Loading...
HomeMy WebLinkAboutPerma Green Hydroseeding - Ranch Site Veteran Monument Project No. 05-CDD-115 - Change Order No. 1 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 1 ~ , , To contract for: Ranch Site Veterans Monument, Project No. 05-CDD-115 eMGtNEER\NG Contractor: Penna Green Hydroseeing Contract Date: 12/1/2005 PECt:YJ:D This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. \! ~ ('; \ t - . .,<, 'R. \NG 'f".....,. \1;:;\,.. , E. N !,J. \ \~ ,-'- Description of Work Brass Lettering for dedication board for a net increase of$2,187.34. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall be extended by fifty-seven (57) calendar days due to the weather and custom lead time for dedication band and lettering, which extends completion date to 5/26/06. I (We) agree to make the above change subject to the terms of this Change Order for the NET INCREASE of $2,187.34 Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost $71,210.00 $0.00 $71,210.00 $2,187.34 $2,187.34 $73,397.34 P.M. Percentage Initial 0.00% L~~~ ~CTOR By: Date: -f'~b 3.07% ACCEPTED BY: ,.- JI-(}(P RECOMMENDED BY: 0-/-CJ~ Date 57Jl 4 'Q; c!)J- Pro] ct Engineer Date 17 - J/- t) eo Date 5/412006