HomeMy WebLinkAboutRBF Consulting - Agreement for Santa Teresa Blvd. Widening Project - Addendum No. 6( 35
WF
CONSULTING
June 7, 2001
Revised July 2, 2001 JN 35- 100063.007
Ms. Kristi Abrams
Traffic Engineer
CITY OF GILROY
7351 Rosanna Street
Gilroy, CA 95020 -6197
Subject: Addendum #6, Santa Teresa Boulevard
Dear Ms. Abrams:
In response to your request, RBF Consulting is pleased to present this addendum to
provide additional design services for the improvements of Santa Teresa Boulevard. The
services include 1) conduct field surveys and finalize geometrics for Santa Teresa
Boulevard between Day Road East and Day Road West 2) prepare dry utility relocation
plans for Santa Teresa Boulevard. An additional budget for reimburseable expense has
been included in this addendum. This reimburseable expense budget is for the entire
Santa Teresa Boulevard project with the anticipated processing for the Mantelli Drive Gap
Closure Project and the remaining efforts on Santa Teresa Boulevard.
Enclosed for your review are the following exhibits: Scope of Services, Exhibit "A" and
Proposed Compensation, Exhibit "B ".
Should you have any questions, please do not hesitate to call me.
Sincerely,
Q
�
W.-LC�C c �--- --
William J. Cony,
Senior Associ td
H:\PDATA \35100063
cc: Accounting
1pir��
wpd
RBF
PLANNING K DESIGN E; CONSTRUCTION
1981 North Broadway, Suite 235, Walnut Creek, CA 94596 -3817 ■ 925.906.1460 ■ Fax 925.906.1465
Offices located throughout California, Arizona & Nevada ■ www.RBF.com
- -d o, ,ew, as papa,
RBF Consulting July 2 , 2001
Contract Agreement for JN 35- 100063.007 Page 2 of 5
EXHIBIT "A"
SCOPE OF WORK
SANTA TERESA BOULEVARD WIDENING
TASK 1.0 GEOMETRIC APPROVAL DRAWINGS
TASK 1.1 FIELD TOPOGRAPHIC SURVEYS
Consultant will conduct field topographic surveys for Santa Teresa Boulevard
between Day Road East and 500' north of Day Road West. Topographic
surveys will extend 300' east on Day Road East and 500' west on Day Road
West. Locations of surface features will be collected including utility
structures and other manmade features. Consultant will prepare a
topographic map file in AutoCAD, Version 14 format derived from the field
survey. Mapping will be a scale of 1" = 40'. A electronic file will be
transmitted to the City upon completion of the mapping.
TASK 1.2 RIGHT OF WAY CALCULATIONS
Consultant will research, assemble existing right of way maps and plats and
calculate in the existing right of way of Santa Teresa Boulevard from Day
Road East and 500' north of Day Road West and Day Road East for 400'
and Day Road West for 600' feet. Specifically excluded from this scope of
work is the preparation of any legal descriptions and exhibits for any new
right of way that may need to be acquired to complete the utility relocation
requirements.
TASK 1.3 GEOMETRIC APPROVAL DRAWINGS
Consultant will prepare geometric approval drawings for Santa Teresa
Boulevard from Day Road East to 500' north of Day Road West. The
intersections of Day Road East and Day Road West with Santa Teresa
Boulevard will be reconfigured to provide for a ninety degree intersections.
The intersections will be designed for a 35 mph approach design speed
utilizing a 600' radius approach curves.
TASK 1.4 BASE DRAWINGS
Consultant will prepare double loaded base drawings at a scale of 1" = 40'
from 1000' south of Sunrise Drive to 500' north of Day Road West. Base
drawing will incorporate approved geometric drawing showing ultimate
improvements and topographic information. Consultant will notify dry utilities
and incorporate existing utilities into base drawings. Base drawings will be
transmitted to RGA for their use in preparing dry utility relocation drawings.
RBF Consulting July 2, 2001
Contract Agreement for JN 35- 100063.007 Page 3 of 5
TASK 2.0 UNDERGROUNDING OF DRY UTILITIES
TASK 2.1 UTILITY COMPOSITE DESIGN
Consultantwill prepare utility composite (P.G.& E., Telephone, CATV) design
and related consulting services for this project. The design shall consist of
a composite for approximately 91 00' along Santa Teresa Boulevard from 1s`
Street to Day Road West; a new joint trench composite for Mantelli Drive
from Santa Teresa Blvd. to Zinnia, and an interim design for the intersection
improvements at Santa Teresa Boulevard and Mantelli Drive. Consultant
shall provide the following services:
• Expedite and coordinate project design with utility companies.
• Perform field analysis and review
• Conduct eight (8) design team meetings
• Conduct utility engineering meetings.
• Complete composite construction drawings (65% & 100 %)
• Perform value engineering
• Prepare Form "B"
• Prepare bid package and specifications and unit price bid form
• Review and analyze utility contracts and fees.
• Schedule and attend pre- construction meeting and job start up.
Consultant services to be provided by RGA Utility Consultants, Inc.
TASK 2.2 DRY UTILITY DESIGN COORDINATION
Consultant will provide design coordination and management services to
facilitate the activities of RGA. Consultant shall:
• Review with RGA the constraints of the project and problem solve for
location of joint trench
• Attend utility meetings as required to develop joint trench design.
(Anticipate two meetings)
• Incorporate joint trench designs, specifications and bid forms into bid
documents being prepared by the consultant.
• Services apply to both the Mantelli Drive Gap Closure Project and the
Santa Teresa Boulevard Widening Project.
• Provide for additional government processing with the City, County
and Water District as a result of the joint trench.
TASK 2.3 MEETING ATTENDANCE
Consultant will attend up to four (4) coordination meetings with the City and
other agencies during the implementation of this additional work. Consultant
will arrange meetings, provide discussion materials and agendas and
develop and distribute meeting notes.
RBF Consulting
Contract Agreement for JN 35- 100063.007
EXCLUSIONS
July 2, 2001
Page 4 of 5
The following are excluded from this additional scope of work as part of this addendum:
1. Drainage Studies
2. Geotechnical Reports
3. Final Street, Drainage, & Traffic Improvement Plans Between 1000' south of
Sunrise Drive to Day Road West
4. Extension of EIR to Day Road West
5. Construction staking, inspection, administration, construction quantity calculations
and management.
6. Legal Descriptions and Exhibits
7. Any item not specifically identified above.
RBF Consulting July 2, 2001
Contract Agreement for JN 35- 100063.007 Page 5 of 5
EXHIBIT "B"
"PAYMENT SCHEDULE"
SANTA TERESA BOULEVARD WIDENING
ADDENDUM #6
The total payment to CONSULTANT for all work, service, material, equipment and
incidentals necessary for performing and completing the Tasks set forth in this agreement,
shall be for the sum of $98,538.00 plus a budget of $10,000.00 for reimburseable
expenses.
CITY shall compensate CONSULTANT in proportion to the services performed and
invoiced to the CITY as outlined below, subject to Article 4 of this agreement.
TASK DESCRIPTION FEE
Task 1.0 GEOMETRIC APPROVAL DRAWINGS
Task 1.1 Field Topographic Surveys $6,526.00
Task 1.2 Right of Way Calculations $2,100.00
Task 1.3 Geometric Approval Drawings $3,592.00
Task 1.4 Base Drawings $2,100.00
Subtotal $14,318.00
Task 2.0 UNDERGROUNDING OF DRY UTILITIES
Task 2.1 Utility Composite Design $73,600.00
Task 2.2 Dry Utility Design Coordination $7,140.00
Task 2.3 Meeting Attendance $3,480.00
Subtotal $84,220.00
Subtotal Professional Fee $98,538.00
Reimbursable Expenses $10.000.00
Total Professional Fee $108,538.00
Blueprinting, reproduction, messenger service and other direct expenses will be charged
as additional costs plus a fifteen percent (15 %) handling fee. A Subconsultant
Management Fee of fifteen percent (15 %) has be added to the direct cost of any
subconsultant services to provide for the costs of administration, subconsultant
consultation and insurance. No escalation of fees for remaining work shall apply in the
year 2002.
Santa Teresa Boulevard Widening Project
Addendum #6
Dry Utility Consultation
Prepared For: City of Gilroy
Prepared By: RBF Consulting
Job ND. 35- 100063.007
Date: July 2, 2001
Prepared By: William Conyers
Task No.
Task
Sub
Consultant
Fee -15%)
Project
Manager
Hours
Project
Engineer
Hours
Design
Engineer
Hours
Cadd
Technician
Hours
Clerical
Hours
Survey
Crew Hours
Total
Hours
Fee Total
Task 1.0
GEOMETRIC APPROVAL DRAWINGS
Task 1.0
Field Topographic Suwe s
4
12
0
0
0
27
43
$6,526.00
Task 1.1
Right of Way Calculations
4
16
0
0
20
$2,100.00
Task 1.2
Geometric Approval Drawings
8
01
32
0
0
0
40
$3,592.00
Task 1.3
Base Drawings
4
01
20
0
0
0
24
$2,100.00
Subtotal Task 1.0
20
281
52
0
0
27
127
$14,318.00
Task 2.0
UNDERGROUNDING OF DRY UTILITIES
Task 1.5
Utility Composite Design
$73,600.00
$73,600.00
Task 1.6
Dry Utility Design Coordination
48
0
0
0
4
0
52
$7,140.00
Task 1.7
Meeting Attendance
24
0
0
0
0
0
24
$3,480.00
Subtotal Task 2.0
72
0
0
0
4
0
76
$84,220.00
Totals
92
281
52
0
4
27
203
Hourly Rate
$145.00
$95.00
$76.00
$68.00
$45.00
$178.00
Fee Total
$73,600.00
$13,340.00
$2,660.00
$3,952.00
$0.00
$180.00
$4,806.00
$98,538.00