Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Granite Rock Company - Downtown Monterey Rd Rehabilitation - Change Order No. 3
Up of Offrup Public Works Department - Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0451; Fax (408) 846-0429 CHANGE ORDER NO. 3 027- To contract for: Downtown Monterey Rd Rehab Project City Project No.: 18-Pw-400, STPURSTP-5034(27) Contractor: Graniterock Company Contract Date: 7/16/2019 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authoritv to proceed with the work. Description of Work Add Signage and Striping, including : (1 ea.) R99 sign, (7 ea.) R7-5 (MOD) signs, (4 ea.) R4-11 signs and 150 LF of 4-inch white stripe, including pre -mark layout, USA ticketing, material purchase, and final installation as shown in the City's R1 DWGs. Paint red curb and stencil "Fire Lane — No Parking" on curb, approx. 300 LF at 4 locations and all added, omitted, and replaced signage as shown in the City's R2 DWGs. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Change in working time granted by this change order: ► All Extra Work authorized under this Change Order must be billed separately from the original contract. All bills for work done under this Change Order shall reference this Change Order No. 3. I (We) agree to make the above change subject to the terms of this Change Order for a NET INCREASE not to exceed $11,787.82. cCONc TCTORrBy. 0 Working Days I Cost Percentam Initial Original Contract Price $1,560,949.00 Previous Change Orders $14,153.13 0.91% Total to Date $1,575,102.13 This Change Order $11,787.82 Total Change Orders to Date $25,940.95 1.66% Revised Contract Price $1,586,889.95 Date: 1 -th 1. Igo RECOMMENDED BY: Construction Manager ACCEPTED BY: \� Project E�gineer/Project Manager Ci gineer -A�k-q City Administrator Q� T.K. / /3 9/ ZD 2D Date Date Date 99 Date C$T. i 4 G7raniterock 11.15.2019 City of Gilroy Department of Public Works 7351 Rosanna Street Gilroy, CA 95020-6197 Attn: Tricia Baxter at tbaxtera,41eafinc.com Julie Oates at Julie.0atesaci.6lrov.ca.us Faranak Mandavi at Faranak.Mandaviaci.ailrov.ca.us RE: City of Gilroy Project No. 18-PW-400, Federal Project No. STPL/RSTP-5034 (027) Monterey Road Rehabilitation Project Subj: PCO�Revised Striping Plan (Updated 11.14.19) 1.0 Ms. Baxter, Graniterock and its subcontractor is pleased to offer the following proposal for the City revision #2 Revised Striping Plan, received Weds 11.14.19. GRC's lump sum proposal is for $11,787.82. This proposal covers the following: • Add: (1 ea.) R99 sign, (7 ea.) R7-5 (MOD) signs, (4 ea.) R4-11 signs and 150' of 4" white stripe, including pre -mark layout, USA ticketing, material purchase, and final installation as shown in the City's R1 DWGs. • Add: Paint red curb and stencil "Fire Lane — No Parking" on curb, approx.. 300 LF at 4 locations. And all added, omitted, and replaced signage as shown in the City's R2 DWGs. • GRC staff and advanced warning signage for GC oversight • All applicable labor, equipment, and subcontractor markups, as well as, 2% bonding and insurance fee as denoted in Section 01035, 2.0 NEGOTIATED CHANGE ORDERS Attached to this proposal letter you will find additional backup information including GRC's subcontractor quote sheets for the modified work described in the City's R1 and R2 Signage and Striping Revisions. Please feel free to contact me with any additional questions or concerns on this topic. Email: kmcleanaaraniterock.com Cell: (408) 858-1370 5225 Hellyer Ave., San Jose, CA 95138 (408) 574-1400 Thank you, Kyle McLean Graniterock Structures Div. Project Manager 5225 Hellyer Ave., San Jose, CA 95138 (408) 574-1400 Fremont Office 43650 Osgood Rd Fremont CA 94539 Phone: (510) 656-2840 Fax: (510) 656-2397 Quotation TO: Graniterock (WATSONVILLE) 411 WALKER STREET WATSONVILLE CA 95077 Phone: (831) 768-2700 Fax: (831) 768-2701 Contact: Kyle McLean email: kmclean@Graniterock.com ITEM NO. DESCRIPTION 1 ADD: (1 ea) R99 Sign, (7 ea) R7-5 (MOD) Signs, (4 ea) R4-11 Signs and 150' of 4" white stripe EXTRA WORK Contractors License No. 374600 DIR Registration No. 1000000306 A General Engineering C-13 Fence, Wire, wood C-32 Highway Improvement Current Date: 10/3/2019 BidDate: 10/4/2019 JobName: Downtown Monterey Road Rehabilitation Project Location: Gilroy Bid#: 43767 1 Contract#: Job#:10G.19,713 Working Days: Liquidated Damages QUANTITY UNIT UNIT PRICE TOTAL 1 LS 6915.000 $6,915.00 Subtotal $6,915.00 TOTAL $6,915.00 WORK IS TO BE DONE WITH / AT SAME TIME OF CONTRACT WORK OR ADDITIONAL MOBILIZATION WILL BE ASSESSED AS PER ORIGINAL QUOTATION AT BID TIME WRITTEN AUTHORIZATION REQUIRED PRIOR TO SCHEDULING Signing of this quotation will constitute a legal and binding contract change order to perform extra work as quoted and a contract change order must be issued to Chrisp company for the agreed amount of work and moneys within 10 days of the beginning for the work. Non -timely issuance of a contract change order will not relieve general contractor of delayed/late payment. Date Approved: Signed: Print name and title: This quote includes all stipulations found on page 3 QUOTE PREPARED BY Danny Azcueta (650) 224-1115 dazcueta@chrispco.com CHRISP COMPANY Page 1 of 3 Cf tbp ConWaruj- Fremont Office 43650 Osgood Rd Fremont CA 94539 Phone: (510) 656-2840 Fax: (510) 656-2397 Quotation EXTRA WORK Contractors License No. 374600 DIR Registration No. 1000000306 A General Engineering C-13 Fence, Wire, wood C-32 Highway Improvement COMMENTS, EXCLUSIONS, AND STIPULATIONS The following stipulations are hereby incorporated into and made part of the quotation from Chrisp co. dated October 3, 2019 for the following project Downtown Monterey Road Rehabilitation Project • NO RETENTION TO BE TAKEN ON CONTRACTS LESS THAN $5000.00 • Chrisp Company reserves the right to withdraw proposal if written acceptance is not received within 30 days of bid date • EXCLUDE: Installation or removal of temporary delineation • Clean, clear and unobstructed access required for Chrisp Co. work • Final PAY QTYS presented by owner MUST be agreed by Chrisp Co. • Changeable Message board if required to be provided by General Contractor for Chrisp Co. Use at no Charge to Chrisp Co. • EXCLUDE: Traffic Control Plan • EXCLUDE: Removal of Existing Striping & Markings • EXCLUDE: Removal of Existing Pavement Markers • EXCLUDE: Seal Coat • Contractor is to Provide Stockpile Location for Striping Removal Debris. • Parking Area is to be Clear of Debris and Parked Vehicles prior to Chrisp Company Arrival. • EXCLUDE: Furnishing and Installation of Mast Arm Signs • EXCLUDE: Red -Lined As -Built Drawings • If Chrisp Co. is required to DIG BY HAND do to issues U.S.A., etc.an additional $20.00 per hole will be charged • Traffic Control INCLUDED for Chrisp Company work ONLY • After receiving contract 10 working days written notice required prior to scheduling of work • EXCLUDE: Special Insurance Requirements,(i.e. Railroad Insurance, ) • EXCLUDE: WHEEL STOPS • EXCLUDE: ALL Signs on Traffic Signal Plans • EXCLUDE: Pedestrian Barricades • EXCLUDE: ALL Solar Powered LED Signs to be Done By Others • EXCLUDE: Construction Area Signs Page 2 of 3 C' kli p ConW al j Fremont Office 43650 Osgood Rd Fremont CA 94539 Phone: (510) 656-2840 Fax: (510) 656-2397 Quotation EXTRA WORK Contractors License No. 374600 DIR Registration No. 1000000306 A General Engineering C-13 Fence, Wire, wood C-32 Highway Improvement • Chrisp Co. will remove contractors short term temporary markers (Floppys) placed for lanelines and centerlines only (no edgelines or shoulders). No Tape removal. Short Term Temporary markers are to be placed so that striping may be placed before removal of temporary markers. • This quotation excludes Primary Liability Insurance greater than $2,000,000. • This quotation excludes all work associated with the project SWPP and WPCP. • This quotation excludes installing permanent striping while other operations are in progress on jobsite. • This quotation excludes performing removal work while other operations are in progress on jobsite. • This quotation excludes the removal & disposal of hazardous grindings & spoils from jobsite. • This quotation Excludes furnishing or placing ALL signage for advance posting of ramp closures / detours for our operations. • This quotation Excludes furnishing or placing ALL detour signage for our operations. • EXCLUDE: Encroachment Permit (If required to be provided at No Cost to Chrisp Company) • Game Court is to be clear of Debris and Parked Vehicles prior to Chrisp Company Arrival • Mobilization & Traffic Control Items shall not be adjusted for decreases in the work. • Mobilization & Traffic Control Items shall be adjusted for increases in the work • Prime contractor to provide disposal area & dispose of all Non -hazardous stripe & marker debris. Disposal area to be on jobsite. • Access / and or Accessibility by 1 Ton Vehicle required for Chrisp Company work • EXCLUDE: Advanced posting of "No Parking" signs • This quotation EXCLUDES removal of Yellow stripe and markings treated as hazardous. • ALL Bid items shall NOT be adjusted or removed without written / or verbal permission. • EXCLUDE: Lead Compliance Plan • Retainage percentage on monthly progress payments to be no greater than the percentage retained by the Owner on its payment to the Contractor. If Owner reduces the retainage percentages on payments to the Contractor, the Contractor shall likewise reduce the retainage percentage on payment to Chrisp Company. Full retention to be released no later than thirty, (30) Days after completion of Chrisp Companys work. Excessive or delinquent retainage will be subject to the highest interest rate allowed by law. • Chrisp Company shall be reimbursed the full amount for bonds upon submission to General Contractor. Retention shall not be held from bond reimbursement. • THIS QUOTATION IS BASED ON A STANDARD MONDAY THROUGH FRIDAY WORK WEEK. ADDITIONAL COSTS WILL OCCUR FOR WORK PERFORMED ON WEEKENDS • CHRISP COMPANY WILL USE EXISTING EMPLOYEE POOL TO PERFORM ALL WORK ON THIS PROJECT. IF THERE ARE ANY HIRING GOALS FOR THIS PROJECT THIS WILL BE EXCLUDED • EXCLUDE: ALL HARD WIRED ELECTRICAL SIGNS Page 3 of 3 awl--, p eamp a/uj, Fremont Office 43650 Osgood Rd Fremont CA 94539 Phone: (510) 656-2840 Fax: (510) 656-2397 Quotation TO Graniterock (WATSONVILLE) 411 WALKER STREET WATSONVILLE CA 95077 Phone: (831) 768-2700 Fax: (831)768-2701 Contact: Kyle McLean email: kmclean@Graniterock.com ITEM NO. DESCRIPTION 1 ADD: Paint Red Curb and Stencil "Fire Lane - No Parking" on curb EXTRA WORK Contractors License No. 374600 DIR Registration No. 1000000306 A General Engineering C-13 Fence, Wire, wood C-32 Highway Improvement Current Date: 11/14/2019 BidDate: 11 /15/2019 JobName: Downtown Monterey Road Rehabilitation Project Location: Gilroy Bid#: 43767 2 Contract#: Job#: Working Days: Liquidated Damages QUANTITY UNIT UNIT PRICE TOTAL 300 LF 4.000 $1,200.00 Subtotal $1,200.00 TOTAL $1,200.00 WORK IS TO BE DONE WITH / AT SAME TIME OF CONTRACT WORK OR ADDITIONAL MOBILIZATION WILL BE ASSESSED AS PER ORIGINAL QUOTATION AT BID TIME WRITTEN AUTHORIZATION REQUIRED PRIOR TO SCHEDULING Signing of this quotation will constitute a legal and binding contract change order to perform extra work as quoted and a contract change order must be issued to Chrisp company for the agreed amount of work and moneys within 10 days of the beginning for the work. Non -timely issuance of a contract change order will not relieve general contractor of delayed/late payment. Date Approved: Signed: Print name and title: This quote includes all stipulations found on page 3 QUOTE PREPARED BY Kenny Roderick (510)456-0759 kroderick@chrispco.com CHRISP COMPANY Page 1 of 3 ehftl p eQf" an* EXTRA WORK Contractors License No. 374600 Fremont Office DIR Registration No. 1000000306 43650 Osgood Rd A General Engineering Fremont CA 94539 C-13 Fence, Wire, wood Phone: (510) 656-2840 Fax: (510) 656-2397 C-32 Highway Improvement Quotation COMMENTS, EXCLUSIONS, AND STIPULATIONS The following stipulations are hereby incorporated into and made part of the quotation from Chrisp co. dated November 14, 2019 for the following project Downtown Monterey Road Rehabilitation Project • NO RETENTION TO BE TAKEN ON CONTRACTS LESS THAN $5000.00 • Chrisp Company reserves the right to withdraw proposal if written acceptance is not received within 30 days of bid date • EXCLUDE: Installation or removal of temporary delineation • Clean, clear and unobstructed access required for Chrisp Co. work • Final PAY QTYS presented by owner MUST be agreed by Chrisp Co. • Changeable Message board if required to be provided by General Contractor for Chrisp Co. Use at no Charge to Chrisp Co. • EXCLUDE: Traffic Control Plan • EXCLUDE: Removal of Existing Striping & Markings • EXCLUDE: Removal of Existing Pavement Markers • EXCLUDE: Seal Coat • Contractor is to Provide Stockpile Location for Striping Removal Debris. • Parking Area is to be Clear of Debris and Parked Vehicles prior to Chrisp Company Arrival. • EXCLUDE: Furnishing and Installation of Mast Arm Signs • EXCLUDE: Red -Lined As -Built Drawings • If Chrisp Co. is required to DIG BY HAND do to issues U.S.A., etc.an additional $20.00 per hole will be charged • Traffic Control INCLUDED for Chrisp Company work ONLY • After receiving contract 10 working days written notice required prior to scheduling of work • EXCLUDE: Special Insurance Requirements, (i.e. Railroad Insurance, • EXCLUDE: WHEEL STOPS • EXCLUDE: ALL Signs on Traffic Signal Plans • EXCLUDE: Pedestrian Barricades • EXCLUDE: ALL Solar Powered LED Signs to be Done By Others • EXCLUDE: Construction Area Signs • Chrisp Co. will remove contractors short term temporary markers (Floppys) placed for lanelines and centerlines only (no edgelines or shoulders). No Tape removal. Short Term Temporary markers are to be placed so that striping may be placed before removal of temporary markers. • This quotation excludes Primary Liability Insurance greater than $2,000,000. • This quotation excludes all work associated with the project SWPP and WPCP. • This quotation excludes installing permanent striping while other operations are in progress on jobsite. Page 2 of 3 Fremont Office EXTRA WORK Contractors License No. 374600 DIR Registration No. 1000000306 43650 Osgood Rd A General Engineering Fremont CA 94539 C-13 Fence, Wire, wood Phone: (510) 656-2840 Fax: (510) 656-2397 C-32 Highway Improvement Quotation • This quotation excludes performing removal work while other operations are in progress on jobsite. • This quotation excludes the removal & disposal of hazardous grindings & spoils from jobsite. • This quotation Excludes furnishing or placing ALL signage for advance posting of ramp closures / detours for our operations. • This quotation Excludes furnishing or placing ALL detour signage for our operations. • EXCLUDE: Encroachment Permit (If required to be provided at No Cost to Chrisp Company) • Game Court is to be clear of Debris and Parked Vehicles prior to Chrisp Company Arrival • Mobilization & Traffic Control Items shall not be adjusted for decreases in the work. • Mobilization & Traffic Control Items shall be adjusted for increases in the work • Prime contractor to provide disposal area & dispose of all Non -hazardous stripe & marker debris. Disposal area to be on jobsite. • Access / and or Accessibility by 1 Ton Vehicle required for Chrisp Company work • EXCLUDE: Advanced posting of "No Parking" signs • This quotation EXCLUDES removal of Yellow stripe and markings treated as hazardous. • ALL Bid items shall NOT be adjusted or removed without written / or verbal permission. • EXCLUDE: Lead Compliance Plan • Retainage percentage on monthly progress payments to be no greater than the percentage retained by the Owner on its payment to the Contractor. If Owner reduces the retainage percentages on payments to the Contractor, the Contractor shall likewise reduce the retainage percentage on payment to Chrisp Company. Full retention to be released no later than thirty, (30) Days after completion of Chrisp Companys work. Excessive or delinquent retainage will be subject to the highest interest rate allowed by law. • Chrisp Company shall be reimbursed the full amount for bonds upon submission to General Contractor. Retention shall not be held from bond reimbursement. • THIS QUOTATION IS BASED ON A STANDARD MONDAY THROUGH FRIDAY WORK WEEK. ADDITIONAL COSTS WILL OCCUR FOR WORK PERFORMED ON WEEKENDS • CHRISP COMPANY WILL USE EXISTING EMPLOYEE POOL TO PERFORM ALL WORK ON THIS PROJECT. IF THERE ARE ANY HIRING GOALS FOR THIS PROJECT THIS WILL BE EXCLUDED • EXCLUDE: ALL HARD WIRED ELECTRICAL SIGNS Page 3 of 3 Engineer's Estimate of CCO# 003 - Revised Striping Chrisp Costs �hrlsp- LA&DIR (A), D Total Labor (A) $1,337.44 # of E'ees NAME Shifts HRS RATE AMOUNT Total Labor, Over Time (Al) $0.00 Laborer 2 8.00 $53.84 $861.44 Total Labor $1,337.44 Concrete Finisher 0.00 $0.00 25 % Markup on Labor $334.36 Supervisor (Foreman) PT 4.00 $119.00 $476.00 Total Labor+ Markup $1,671.80 Mechanic 0.00 $0.00 General Operator 0.00 $0.00 Operator (Blade / Excavator) 0.00 $0.00 I Equipment (9) $335.20 Carpenter 0.00 $0.00 15 % Markup on Equipment $50.28 Teamster 0.00 $0.00 I Total Equipment+ Markup $385.48 ILA$3'DK OVER Ttl E Q41u OT Laborer $0.00 Concrete Finisher $0.00 Material / Other (C) $6,362.50 Supervisor (Foreman) $0.00 I 15% Markup on Material $954.38 Mechanic $0.00 Total Material + Markup $7,316.88 General Operator $0.00 Chrisp Total Cost (A,B,C) $9,374.16 Operator (Blade / Excavator) $0.00 Carpenter $0.00 Sub Work (Cl) $9,374.16 Teamster $0.00 5 % Markup on Subs $468.71 IMP OPEMTED Eft IMENT M total Subs + Mai,, CODE DESCRIPTION Shifts HRS RATE AMOUNT Truck - with trailer 1 8.00 $41.90 $335.20 Owiw WIATEF'1 AL X) DESCRIPTION QUAN PRICE AMOUNT R99 Sign I 3OX30 sign I 1.00 I $370.00 I $370.00 R7-5 I 30X30 sign I 7.00 I $420.00 I $2,940.00 R4-11 I 30X30 sign I 4.00 I $420.00 I $1,680.00 150 Lf. of 4-inch white stripe I 150.00 I $1.15 I $172.50 Red curb with fire lane parking 300.00 $4.00 $1.200.00 GRC Supervision East rate from April 2019 Gilroy Project by Chrisp rate from April 2019 Gilroy Project by Chrisp Assumed same as R7-5 since same size From this project's estimate. Cost seemed reasonable. DESCRIPTION QUAN PRICE I AMOUNT GRC Cost GRC Oversight Supervisor (Foreman) I 8.00 I $153.00 $1,224.00 Total Labor (A) $1,224.00 Total Labor, Over Time (Al) $0.00 Total Labor $1,224.00 25 % Markup on Labor $306.00 Total GRC Labor+ Markup $1,530.00 Subtotoal GRC & Subs) $11,372.86 Bond Costs (2%) $227.46 Estimated Total CCO Cost $11,600.32 LABOR NOTES Prev. Wage Rate $53.84/hr. (Per Prev. wage rates Santa Clara County, Group 2 Laborer (pg 39). Contractor's proposed $68/hour is acceptable given busy construction season. Currently in the industry, higher than prevailing wage rates are common to retain staff. Assume Foreman rate is ok. Prev. Wage Rate $72.05/hr. (Per Prev. wage rates Santa Clara County, Group 3 Operator (pg 39)jArea A (p25). Contractor's proposed $87/hour is acceptable given busy construction season. Currently in the industry, higher than prevailing wage rates are common to retain staff. Assume same as General Operator Rate. EQUIPMENT NOTES CT Equipment per hour (Labor Surcharge and Equipment Rental Rates (4/2019- 3/2020) Cars, Light trucks (p. 34) 26.15 Skip Loader pg. 17-19. Ave. $50 50 Tackpot (no info avail) Use $25 25 Wacker (pg 24-26) Rate $25 is reasonable 32 All material rates verified with suppliers. Assumes GRC's estimate for sub. GRC's Cost Estimate $11,787.82] � 2 G' )1-)ZD -1 Ff--Di /, / bExhibit D `�r'I' ��""d Payment Schedule and Payment Rate Contractors License No.374600 Fremont Office DIR Registration No, 1000000306 43650 Osgood Rd tA4 c n A General Engineering Fremont CA 94539 C-13 Fence, Wire, wood Phone: (510) 656-2840 Fax: (510) 656-2397 C-32 Highway Improvement Quotation Union Contractor/ No minority Status TO: Current Date: 2/20/2019 GILROY, CITY OF BidDate: 2/20/2019 7351 ROSANNA STREET JobName: Striping, Markers and Object Marker 2019-2020 GILROY CA 95020 Location: GILROY Bid#: 31682 0 Phone: (408) 846-0238 Fax: ( ) - Contract#: Job#: Working Days: Contact: Nirorn Than Liquidated Damages email: Nirorn.than@cityofgilroy.org ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL 01 Detail 4 LF 0.70 02 Detail 9 LF 1.40 03 Detail 10 LF 1.15 04 Detail 21 LF 2.10 05 Detail 22 LF 3.50 06 Detail 23 LF 3.50 07 Detail 25 LF 1.15 08 Detail 25A LF 1.40 09 Detail 26 LF 0.60 10 Detail 27B LF 1.15 11 Detail 27C LF 1.10 12 Detail 29 LF 6.90 13 Detail 30 LF 4.60 14 Detail 32 LF 3.50 15 Detail 33 LF 3.50 16 Detail 37B LF 3.25 17 Detail 37C LF 3.25 18 Detail 38 LF 3.50 19 Detail 38B LF 3.70 20 Detail 39 LF 1.75 21 Detail 39A LF 1.70 22 Detail 40 LF 2.30 23 Detail 40A LF 2.30 24 Detail 41 LF 2.30 25 12" White or Yellow Crosswalk or Limit Line LF 4.60 26 12" White or Yellow Crosswalk Hatching LF 4.60 27 8" White or Yellow Thermoplastic LF 3.50 28 4-inch white lines for parkinq stalls (Paint) LF 1.15 1,-- 29 Removing and sealing existing pavement marking SF 3.50 30 Removal of Markers LF 2.50 31 Type 1 10' Arrow EA 69.00 32 Type 118' Arrow EA 115.00 33 Type 124' Arrow EA 145.00 34 Type 11 (L) Arrow EA 185.00 35 Type II (B) Arrow EA 255.00 36 Type III (L) Arrow EA 185.00 37 Type III (B) Arrow EA 255.00 38 Type IV Arrow EA 75.00 Page 1 of 4 eVLb p em" atuj Contractors License No. 374600 Fremont Office DIR Registration No. 1000000306 43650 Osgood Rd A General Engineering Fremont CA 94539 C-13 Fence, Wire, wood Phone: (510) 656-2840 Fax: (510) 656-2397 C-32 Highway Improvement Quotation Union Contractor/ No minority Status 39 Type V Arrow EA 155.00 40 Type VI Arrow EA 185.00 41 Type VI Arrow EA 140.00 42 Type VIII Arrow EA 185.00 43 Railroad Crossing Symbol EA 325.00 44 Disabled Persons Parking Symbol EA 245.00 45 Two -Way Blue Reflective Fire Hydrant Marker EA 20.00 46 Bike Lane with Arrow Pavement Marking (per City SF 6.90 Standard 27A) 47 Install Pavement Marking Words (STOP, SCHOOL SF 5.25 48 Install Pavement Marking Numbers (35, 35 etc.) SF 5.25 49 Stop Sign - Standard Size EA 420.00 50 Pedestrian Crossing Sign - Size 30x30 (W54) EA 420.00 t1- 51 School Children Crossing Sign - Standard Size EA 455.00 52 Handicap Parking Only Sign - (R99) EA 370.00 53 Green Thermoplastic Bike Lane SF 14.00 54 Traffic Control 1 Man - Minor Streets DAY 1750.00 55 Traffci Control 2 Man - Major Streets DAY 2850.00 Notes Work Order Minimum $3500.00 ALL STRIPING/ PAVEMENT MARKING TO BE THERMOPLASTIC Written Authorization is Required Prior to Proceeding With Work ACCEPTED BY: P.O. Number TITLE: Job Number Bond Rate Addendu 1.2% This quote includes all stipulations found on page 4 QUOTE PREPARED BY David Morris (510) 719-6453 dmorris@chrispco.com CHRISP COMPANY Page 2 of 4 NOTES: LEGEND: 1. EXACT LOCATION AND POSITION OF ALL POLES AND ROADSIDE SIGNS SHALL BE DETERMINED BY THE ENGINEER. No 2. ALL SIGNS ARE BASED ON THE CALIFORNIA 2014 MUTCD. 3. CONTRACTOR SHALL REMOVE EXISTING PAVEMENT DELINEATION WHICH CONFLICT WITH THIS PLAN. f 4. ALL PAVEMENT STRIPING AND MARKINGS SHALL BE THERMOPLASTIC. • 5. EXACT LOCATION AND POSITION OF PAVEMENT MARKINGS TO BE DETERMINED IN THE FIELD BY THE ENGINEER. 6. REFER TO 2018 CALTRANS STANDARD PLAN ES-1A FOR ANNOTATIONS. 7. FOR RRFB INFORMATION, SEE SHEET E-1. 8. EXISTING TRAFFIC SIGNAL SYSTEM TO BE UPGRADED TO VIDEO DETECTION (BY OTHERS). CONTRACTOR TO CONFIRM PRESENCE OF VIDEO DETECTION PRIOR TO STARTING WORK. IF EXISTING TRAFFIC SIGNAL LOOP DETECTORS ARE FOUND, COORDINATE WITH THE CITY TO CONFIRM THAT LOOPS ARE NO LONGER ACTIVE OR IN NEED OF REPLACEMENT. See *Note above (typ) tl_tiI CB SC -1' ROUTE 152 11+00 F 1 � I � in Replace W11-1 and W 16-1 P with R4-11 MA.FULL LANE �r R4 11 OM2-1 V RI.1 wtrs-9P ATE BY IYOEAROS D926 BAS REVISED FOR CCO3BRF REVISIONS +20109 ENGINEERS. SURVEYORS. PLANNERS CITY APPROVALS DEPARTMENTS PAVEMENT DELINEATION DETAIL PER 2018 CALTRANS STANDARD PLANS EXISTING ROADSIDE SIGN PROPOSED ROADSIDE SIGN REMOVE EXISTING ROADSIDE SIGN AND POLE INSTALL NEW ROADSIDE SIGN INSTALL TYPE D LOOP. SEE 2018 CALTRANS STANDARD PLANS ES-5A AND ES-58 FOR DETAILS. INSTALL TYPE A LOOP. SEE 2018 CALTRANS STANDARD PLANS ES-5A AND ES-58 FOR DETAILS. YIELD LINE PAVEMENT MARKINGS PER 2018 CALTRANS STANDARD PLANS Note: All Shared Lane Markings (Sharrows) are to be centered within the effective lane width. IAdd 15' red curb r , � Add red curb 15' on each side of fire hydrant SCHOOL S-0P SPEED HE HERE je of LIMIT 25 Rr•S R2.1 RIVEN fEN AREE PREPRESENT S4.2P DRAWN BY: AL DATE CITY OF GILROY 119 DEPARTMENT OF PUBLIC WORKS DESIGNED BY: BS 7351 ROSANNA STREET GILROY, CALIFORNIA 95020 MAIN (408) 846-0451 1 FAX (408) 846-0469 REVIEWED BY: MC SHARED LANE MARKING WHEN EFFECTIVE LAKE WtOTH c 14' n 1 i NOT TO SCALE Add red curb 15' on each side of fire !� ," r t Add red curb 12' north and 2' south of crosswalk DATE SCALE JAN 2018 1" = 40' DATE JAN 2018 PROJECT No. DATE 18-PW-400 JAN 2018 Add 16' red curb Omit S1-1 and W16-9P, they are already there L661aµ, m C6940' 0' 40' 80, � 06 30&20 n CML - °TE0r0u -- GRAPHIC SCALE _. )OWTW ON'MONT.EREY ROAb N DRAWING No; N• `REHABILITATION PROJECT SS-1 m N SIGNING AND STRIPING 13 35 SHEET OF Add 58' red curb Add 15' red curb I I Add 9' red curb vil ( TYPE 2 OBJE MARKER OM2-1V: k t III Q g REPAINT MEJN .` %OSE WHITE SEE 8' 8 , f• : (s ti- ► C713 r > i TYP 12' _ — — — 12'_ . _ _ _ _ _ _OWEkY ROAD 12' 2' 22+00-= C 12' 23+00 24+00 25+00 •M • N 26+00 — — — .27+00 12' Z '2' J� 12' TYPE V("(L) ARRO)J�•24' t:.A� el 2' — 3N). — — 24'�j so 24.1 t °l) t 1 _p) 8' t TYP 8f U nntn+ - ~Q —(0 (riP) �a��� �� zo ._ _. �. _ -- 20 s - �2'0,(TYP) (TYP) dt' t' (TYP)P)wtTYPE YI (L) ARRI. Nc 278 *SNS, Third StCOTRIPLE FOUR YELLOW SNS �Ma) nterey T) o CROSSWALK, �. . Y •_ r tSNS (Third St) SINS (Mon erey ST)---I r 1 REMOVE=XISTING ROSSWALK r ji �a � i 4 l•� .. ' �- i J _ _ —ter• !,t�F'.'• �'- A;r Add 37.5' red curb �BRF 100 + © 201190926 ILiS REVISED FOR CCO3 REVISIONS moot YEARS ENGINEERS. SURVEYORS. PLANNERS MOTORCYCLE GREEN ON WHITE 2" CAP PARKING ONLY R7-5 (MOD) Omit. R99 sign is already in correct Omit parking T's & L's I location / 55(MOD)--• ' *R , `INSTALL MOTOR I jLE I ..i� TYA IV �(L) ARROW w I l PARKING 4'x1I IH E PE RI OBJECT MARR 4"WH ' ) Q2 M2-IV �,'R99(CFa Ln I ). 1 SEE NOTE-8 _ 12EPAINT MEDIAN - - cn I *R99(CO) 12"' WHITE + m OTE 8 NOSE WHIE 38 + r + 20 20' 2�' - — - i 22 � P (TYP TYP - 0+ 1 +00 - -' �'' 32+00 �`12' 12 + 12' LU _r 12 1 1 so 12' 8 (TYP 12' ! _ 11211 sb i - z' J 8' 12 2 P)(TY) 12 WHITE 22 — F=U-• 25A w 2 ' - 12",WHITE DI A NAL t~i1 *R 11 ®4 O.C. TY L A. OW _ TYP) •12" iffE 4"- BL1 E LI IE B )RDERS WITH 0�11 *R518 CA — ) 'SEE"" TE 8 'PARKII•G" MARKING. SEE LATE CA MUTCD FIGURE 3B-22 (CA) FO DETAIL. (TYP) ( j INSTALt INTER NA ONAL SYMBOL OF i � � -• L ACCESSIBILITY (1 ) MARKING. E I- ' 3 l • I LATEST CA MUT FIGURE 38—k'•' 1 ` (CA) FOR DETAIL3r3 (TYP) I-1 Add 37.5' red curb I I Omit parking T's & L's r� �t,�f , f OM2-1 V R99 (CA) CITY APPROVALS DATE SCALE DRAWN BY: AL DEPARTMENTS DATE CITY OF GILROY JAN2018 ill =40' DEPARTMENT OF PUBLIC WORKS DESIGNED BY: BB DATE 7351 ROSANNA STREET JAN 2018 PROJECT No. GILROY, CALlFORNIA 95020 MAIN(40B)846-0451 I FAX(408)846-0469 REVIEWED BY: MC DATE JAN2018 18-PW-400 40' 0' 40' GRAPHIC SCALE DOWNTOWN MONTEREY ROAD REHABILITATION PROJECT SIGNING AND STRIPING sO py�r,FEsslaw i MM cosermrro k. 90, C8909S '2 8o' E p 09 a0 20 m CML •IlpW ql\E m o N DRAWING No. - N SS-2 SHEET 14 OF 35 . Keep parking T's & L's _,C, i GI to- � t 4° WHITE ( ) 22 0 Ln + ).(TYP) 20CQ 2 34+00 g : 2\\ \\ g (TYP) r Z J � U H Add R5-1 Do Not Enter sign to existing post 4: Pending further discussion with Fire Chief and City Engineer Will either be "per plan" or "add 30' red curb and omit 3 motorcycle parking signs" Keep parking T's & L's MOTORCYCLE GREEN ON WHITE 2" CAP PARKING ONLY y I R7-5 (MOD) Keep parking T's & L's Keep parking T's & L's I Omit parking T's & L's 11 1 MAY USE FULL LANE r' R4-11 ON12-1 V R99 (CA) No. DATE BY REVISIONS CITY APPROVALS DATE SCALE • ®-�' Q 20190928 BAS REVISED FOR 0003 DEPARTMENTS DATE CITY OF GILROY DRAWN BY: AL JAN 2018 1"=40' DEPARTMENT OF PUBLIC WORKS DESIGNED BY: BS DATE BRF YEARS I 7351 ROSANNA STREET JAN 2018 PROJECT No. GILROY, CALIFORNIA 95020 ENGINEERS . SURVEYORS . PLANNERS I MAIN (408)846-0451 1 FAX (408) 846-0469 REVIEWED BY: MC DATE JAN2018 18-PW-400 0 Ln + �1 tx W Omit parking Ts & L's EMM, o 03 40' 0 40' 80, .a 00 30 20 M L—�—� CML GRAPHIC SCALE arau�a m 0 N DRAWING No, DOWNTOWN MONTEREY ROAD n REHABILITATION PROJECT SS-3 w SIGNING AND STRIPING .� 15 35 SHEEP OF Omit parking T's & L's Add 15' red curb north of fire hydrant t v �•U- i� J ,t R Z N$S LLO �2" WHIT 00 1 P" WHITE F I // _ TYPE IV 2 - -- 46+00— W U Q 12" WHI Omit parking T's & L's I 4M2-1 V ,BRF IYEAROS o+ No. DATE BY 201190926 BAS REVISEDFOR CC03 REVISIONS ��® ENGINEERS. SURVEYORS. PLANNERS Add 15' red curb I I rn„a ,.phi— r. z I I Omit parking T's & L's I Omit parking T's & L's CITY APPROVALS DATE SCALE DRAWN BY: CITY OF GILROY AL 1AN2018 1"=40' DEPARTMENTS DATE DEPARTMENT OF PUBLIC WORKS DESIGNED BY: BS DATE 7351 ROSANNA STREET JAN 201 B PROJECT No. GILROY, CALIFORNIA 95020 DATE MAIN (408) 846-0451 1 FAX (406) 846-0469 REVIEWED BY: MC 18-PW-400 JAN 2018 ORD MAY USE FULL LANE R4-11 Replace W11-1 and W 16-1 P with R4-11 • r •. r ' ¢i •� . 12" WHITE TYPE 2 OBJECT MARKER OM2 �1V 12 +00 56+50 — I 2 '-- REPAINT MEDIAN NOSE %141TE 12" WHITE i t - ;Ar .. s m QpOFEU14N / ` E m 40' 0' 40' 90, C69053 12 80, a.06 30 20 d, CML I 'EG"F GRAPHIC SCALE a 0 N DRAWING No. DOWNTOWN MONTEREY ROAD N REHABILITATION PROJECT SS-4 m SIGNING AND STRIPING SHEET 16 OF 35 �,