Loading...
HomeMy WebLinkAboutPerma Green Hydroseeding - Christmas Hill Park Miscellaneous Improvements Project No. 03-CDD-100 - Change Order No. 06 Q1it~ of ~ilrotl d? Planning Division Engineering Divison Building. Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT Norman S. Allen, P.E.. Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 FAX (408) 842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 CHANGE ORDER NO. 00006 To contract for: Christmas mn Park Improvement Contractor: Perma-Green Hydroseeding Ine Contract Date: 4/15/02 This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF WORK: PROVIDE ALL LABOR AND MATERIALS TO INSTALL NEW IRRIGATION SYSTEM, NEW PLANTING AND ADDED EROSION CONTROL FOR WATER TANK AT SANTA TERESA AND MILLER STREETS AS SHOWN AND INDICA TED ON DRAWINGS L-1 THROUGH L-5, DATED AND ISSUED ON 12/12/02. I (We) hereby agree to make the above changes subject to the terms of this Change Order for NET INCREASE I D~CI?Ji ^ ~Ii: Qp $39,944.00 Original Contract Price $1,556,117.00 By: uJ/2I Previous Change Orders TOTAL TO DATE $ 81,546.00 $1,637,663.00 This Change Order $ 39,944.00 Date {(3/o3 Revised Contract Price $1,677,607.00 RECOMMENDED B : Originals to: CITY: (2) Originals 9810312.02.045.000 CONTR: (1) Original Date 1