Loading...
HomeMy WebLinkAboutSandis - 2012 Agreement - Amendment No. 1AMENDMENT TO THE AGREEMENT FOR SERVICES BETWEEN CITY OF GILROY AND SANDIS FOR ON -CALL CIVIL ENGINEERING SERVICES DATED OCTOBER 1, 2012 AMENDMENT NO. 1 This Amendment shall become effective when it has been signed by the City Administrator, Project Manager, and Consultant. All copies forwarded to Consultant for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Consultant's copy will be returned to him as his authority to proceed with the work. This Amendment extends the term of the Agreement for Services between the City of Gilroy and SANDIS, dated OCTOBER 1, 2012 to OCTOBER 1, 2015. The scope of work authorized includes a full review of the City of Gilroy's Storm Water Management Plan and a strategic planning for the implementation. See attached scope of work and fee. All requirements of the original Agreement Documents shall apply to the above work except as specifically modified by this Amendment. The contract time shall not extend unless expressly provided for in this Amendment. SANDIS hereby agrees to make the above changes subject to the terms of this Amendment for ongoing construction management services. nt: ACCEPTE I9 JI(I I I I CIVIL O ERS SURVEYORS PLANNERS October 10, 2012 Promo No. 612444 Teresa Mack, P.E. Development Engineer, Engineering Division City of Gilroy Public Works Department 7351 Rosanna Street Gilroy, CA 95020 T: 408.846.0255 E: teresa.mack @ci.gilroy.ca.us RE: STORM WATER MANAGEMENT PLAN PLAN REVIEW, STRATEGIC PLANNING & SCHEDULE DEVELOPMENT GILROY, CA Dear Teresa, Thank you for the opportunity to submit our proposal to provide Engineering Services for the above referenced project. Our proposal is based on our project meeting Tuesday, October 9, 2012. During our meeting we discussed the current state of the city's storm water management plan, the basics of what needs to be completed, and a rough of magnitude schedule to deliver services to assist the city in completing the effort. Based on our discussion and a phased approach to delivering services, we propose to provide the following scope of services: PHASE 1 ENGINEERING SERVICES $10,200 ♦ Review the existing Gilroy storm water management plan documents and website information, development standards, related city ordinances, county initiatives and Regional Water Quality Control Board permits. ♦ Develop a list of new initiatives such as a revised storm water management plan, update website information, staff training, revised development requirements, revised standard details and standard specifications. ♦ Develop a preliminary schedule of implementation and deliverables, as well as a prioritized list of items for completion in future phases of service. ♦ Conduct a bi- weekly progress meeting with City of Gilroy Engineering staff. ♦ Prepare letter report describing the above items and provide example deliverables where appropriate to illustrate options. ♦ We expect this first phase will start on or about October 22, 2012 and be completed in approximately four weeks. SCOPE OF WORK ASSUMPTIONS ♦ Our work will be performed using MS Word, MS Excel, MS PowerPoint, Adobe Acrobat and AutoCAD Version 2013 where applicable. SAN D I i PCIVIL LANNER5151EERS October 10, 2012 Teresa Mack, P.E. City of Gilroy Public Works Department Promo No. 612444 Page No. 2 TERMS AND CONDITIONS This proposal and the attached Agreement for Professional Services will become our contract for services upon execution. The scope of work included in the proposal is limited to the specific scope included and specified only. Any exclusions listed are for clarity only and do not represent a complete list of exclusions to the scope. Any additional scope proposed or done other than that listed in the proposal as included shall be done as an additional service. This proposal is firm for thirty (30) days from the date of this letter. Our services will be provided for the amounts listed above and will be performed under the Provisions of the Agreement for Professional Surveying and Engineering Services. Pursuant to state law, no work can proceed on this project without written acceptance. Please return one signed copy of this proposal and one signed copy of the Agreement for Professional Surveying and Engineering Services to our Oakland office as our authorization to proceed. Regards, SANDIS 1 J rey M. Setera, P.E. V President JMS /nn Approved CITY OF GILROY By: Title: Date: Attachments: Agreement for Professional Surveying and Engineering Services CC: Ken Olcott, P.E., SANDIS President • ® S A N D I S PCIVIL ENGIN LANNERS EERS SANDIS STANDARD HOURLY CHARGE RATES - OAKLAND OFFICE Effective June 1, 2012 through August 31, 2013 HIGH DEFINITION SCANNING / 3 -D MODELING SERVICES Laser Scanning Field: 2- Person $245.00 Laser Scanning Field: 1- Person $215.00 3 -D Model / Scan Post Processing Project Manager $135.00 3 -D Scanning Technician Level 1 $105.00 3 -D Scanning Technician Level II $115.00 3 -D Scanning Technician Level III $125.00 ENGINEERING SERVICES Clerical $50.00 Computer / Engineer Technician Level 1 $55.00 Level 11 $70.00 Level 111 $85.00 Design Engineer Level 1 $65.00 Level 11 $75.00 Level 111 $85.00 Project Engineer Level 1 $85.00 Survey Manager Level 11 $95.00 1- Person Survey Crew Level III $110.00 Traffic Engineer Level 1 $105.00 2- Person Survey Crew with Apprentice Level 11 $115.00 3- Person Survey Crew Level III $125.00 Project Manager $140.00 Associate Principal / Senior Project Manager / Senior Traffic Engineer $175.00 Principal $250.00 SURVEYING SERVICES Computer / Surveying Technician Level 1 $55.00 Level 11 $70.00 Level 111 $85.00 Project Surveyor Level 1 $85.00 Level 11 $95.00 Level 111 $105.00 Senior Project Surveyor $140.00 Survey Manager $150.00 1- Person Survey Crew $170.00 2- Person Survey Crew $215.00 2- Person Survey Crew with Apprentice $250.00 3- Person Survey Crew $290.00 Utility Locating Field Crew $175.00 Utility Locating Office Staff $105.00 REIMBURSABLE COSTS: Printing, Monuments, Materials, Outside Services and Consultants, Courier /Delivery Services, Express /Overnight Mail, Travel /per diem, Agency Fees Advanced, etc., at Cost Plus 15 %. OVERTIME: All overtime charges are invoiced on the basis of one and one -half times the above rates.