HomeMy WebLinkAboutPerma Green Hydroseeding - Christmas Hill Park Miscellaneous Improvements Project No. 03-CDD-100 - Change Order No. 23 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 23 To contract for : Christmas Hill Park Improvements Project 1'03-CDD-lOO Contractor: Penna-Green Hydroseeding Contract Date: 7/17/2002 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Uvas Phase II - Trail 1 Install 15 inch RCP 2 Provide and Install Manhole 3 Extra Staking 4 Demo 36 inch CMP 5 Install 36 inch RCP 6 Raise Manhole 7 Retaining wall Extra Concrete 38 LF 1 ea 1 ea 11 LF 47 LF 1 ea 1 ea $115.001 LF $12,220.001 ea $650.00 1 ea $89.33 1 LF $300.00 1 LF $1,600.001 LF $3,894.00 1 LF $4,370.00 $12,220.00 $650.00 $982.67 $14,100.00 $1,600.00 $3,894.00 $37,816.67 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I ~e) agree to make the above change subject to the tenus of this Change Order for the NET INCREASE of $37,816.67 By: ACCEPlED BY: Original Contract Price Previous Change Orders to Date Total to Date This Change Order Total Change Orders to Date Revised Contract Price Cost Percentage $1,556,117.00 $799,916.80 51.0% $2,356,033.80 $37,816.67 $837,733.47 54,0% *1311- $2,393,850.47 *Requires emergency authorization if greater than 25%. Date: ;/;-~~ z. 'Z' t.J5- Date