Loading...
HomeMy WebLinkAboutState of California - Federal Aid Project - Bridge Rail Replacement on Rogers Lane and Gilman Road PROGRAM SUPPLEMENT NO. 009 to LOCAL AGENCY-STATE AGREEMENT FOR FEDERAL-AID PROJECTS NO. 04-5034 Date: August 5, 1994 Location: 04-SCL-0-GIL Project Number: STPLX-5034 (004) E.A. Number: 04-068374 This Program Supplement is hereby incorporated into the Local Agency-state Agreement for Federal Aid which was entered into between the Local Agency and the state on 06/05/78 and is subject to all the terms and conditions thereof. This Program Supplement is adopted in accordance with Paragraph 2 of Article II of the aforementioned Master Agreement under authority of Resolution No. 94-64 , approved by the Local Agency on 9/6/94 (See copy attached). The Local Agency further stipulates that as a condition to payment of funds obligated to this project, it accepts and will comply with the covenants or remarks setforth on the following pages. PROJECT TERMINI: ON ROGERS LANE @ GILMAN ROAD BRIDGE NO. 37C-349 TYPE OF WORK: BRIDGE RAIL REPLACEMENT LENGTH: 0.1 (MILES) PROJECT CLASSIFICATION OR PHASE(S) OF WORK [Xl Preliminary Engineering [] Right-of-Way [] [ ] Construction Engineering [] Construction Estimated Costl Federal Funds Matching Funds $ 3500 33D $ BRP $ 3098 $ o Local OTHER OTHER 402 $ o $ o STATE OF CALIFORNIA Depa tment of Transportation OF 4 Date <SZftl 2-0)091 I hereby Certify upon my personal knowledge that budgeted funds are available for this encumbrance: Accounting Office Chapter I Statutes I Item 139 1994 2660-101-890 94-95 Date <6 . 5. 9 tj I 3098.00 $ Program IBCI AMOUNT Fund Source 20.30.010.810 C 262040 892-F 3098.00 Page 1 of 2 04-SCL-0-GIL STPLX-5034 (004) DATE: 08/05/94 SPECIAL COVENANTS OR REMARKS 1. All maintenance, involving the physical condition and the operation of the improvements, referred to in Article VI MAINTENANCE of the aforementioned Master Agreement will be performed by the Local Agency at regular intervals or as required for efficient operation of the completed improvements. 2. The Local Agency agrees the payment of Federal funds will be limited to the amounts approved by the Federal Highway Administration in the Federal-Aid Project Agreement (PR-2)/Detail Estimate, or its modification (PR-2A) or the FNM-76, and accepts any increases in Local Agency Funds as shown on the Finance or Bid Letter or its modification as prepared by the Division of Local Streets and Roads. 3. This Program Supplement will be revised at a later date to include other phases of work. 4. In executing this Program Supplemental Agreement, Local Agency hereby reaffirms the "Nondiscrimination Assurances" contained in the aforementioned Master Agreement for Federal-Aid Program. 5. Whenever the local agency uses a consultant on a cost plus basis, the local agency is required to submit a post audit report cover- ing the allowability of cost payments for each individual consul- tant or sub-contractor incurring over $25,000 on the project. The audit report must state the applicable cost principles utili- zed by the auditor in determining allowable costs as referenced in CFR 49, part 18, Subpart C - 22, Allowable Costs. Page 2 of 2