HomeMy WebLinkAboutPerma Green Hydroseeding - Christmas Hill Park Miscellaneous Improvements Project No. 03-CDD-100 - Change Order No. 22 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 CHANGE ORDER NO. 22 To contract for: Christmas Hill Park Improvements Project No. 03-CDD-100 Contractor: Penna-Green Hydroseeding Contract Date: 7/1712002 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work This balancing change order will bring the project "Balance to Finish" to a zero amount. Line Item 24 Concrete wheel stops, 1 each at $300.00 Line Item 56 2" PVC, 10 LF at $6.00 Line Item 69 Concrete wheel stops, 1 each at $300.00 Line Item 70 Install City Provided Bench, 1 at $500.00 Line Item 80 Park Directional Signage, 1 at $500.00 -$300.00 -$60.00 -$250.00 -$500.00 -$500.00 -$1,610.00 All requirements of the original Contract Docwnents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. I ry.Ie) agree to make the above change subject to the tenus of this Change Order for the NET INCREASE of -$1,610.00 Original Contract Price Previous Change Orders to Date Total to Date This Change Order Total Change Orders to Date Revised Contract Price ;L~~ By: Date: Cost $1,556,117.00 $801,526,80 $2,357,643.80 -$1,610.00 $799,916.80 $2,356,033,80 *Requires emergency authorization if greater than 25%, f.IXftr ACCEPlEDBY: Percentage 52.0% 51.0% * W-