CHANGE ORDER NO. 00006
To contract for: Christmas mn Park Improvement
Contractor: Perma-Green Hydroseeding Ine
Contract Date: 4/15/02
This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All
copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City,
the Contractor's copy will be returned to him as his authority to proceed with the work.
DESCRIPTION OF WORK:
PROVIDE ALL LABOR AND MATERIALS TO INSTALL NEW IRRIGATION SYSTEM, NEW PLANTING AND ADDED
EROSION CONTROL FOR WATER TANK AT SANTA TERESA AND MILLER STREETS AS SHOWN AND INDICA TED
ON DRAWINGS L-1 THROUGH L-5, DATED AND ISSUED ON 12/12/02.
I (We) hereby agree to make the above
changes subject to the terms of this
Change Order for NET INCREASE I D~CI?Ji ^ ~Ii: Qp
$39,944.00
Original Contract Price
$1,556,117.00
By:
uJ/2I
Previous Change Orders
TOTAL TO DATE
$ 81,546.00
$1,637,663.00
This Change Order
$ 39,944.00
Date
{(3/o3
Revised Contract Price
$1,677,607.00