Loading...
HomeMy WebLinkAboutRolfe Construction - 2014 Agreement - Change Order No. 11C itv of 011rov Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0451; Fax (408) 846 -0429 CHANGE ORDER NO. 11 To contract for: Gilroy- Morgan Hill Joint Trunk Sewer Main City Project No.: 14 -PW -208 Contractor: Rolfe Construction, Inc. Contract Date: August, 2014 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer. and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Extra Work at Agreed Upon Lump Sum Compenstation Price for the provision of water consumption used througout the construction period for the project. This specific item of work was necessary to adequately and properly complete the required project improvements per plan and within the contract documents. Ail requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work "), including but not limited to labor. materials. overhead and profit. delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Change in working time granted by this change order: 0 Working Days I Cost Percentage Initial ► All Extra Work authorized under this Change Order must be billed separately from the original contract. All bills for work done under this Change Order shall reference this Change Order No. 11. I (We) agree to make the above change subject to the terms of this Change Order for a NCREASE not to exceed..S964.?„Y CONTRACTMR By: Rolfe Construction. Inc. RECOMMENDED BY: ACCEPTED BY Contingency Amount 515,095.00 103: used Original Contract Price $3.423.467.00 Previous Change Orders $841.228.21 24.57% of bid Total to Date 54,264,695.21 This Change Order 5964.21 Total Change Orders to Date $842.19242 24.60% of bid Revised Contract Price S4,265,659.42 Construction Manager,' Projectgineer /Project Manager X--"- � �OI -City Engineer Date: 5/12/2016 Dat > G Date I L Date ,,