CHANGE ORDER NO. 00014
To contract for: Christmas Hill Park Improvement
Contractor: Perma-Green Hydroseedinl!; Ine
Contract Date: 8/18/03
This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All
copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City,
the Contractor's copy will be returned to him as his authority to proceed with the work.
DESCRIPTION OF WORK:
Provide all labor, equipment, surveys, and materials to revise work specified per Contract Change Order 7
(Drawings C-l through C-6, dated and issued November 11, 2002) to the work specified per the phase one
limits on revised plan sheets C-l through C-7 (dated 7/14/03), L-2 through L-6 (dated 7/09/03), including the
trail portion on the south east side of Santa Teresa Bridge (connects bridge sidewalk to existing school trail) and
keyway detail dated 2/11103. All work shall be in conformance with required permits. No work shall occur
within 50 feet of an occupied swallows nest. The additional specified work will be done at the agreed to lump
sum prices of:
Grading using onsite fill material
18' Double wide swing gate
1800sf of CLII AB for SCVWD access
Increased AC section to 4" at (Station 5+50 to 6+00)
AC Paving and CL II AB at South end of bridge
AC Paving & Base
Signs and striping
Keyway Work (Station 6+00 to 7+00)
Additional 15" Storm Drain Inlet
8 Collapsible Bollards (per note 5 on page C-5)
Sleeves and Surveys
Hydroseeding, Planting and Revegetation
Total This Change Order
$18,500.00
$4,360.00
$3,600.00
$600.00
$7,200.00
$13,000.00
$2,540.00
$39,000.00
$5,500.00
$1,200.00
$12,000.00
$8,500.00
$116,000.00
Section 22, "Wage Rates" and paragraph No.1 of 4.11.1, "Prevailing Wage" of the project specifications is
amended to the following: If there is a difference between the minimum wage rates predetermined by the
United States Secretary of Labor and the general prevailing wage rates determined by the Director of the
California Department of Industrial Relations for similar classifications of labor, the Contractor and
subcontractors shall pay not less than the higher wage rate. The City will not accept lower State wage rates
not specifically included in the Federal minimum wage determinations. This includes "helper" (or other
1
classifications based on hours of experience) or any other classification not appearing in the Federal wage
determinations. Where Federal wage determinations do not contain the State wage rate determination
otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall
pay not less than the Federal minimum wage rate which most closely approximates the duties of the
employees in question.
This change order adds 260 days to the time allowed for completion specified in section 00810-2 " Time
Allowed for Completion". The revised estimated contract completion date is October 15th, 2003.
I (We) hereby agree to make the above
changes subject to the terms of this
Change Order for NET INCREASE 9F
$~:4'960~~
gr;/7/o3
Original Contract Price
$1,556,117.00
Previous Change Orders
TOTAL TO DATE
$ 361,475.00
$1,917,592.00
This Change Order
$ 116,000.00
Revised Contract Price
$2,033,592.00