Loading...
HomeMy WebLinkAboutRBF Consulting - Agreement for Santa Teresa Blvd. Widening Project - Addendum No. 4-f March 5, 2001 JN 35- 100063.005 Ms. Kristi Abrams Traffic Engineer CITY OF GILROY 7351 Rosanna Street Gilroy, CA 95020 -6197 Subject: Addendum #04, Santa Teresa Boulevard Dear Ms. Abrams: In response to your request, RBF Consulting is pleased to present this addendum to provide additional design services for the improvements of Santa Teresa Boulevard. This scope of work provides for separating Mantelli Drive from the current plan set into a separate bid document and for providing for a traffic signal and intersection improvements at the intersection of Santa Teresa Boulevard and Mantelli Drive. This scope of work further provides for revising the existing Santa Teresa Boulevard "Ultimate" Improvement Plans to show Mantelli Drive and the traffic signal at the intersection of Santa Teresa Boulevard as existing improvements. Enclosed for your review are the following exhibits: Scope of Services, Exhibit "A" and Proposed Compensation, Exhibit "B ". Should you have any questions, please do not hesitate to call me. Sincerely, IV/t,& /'ate lWilliam J. C s, P Senior Asso H: \PDATA \35100063 \Proposal\Add4.wpd cc: Accounting RBF John Zellmer RBF PLANNING DESIGN t CONSTRUCTION 1981 North Broadway, Suite 235, Walnut Creek, CA 94596 -3817 ■ 925.906.1460 ■ Fax 925.906.1465 Offices located throughout California, Arizona & Nevada ■ www.RBF.com printed an recycled paper RBF Consulting Contract Agreement for JN 35- 100063.005 EXHIBIT "A" SCOPE OF WORK SANTA TERESA BOULEVARD WIDENING AND MANTELLI DRIVE GAP CLOSURE PROJECT ADDENDUM #4 SEPARATE BID PACKAGE FOR MANTELLI DRIVE PHASE I ENGINEERING TASK 1.0 GEOMETRIC APPROVAL DRAWINGS March 5, 2001 Page 2 of 8 Consultant will prepare geometric approval drawings at the intersection of Santa Teresa Boulevard and Mantelli Drive. The geometric approval drawings will illustrate the transitions, striping and join conditions from the existing condition at Santa Teresa Boulevard to the ultimate curb return location at the intersection of Mantelli Drive. It is anticipated that no hardscape medians will be developed on Santa Teresa Boulevard rather left turn pockets on Santa Teresa Boulevard will be striped. The geometric approval drawings will, in schematic format, illustrate the location of the traffic signal mast heads. Consultant will gain Cities approval of the preliminary drawings before commencing with final plans, specifications and estimates. TASK 1.1 STREET IMPROVEMENT PLANS (Mantelli Drive Bid Set) Consultant will assemble previously prepared street improvement and related plans into new plan set for the construction of the Mantelli Drive project. They include: Plan Intersection Detail Plan and Profile (Mantelli) Water Line Plan Storm Drain Plan Sound Wall Plan Estimated Number of Sheets 1 1 1 1 1 TOTAL 5 RBF Consulting Contract Agreement for JN 35- 100063.005 TASK 1.2 March 5, 2001 Page 3 of 8 Consultant will prepare new street improvement plans to accompany the previously assembled plan sheets to complete a plan set. They include: Plan Estimated Number of Sheets Title Sheet 1 Typical Section and Details 1 Plan and Profile (Santa Teresa Blvd.) 1 New Storm Drain Lateral 1 TOTAL 4 TRAFFIC IMPROVEMENT PLANS (MANTELLI DRIVE) Consultant will assemble previously prepared traffic improvement plans into new plan set for the construction of the Mantelli Drive project. They include: Plan Mantelli Drive Striping Plan Street Light Plan Estimated Number of Sheets 1 1 TOTAL 2 Consultant will prepare new traffic improvement plans to accompany the previously assembled plan sheets to complete the plan set. They include: Plan Traffic Signal Modification Plan Santa Teresa Blvd. Striping Plan Estimated Number of Sheets 1 1 TOTAL 2 TASK 1.3 REVISE EXISTING SANTA TERESA BOULEVARD STREET IMPROVEMENT PLAN SET Consultant will revise the previously prepared Santa Teresa Boulevard Street Improvement Plan Set and other related plans to reflect the construction of Mantelli Drive. The modifications to the existing plan set includes: • Modifying the existing base topo to reflect Mantelli Drive and the intersection of Santa Teresa Boulevard as constructed. • Modifying the Santa Teresa Boulevard Plan and Profile Sheets to reflect the construction of the intersection of Santa Teresa and Mantelli Drive. • Modifying Storm Drain Plans to reflect construction of Mantelli Drive. • Modifying Typical Sections Sheets deleting Mantelli Drive sections along RBF Consulting March 5, 2001 Contract Agreement for JN 35- 100063.005 Page 4 of 8 with modifying other sheets referencing Mantelli Drive. TASK 1.4 REVISE EXISTING SANTA TERESA BOULEVARD TRAFFIC IMPROVEMENT PLAN SET Consultant will revise the previously prepared Santa Teresa Boulevard Traffic Improvement Plan Set to reflect the construction of Mantelli Drive. The modifications to the existing plan set includes: Modifying the now existing Traffic Signal Plan to reflect the full street improvements of Santa Teresa Boulevard Modify Striping Plans, Traffic Control Plans and Street Light Plans to reflect the construction of Mantelli Drive TASK 1.5 TRAFFIC SIGNAL TIMING PLANS As part of the RBF Project Team, Hartzog & Crabill Inc.(HCI), shall prepare a Traffic Signal Timing Plan for the traffic signal at the following location: - Santa Teresa Boulevard at Mantelli Drive (new traffic signal) Three copies of the timing sheets for the project intersection will be provided to the City. Products: Timing Sheets for the Project Intersection TASK 1.6 INTERSECTION TURNING MOVEMENT TRAFFIC COUNTS In order to develop the signal timing, intersection turning movement traffic counts will be taken for the morning, mid -day and afternoon peak hour at the Mantelli intersection. It is estimated that the City will provide twenty -four hour traffic counts to assist in the development of the signal timing plans. Product: 1. Morning, Mid -day and Afternoon Intersection Turning Movement Traffic Counts (1 intersection) Exclusions — Any work relating to the following items are specifically excluded from the engineering services but may be added as additional services for an additional fee: RBF Consulting Contract Agreement for JN 35- 100063.005 • Left Turn /Right Turn Storage Report • Additional Traffic Engineering Reports • Subconsultant Meeting Attendance • Additional Peak Hour Traffic Counts • Twenty -Four Hour Traffic Counts • Additional Timing Sheets and Coordination Plans TASK 1.7 DRY UTILITY NOTIFICATIONS March 5, 2001 Page 5 of 8 Consultant will identify other utility owners within the sphere of the project which may be affected by the proposed improvements. Consultant will provide coordination interface to establish controls for utilities that would be included within the right -of -way limits, identify agencies responsible for the design and construction or relocation of said utilities and contact each agency to determine what utilities relocation efforts are required by this project. This task excludes preparation of dry utility relocation plans which will be prepared by others, if required. Utility potholing, if required, will be by City forces or the serving utility as appropriate. Consultant will request information and notify utility at appropriate milestones as necessary. TASK 1.8 FINAL QUANTITY AND COST ESTIMATES Consultant will prepare final quantity take off and cost estimates for each plan submittal at 90% and 100 %. One composite quantity and cost estimate will be provided. The final quantity take off will be utilized in the preparation of the bid schedule. TASK 1.9 SPECIFICATIONS Consultant will prepare contract documents in accordance with the requirements of the City of Gilroy. The City will provide its current `boilerplate" contract forms, general conditions, and general provisions on a diskette in Word format. TASK 1.10 PROJECT MEETINGS Consultant will attend up to one(1) coordination meetings with the City and other agencies during the implementation of this phase of work. RBF Consulting Contract Agreement for JN 35- 100063.005 EXCLUSIONS The following are excluded from this scope of work as part of this addendum: March 5, 2001 Page 6 of S 1. Utility Relocation Plans other than water relocation plans. 2. Storm Water Pollution Prevention Plan /Notice of Intent. 3. Construction staking, inspection, administration, construction quantity calculations and management. 4. Interconnect Plans 5. Traffic Control Plans 6. Construction Support Services 7. As -Built Drawings 8. Any item not specifically identified RBF Consulting March 5, 2001 Contract Agreement for JN 35- 100063.005 Page 7 of 8 EXHIBIT "B" "PAYMENT SCHEDULE" SANTA TERESA BOULEVARD WIDENING AND MANTELM DRIVE GAP CLOSURE PROJECT ADDENDUM #04 The total payment to CONSULTANT for all work, service, material, equipment and incidentals necessary for performing and completing the Tasks set forth in this agreement, shall be for the sum of CITY shall compensate CONSULTANT in proportion to the services performed and invoiced to the CITY as outlined below, subject to Article 4 of this agreement. SEPARATE BID PACKAGE FOR MANTELLI DRIVE TASK DESCRIPTION FEE Phase I ENGINEERING Task 1.0 Geometric Approval Drawings $2,592.00 Task1.1 Street Improvement Plans (Mantelli Drive Bid Set) $6,628.00 Task 1.2 Traffic Improvement Plans (Mantelli Drive Bid Set) $5,808.00 Task 1.3 Revise Existing STB Street Improvement Plan Set $4,008.00 Task 1.4 Revise Existing STB Traffic Improvement Plan Set $5,508.00 Task 1.5 Traffic Signal Timing Plan $1,610.00 Task 1.6 Intersection Turning Movement Counts $698.00 Task 1.7 Dry Utility Notifications $1,464.00 Task 1.8 Final Quantity and Cost Estimates $1,704.00 Task 1.9 Specifications $2,556.00 Task 1.10 Project Meetings $1,072.00 Total Professional Fee $33,648.00 RBF Consulting Contract Agreement for JN 35- 100063.005 March 5, 2001 Page 8 of 8 Blueprinting, reproduction, messenger service and other direct expenses will be charged as additional costs plus a fifteen percent (15 %) handling fee. A Subconsultant Management Fee of fifteen percent (15 %) will be added to the direct cost of any subconsultant services to provide for the costs of administration, subconsultant consultation and insurance. These charges will be invoiced against previous authorizations. The fees proposed herein shall apply until December 31, 2001. Due to ever - changing costs, Consultant will increase those portions of the contract fee for which work must still be completed after December 31, 2001, by ten - percent (10 %). Santa Teresa Boulevard Widening Project Addendum #4 Separate Bid Package For Mantelli Drive Prepared For: City of Gilroy Prepared By: RBF Consulting Job No. 35- 100063.005 Date: January 11, 2001 Prepared By: William Conyers Task No. Task Principal Hours Project Manager Hours Project Engineer Hours Design Engineer Hours Cadd Technician Hours Clerical Hours Survey Crew Hours Total Hours Fee Total PHASE I ENGINEERING Task 1.0 Geometric Approval Drawings 2 6 0 20 0 0 0 28 $2,592.00 Task 1.1 Street Improvement Plans Mantelli Drive Bid Set 2 8 0 52 20 0 0 82 $6,628.00 Task 1.2 Traffic Improvement Plans Mantelli Drive Bid Set 01 8 32 0 24 01 0 64 $5,808.00 Task 1.3 Revise Existing Santa Teresa Blvd. Street Imp. Plan Set 0 4 0 32 16 0 0 52 $4,008.00 Task 1.4 Revise Existing Santa Teresa Blvd. Traffic Imp. Plan Set 0 10 32 0 16 0 0 58 $5,508.00 Task 1.5 Traffic Signal Timing Plans 0 0 0 20 0 2 0 22 $1,610.00 Task 1.6 Intersectioon Turning Movement Traffic Counts 0 0 0 8 2 0 0 $698.00 Task 1.7 Dry Utility Notification 0 12 0 0 0 0 0 12 $1,464.00 Task 1.8 Final Quantity and Cost Estimates 0 4 0 16 0 0 0 20 $1,704.00 Task 1.9 S ecifications 0 18 0 0 0 8 0 26 $2,556.00 Task 1.10 Project Meetings 2 6 0 0 0 0 0 8 $1,072.00 Subtotal Phase 1 6 76 64 148 76 12 0 372 $33,646.00 Hourly Rate $170.00 $122.00 $100.00 $76.00 $68.00 $45.00 $178.00 Fee Total $1,020.00 $9,272.00 $6,400.00 $11,248.00 $5,168.00 $540.00 $0.00 $33,648.00