Loading...
HomeMy WebLinkAboutDon Chapin Co. - 2014 Agreement - Project No. 15-PW-216 - Change Order No. 8Citp of diirrop Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0451; Fax (408) 846 -0429 CHANGE ORDER NO. 8 To contract for: 6th Street Improvements, LED Trail and Led Upgradf City Project No.: 15 -PW -216 Contractor: Don Chapin Company Contract Date: Oct. 22, 2014 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Description of Work Adjust final item quantites to reflect actual construction quantities as follows: Item 3 Remove concrete sidewalk + 82 SF; Item 5 Lean concrete backfill -4 CY; Item 6 Minor concrete (sidewalk, no color) +82 SF; Item 18 Minor concrete (sidewalk) +221 SF; Item 19 Minor concrete (sidewalk, standard) +98 SF; Item 20 Minor concrete (curb & gutter) +14 LF; Item 22 Minor concrete (raised curb) +150 LF; Item 24 Hot Mix Asphalt (type B) +5 Tons; Item 25 Brick pavers +72 SF; Item 29 Class 2 aggregate base +6 CY; and Item 49 Pop up spray heads (irrigation) +2 Each. The total additional cost of these quantity adjustments at contract unit prices is $28,559. Reduce Change Order 4, Modify Tenon Adaptors (lighting) to $3,475.56 from the $10,000 originally estimated. to reflect the reduced number of tenons requiring modification. Credit of $6,524.44. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work "), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and /or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Change in working time granted by this change order: I (We) agree to make the above change subject to the terms of this Change Order for a NET INCREASE not to exceed $22,034.56. CONTRACTOR By: RECOMMENDED BY: ACCEPTED BY: 0 Working Days I Cost Percentage Original Contract Price $805,729.00 Previous Change Orders $176,960.00 21.96% of bid Total to Date $982,689.00 This Change Order $22,034.56 Total Change Orders to Date $198,994.56 24.70% of bid Revised Contract Price $1,004,723.56 Date: ) .Z ) °) � 15 .11VII, /z, 71, Date