Loading...
HomeMy WebLinkAboutPerma Green Hydroseeding - Christmas Hill Park Miscellaneous Improvements Project No. 03-CDD-100 - Change Order No. 05 QIit~ of Qf}ilrot! 2 Planning Division Engineering Divison Building, Life & Environmental Safety Division Housing & Community Development COMMUNITY DEVELOPMENT DEPARTMENT Norman S. Allen, P.E., Director (408) 848-0440 (408) 848-0450 (408) 848-0430 (408) 848-0290 FAX (408) 842-2409 FAX (408) 842-2409 FAX (408) 848-0429 FAX (408) 848-0429 CHANGE ORDER NO. 00005 To contract for: Christmas Hill Park Improvement Contractor: Perma-Green Hydroseedin~ Ine Contract Date: This order shall become effective when the City Administrator, City Engineer, Project Engineer, and Contractor have signed it. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. DESCRIPTION OF WORK: PROVIDE ALL LABOR AND MATERIALS TO ACHIEVE; 1.0 Handicap striping and signage 2.0 Concrete steps, AC ramp and pathway with header board. *** All as per sketch dated 9/10/02 I (We) hereby agree to make the above changes subject to the terms of this Change Order for NET INCREASE $~y95400 uJJlf ~ ( zPslc~ Original Contract Price $1,556,117.00 Previous Change Orders TOTAL TO DATE $72,592.00 $1,628,709.00 \ ' This Change Order $8,954.00 Revised Contract Price $1,637,663.00 Date ACCEPTED Originals to: CITY: (2) Originals 9810312.02.045.000 CONTR: (1) Original RECOMMENDED /;/3/6 1lt./P.3 16~e 1 ''" _ CONTRACT CHANGE ORDER NO. 00005 Harris & Associates 178 Second Street Suite C Gilroy, CA 95020 Phone: (408) 842-5777 Fax: (408) 842-5758 E-Mail: rmcdowell@harris-assoc.com City of Gilroy TO: Penna Green Hydroseeding Ine 7096 Holsclaw Road Gilroy, CA 95020 Christmas Hill Park Misc Imprv Project Date: December 19, 2002 A TTN: Mitch Chuck Subject: Final-revised quote.Las Animas ADA Reference Spec. Section: Gentlemen: You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications of this contract. All new work herein described shall be done in accordance with the applicable provisions of the plans and specifications, except as modified by this contract change order. NOTE: This change order is not effective until approved by the Owner, or until an authorized Field Directive is executed. Provide all labor and materials to achieve; 1.) Handicap striping & signage. 2.) Concrete steps, AC ramp & pathway with header board. **** All per sketch of 9/10/02 ..."tiC1rA}f~::;t::~ml~r""""''''''''''''''''''''''''''...................................................................................................................................-..........................................................................................................................................-.........................................................................-.-...........................-. ......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... ::QUM(lBHfnWJM~$T._.iIIi:i:i:i:::::::::::::::::::::::::::i:::::i:i:::i:i:i:i:::i:i:i:i:i:i:IIIIitii:i:iiIitttt::::ttt:::i:i:::i:i:i:i:i:::i:i:IIIIIIIIi:Ii:i:Ii:i:it:i:i:i:it:::::i:::::i::::t:::::::::::r ..;.:.:.:.:.:.:.:-:.... ....:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.;.:.:.:.:.:.:.:':':':':':'..:.:.:.:.:':.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:...;.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:-:.:.:.:-:-:.:.:. ..........:::::.:.::::::::::::;:::::::::::;:::::::::::::::::::::::::::::::::::;:::::::::::::::::::::::::::;:;:;:;:;:;:;:;:;:::::::::::::::::::::::::::::::;:::::::::;:;:;:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::;:;:;:;:;:;:;:;:::::;:;:::;:;:::::::::::::::::::::::::::;:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit any and all indirect costs, and time adjustment to perform the above described change. All other costs are non-compensable. lijii~i:::l 1!~ii..g:::IY;:!:!::1 Hl.{?!!/~) /,2 -;/tI-cJ;0 ~...._..""'.""""""""~"'. ::.:.:::::::::::::::::::::::::'::::::::::.Ilf::::::::::: .:.:~:.:.:.:.:...:....:...:........:................... . iii ~, lIi#.d!J Harris & Associates I?/~()L (/0:3 File No.: 9810312-02-045 Page 1 of 1 Ca_ccoOl Issue File: 18-02 1~:07A P.02 , ' PERMA-GREEN HYDROSEEDING, INC. LANDSCAPE CONSTRUCTION December 18, 2002 Harris &. Assudates /78 Second Strc.'ct. Suile <.: Gilroy. CA 95020 Attn: Ron McUowell Rf.: l.:fS Animas Park Kl.'Vi.~ed Cos1 DC3r ROil. Endno;ed is a revised price on the ac'cs~iblc ramp at the Las Anima.. Park as rl:Q!Jcstcd. The costs arc as 1()lIows: '7 Concrete steps. AC Ramp & Pathw-"" with he:Jder board - Sl.'J75.00 ~ Handicap Striping & Sit;nage - $?79.00 - ror;z:rL K. '1 f' ~y tJ tJ If you have ar!,V further Q.uestlons please feel free to cunt<lct lIS at 408-8J-3.310. Thank YUU(" Sincerety. Vv' Milch Chu(.k Presldcnl License #664209 7096 Holsclaw Road · Gilroy, California 95020. (408) 848-3310