _;r`,_IN rlr0UF'_T