Loading...
HomeMy WebLinkAboutDon Chapin Co. - 2014 Agreement - Project No. 15-PW-216 - Change Order No. 1(City of Offrop Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0451; Fax (408) 846 -0429 CHANGE ORDER NO. 1 To contract for: 6th Street Improvements, LED Trail and Led Upgrade City Project No. Contractor: Don Chapin Company Contract Date: 15 -PW -216 Oct. 22, 2014 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Full and complete reimbursement for all costs including allowable profits and markups for bonds, insurances and taxes for the necessary adjustments to original contract scope due to unknown site conditions. The work required includes both an increase in contract unit quantities and the addition of materials and work not originally anticipated in the original scope of work. This change authorizes the increase in base bid quantities and the addition of items not included in the base bid. All items will be billed per the actual unit installed. Unit prices for base bids added quantities are not increased. Addition of the following unit items - Installation of 10" SDR 26 pipe - 260 If @ $230 per linear foot; U37 curb inlets - 2 2 each at $2000 each; U37 precast top - 2 each at $1050 each; Remove, raise and reinstall sod areas 450sf @ $11.00 per square foot. Credit for RCP storm drain pipe 51 LF @ $165 per linear foot; Credit for Misc Concrete at Manhole - 1cy @ $2000 per cy. TOTAL PRICE THIS CHANGE (including all credits deducted) = $44,720.00 All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and /or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Change in working time granted by this change order: ► All Extra Work authorized under this Change Order must be billed separately from the original contract. All bills for work done under this Change Order shall reference this Change Order No. 1. I (We) agree to make the above change subject to the terms of this Change Order for a NET INCREASE not xcee 0.00. CONTRACTOR RECOMMENDED BY: ACCEPTED BY: 0 Working Days Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Price Date: -I - aB - 1 Cost Percentage $805,729.00 $0.00 0.00% $805,729.00 $44,720.00 $44,720.00 5.55% of bid $850,449.00 Constru tion Manager Date Project r12 / i gin r Date 'i� -2-S 1 S City Administrator I Date