Loading...
HomeMy WebLinkAboutPerma Green Hydroseeding - Christmas Hill Park Miscellaneous Improvements Project No. 03-CDD-100 - Change Order No. 19 ar itt! of (W)ilrot! Planning Division Engineering Divison Building, Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT Norman S. Allen, P.E., Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 FAX (408) 842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 CHANGE ORDER NO. 00019 To contract for: Christmas Hill Park Improvement Contractor: Perma-Green Hydroseedine; Ine Contract Date: 12/18/03 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF WORK: Make the following revisions to the Safer Route to School Phase 1 plans supplied and specified per CCO No.7 & 14. This work will be compensated for at the following agreed to lump sum prices: 4, ~. Revise keyway detail per CCO No. 14; Remove and off-haul rock slope protection from fill slope - $7,945.00 Additional grading due to incorrect topography elevations on plans for station 3+50 to 5+50 - $5,334.00 C,. Extend 36" CMP, pour concrete collar and remove unsuitable material at station 6+00 t^ Install 18" CMP and Headwall at station 2 - $6,690.00 - $2,880.00 ~, Hydroseed borrow site and install Jutte Matting on fill slope aG. t' _11 from station 5+64 to 8+25 - $2,740.00 I (We) hereby agree to make the above changes subject to the terms of this Change Order for N T CASE OF $ 25,589.00 Original Contract Price $1,556,117.00 Previous Change Orders $501,496.75 This Change Order $25,589.00 By: Revised Contract Price $2,083,202.75 Date RECOMMENDED BY: Originals to: CITY: (2) Originals 9810312.02.045.000 CONTR: (1) Original 1 .. PERMA-GREEN HYDROSEEDING, INC. LANDSCAPE CONSTRUCTION December 18, 2003 Harris & Associates 178 Second Street Suite C Gilroy, CA 95020 Attn: Kory Odell ~ iF. . ,,'..J ~.\'? \b\VU U RE: Uvas Park Trail Project Dear Kory, Enclosed are the additional costs for the extra work items at the Uvas Trail Project that were completed. They are as follows: A. (1). 6. Q. ~ Additional off hauling for material in Key~Way ~ $7,945.00 Additional seeding and straw matting for new key~way detail- $2,740.00 Extend 36" storm drain beyond toe of slope - $6,690.00 Install 20' of 18" CMP & Hand wall ~ $2,880.00 Additional grading at station 35+00 - 55+50 due to inconsistent topography ~ $5,334.00 If you have any further questions please feel free to contact us at 408~848- 3310. T~<h'1k.~Of", Smcer, , U j Mitch Chuck President License #664209 7096 Holsclaw Road · Gilroy, California 95020 · (408) 848-3310