HomeMy WebLinkAboutGranite Rock Company - 2015 Agreement - Contingency Change Order No. 3Citp of Oilrop Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846 -0451; Fax (408) 846• -0429 CONTINGENCY CHANGE ORDER NO. 3 To contract for: Eigleberry Street Resurfacing Fr.ject City Project No.: 14- PW- 213/STPL- 5034(025) Contractor: Graniterock Inc. Contract Date: 3/1/2015 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Description of Work Increase depth of 6 ft wide edge grind from 0.15 ft to 0.25 ft for an additional $3.60/SY,delete original bid items 7 & 8 which will be paid at force account, AC pavement repair, add leveling course of AC and pavement fabric, delete bid item 16 profile grind, and additional asphalt emulsion, all as per the attached sheet, for a net increase of $387,628.80. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work "), including but not limitad to labor, materials, overhead and profit, delay, disruption, lo$s of efficiency and wry and aii other direct acd; ^r ir,.iirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the ;ra Work. Change iii kl�,orking time qranted by this chang- order ► All Extra Work authorized udder this Change Order must be billed separately from the original contract. All bills for work done under this Change Order shall reference this Change Order No. 3. I (We) agree to make the above change subject to the terms of this Change Order for a NET INCREASE not to exce8�,62$.80. WIRMPffili€ch, Area Manager By: RECOMMENDED BY: ACCEPTED BY: City Administrator deferred I Working Days Cost Percentage Contingency Amount $906,403.00 123.0% used Original Contract Price $1,189,355.00 Previous Change Orders $726,870.40 61.11% of bid Total to Date $1,916,225.40 This Change Order $387,628.80 Total Change Orders to Date $1,114,499.20 93.71% of bid Revised Contract Price $2,303,854.20 Manager �= Jqmllrffi 25'��evt /.6 Date /a Zs /6 Date /