City of Gilroy
Engineering Division
7351 Rosanna St., Gilroy, CA 95020
Phone (408)846-0450; Fax (408) 846-0429
CHANGE ORDER NO. 25
To contract for:
Christmas Hill Park Improvements
Projectl 03-CDD-lOO
Contractor:
Penna-Green Hydroseeding
Contract Date: 7/17/2002
This order shall become effective when it has been signed by the City Administrator, City Engineer,
Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to
The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned
to him as his authority to proceed with the work.
Description of Work
Uvas Phase n - Trail
Ten ft addition to retaining wall west end per city field direction
Addition footing excavation, re-set form and rehar at east end
per city directive
Additional footing excavation at west end, mobilization and haulage
for additions to retaining wall at west and east ends
Collapsible bollards (4) at Miller crossinb, (2) at Luchessa Crossing
per city directive
Additional concrete split rail f 8 ft. not installed as per plan
Additional striping and signag 1 ea not installed as per plan
$6,412.40
$2,111.00
$1,640.00
$600.00
$2,560.00
$1,513.00
$14.836.40
All requirements of the original Contract Docwnents shall apply to the above work except as specifically
modified by this Change Order, The contract time shall not extend unless expressly provided for in this
Change Order.
ACCEPIED BY:
Original Contract Price
Previous Change Orders to Date
Total to Date
This Change Order
Total Change Orders to Date
Revised Contract Price
Cost Percentage
$1,556,117.00
$825,813.47 53.0%
$2,381,930.47
$14,836.40
$840,649,87 54.0% * JS#-
$2,396,766.87
I (We) agree to make the above change
subject to the terms of this Change Order
for the NET INCREASE of $14,836.40
*Requires emergency authorization if greater than 25%.
Date: (~/c;s--
'Z.os-