Loading...
HomeMy WebLinkAboutSilicon Valley Energy Watch - Corp Yard - Phase 2SILICON VALLEY ener Energy Efficiency Proposal Upgrade Recommendations for Corporation Yard - Phase 2 Project Name: Corporation Yard - Phase 2 Project Location: 613 Old Gilroy St Gilroy,CA 95020 Presented To: Rick Brandini Presented By: Jack Lu Mobile: +14152653707 Fax: (831) 427 -1368 Email: jlu @ecoact.org For questions during your installation, please contact your Installation Manager: Rachel Radcliffe Ecology Action 2672 Bayshore Parkway #505 Mountain View, CA 94043 Phone: (831) 515 -1304 ext 104 Mobile: +1 6507667006 Fax: 650 - 210 -9953 Email:rradcliffe @ecoact.org 8/G,2013 a1, .",menledbYEc.01TAcbm and faMedby Corporation Yard (Phase 21- L I G I race l t CtiROmla ratapaXCrs Amer Ne auspk,=.s of ibc CaltlorcJa ?��bic Uw ly Cp -1—n. ECOIO ACtIOCi SILICON VALLEY ene -v rya Savings Summary Installed Cost Before Rebate Total Rebate Your Final Cost After Rebate Rebate % of Total Cost Estimated Monthly Savings Estimated 1 st Year Savings Estimated 5 Year Savings S15,888.67 $11,628.66 $4260,01 g 9 73% S463.96 j $5,567.47 $27,837.35" Environmental Benefits Cus:amef Cost vs. Erse *gy Ccsl saw,rg ® Customer Cost N Energy Cost Savings Simple Payback 0.77 Years P By implementing the measures outlined in this proposal you will save enough energy to achieve one of the following: Estimated Energy Savings 32,787.64 kWh •�r�'.' Removal of 4.43 passenger vehicles from the road. Estimated Power Savings 13.61 kW 6 Cia�� Addition of 48.2 acres of pine or fir trees (over a 10 year life span). 1„ i' 'Note - Savings are estimated using standard engineering calculations and are based on the hours of operation as described to the surveyor. Depending on actual usage as well as changes in your electric utility rate, your savings may be higher or lower. The savings indicated above are NOT guaranteed. Construction costs may vary slightly depending on fixture quantities and unforeseen conditions. "Note - Based on DEER property type and measure savings values from the CPUC, this project is deemed to deliver 58760.27 kWh and 18.60 kW. The rebate offered For the project is calculated based on the deemed savings values. 8J6!2013 rr sure V4.yE- mr x„p -- .Wmeh,E- TyAni�,, -d Fa M+.db, Corporation Yard (Phase � LTG Pape 2 CI Mc a 11W"ye.n urrJc� N x 0111 ci ma C11&11b Pubik Utu ty C-33— • p � ) ' I p Ecology Action SILICON VALLEY .......... 11 eEler pia Ni Below is a summary of work to be performed. The first table shows total costs for all work to be performed in this proposal. The second table shows a list of individual work orders referenced by this proposal. To authorize the job initial next to each work order in the section provided. Not initialing may delay when installation will commence. Work Order Cost Breakdown Summary Disposal Material Labor (weekdays Rate) Base Labor Cost Access Difficulty Cost Adjustment Ceiling Height Cost Adjustment Labor Total $135.00 $9,283.37 $3,750.00 $0.00 $1,818.00 $5,568.00 Other Fees (Permits, Inspections, Lifts, etc.) $90.00 Estimated Taxes $812.30 Total $15,888.67 Work Order List Summary Work Order Installation cost Rebate Customer cost Corporation Yard (Phase 2) - DLTG $13,156.34 $9,663.18 $3,493.16 Corporation Yard (Phase 2) - MLTG $2,732.33 $1,965.48 $766.85 8!6/2013 c�°r�r"r ,,Rax "�be �s � � U c" �'C� x "etl °y Corporation Yard (Phase 2) - LTG i Page 3 SILICON VALLEY Q, Ec_0109YAO 'Lon enervy Corporation Yard - Phase 2 613 Old Gilroy St Gilroy,CA 95020 Customer Work Order Agreement By signing this Customer Work Order Agreement ("Agreement"), Customer (the business entity listed above) agrees mthe following: Measures and Incentives: the Silicon Valley Energy Watch Program ("Silicon Valley Energy Watch" or "Program"), a copy of which is attached to this Agreement. I agree that to the best of my knowledge the schedule of operations contained in the Report accurately describes the hours of operation at the facility listed above. I understand that the energy efficiency measures described in the Report represent an estimate of expected energy savings, and that Silicon Valley Energy Watch does not guarantee a specific level of cost savings from the implementation of the proposed energy efficiency measures (collectively, the " Project"). I ilicon Valley Energy Watch is implementing the Project on the Customer's behalf. Incentives for energy savings are calculated using the appropriate baseline to exceed California Title 20 and Title 24 standards. New products ordered, purchased or installed prior to 1/1/13 or after 12/15/14 do not qualify for an incentive. Resale products, products leased, rebuilt, rented, received from warranty of insurance claims, exchanged, won as a prize or new parts installed in existing products do not qualify for Incentives. PG&E is not responsible for the economic and technical feasibility, operational capability, and reliability of the Project. Program Dates: /oo» eligible for incentives, all projects must be installed and completed before December 14, 2014. Funding of incentives is distributed v"""first-come first-served basis. Silicon Valley Energy Watch is funded by California ratepayers undorU`eauspices of the California Public Utilities Commission (^CP{").|have information about other programs offering rebates ur services for measures covered by the Silicon Valley Energy Watch Program. Project Commitment and Installation Completion Process: I understand that I must have a signed Site Access Agreement on File to confirm Program Eligibility and a signed Customer Agreement to initiate installation. For each work order, I agree to have Silicon Valley Energy Watch contact (a) participating contractor(s) ("Contractor") who will perform a walk-through inspection, review the scope of the Projects outlined in the Report, and schedule the Project installation at a time that is mutually agreeable to all parties. I understand that the total installed costs for the components of the Project are described in the attached listing of individual work orders. Costs for correcting electrical code violations are not included in the costs quoted above and are not covered by the Program. Any electrical code violations found during the Contractors' inspections or during installation will be cause for the Contractors to stop work on the affected item(s) until such violations are corrected. I understand that the contractor walk- through may result in a Change Order due to specification or electrical code violations and that I will be notified and approve of any cost adjustments before additional work is completed. I will sign an agreement with each Contractor, which shall be solely between the Contractor and Customer, for the out-of-pocket portion of the Project costs. I understand that Silicon Valley Energy Watch will provide a rebate, detailed in the work order listing, to offset the cost of the Project installations, and the rebate will be paid directly to the Contractors. I understand that I am responsible for paying the balance of the agreed-to contract price after rebate payment and that payment is due to the Contractor upon completion of the individual work order. At the completion of the project, I agree to sign the Customer Acceptance/Project Completion Form presented by the contractor on Ecology Action's behalf. fCOIOgyACtIon SILICON VALLEYr General Terms and Conditions 1. Funding: Implementer is receiving funds from Pacific Gas and Electric (PG &E) for this Project, but the Parties agree that PG &E is not liable to either Party for any losses or damages, including incidental or consequential damages, arising from this Agreement. PG &E makes no representation or warranty, and assumes no liability with respect to quality, safety, performance, or other aspect of any design, system or appliance installed pursuant to this Agreement, and expressly disclaims any such representation, warranty or liability 2. Incidental and Consequential Damages: BOTH PARTIES AGREE NEITHER PARTY SHALL BE LIABLE TO THE OTHER FOR ANY INCIDENTAL, SPECIAL OR CONSEQUENTIAL DAMAGES. 3. Life of Product: Customer understands Incentive payments are based on related energy benefits over the life of the product. Customer agrees if 1) Customer does not provide PG &E with 100% of the related benefits for the life of the product or a period of 5 years, whichever is less, or 2) Customer ceases to be a distribution Customer of PG &E during said time period, Customer shall refund a prorated amount of Incentive payment(s) to PG &E based on the actual period of time for which Customer provided the related energy benefits as an electric Customer of PG &E. 4. Customers with self generation capabilities: If Customer has existing onsite cogeneration or self- generation, Implementer shall not pay Incentives for energy savings that exceed Customer's annual energy usage from PG &E. KW, kWh and therm savings are limited to the previous 12 months quantity of kW, kWh, and /or therms purchased from or delivered by the utility on the meter(s), serving the equipment to be installed, for which the utility collects the Public Purpose Programs (PPP) surcharge. The previous 12 months are defined as the calendar year prior to the date the Customer submitted and signed this Program Participation Agreement (including usage from Standby Service and less savings associated with pending energy efficiency applications). This policy is subject to change with 30 day written notice to Customer. 5. Incentive may not exceed Project cost: Customer must submit Project invoice(s) which include: vendor name /address /phone, itemized listing of product(s) including quantity, product description(s), manufacturer, model #, and other identifying information as appropriate, Project cost, date invoice paid or payment terms, and installation date. 6. if Tenant: If a tenant, Customer is responsible for obtaining the property owner's permission to install the Measure(s) for which Customer is applying for an Incentive payment. Customer's signature on this Program Participation Agreement indicates Customer has obtained this permission. 7. Access : Customer will allow, if requested, a representative from PG &E, CPUC, Implementer, or any authorized subcontractor reasonable access to Facility to verify the installed product. 8. Compliance with Laws: Implementer shall comply with all federal, state, and municipal laws, ordinances, rules, orders, and regulations, which apply to its actions at the Facility or to the Project. 9. Advertising: Implementer agrees not to use the names or identifying characteristics of thg Customer's Facility for published Project reports (except to fulfill reporting requirements to PG &E and /or the CPUC), advertising, sales promotion or other publicity without the Customer's written approval. In addition, Customer agrees not to use the names or identifying characteristics of Implementer for published Project reports, advertising, sales promotion, or other publicity without Implementer's written approval. 10. No Double- Dipping: Customer understands that Customer cannot receive Incentives for the same product, equipment or service from more than one California investor -owned utility or third party Energy Efficiency program offering Incentives for the same product, equipment, or service funded with CPUC Public Goods Charge funds. Customer understands this prohibition applies to future applications and for three years prior to receiving the Incentives for the same product, equipment or service. 11. No Obligation: California consumers are not obligated to purchase any full fee service or other service not funded by this Program This Program is funded by California utility ratepayers under the auspices of the CPUC. Los consumidores en California no estan obligados a comprar servicios completos o adicionales que no esten cubiertos bajo este programa. Este programa esta financiado por los usuarios de servicios publicos en California bajo la jurisdicci6n de la Comisibn de Servicios Publicos de California (CPUC). 12. Availability of Funds: This program is available on a first -come, first served basis until allocated funds are depleted. This Program may be modified or terminated without notice. 13. Project Permits: After energy- saving measures are installed and operable and before incentive or rebates are paid, recipients must comply with the following terms, as applicable, and will be required to certify after installation. For HVAC measures, installation contractors shall certify that appropriate permits have been obtained, if applicable and contactor must document permit number, permitting agency, contractor name, signature and date. For all rebates or incentives offered by PG &E for an energy efficiency improvement or installation of energy efficiency components, equipment or appliances, the recipient must certify that appropriate permits have been obtained and, if a contractor performed the installation or improvement, that the contractor holds the appropriate license for the work performed. In the case of Direct Install measures in which the Third Party Implementer or contractor /installer is the recipient of the rebate or incentive, the Implementer shall certify that permitting requirements have been met. Th. Ski— V.:. F-M Watch P,raW. is k,q,!zmtnh±d by erd Acdw and funded by 7 8/612013 ca:�t «�at.w.y- -da,tt. —P.— hacilSOmaPUhilcUty comM"wa Corporation Yard (Phase ) - LTG � Page 5 EcologyAction Customer Cost, after rebates, to execute all work orders presented in this proposal: $4260.01 1 have read and understood the Terms and Conditions. I certify that the information I have provided is true and correct. SILICON VALLEY energy GK:lrC�l IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their duly authorized representatives as of the date set forth below Customer:City of Gilroy Customer Representative:Rick Brandini Silicon Valley Energy Watch Program Representative:Jack Lu 7351 Rosanna St Gilroy,CA 95020 Ecology Action 2672 Bayshore Parkway #505 846 -0282 Mountain View, CA 94043 M408) il: rick.brandini @cityofgilroy.org Mobile: +1 4152653707 Fax: (831) 427 -1368 Email:jlu @ewactorg Ac�nca C�t� Ad,nnin��l"��c ' ThC N) P\b , j Program Representative's Printed Name Program Representative's Signature Date PG &E Service Agreement ID# (Electric) PG &E Service Agreement ID# (Gas) The value of Incentives and direct installations is taxable. Implementer will report incentives and direct installations greater than $600 to the IRS unless you are exempt. Please consult your tax advisor concerning the taxability of incentives. The Customer, not the implementer, is responsible for any taxes imposed as a result of your receipt of Incentives from this Program. Form 1099 will be issued for the Customer, regardless of who the payee is, because the Customer receives the benefits of the Incentives. TM W�hP -y—Is enNe,r. ° ^' <^�Y�ro ^ ^'"^^'"" ""' ^a °Y Corporation Yard (Phase LTG Page 6 }i'6.13013 crnnrr.T ra eaayer, roar � w�e.9 c�W a efl uei r cnn nuuw i� ( ) - M 1,R)i Q;p10 c ion SILICON VALLEY gy&-L- VNU n[C I NO MJMIMIMMM� Corporation Yard - Phase Solution Key 2 AHO: Annual Avg. Hours of 613 Old Gilroy St Appendix A: Operation Gilroy,CA 95020 kWh: Annual kiloWatt Hours Recommendations and Savings Checklist kW: kiloWatt Load Watts: Watts as published by the manufacturer Existing Equipment kW M per per TWO. t w 0 �-� Qty Description Watts Qty AHO kWh Qty Description Watts Qty AHO kWh rebate Est. Savings Area: (135223) Fabrication Shop 4 13 H=P Hn,w, Cn,Pj 234,0 211 2867' F039,36 ��--4-11"13 —77 $2,582,93 $939,96 Area: (135224) Small Equipment Shop 6 NIH400WIL 458.0 3.66 1300,0 4763.20 4 LED Wallpack 91 Vian ,VhRL 91 C 036 1300.0 473.20 Housing RAB Area: (135225) Apparatus Bay S2 7K" 33 3. 52.732.33 5894,17 (j��fSii I,, — VlpkyE 1��P 1 AcN- M k ded by LTG (Page 7 UZ 816/2013 �c 'y C—�--" Corporation Yard (Phase 2) 3283` 1 i, ,�,,,jN!y 2340 5 8 2c'37 25 ,8ey754L H50 H,4 --�7,174 8i $2,611.00 Area: (135226) Wash Bay 4Z2 R-,� F. 52869,92 51,044.40 Area: (135227) Front Building Exterior 2 C 47 1,; 0 5528.67 517,9 (j��fSii I,, — VlpkyE 1��P 1 AcN- M k ded by LTG (Page 7 UZ 816/2013 �c 'y C—�--" Corporation Yard (Phase 2)