Loading...
HomeMy WebLinkAboutState of California - Department of Transportation - Utility AgreementSTATE OF CALIFORNIA Department of Transportation Dist. County Route P. M. E. A. 4 SCl 152 9.8 124414 Federal Aid No. Owner's File UTILITY AGREEMENT NO. 04 -Ut . 651.1 DATE Y_,J State of Calilfornia, acting by and through the Department of Transportation, hereinafter called STATE pro - posesto modify traffic signals and resurface pavement on Route 152 (Leavesley Road and Monterey Street) at the intersection of Welburn AA* Avenue in Gilroy, Santa Clara County and the CITY OF GILROY hereinafter called OWNER, owns and maintains existing m a n h o l e s and w a t e r valve within the limits of State's project which require a d iu s t m e n t to grade to accommodate State's project. It is hereby mutually agreed that: I. WORK TO BE DONE In accordance with Notice No. 651.1 dated September 6, 1988, State shall adjust to grade Owner's manholes (3) and water valve (1) as shown on State's contract plans for the improvement of Road 152, EA 124414, which by this reference are made a part hereof. Owner shall have the right to inspect the work during construction. Upon completion of the relocation, Owner agrees to accept ownership and maintenance of the relocated facilities and relinquishes to State ownership of the replaced facility. Minor deviations from said plan may be made and incidental work may be performed by the State when mutually acceptable by both parties and on approval by the State. In the event the Owner wants to retain ownership of old facilities removed by the State's contractor, a clause stating this fact must be included in the special provisions, otherwise the Standard Specifications will award all salvaged material to State's contractor. II. LIABILITY FOR WORK Liability for the above - described work is at Owner's expense pursuant to Section 673 of the Streets and Highways Code, since the existing facilities now occupy the right of way of a conventional State highway. R/W 05 -2 1 Of 3- 84 32275 Utility Agreement No.04 -Ut. 651.1 III. PERFORMANCE OF WORK Owner shall have access to all phases of the adjustment work to be performed by State for the purpose of inspection to ensure that the work is in accordance with the specifications contained in the Highway Contract; however, all questions regarding the work being performed will be directed to State's Resident Engineer for his evaluation and final disposition. IV. PAYMENT FOR WORK Estimated construction costs at Owner's expense is approximately $900.00. Owner agrees to deposit with State within 30 days of receipt of billing therefor, which billing shall be forwarded immediately following State's bid advertising date of the construction contract the sum of $900.00, which is the total estimated cost of the work. It is understood and agreed between the parties that this amount may be either more or less, and final costs will be based upon the actual contract bid price. Upon completion and acceptance of the Construction Contract, State will furnish to the Owner a Statement of Construction Costs to be borne by the Owner, and to refund to Owner any amount of Owner's advance deposit, as provided hereinafter, remaining after the actual costs to Owner have been deducted. Owner agrees to pay State promptly upon receipt of a Statement therefor, any amount over and above said deposit required to complete Owner's share of the costs. R/W 05 -2 2of3 OWNER. THE ESTIMATED COST TO MaTIE FOR ITS SHARE OF THE ABOVE DESCRIBED WORK IS $ aim Utility Agreement No. OG" Ut. 651.1 IN WITNESS WHEREOF, the above parties have executed this agreement the day and year first above written. STATE OF CALIFORNIA CITY OF SLR DEPARTMENT OF TRANSPORTATION QW B B J aksa, C4TY Deputy District Director `55 APPROVED: 244�� -� Division of Right of Way IV APPROVAL RECOMMENDED: 'bistric lity oordinator Supervising R/W Agent OWNER'S COPY Susanne E. Steinmetz, City Clerk R/W 05 -2 3A of 3 84 32274 STATE OF CALIFORNIA Department of Transportation Dist. County Route P. M. E. A. 4 SCl 152 M9'8/ M10.3 115731 Federal Aid No. Owner's File UTILITY AGREEMENT NO. 110.23.1 DATE !%Z -0*41 i "I'/' Ak t(1,0 State of Calilfornia, acting by and through the Department of Transportation, hereinafter called STATE pro- poses to the CITY OF GILROY and hereinafter called OWNER, owns and maintains sanitary sewer and water main facilities within the limits of State's project which require adjustment of manhole and water valve covers to accommodate State's project. It is hereby mutually agreed that: I. WORK TO BE DONE In accordance with Notice to Owner No. 110.23.1 dated August 22, 1985, and Owner's letter of July 8, 1985, requesting the State to include the adjustment of approximately eighteen sanitary manhole and nine water valve covers to grade as part of the State's construction contract, the State shall perform the work as shown on the State's contract plans for the improvement of Road 152 from east of Monterey Street to Route 101 in Gilroy, E.A. 115731, which by this reference is made a part hereof. II. LIABILITY FOR WORK The existing facilities are located within the State's right of way as encroachments and will be adjusted at Owner's expense. III. PERFORMANCE OF WORK Owner shall have access to inspect the adjustment of said manhole and valve covers to ensure that the work is in accordance with the specifications contained in the Highway Contract. Upon completion and approval of the adjustment of said manhole and valve covers, Owner agrees to accept full Fes '� ibility for the maintenance of the adjusted aci ies. R/W 05 -2 1 of 3 0.05P IV. PAYMENT FOR WORK Estimated Cost: Utility Agreement No. 110. 2 3. 1 18 manhole covers @ $200.00 each = $3,600.00 9 valve covers @ $100.00 each = $ 900.00 TOTAL = $4,500.00 When the State contract is awarded, the State shall furnish the Owner with a statement of the actual bid price of the adjustment of manhole and valve covers to grade, whereupon the Owner agrees to pay the State the full amount within thirty days after the receipt of the statement of costs. R/W 05 -2 2 of 3 0 • osa V Utility Agreement No. 110.2 3. 1 OWNER THE ESTIMATED COST TO MA FOR ITS SHARE OF THE ABOVE DESCRIBED WORK IS $ 4, 500. 00 IN WITNESS WHEREOF, the above parties have executed this agreement the day and year first above written. STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION By De uty Disttri t Director APPROVED: �'4-44� ttYl c� Division of Right of Way APPROV/LR ;QR IMENDED: Supervising R/W Agent Ic V 'K -�r Z ,i ti-il.. Utilities Engineer OWNER'S COPY R/W 05 -2 3A of 3 30437 - 5001 -845M 0 OSP STATE OF CALIFORNIA DEPARTmExT of PuBuc Womo Dlv iox of I31GHwAYs INTERSTA FORM HR /W -39 (REV. 6 -70) Dist. County Rte. P. M. E. A. 0)+ SGl 141 5.1 -17.8 NOTICE NO.____ 110 -78, 2_� _ SOURCE CODE OWNER'S FILE UTILITIES AGREEMENT NO.__IM.7 &2__. SAN FRANCISCO, CALIFORNIA. Date FIRST PARTY: State of California, acting by and through its Department of Public Works, Division of Highways, hereinafter called STATE. SECOND PARTY: _ CITY OF QILROY_ 7190 Rosanna Street hereinafter called OWNER Relocation is required of certain utility facilities of OWNER, coat of which is to be borne by S'1i 1, IM i Pam Owner Pursuant to Section 680 of the Streets and Highways Code since the existing facilities occupy the right of way of a Conventional State Highway. State shall adjust to grade approximately 18 of the Owner's sanitary sewer manholes and 30 water valve covers within the area to be resurfaced on Monterey Highway, Routs 04-SC1 -101, in the City of Gilroy,in accordance with Notice to Relocate No. 110.78.2, dated October 12, 1972, all as directed by the State's Resident Engineer. ,Estimated Cost 18± sewer manholes @ $100.00 $1,800.00 30 water valves @650.00 ' 6`, 00.00 24% Overhead �,,,,,. Estimated Owner's Liability 100% $41092.00 Say, $4 ,100.00 upon completion and acewanee of the contract, the State win furnish �thee Owner a statement of engineer and construction costs to bar borne Owner. Preliminary engineering and construction ineelin by will be 24 of the contract item costs for aadusting Ownerts sanitary sewer ilea to grade* Owner` agrees to pay State promptly upon receipt of a statement of costs* Owner or his authorized representative will have the right to inspect the work as it progresses. Upon completion of the work, Owner agrees to "sums responsibility for maintl�nce of the adjusted fa ascilities* Omer 4 lOf1.Ot Estimated Cost to # f!___ State owner MOM agrees to perform and S7ggopgrees to pay for the above described work in accordance with— the terms of this Agreement. IN WITNESS WHEREOF, the parties have executed this agreement the day and year first above written. APPROVAL RECOMMENDED: Assistant District Engineer l� str c Utility Engineer APPROVED: CITJ OF GILROY �2 Mayor City Clerk Owner STATE OF CALIFORNIA DEPARTMENT OF PUBLIC WORE: DrMION OF HIGHWAYS B � 9 District Right of Way Agent. . EST. 7492. 44106 -500 E -70 10M Q OSP