CHANGE ORDER NO. 1
02J
To contract for: Downtown Monterey Rd Rehab Project City Project No.: 18-Pw-400, STPURSTP-5034(27)
Contractor: Graniterock Company Contract Date: 7/16/2019
This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and
Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon
acceptance by the City, the Contractor's copy will be returned to him as his authoritv to proceed with the work.
Description of Work
Removal of in -ground warning lights at four locations on Monterey Road between 4th Street and 8th Street. Work includes
traffic control, spot removal of in -pavement warning lights, and paving back the voids left by the removed in -pavement
lights.
All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this
Change Order. The contract time shall not extend unless expressly provided for in this Change Order.
By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained
herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses
associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit,
delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra
Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the
Contract associated with the Extra Work.
Change in working time granted by this change order: 0 I Working Days
Cost PercentagE Initial
All Extra Work authorized under this Change Order
must be billed separately from the original contract. All
bills for work done under this Change Order shall
reference this Change Order No. 1.
Original Contract Price $1,560,949.00
Previous Change Orders
$0.00 N/A
Total to Date
$1,560,949.00
This Change Order
$11,828.13
Total Change Orders to Date
$11,828.13 0.76%
Revised Contract Price
$1,572,777.13
I (We) agree to make the above change subject to the
terms of this Change Order for a NET INCREASE not
to exceed $11,828.13.
aCONACTOR
17 By: Date
RECOMMENDED BY:�G�t ./� /G
Construcfion �er
ACCEPTED BY: rngineer/Pro'
Proj ct ct Manager
engineer
City Administrator
N�,
►z11�� i�r
A
Date
Date
1 7tZ_&rzi
Date
/C/�'d
Date
W
W
DATE: 10/18/2019
JOB NUMBER: 6664 Monterey Rd. Rehab.
Gran iterock Proposal: Remove E-4�J�ri�dl L-re1��y f uu�." a, Id matte- 111 ,- a ,,,.� ,=/ l�
Markups per Contract Agreement
Markup Labor25% L7�
Markup Equipment 1�1'1
15%
MaFkup� Materials 15%
Markup Subs 5%
OPERATION
Operation #001: Mobilize (Traffic/Control Plan, Equip. Mobe)
In- bra vs n -1 � V ✓L.t G 27�
Operation #002: Remove Pwr&k 'and Place AC
Bond Costs
AMOUNT
$9,645.03
$243
TOTAL $12,403.33---
I-- ,
1-5
FILENAME: PCO #1-Hockey Pucks (revised scope as of 10.18.19) PAGE NO. 1
Job Name:
Owner/Agency:
Work Performed By
Graniterock Company
Issue:
Operation #001
COMMENTS:
# of E'ees
1.00
GRANITEROCK COMPANY
PROPOSAL
6664 Monterey Rd. Rehab. Job Number 6664
City of Gilroy
Data Performed
Date of Report
Mobilize (Traffic Centro! Plan, Equip. Mobe)
Change Order No. 1
LABOR (A)
® -D = DAY / N = NIGHT
NAME
Shifts
HRS
RATE AMOUNT
Laborer
0.00
68.00 0.00
Concrete Finisher
0.00
71.00 0,00
Supervisor (Foreman)
0.00
119.00 0.00
Mechanic
0.00
112.00 0.00
General Operator
0.00
87.00 0.00
Operator (Blade / Excavator)
0.00
112.00 0.00
Carpenter
0.00
91.00 0.00
Teamster
1
L 8.0011
72.00 576.00
LABOR, OVER TIME (A1)
OT or DT
Laborer
91.00 0.00
Concrete Finisher
93.00 0.00
Supervisor (Foreman)
153.00 0.00
Mechanic
142.00 0.00
General Operator
115.00 0.00
Operator (Blade / Excavator)
142.00 0.00
Carpenter
I
123.00 0.00
Teamster
93.00 0.00
OPERATED EQUIPWNT (B)
DESCRIPTION
Shifts
HRS
RATE AMOUNT
Transport Truck (Incl/ Trailer)
1
8.00
133 1060.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 Total Labor (A)
0.00
0.00 Total Labor, Over Time (Al)
0.00,
0.00 Total Labor
0.00
0.00 25 % Markup on Labor
0.00
o.00 Total Labor +Markup
0.00
0.00
0.00
0.00 Equipment (B)
0.00
0.00 15% Markup on Equipment
0.00
o.00 Total Equipment+ Markup
o.00
0.00
L
0.00 Material/Other (C)
0.00 15 % Markup on Material
MATERIAL (C)
Total Material + Markup
DESCRIPTION
CLAN
PRICE
AMOUNT
Cream Rolling Closure T/C Plan
1.00
. 0
0050WO
0.00 Sub Work(Cl)
0.00 5 % Markup on Subs
0.00 Total Subs + Markup
0.00
0.00
0.00
0.00
0.00
OTHER CHARGES/SUB WORKTotal Cost (w/ Markup)
DESCRIPTION
(CI)
I QUAN PRICE AMOUNT
GRAND TOTAL
576.00
0.00
$576.00
144.00
720.00
1060.96
159.14
1220.10
5
7
5.00 "07
$0.00
0.00
0.00
$2,515.10
2515 /c%% 5 , ICs
FILENAME: PCO #1-Hockey Pucks (revised scope as of 10.18.19)
LABOR NOTES
Prev. Wage Rate $53.84/hr. (Per Prev. wage rates Santa Clara County, Group 2 Laborer (pg 39).
Contractor's proposed $68/hour is acceptable given busy construction season. Currently in the industry,
higher than prevailing wage rates are common to retain staff.
EQUIPMENT NOTES
CT Equipment per hour (Labor Surcharge and Equipment Rental Rates (4/2019-3/2020)
Cars, Light trucks (p. 34) 26.15
2 axle trailer 4 tires/axle (pg. 32) 15.75
41.9
Contractor's proposed $56.5/hour is acceptable given busy construction season. Hourly rental
rates may be higher.
llr_�1114IN"- Wkrolm
Assume Foreman's rate is ok.
GRC's Cost Estimate = $11,828
Job Name:
Owner/Agency:
Work Performed By
Granilerock Company
Issue:
Operation #00e
COMMENTS:
# of E'ees
3.00
1.00
1.00
CODE
pu
skip
tack
turtle
GRANITEROCK COMPANY
PROPOSAL
6664 Monterey Rd. Rehab.
City of Gilroy
Job Number
Date Performed
Date of Report
Re-mve P s and Plato AC
Change Order No. 1
LABOR (A)
-6- jD = DAY / N = NIGHT
NAME
Shifts HRS
RATE
AMOUNT
Laborer
1
24.00
68.00
1632.00
Concrete Finisher
0.00
71.00
0.00
Supervisor (Foreman)
1
8.00
119.00
952.00
Mechanic
0.00
112.00
0.00
General Operator
1
8.00
87.00
696.00
Operator (Blade / Excavator)
0.00
112.00
0.00
Carpenter
0.00
91.00
0.00
Teamster
0.00
72.00
0,00
LABOR, OVER TIME Al)
or OT or DT
Laborer
91.00
0.00
Concrete Finisher
93.00
0.00
Supervisor (Foreman)
1
1.00
153.00
153.00
Mechanic
142.00
0.00
General Operator
115.00
0.00
Operator (Blade / Excavator)
142.00
0.00
Carpenter
123.00
0.00
Teamster
93.00
0.00
OPERATED EQUIPWNT
(B)
DESCRIPTION
Shifts HRS
RATE
AMOUNT
Truck - Pickup
1
17.00
27
451.18
Skip Loader
1
8.00
58
461.68
Tackpot
1
8.00
25
203.60
Wacker Turtle (24")
1
8.00
32
257.04
0.00
0.00 Total Labor (A)
0.00
0.00 Total Labor, Over Time (Al)
0.00
0.00 Total Labor
0.00
0.00 25 % Markup on Labor
0.00
o.00 Total Labor+ Markup
0.00
0.00
0.00
0.00 Equipment (B)
0.00
0.00 15 % Markup on Equipment
0.00
o.00 Total Equipment + Markup
0.00
0.00
0.00,
0.00
0.00
0.00 Material/Other (C)
0.00 15 % Markup on Material
MATERIAL (C)
Total Material + Markup
DESCRIPTION
QUAN
PRICE
AMOUNT
Trucking (AC)
8.00
160.00
1280.00
Buy AC
4.00
75.001
300.00 Sub Work(CI)
SS1-H Tack Oil
1.00
200.00
200.00 5 % Markup on Subs
o.00 Total Subs + Markup
0.00
0.00
0.00
0,00
0.00
OTHER CHARGES/SUB WORK
fC1)
Total Cost (w/ Markup)
DESCRIPTION
I QUAN
PRICE
AMOUNT
tl Traffic Control
1
1.001
1645.001
1645.00
GRAND TOTAL
3280.00
153.00
$3,433.00
858.25
4291.25
1373.50
206.03
1579.53
1780.00
267.00
2047.00
$1,645.00
82.25
1727.25
$9,645.03
9 645.03
FILENAME: PCO #1-Hockey Pucks (revised scope as of 10.18.19)
Engineer's Estimate of CCO# 001
- In -Ground Pavement Lighting
I Total Labor (A)
�LABOR(Al)
D,
# of E'ees
NAME
Shifts
HRS
RATE
AMOUNT
Total Labor, Over Time (Al)
3.00
Laborer
1
24.00
$53.84
$1,292.16
I Total Labor
Concrete Finisher
0.00
$71.00
$0.00
25 % Markup on Labor
1.00
Supervisor (Foreman)
1
8.00
$119.00
$952.00
I Total Labor+ Markup
Mechanic
0.00
$112.00
$0.00
1.00
General Operator
1
8.00
$72.05
$576.40
Equipment (B)
15 % Markup on Equipment
Teamster (Mobilize)
8.00
$72.05
$576.40
I Total Equipment+Markup
�IJLAUGR, OVER TY1 E 01
Of
Material / Other (C)
Supervisor (Foreman)
1
1
$154.70
$154.70
I 15 % Markup on Material
Total Material + Markup
Sub Work (C1)
10 % Markup on Subs
PPEMM D ECIIIIIIIPMEWT
Total Subs + Markup
CODE
DESCRIPTION
Shifts
HRS
RATE
AMOUNT
PU
Transport Truck (Incl Trailer) -
1
8.00
$133.00
$1,064.00
Subtotal
Mobilization
Bond Costs (2 %)
Truck - Pickup
1
17.00
$26.15
$444.55
Skip Loader
1
8.00
$50.00
$400.00
Tackpot
1
8.00
$25.00
$200.00
Total Estimated Cost GRC &
Subs
Wacker Turtle (24")
1
8.00
$32.00
$256.00
DESCRIPTION
IQUAN
PRICE
AMOUNT
Trucking (AC)
I 8 I
$160.00 I
$1.280.00
Buy AC
I 4
$75.00 I
$300.00
SS-1 H Tack Oil
1.00
$200.00
$200.00
DESCRIPTION
QUAN
PRICE
AMOUNT
Traffic Control (Hernandez)
1.00 I
$1,645.00 I
$1,645.00
$3,396.96
$154.70
$3,551.66
$887.92
$4,439.58
$2,364.55
$354.68
$2,719.23
$1,780.00
$267.00
$2,047.00
$1,645.00
$164.50
$1,809.50
$11.015.31
$220.31
$11,235.61 l