Loading...
HomeMy WebLinkAboutVTA - MOU of Project Coordination for Monterey Streetscape Improvement Project ( . MEMORANDUM OF UNDERSTANDING ON PROJECT COORDINATION BETWEEN CITY OF GILROY AND SANTA CLARA VALLEY TRANSPORTATION AUTHORITY This Memorandum of Understanding is entered into between the City of Gilroy (CITY) and Santa Clara Valley Transportation Authority (VTA). 1. SCOPE OF MOU This Memorandum of Understanding (MOD) sets forth the general provisions for the coordination of construction items between VfA's Gilroy Caltrain Transit Center project and CITY's Monterey Streetscape Improvement project. The MOU is a preface to the preparation of a Cooperative Agreement between the parties regarding this matter which shall contain the agreed upon terms set forth herein. This MOU is not intended to be a legally binding document. II. COMMON PROJECT BOUNDARIES The common project boundary between the two aforementioned projects on Monterey Road between 71lt Street and gilt Street is defined in Exhibit A, Limit of Work, City of Gilroy Streetscape. ill. OBUGATIONSOFVfA · All work within the VfA property and the project boundary line detailed in Exhibit A shall be constructed by VfA. · VfA shall transfer to CITY the construction, inspection and administration of the Monterey Road improvements originally included in VfA's Gilroy Caltrain Transit Center project located within the project boundary of CITY's Monterey Streets cape Improvement project, including median modification, striping, curb, sidewalk, signage, landscaping and irrigation. · VfA shall reimburse CITY for the construction cost of the transferred Monterey Road improvements, with the maximum reimbursement not to exceed the contract change order price that VfA negotiates with VfA's contractor, Golden Bay Construction, Inc. · CITY may review Vf A's negotiations for the contract change order with Golden Bay Construction, Inc. Page 1 of 5 · VT A shall also reimburse CITY for the PG&E design fee for the service box for the traffic signals and a controller cabinet included in the VTA's Monterey Road improvements transferred to CITY. · VTA shall remove the VTA bus shelter located on Monterey Road adjacent to Gilroy Caltrain Station prior to the start of the Monterey Streetscape Improvement project. IV. OBLIGATIONS OF CITY · CITY shall develop the design and construction documents and shall construct, inspect and administer, at its sole cost, all Monterey Road improvements transferred to CITY from VTA's Gilroy Caltrain Transit Center project, including median modification, striping, curb, pavement, sidewalk, signage, landscaping and irrigation. · CITY shall pay for the design and construction documents and the construction inspection and administration of all Monterey Road improvements transferred to CITY. · VTA's Monterey Road improvements transferred to CITY shall meet all applicable ADA and Title 24 requirements. V. CONSENT FOR NEGOTIATIONS · VT A shall agree to discuss and determine whether the traffic signal work at Monterey Road and 71lt and gilt Streets should be included in VfA's Gilroy Caltrain Transit Center project or CITY's Monterey Streetscape Improvement project. All costs associated with the traffic signal work, including design, construction inspection and administration, will be negotiated and transferred to the appropriate agency. · CITY and VfA shall agree to negotiate appropriate compensations, if any, for all future unforeseen costs to VfA and CITY arising from this MOU/Cooperative Agreement (additional contract change orders, contractor claims, etc.). VI. SCHEDULE FOR COOPERATIVE AGREEMENT · CITY to prepare the draft Cooperative Agreement: September 22, 2000 · VT A comment on the draft Cooperative Agreement: September 29, 2000 · Finalize the Cooperative Agreement: October 4, 2000 · VT A Board of Directors action on the Cooperative Agreement: October 5, 2000 · City Council action on the Cooperative Agreement: October 16, 2000 Page 2 of 5 City of Gilroy: ~A/P~ City Administrator ~9~ Approved as to Form ~ City Att~~ney .., ,/./ ,--. \ Attest City Clerk Santa Clara V ey Transportation Authority: ~:L 4~, I'/z.-V&?'iJ General Manager ~~/:l5joo Approv as to Form Legal Counsel Page 3 of 5 . . EXHIBIT A Page 4 of 5 , .' . . ~- .. -~- ~ + . .... ... .... - -. -. -..... -.. -.... .....~-.~..~ l ::::'P:h-: -:: l~~l, ~ ~ I U1 ~ ~ t-O ..... co U1 ..... :I: OJ >< OJ w <tl a.. ++00 -------- :-:::J - - - ~ It&T 1 1 GILROY TRANSIT CENTER LIMIT OF WORK CIlY OF GILROY STREETSCAPE 0If NO. DoI.11E ~ CT861 99250